Chapter IBACKGROUND
A. Overall Goal
B. General Objectives
C. General Policies (coordination, division of labor, resources, standards) Please refer
to the Sendai Framework 2016-2030, RA 10121, RA 7160, National Disaster
Response Plan, NDRRMC Memos/Circulars, Local Ordinances, Inter-agency
arrangements, community values
A. Clusters Identification
Structure
Composition
A. Activation
B. Deactivation
Chapter I: Background
A. INTRODUCTION
1. History of Dulag1
This coastal town has 11,007 hectares of land and lies 36 kilometres (22 mi) south of
Tacloban, the concurrent regional center of Eastern Visayas.
Popularly known as the "Liberation Town", Dulag survived and has risen from the ruins
of the Second World War and at present time, a thriving coastal town fronting Leyte Gulf and
the Pacific Ocean.
Dulag was one of the few barangays in Leyte that antedated the discovery of the
Philippines in 1521. There are several versions as to how Dulag got its name. The first was that
in the early years of the 18th century, the town was already a flourishing community, the center
of trade and commerce in eastern Leyte; thus, it was named Dulag, the German term for center.
Another version states that it is the etymological variation of a certain herb called "dulao"
which grew abundantly in the area. Dulao is a kind of plant which is yellowish-green in color
used as a food seasoning for a local dish. Because of its abundance, the place was called after
this herb.
The third version states that there was a time when bones of different kinds of animals
were scattered all around the place. Whenever people would see bones all around, they always
commented, "nagdudulag hin tul-an." This means that bones were scattered all around. The
word nagdudulag was then shortened to Dulag.
The last version says that the name could have come from the name of the first settler
whom legend says was named Dulagdulag.
2. Geographical Location
Dulag is located along the eastern coast of the Province of Leyte, specifically at 110 0 55’
North latitude and 1240 49’ East longitude. It is approximately thirty-six (36) kilometers South
of Tacloban City, the provincial capital. The town proper is traversed by the Tacloban – Baybay
south road of Daang Maharlika. It is approximately 11,007 hectares or 11.07 square kilometers
in area. It is bounded on the North by the Municipality of Tolosa, on the East by the Leyte Gulf,
on the South by the Municipality of Mayorga and on the West by the Municipality of Julita.
1
https://en.wikipedia.org/wiki/Dulag,_Leyte
3. Barangay Subdivision
Dulag is politically subdivided into 45 barangays, 11 are in the Poblacion and the rest are
interior barangays. In 1957, the sitio of Inawangan was converted into barrio Kamitok. In the
same year, Mat-i was renamed President Roxas, Cogon-Bingkay was renamed Salvacion, and
sitio Pamoblaran was converted into barrio San Antonio. The 45 barangays are:
The townspeople of Dulag speak a variety of dialects. But the people are basically
Waray by mother tongue which is recorded for 41,912 or 98.42 % of the total household
population. This is followed by the Tagalog speaking residents with 360 or 0.87 % and
Cebuano speaking residents with 296 or 0.69 % of the total household population. Others or
0.02 % of the population has undetermined or whose mother tongue was not stated. (Table No.
7: Household Population by Mother Tongue, 2004.)
5. Religious Affiliation
6. Literacy Rate
Of the recent 30,903 population 10 years old and over, 29,126 of which are literates and
1,777 are illiterates. The literacy rate therefore, is 94.25 %. This is the percentage of the
population 10 years old and over who have completed at least one year in elementary education.
The total population 5 years old and over is 36,848 and this age are those that are in
school or at least have attended school. Of this number, 18,822 were able to attend elementary;
9,247 were able to attend grades 1 – 4 and the remaining 9,575 were able to attend 5th – 6th
grade. The total number of those who attended secondary is lesser with only 9,451 of which
only 2,866 were able to finish and 6,585 are still undergraduates.
2. Records of Past Disasters (in the last 7 years)
Number of
No. of Houses Source of
Number of Casualties Affected Damage to Properties (Php)
Damaged Information
Persons
Hazard Events
Priva
and Affected Barangays
te /
Description/Date Injur Missi Perso Famili Totall Parti
Dead Infra Agri Insti Com Total
ed ng ns es y ally
merci
al
A B C D E F G H I J K L M N O
8/31/2012,
Magnitude 7.6
earthquake
epicentered at All barangays, No
No No No No No No No No No No No MDRRM 2014-
Guiuan Eastern especially the coastal Record Record Record Record Record Record Record Record Record Record Record
Recor
d 2016 Plan
Samar with barangays
corresponding
Alert Level 3
Tsunami Warning
Batug, Barbo, Fatima,
Victory, Cabarasan, 6
02/2012 Flooding No No No No No No MDRRM 2014-
Cabacungan, Alegre, None None None House 6.3M 6.3M
due to Amihan Record Record
s
Record record Record Record 2016 Plan
Sabang Daguitan,
Market Site
10/15/2013, All barangays, No
No No No No No No No No No No No MDRRM 2014-
Magnitude 7.2 especially the coastal Record Record Record Record Record Record Record Record Record Record Record
Recor
d 2016 Plan
earthquake struck barangays
Bohol in which
Leyte was
Intensity VI
73 Dulag
Sungi, San Miguel, No No No 3.650 No No No 3.650
11/4/2013, None None None House Rehabilitation
Cabarasan Record Record Record
s
M Record Record Record M
Tornado Plan
1,011, Dulag
7588 3559 634,17 34,400 No
11/8/2013, All barangays 26 1,438 3 53,386 12,097
houses houses 5,000 ,000
343M
Record
575,00 Rehabilitation
Typhoon Yolanda 0 Plan
All barangays, No Municipal
12/6/2014, No No No No No No No No
especially the coastal None None None Recor Contingency Plan
Typhoon Ruby Record Record Record Record Record Record Record Record
d
barangays 2016
All barangays
especially those locted Municipal
12/30/2014, TD No No No No No No No 500,00 500,00
in low lying areas and 1 None None Contingency Plan
Seniang Record Record Record Record Record Record Record 0 0
along the rivers in the 2016
municipality
Victory, Cabacungan,
Salvacion, Calipayan,
San Agustin,
Magsaysay, Gen.
1/25/2016, No Incident Report
Roxas, San Antonio, None None None 8705 None None 0 0 0 0 0
Flooding Record January 27, 2017
Bolongtohan, Tigbao,
Romuladez, Calubian,
San IsidroBulod,
Fatima, Dacay, Barbo
Calubian, Camote,
1/16/2017, Gen. Roxas, Incident Report
None None None 4,570 980 None None 0 0 0 0 0
Flooding Romuladez, San January 16, 2017
Isidro
7/6/2017, All baragays None None None 51,591 13,722 No No 0 0 16.47 0 16.47 Incident Report
Magnitude 6.5 Record Record M M July 14, 2017
Earthqauke in
which Dulag was
Intensity IV and
5.4 aftershock on
July 10, 2017
109 Incident Report
9/13/2017, No 660,00 61,500 71,500
Coastal barangays None None None Fisher None None 0 0 September 14,
Thunderstorm men
Record 0 .00 .00
2017
10/15/2017, Fire
Incident at San 4.410 4.410 Incident Report
San Jose None None None None None None None 0 0
Jose Elementary M M October 15, 2017
School 0
HAZARD IDENTIFICATION
EXISTING
EARLY WARNING TRIGGERING
ROOT CAUSES MITIGATING
SIGNS FACTORS
MEASURES
High tide Storm Warning Strong typhoon Seawall along
Strong typhoon No. 3 or above Brgy. San Jose and
Small scale mining Storm surge Luan
Geographical warning Ordinance
location Prohibiting Sand
Lack of both and Gravel
natural and Extraction at sea
structural wave (Ordinance 2017-
breakers 14, An Ordinance
Enacting the
Environmental
Code of Dulag,
Leyte)
Tree Planting
activities in coastal
areas
Ordinance on the
Prohibition of
Illegal Fishing
(Ordinance 2013-1,
An Ordinance on
Coastal Resource
Management of the
Municipality of
Dulag, Leyte)
The Super Typhoon Yolanda which hit the Island of Leyte in 2013 was by far the worst
disaster that the Municipality of Dulag has experienced. It took lives, destroyed properties and
livelihoods. Aside from the strongest wind ever experienced by the people of Dulag, ST Yolanda
has introduced a monster call Storm Surge.
Storm Surge was not known yet to the people until it was experienced during the ST
Yolanda. As per the perception of the planning team, the following are the root causes of the storm
surge and likewise aggravates the effect of the hazard:
1. High Tide- High tide makes the sea move closer to the human settlement and likewise
makes the water deeper. Waves generated by storm are high if the water is deeper.
2. Strong Typhoon- Storm surge is created when a strong wind of constant strength pushes
the water to shore. A strong typhoon mainly causes the surge.
3. Geographic location- Municipality of Dulag is located on the east side of the Island of
Leyte which faces the Leyte Gulf.
4. Lack of natural and structural wave breakers- The municipality of Dulag has a only a
small percentage of structural mitigation in the affected barangays. Surge may not be
destructive if wave breakers are in place.
5. Small scale mining- In the past years, small scale mining in the sea were unregulated
until the enactment of the local ordinance in 2017 prohibiting small scale mining in
coastal areas. The unregulated mining caused the destruction of the coastal plains.
C. SCENARIOS
Lawlessness
CASUALTY
100 persons
San jose-15
San Rafael- 10
San Miguel 10
Death NONE 1-5
Buntay- 20
Sungi- 35
Sabang Daguitan 10
Damage to
government
Damage to government
establishments
Damage to government establishments excluding
amounts to 300
establishment excluding schools amounts to 800
Million
schools amounts to 10 Million
Million
Properties Damage to school
Damage to school
properties amounts to
No damage to schools properties amounts to 300
50 Millions.
Million
Classrooms are
partially damaged
Fisheries 50% of 872 fisher folks 872 or 100% 2 or 100% fisher folks loss
fisher folks loss
their source of
income
loss their source of
income their source of income
235 or 100%
registered fishing
117 or 50% registered 235 or 100% registered
boats are damaged
fishing boats are fishing boats are damaged
worth 28M
damaged worth 28M worth 28M
Reduced fish catch
Reduced fish catch Reduced fish catch during
during coastal
during coastal recovery coastal recovery period at
recovery period at
period at least 80% of least 80% of 63,000
least 80% of
63,000 annual income of annual income of
63,000 annual
fishermen is reduced. fishermen is reduced.
income of
fishermen is
30% of the municipal reduced. 100% of municipal
protected area is protected area is destroyed
destroyed
50% of municipal
protected area is
destroyed
No power in 3 days to
No power for 3 days after the No power for more than a
Power one week after the
emergency week after the emergency.
emergency
50% of the water
source (jetmatic
pump) in the
affected barangays
are not serviceable 100% of the water source are
20% of water source (jetmatic
not serviceable including
Water pump) in the affected
jetmatic pumps and water
barangays are not serviceable Water refilling
refilling stations.
stations in the
affected barangays
are closed
8 tents
Rescue Equipment
2 communication
groups (Kabalikat
and Access 5)
CP Form 4A: Affected Population
RIZAL 501 2192 300 1323 CABACUNG 201 869 501 2192 Houses are made of light
AN (CNHS) materials or with
PWD/children or in high
susceptible areas
BARBO 129 509 100 400 RAWIS 29 109 129 509 Houses are made of light
materials or with
PWD/children or in high
susceptible areas
FATIMA 227 1008 120 620 ALEGRE 107 388 227 1008 Houses are made of light
materials or with
PWD/children or in high
susceptible areas
CAMBULA 109 447 50 212 COMBIS(FD 69 235 109 447 Houses are made of light
MES) materials or with
PWD/children or in high
susceptible areas
CANDAO 172 570 50 198 COMBIS(CD 122 372 172 570 Houses are made of light
C) materials or with
PWD/children or in high
susceptible areas
COMBIS 34 173 34 143 34 173 Houses are made of light
materials or with
PWD/children or in high
susceptible areas
HIGHWAY 234 1,091 100 418 HIGHWAY(S 134 673 234 1,091 Houses are made of light
PED 2ND materials or with
FLOOR PWD/children or in high
ONLY) susceptible areas
MARKET SITE 145 607 145 578 SERRANO( 0 0 145 607 Houses are made of light
DNHS 2ND materials or with
FLOOR PWD/children or in high
ONLY) susceptible areas
SERRANO 139 610 139 594 SERRANO 0 0 139 610 Houses are made of light
( DNHS, 2ND materials or with
FLOOR AND PWD/children or in high
ABOVE) susceptible areas
RAWIS 4 14 4 14 4 14
Families which are not evacuated to the designated evacuation areas are those families identified with resilient houses with two-storey houses or higher or those which
were listed as among in the Adopt a Family Program of the LGU which is effected through a Memorandum of Understanding between the MDRRMC and owners of resilient
houses.
Rawis 2 0 2 0 3 0 2 0 9 0 0 1 1 2 0 1 0 5
29 18 25 45 36 40 42 21 27 254 16 28 37 30 45 35 21 14 226
Sungi 81 78 146 146 331 82 144 9 1017 84 78 157 157 304 76 120 10 986
98 137 103 10 26
TOTAL 989 1094 1238 3025
5
779 266 9751 855
1 59
1240
27
1066 801 175 8854
5
TOTAL NO. OF INDIVIDUALS: 18, 605
Chapter II
GOAL:
The goal of the Contingency Plan of the Municipality of Dulag is to provide effective, efficient,
timely and well-coordinated response mechanism in the event of the occurrences of Storm Surge in the
Municipality of Dulag. Such mechanism shall help to protect lives, properties and environment, and
restore the immediate needs of the people in the Municipality of Dulag.
OBJECTIVES:
1. To ensure the protection of lives and properties in the event of Storm Surge in the Municipality of
Dulag;
2. To determine the immediate needs and the resources that will meet the needs in the event of Storm
Surge.
3. To establish coordination and linkages between and among the stakeholders of Municipality of Dulag
in the event of Storm Surge.
4. Efficiently use all available resources from the government, non-government organizations, private
sectors and volunteer groups.
5. To become self-reliant and to promote mutual-help, with the full utilization of available resources
within the municipality before seeking assistance from neighboring or higher entities.
GENERAL PROTOCOL
The LGU will adopt the approved NDRRMC Operations Center SOP which provides the clear
indicators of alert level. Alert Levels are defined in a three (3) step color code: WHITE, BLUE, and
RED
A. CLUSTER IDENTIFICATION
LEAD
AGENCIES/OFFICES INVOLVED AGENCY / CO-LEAD STAFF
OFFICE
CLUSTER
Mayo Budg
MDRR GS RH PN MSW MPD DepE HRM
r’s BFP et DA ABC
MO O U P DO C d O
Office Office
2. Health (WASH,
RHU Engr. Thelma Legaspi
Nutrition, PFA) (Dr. Allan)
3. Protection MSWDO
Julie Ruth Martija
(Meldred)
4. Camp
MDRRMO
Coordination & Marivic De Luna
(Leah)
Management
5. Emergency Judith Petilla & Gilbert
MDRRMO
Telecom (Leah) Rivas
6. Search, Rescue
MDRRMO Eddie Kempis
& Retrieval (Leah)
7. Local and MDRRMO MPDO
International (Atty. Leah Engr. Restituto Polillo
Humanitarian Caminong)
Assistance
7. Local and International Humanitarian Assistance MDRRMO MSWDO, Mayor’s Office’ MPDC
LEAD : MDRRMO
MEMBERS: DERRU/BFP/PNP/ RHU/GSO
SCENARIO:
After the water subsided 100 dead bodies were found. 15 bodies were found at Brgy. San Jose,
10 from Brgy. San Rafael, 10 from Brgy. San Miguel, 20 from Brgy. Buntay, 35 from Brgy. Sungi
and 10 from Sabang Daguitan.
Meanwhile, 250 persons were injured and 40 were declared missing.
OBJECTIVES:
1. MDRRMO/ DERRU -
2. PNP – Secure the premises of the highly damaged areas specifically to prevent interference
of bystanders during the search and rescue operation.
4. RHU – Provide additional transportation vehicle. Activate catchment areas which were not
affected by the storm surge.
5. GSO – Clear the roads for SRR team
PROTOCOLS
Pre-Emergency
1. Preposition equipment and personnel upon receipt of warning.
2. Raise Red Alert (All personnel must report to the Operation Center) upon receipt of
warning.
3. Conduct meeting with personnel for inventory and safety protocols.
Operation Phase
1. All augments must proceed to the Incident Command Post for check-in of personnel and
equipment.
2. Any and all communication/information must be known to the Incident Commander.
3. Media relations as to the information on casualty must be the call of Public Information
Officer.
4. Do triage, if necessary.
5. Transport of casualties must be in accordance to the degree of injury.
6. All dead bodies must be put in cadaver bags and transported to Dulag Plaza for purposes of
identification.
NEEDS AND ACTIVITIES
ACTIVITIES /
RESPONSIBLE AGENCIES /
NEEDS ARRANGEMENTS TO MEET TIME FRAME
OFFICES
THE NEEDS
First Aid Kit / Trauma Kit • Preposition existing first aid BAC, MDRRMO • Preposition first aid kit upon receipt of warning
kit from PAGASA
• Purchase additional • Purchase within 1 week from the time the
equipment existing supplies are depleted
WASAR Equipment • Preposition BAC, MDRRMO • Preposition WASAR equipment upon receipt of
• Purchase additional warning from PAGASA
WASAR equipment • Purchase during the 3rd quarter of 2018
Ambulance • Preposition RHU, MDRRMO • Preposition the vehicle upon receipt of warning
• Maintain from PAGASA
• Repair • Regularly maintain the equipment
• Repair the vehicle immediately after malfunction
Rubber Boat • Preposition MDRRMO • Preposition the vehicle upon receipt of warning
• Maintain from PAGASA
• Repair • Regularly maintain the equipment
• Repair the vehicle immediately after malfunction
Trucks • Preposition GSO • Preposition the vehicle upon receipt of warning
• Maintain from PAGASA
• Repair • Regularly maintain the equipment
• Repair the vehicle immediately after malfunction
Personal Protective Equipment • Preposition MDRRMO • Preposition the vehicle upon receipt of warning
• Purchase additional PPEs from PAGASA
• Purchase additional PPEs on the 3rd quarter of
2018
Communication Equipment • Preposition BAC, MDRRMO • Preposition the vehicle upon receipt of warning
• Purchase additional from PAGASA
communication equipment • Purchase additional communication equipment
on the 3rd quarter of 2018
Clearing Equipment • Maintain / Repair GSO • Preposition the equipment upon receipt of
warning from PAGASA
• Regularly maintain the equipment
• Repair the vehicle immediately after malfunction
Cadaver Bags • Preposition / request for RHU • Preposition the supply upon receipt of warning
additional bags from PAGASA
Tents • Preposition GSO • Preposition the supply upon receipt of warning
from PAGASA
SRR Team • Preposition MDRRMO, BFP, Bantay Dagat, • Preposition the personnel upon receipt of
BDRRMC warning from PAGASA
WASAR Team • Conduct training MDRRMO • 3rd quarter of 2018
• Coordinate with PDRRMO
BLS and First Aid Training • Conduct training MDRRMO • 3rd quarter of 2018
• Coordinate with PDRRMO
Generator Set • Preposition MDRRMO • Preposition the equipment upon receipt of
warning from PAGASA
• Regularly maintain the equipment
• Repair the vehicle immediately after malfunction
Flashlights • Preposition MDRRMO • Preposition the supplies upon receipt of warning
• Purchase additional supply from PAGASA
• Purchase additional items during the 3rd quarter
in 2018
RESOURCES INVENTORY
RESOURCE
Resources Qty Unit AGENCY / OFFICE REMARKS
LOCATION
WASAR Equipment MDRRMO OPCEN In good condition
• DERRU 22 persons
• BFP 17 persons
• RHU 23 persons
• PNP Personnel 10 persons
• Bantay Dagat 8 persons
• Barangay Volunteers 95 persons
• SALAG 5 persons
Generator 1 set MDRRMO OPCEN In good condition
Personal Protective Equipment In good condition
• Headlamp 2 pcs
• Raincoat 14 pcs
• Helmet 15 pcs
• Individual rope 10 pcs
• Rubber boots 14 pcs
Flashlights 10 pcs MDRRMO OPCEN In good condition
GAPS SOURCES
TARGET CURRENT
UNIT PROJECTED (PROJECTED - TO FILL
POPULATION STANDARD RESOURCES
Resources COST NEDED CURRENT) THE GAPS
S
Familie Person (PHP) QTY COST QTY COST
s s QTY COST (PHP) (PHP)
First Aid Kit/ -1 first aid kit 8,000.00 25 200,000 9 72,000.00 16 128,000 DRR Fund
Trauma Kit for response
team
WASAR Equipment 8 1 set for every DRR Fund
• Life vest WASAR 500.00 8 17 500.00 - -
• Life ring Team member 300.00 8 9 300.00 - -
• Throw bag 300.00 8 4 300.00 4 300.00
• WASAR 3,000.00 8 2 3,000.00 4 3,000.00
Helmet 5,000.00 1 1 5,000.00 - -
• Spine Board 850.00 8 4 850.00 4 850.00
• Snorkel and
Mask 700.00 8 3 700.00 5 700.00
• Flippers 200.00 8 8 200.00 - -
• Storm Whistle 3,500.00 8 - - 8 3,500.00
• Dry suits
LEAD : MDRRMO
MEMBERS: Mayor’s Office
SCENARIO:
Cellphone signal is down and cannot be within three (3) days. Antenna of the base radio was likewise damaged thus making the town unable to communicate outside for help.
OBJECTIVES:
1. Ensure that radio communication is restored within two days from the time of damage.
2. Ensure that communication is available for all clusters
3. Ensure submission of situational reports to EOC.
MDRRMO/ DERRU -
Mayor’s Office –
Ensure that needs of the Emergency Telecommunication Cluster is provided.
Approve requests and reports.
PROTOCOLS
ACTIVITIES /
RESPONSIBLE AGENCIES /
NEEDS ARRANGEMENTS TO MEET TIME FRAME
OFFICES
THE NEEDS
Base Radio • Preposition MDRRMO • Preposition upon receipt of
warning
Handheld Radio • Preposition MDRRMO, BDRRMO, BAC • Preposition upon receipt of
• Purchase additional radio warning
• Purchase on 3rd quarter of
2018
Log Book • Preposition MDRRMO • Preposition upon receipt of
warning
Car Battery • Purchase 1 battery MDRRMO • Preposition upon receipt of
Charge warning
• Preposition • Purchase on 3rd quarter of
2018
Crocodile Clip • Purchase 1 pair of crocodile MDRRMO • Purchase on 3rd quarter of
clip 2018
Soldering iron kit • Purchase MDRRMO • Purchase on 3rd quarter of
2018
Tie wire • Purchase MDRRMO • Purchase on 3rd quarter of
2018
Electric tape • Purchase MDRRMO • Purchase on 3rd quarter of
2018
Engineers tool kit • Purchase MDRRMO • Purchase on 3rd quarter of
2018
Communication groups • Preposition Access 5, Kabalikat, MDRRMO • Preposition upon receipt of
warning
Repeater • Purchase BAC, MDRRMO • Purchase on 2019
Generator • Preposition MDRRMO • Preposition upon receipt of
warning
Emergency Telecommunication • Conduct training MDRRMO • 4th quarter of 2018
Training
RESOURCES INVENTORY
RESOURCE
Resources Qty Unit AGENCY / OFFICE REMARKS
LOCATION
Base Radio 4 units MDRRMO OPCEN, Cabacungan in good condition
Brgy. Hall, San Jose
Handheld Radio 65 units Kabalikat, Access 5 Communication In good condition
Group
Log Book 2 pcs MDRRMO OPCEN new
Car Battery 3 pcs MDRRMO OPCEN, Cabacungan In good condition
Brgy. Hall, San Jose
Crocodile Clip 3 pairs MDRRMO OPCEN, Cabacungan In good condition
Brgy. Hall, San Jose
Communication groups 65 persons Kabalikat, Access 5 Communication In good condition
Group
Generator 1 units MDRRMO MDRRMO In good condition
NEEDS PROJECTION AND RESOURCE GAP IDENTIFICATION
GAPS
TARGET CURRENT
UNIT PROJECTED (PROJECTED - SOURCES TO FILL THE
POPULATION STANDARD RESOURCES
Resources COST NEDED CURRENT) GAPS
S
Familie Person (PHP) QTY COST QTY COST
s s QTY COST (PHP) (PHP)
Base Radio - - 4 - -
Handheld Radio 1 handheld per 5,000 65 325,000 65 325,000 - -
station
Log Book 1 logbook for 100 2 200 2 200 - -
incoming
traffic
1 for outgoing
traffic
Car Battery 1 car battery 5,000 4 20,000 3 15,000 1 5,000 LDRRMF
per base radio
Crocodile Clip 1 pair of 300 4 1,200 3 900 1 300 LDRRMF
crocodile clip
per radio base
Soldering iron kit 1 soldering kit 1,200 4 4,800 - - 4 4,800 LDRRMF
per base radio
Tie wire 100 meters per 1,300 4 5,200 - - 4 5,200 LDRRMF
base radio
Electric tape 1 per base 20 4 80 - - 4 80 LDRRMF
radio
Engineers tool kit 1 per base 1,800 4 7,200 - - 4 7,200 LDRRMF
radio
Communication - 65 - - - - - -
groups
Repeater 1 repeater per 25,000 1 25,000 - - 1 25,000 LDRRMF
municipality
Generator 1 in the 90,000 1 90,000 1 90,000 - - LDRRMF
operation
center
TOTAL 47,580 LDRRMF
BUDGETARY
REQUIREMENT
LEAD : MDRRMO
MEMBERS: MSWDO/Mayor’s Office/MPDC
SCENARIO:
Humanitarian groups flock in the municipality offering food, water, non-food items, medical, and shelter assistance.
OBJECTIVES:
a. MDRRMO
To identify the needs in the barangay.
To recommend/refer needs of the different clusters which could be answered by the humanitarian groups.
Ready the barangay profiles for reference.
b. MSWDO
To receive food and non-food assistance for distribution.
c. Mayor’s Office
To coordinate/talk with international and humanitarian groups.
d. MPDC
PROTOCOLS
Pre-Emergency
1. Ready the barangay profiles/database to be utilized after the emergency.
2. Prepare the meeting room for all humanitarian groups.
During Emergency
1. All Local and Humanitarian groups shall register with the Local and International Humanitarian Assistance Cluster.
2. All relief goods and services from the humanitarian groups must be duly recorded and accounted.
3. All Humanitarian groups coordinate with the Local and International Humanitarian Assistance Cluster prior to engaging with barangays/households.
4. All humanitarian groups must follow the established protocols to prevent expulsion from the municipality.
RESOURCES INVENTORY
RESOURCE
Resources Qty Unit AGENCY / OFFICE REMARKS
LOCATION
Barangay Profile/Database 1 MDRRMO, MPDC MDRRMO, MPDC On Going
Laptop 1 unit MPDC MPDC In good condition
Ballpen 1 dozen MPDC MPDC On stock
Paper 1 ream MPDC MPDC On stock
Logbook 1 pc MPDC MPDC On stock
SCENARIO:
With the wide scale of damage, all the employees as well as volunteers within the municipality of Dulag were required to report to serve as manpower in the emergency operation
for all clusters. A total 0f 500 manpower are working.
OBJECTIVE:
a. HRMO
Account all manpower present in the operations
Manage and see that all needs are provided
Coordinate with Logistics Cluster for the procurement/preparation of needed goods and supplies.
Distribute relief goods and ready to eat foods intended for workers.
Coordinate with other clusters with regards to the personal needs of the workers.
PROTOCOLS
Pre-Emergency
2. Prepare the signed MOA with the partner stores in preparation for emergency procurement.
3. Preposition goods and supplies intended for the workers.
4. Maintain a list of all volunteers and employees who reported on duty.
Operation Phase
1. Check all employees’ needs every day.
2. Distribute relief goods and ready to eat foods to the workers regularly.
NEEDS AND ACTIVITIES
ACTIVITIES /
RESPONSIBLE AGENCIES /
NEEDS ARRANGEMENTS TO MEET TIME FRAME
OFFICES
THE NEEDS
Relief Good intended for • Preposition/ Procurement BAC, HRMO, MBO, • 3 days before landfall
workers Accounting Office, MTO
Ready to eat Food • Preposition/Procurement HRMO • 3 days before landfall
Papers and ballpen • Preposition HRMO • 3 days before landfall
Logbook • Preposition HRMO • 3 days before landfall
Hygiene Kit for workers Preposition/ procurement BAC, HRMO, MBO, • 3 days before landfall
Accounting Office, MTO
•
RESOURCES INVENTORY
RESOURCE
Resources Qty Unit AGENCY / OFFICE REMARKS
LOCATION
Relief Good intended for 0 pack MDRRMO, MPDC - For procurement
workers
Ready to eat Food 0 unit MPDC - For procurement
Papers 1 ream MPDC HRMO On stock
Ballpen 1 dozen HRMO On stock
Logbook 1 pc MPDC HRMO On stock
Hygiene Kit for workers 0 sets MPDC - For procurement
NEEDS PROJECTION AND RESOURCE GAP IDENTIFICATION
GAPS
TARGET CURRENT SOURCES
UNIT PROJECTED (PROJECTED -
POPULATION STANDARD RESOURCES TO FILL
Resources COST NEDED CURRENT)
S THE GAPS
Familie Person (PHP) QTY COST QTY COST
s s QTY COST (PHP) (PHP)
Relief Good 500 1:1 (5 days) 300 2,500 750,000 0 0 2,500 750,000 QRF
intended for
workers
Ready to eat Food 500 1:1 (3x a day) 100 7,500 750,000 0 0 7,500 750,000 QRF
(for 5 days)
Papers 320 1 ream 320 1 320 - -
Ballpen 5 1 dozen 5 1 60 - -
logbook 50 1 50 1 50 - -
Hygiene Kit for 500 1:1 250 500 125,000 0 0 500 125,000 QRF
workers
TOTAL 1,625,000 QRF
5. HEALTH CLUSTER
Sub-Clusters: WASH, NUTRITION, PSYCHOSOCIAL
II SCENARIO:
III. OBJECTIVES:
GENERAL OBJECTIVE: Proper awareness, preventive and proto health services to all Storm surge victims.
Sub-Cluster Objectives:
Health:
1. Conduct medical conservation, diagnosis and treatment to all patients
2. To prevent spread of foam and water borne dieses
Nutrition:
3.To identify case of SAM (Severity Acute Malnutrition and provide intervention
WASH:
4. Ensure update summary of potable water, medicines and medical supplies at the evacuation sites.
PSYCHOSOCIAL:
5. To provide initial services package for reproductive health and psychosocial first aid.
IV. ROLES AND RESPONSIBILITIES
RHU on HEALTH SUB-CLUSTER
1. Rapid Health Assessment by RHU personnel /ABC Barangay Officilas to include the following;
Functional Health Facility/ with supplies and medicines
Health Manpower (Doctors, Nurses, Midwives, BHW & other health volunteers
Emergency Transport Vehicle and Communication Facilities and Equipment
Accessibility to health facility
2. Provision of Services for maternal and child health to include the following;
2.1. Minimum initial services package (continual)
2.1.1 Birthing services
2.1.2 Provision of family planning services
2.1.3 Pre/Post Natal services; from tablets, tetanus toxoid
2.1.4 Reproductive health
2.2 Measles, Vit-A, Polio Mass Vaccination
3. Provision of Surgical cane for trauma and injuries (for the first 24 hrs), medical and pematric care.
4. Treatment and preventive isolation of individuals with communicable diseases (2-3 days onwards).
5. Provision of chronic diseases care (maintenance meds 2-3 days onwards)
6. Provision of services related to water sanitation and hygiene to include the following;
6.1 Sanitation Survey
6.2 Water Analysis and Treatment
6.3 Provision of Jerry Cans, water treatment solution and tablets,
6.4 Provision of toilet facility
6.5 Fogging of evacuation center (as needed and if appropriate)
V. PROTOCOLS
CODE ALERT RED - Activation must be done by incident commander or MHO
Upon issuance of code RED, all heath workers must be in their respective area of assignment /BUS
Activation of SPEED must be done by MHO with in 24 hrs, Post-disaster and reporting must be done by RSI/URH in core
All dead bodies must properly identified prior to disposal with certification of death signed by MHO
Search and Rescue operation must be done with 1st 72 hrs, post-disaster and retrieval operation after 72 hrs.
NEEDS ACTIVITIES RESPONSIBLE OFFICS TIME FRAME
ELECTRIC GENERATOR with Procurement of gasoline /fuel HU staff 2 Days prior to landfall
FUEL
Tuning, testing gen ser LGU Electrician
AMBULANCE VEHICLE with Conduct inspection of ambulance vehicle to focus on Driver in-charge 5 days prior to land fall
FUEL BLOWBAG and Oxygen Tank with accessories
Communication Equipment) 2-way Conduct f inventory of communication equipment GSO 5 Days prior to landfall
hand held radio
Procurement of 8 two way radio for 8 TB'S (if
possible)
BAC
Human Resource Identification and Deployment of Health worker to MHO 3 Days prior to landfall
include the following;
Doctors
Nurses RUM/RHU/MPS/BHW
Midwives
BHWs
Hygiene Kits Provision of food/water/hygiene kits to Health LGU/GSO/HW 2 days prior to landfall
worker/last 3 days
Potable water
RESOURCES INVENTORY
RESOURCE
Resources Qty Unit AGENCY / OFFICE REMARKS
LOCATION
Anti-Tetanus 10 Ampoule RHU RHU Stored
Generator 1 Unit
RHU RHU
BP apparatus 10 Pcs In good condition
RHU, BHS RHU, BHS
Weighing Scale 46 Pcs RHU, Barangay RHU, Barangay In good condition
GAPS SOURCES
TARGET CURRENT
UNIT (PROJECTED - TO FILL
POPULATION PROJECTED NEDED RESOURCES
Resources STANDARDS COST CURRENT) THE GAPS
Famili Persons (PHP) QTY COST (PHP) QTY COST
es QTY COST (PHP)
Anti-Tetanus 1 per one person 250 250 62500 10 2500 240 60000 DOH
Chlorine Tablet 500 2500 1250000 100 50000 2400 1200000 DOH
Cough Syrup 1,840 108 1840 198720 50 5400 1790 193320 DOH
children
Colds medicines 720 100 72000 50 36000 50 36000 DOH
Colds syrup for kids 80 1840 147200 50 4000 1790 143200 DOH
Antibiotic for kids 320 1840 588800 100 32000 1740 556800 DOH
Doctors 4 4 0 0
Nurses 20 20 0 0
Midwives 8 8 0 0
MEMBERS:
SCENARIO:
Municipality of Dulag, Leyte areas hit by a Typhoon with a velocity of 250 KPH with storm surge, affecting 100mts, away from the shore line of Dulag, Leyte.
Commercial establishment was severely damage
Provincial Jail and City jail was destroyed and most of the prisoners was able to escape and scattered to different Municipality of Region 8 and possible to conduct criminal
activities.
Dulag PNP received report that those lawless elements are sighted in the different barangay of Dulag and possible to conduct criminal activities
OBJECTIVES:
SANGGUNIANG BAYAN
Activate the Barangay Tanod ready to perform duties at the evacuation center as security and maintenance of peace and order
Make report on the presence of lawless elements or strangers sighted at the evacuation center
Utilize Barangay Tanod as force multiplier in the conduct police visibility patrol
PROTOCOLS
4. Heighted Alert - heightened alert status will be declared 3 days before the disaster strike to possible affected areas and will be lifted when the situation is in normal condition.
During Disaster
3. Full alert status - will be declared by PNP high headquarter one day before the disaster hit, and will be lifted right after the situation in the areas is normalize.
2. Dispatches PNP personnel to assist the search and rescue and retrieval operation
RESOURCES INVENTORY
RESOURCE
Resources Qty Unit AGENCY / OFFICE REMARKS
ALLOCATION
Personnel 20 PNP
Personnel (see
annex 1.1)
PNP
Brgy Tanod
BIN
Other
volunteers
GAPS
TARGET CURRENT SOURCES
POPULATION UNIT PROJECTED RESOURCES (PROJECTED -
TO FILL
Resources STANDARDS COST NEDED CURRENT)
THE GAPS
Household Persons (PHP) QTY COST QTY COST
(PHP) (PHP)
QTY COST
MDRRM
Fund
70
Food Good for 30 Days personnel 315,000 None 70 315,00
LGU
Good for 30 Days 2,700 121,500 none 2,700 121,500
Litters Litters
Fuel
(for 30
days of
use)
5 tanods per 90 0 0 90
Brgy Tanod barangay (18
Barangay Affected)
1 per Tanod
Rain Coat
1 per tanod 340.00 90 27,000 90 27,000 Barangay
Fund
Helmet 550.00 90 49,500 90 49,500
1 pair per tanod
Barangay
Rubber Boots 1 pair per tanod 450 90 40,500 90 40,500 Fund
Barangay
50 90 4,500 90 4,500 Fund
7. LOGISTICS
LEAD : GSO
MEMBERS: MBO
SCENARIO:
With the wide scale of damage, all the employees as well as volunteers within the municipality of Dulag were required to report to serve as manpower in the emergency
operation for all clusters. A total 0f 500 manpower are working.
OBJECTIVES:
The Logistics Cluster aims to provide an efficient and effective logistics coordinating structure that will harmonize the activities of all clusters and encourage regular
info-sharing among all stakeholders and other partners. The Cluster also formulates, updates, implements and monitors logistical policies, plans, programs and procedures that
will harmonize the activities of each cluster.
a. GSO
Provide for vehicles and clearing equipment.
Provide for the manpower and or recruit volunteers if necessary.
Provide fuel to all other clusters.
Communicate all possible routes to and from the municipality.
Tracking of deployed items
Inventory of supplies and equipment
b. MBO
Facilitate in the making and signing of vouchers and other needed documents to ensure that funds are available for emergency use.
PROTOCOLS
During Disaster Phase
1. Coordinate and request to relevant clusters in order that Transportation Support can be provided when it is considered necessary and/or requested by the affected
areas.
2. Coordinate the usage of hauling and delivery means for transport of such goods to affected areas based on the direction of MDRRMC.
3. Consolidate reports and prepare cluster report/s.
4. Update assessments of roads, warehouses, transport capacities to and from, and available logistic services.
5. Coordinate PDANA Activities.
6. Deploy additional food and non-food items and personnel to disaster affected areas in coordination with Food and Non-Food Cluster.
Relief Good intended for • Preposition/ Procurement BAC, HRMO, MBO, Accounting • 3 days before landfall
workers Office, MTO
Ready to eat Food • Preposition/Procurement HRMO • 3 days before landfall
Papers and ballpen • Preposition HRMO • 3 days before landfall
Logbook • Preposition HRMO • 3 days before landfall
Hygiene Kit for workers Preposition/ procurement BAC, HRMO, MBO, Accounting • 3 days before landfall
Office, MTO
ELECTRIC GENERATOR with Procurement of gasoline /fuel HU staff 2 Days prior to landfall
FUEL
Tuning, testing gen ser LGU Electrician
AMBULANCE VEHICLE with Conduct inspection of ambulance vehicle to Driver in-charge 5 days prior to land fall
FUEL focus on BLOWBAG and Oxygen Tank with
accessories
Human Resource Identification and Deployment of Health MHO 3 Days prior to landfall
worker to include the following;
Doctors
Nurses RUM/RHU/MPS/BHW
Midwives
BHWs
1 Single Motorcycle
Manpower to conduct RDNA • Be on standby MAO, CSO, ABC Upon receipt of the warning from PAGASA
4,852 Food packs enough for 5 Request pre-position of goods in DSWD MSWDO Before typhoon
days Region 8 for 4,352
Maintain pre position of 500 food packs in MSWDO Within 6 months period
LGU
Warehousing Determine safe and secured warehouse area GSO August 2018
GSO
Training on Management of the • Conduct training MDRRMO, DILG, RHU • 4th quarter of 2018
Dead and Missing
Mass grave site Maintain the area GSO • regularly
Formaldehyde • Purchase RHU • 7 days before landfall
Embalming equipment • Purchase RHU • 7 days before landfall
N95 Mask • Preposition RHU • 7 days before landfall
Surgical Gloves • Preposition RHU • 7 days before landfall
Logbook • Preposition RHU • 7 days before landfall
DNA Kits • Request DOH, NBI • 7 days before landfall
camera • Preposition MDRRMO • 7 days before landfall
Temporary mortuary • Designation of the area DILG • 7 days before landfall
Embalmer • Execute a MOA RHU, MDRRMO • 4th quarter of 2018
Truck • Preposition MDRRMO • 7 days before landfall
Temporary Learning Spaces Preposition of the materials needed School, PTA, Stakeholders Upon receipt of the warning
(Tents and/or make shift
classrooms)
Pyscho-social Services Experiential Learning and Debriefing School and MSWDO 4th week of 2018
training
Vehicles to transfer properties to Borrow vehicle from LGU, Barangay Each School Upon warning from the PAGASA.
safest area. Officials and volunteers
Communication Equipment Purchase hand held radios for the schools DepEd Third Quarter (September 2018)
Learning Materials Evacuate learning materials from the Teachers Upon receipt of warning
affected schools
Clearing Eqquipment Preposition clearing equipment Students, Teachers, PTA, Right after the disaster (Storm Surge)
5,000 Food packs enough for 5 - Families bring their food for the 1 st day in BDRRMO Before and after typhoon
days evacuation center
BDRRMO
- Barangay provide the food packs for the 2 nd
day in the evacuation center
Maintain pre position of 500 food packs in MSWDO Within 6 months period
LGU
Storage room in evacuation Determine safe and secured room within the MSWDO August 2018
centers evacuation area
MSWDO
Assign a personnel to manage the storage
August 2018
August 2018
Water bladder/tank Purchase of water bladder MDRRMO Oct. 2018 - Dec. 2019
Camping bed (Polyester) Purchase of camping bed MDRRMO Oct. 2018 - Dec. 2019
Sleeping kit (sleeping mat, Purchase of sleeping kit MDRRMO Oct. 2018 - Dec. 2019
pillow & blanket)
Pop-up divider Purchase of pop-up divider MDRRMO Oct. 2018 - Dec. 2019
Emergency shelter kit (tarpaulins Purchase of emergency shelter kit MDRRMO Oct. 2018 - Dec. 2019
& rope)
Generator & fuel container Purchase generator and preposition fuel MDRRMO
Trash cans and bags Assign recovery facility and garbage area MDRRMO
within the evacuation site
RHU (Sanitary Inspector)
Signage Create and install signages within the MSWDO - Camp manager Oct. 2018 - 2019
evacuation center
- Water station/Drinking water
- Kitchen
- Bath area
- Exit
- Laundry area
- Charging station
- Information board
Safety & security personnel Coordinate with the Barangay Captain and PNP
PNP for the respective assignment of safety
- Tanod and security personnel
- Police
Staff care personnel Coordinate with HRMO to assign LGU staff HRMO
to focus on caring for the staff who attends
to the needs of the IDPs MSWDO
RHU personnel (Nurse and Coordinate with RHU officer to delegate RHU Oct. - Dec. 2018
BHW) nurse for each evacuation center.
Camp management training Coordinate with MDRRMO & DSWD for MSWDO Oct. - Dec. 2018
camp management training
Camp management team Identify LGU personnel to compose the MSWDO Oct. - Dec. 2018
camp management team 1 & 2.
Camp management team Identify safe and secured room to serve as MDRRMO Oct. - Dec. 2018
temporary office space in the temporary working space for the camp
evacuation center management team. MSWDO
RESOURCE INVENTORY
RESOURCE
Resources Qty Unit AGENCY / OFFICE REMARKS
LOCATION
WASAR Equipment MDRRMO OPCEN In good condition
• DERRU 22 persons
• BFP 17 persons
• RHU 23 persons
• PNP Personnel 10 persons
• Bantay Dagat 8 persons
• Barangay Volunteers 95 persons
• SALAG 5 persons
Generator 1 set MDRRMO OPCEN In good condition
Personal Protective Equipment In good condition
• Headlamp 2 pcs
• Raincoat 14 pcs
• Helmet 15 pcs
• Individual rope 10 pcs
• Rubber boots 14 pcs
Flashlights 10 pcs MDRRMO OPCEN In good condition
Barangay Profile/Database 1 MDRRMO, MPDC MDRRMO, MPDC On Going
Laptop 1 unit MPDC MPDC In good condition
Ballpen 1 dozen MPDC MPDC On stock
Paper 1 ream MPDC MPDC On stock
Logbook 1 pc MPDC MPDC On stock
Relief Good intended for 0 pack MDRRMO, MPDC - For procurement
workers
Ready to eat Food 0 unit MPDC - For procurement
Papers 1 ream MPDC HRMO On stock
Ballpen 1 dozen HRMO On stock
Logbook 1 pc MPDC HRMO On stock
Hygiene Kit for workers 0 sets MPDC - For procurement
Anti-Tetanus 10 Ampoule RHU RHU Stored
Syringe 10 Boxes RHU RHU Stored
Generator 1 Unit
RHU RHU
BP apparatus 10 Pcs In good condition
RHU, BHS RHU, BHS
Weighing Scale 46 Pcs RHU, Barangay RHU, Barangay In good condition
1000 pack Food packs (5 kilos rice, 8 can MSWDOffice Dulag Operation
goods) Thelma Arguta Center 500 will be dispose
Brgy. Buntay, Dulag within June 2018
Leyte
Vehicles to transfer properties 3 vehicles units LGU, barangay LGU, barangay Functional
to safest area.
5,000 pack Hygiene kit MSWDO & RHU 1,000 hygiene kit -
DSWD
2,500 set Camping bed (Polyester) MSWDO & GSO DRR budget
2,500 set Sleeping kit (sleeping mat, MSWDO & GSO DRR budget
pillow & blanket)
GSO
- Kitchen
- Bath area
- Exit
- Laundry area
- Charging station
- Information board
GAPS
TARGET CURRENT SOURCES TO
(PROJECTED -
POPULATION UNIT COST PROJECTED NEDED RESOURCES FILL THE
Resources STANDARDS CURRENT)
(PHP) GAPS
Families Persons QTY COST QTY COST
QTY COST (PHP) (PHP)
First Aid Kit/ Trauma -1 first aid kit for response 8,000.00 25 200,000 9 72,000.00 16 128,000DRR Fund
Kit team
WASAR Equipment 8 1 set for every WASAR DRR Fund
• Life vest Team member 500.00 8 17 500.00 - -
• Life ring 300.00 8 9 300.00 - -
• Throw bag 300.00 8 4 300.00 4 300.00
• WASAR Helmet 3,000.00 8 2 3,000.00 4 3,000.00
• Spine Board 5,000.00 1 1 5,000.00 - -
• Snorkel and Mask 850.00 8 4 850.00 4 850.00
• Flippers
• Storm Whistle 700.00 8 3 700.00 5 700.00
• Dry suits 200.00 8 8 200.00 - -
3,500.00 8 - - 8 3,500.00
Ballpen 5 1 dozen 5 1 60 - -
logbook 50 1 50 1 50 - -
Hygiene Kit for workers 500 1:1 250 500 125,000 0 0 500 125,000 QRF
GAPS SOURCES TO
TARGET CURRENT
UNIT COST (PROJECTED - FILL THE
Resources POPULATION STANDARDS PROJECTED NEDED RESOURCES
(PHP) CURRENT) GAPS
Families Persons QTY COST (PHP) QTY COST
QTY COST (PHP)
Anti-Tetanus 1 per one person 250 250 62500 10 2500 240 60000 DOH
Chlorine Tablet 500 2500 1250000 100 50000 2400 1200000 DOH
Cough Syrup 1,840 108 1840 198720 50 5400 1790 193320 DOH
children
Colds medicines 720 100 72000 50 36000 50 36000 DOH
Colds syrup for kids 80 1840 147200 50 4000 1790 143200 DOH
Antibiotic for kids 320 1840 588800 100 32000 1740 556800 DOH
Paracetamol for kids 83 1840 152720 100 83000 11740 144420 DOH
Doctors 4 4 0 0
Nurses 20 20 0 0
Midwives 8 8 0 0
Psychological First 50 50 0 0
Aider
Generator 25000 1 25000 1 25000 0 0
GAPS
CURRENT
TARGET POPULATION (PROJECTED - SOURCES TO
UNIT PROJECTED NEDED RESOURCES
Resources STANDARDS COST CURRENT) FILL THE GAPS
PNP
Brgy Tanod
BIN
Other volunteers
GAPS
CURRENT
TARGET POPULATION (PROJECTED - SOURCES TO
UNIT PROJECTED NEDED RESOURCES
Resources STANDARDS COST CURRENT) FILL THE GAPS
MDRRM Fund
Food 70 personnel
Good for 30 Days 315,000 None 70 315,00 LGU
2,700 Litters
(for 30 days
Fuel Good for 30 Days of use) 121,500 none 2,700 121,500
Litters
5 tanods per 90 0 0 90
Brgy Tanod barangay (18
Barangay Affected)
1 per Tanod
Rain Coat
1 per tanod 340.00 90 27,000 90 27,000 Barangay Fund
Helmet 550.00 90 49,500 90 49,500 Barangay Fund
1 pair per tanod
Rubber Boots 1 pair per tanod 450 90 40,500 90 40,500 Barangay Fund
50 90 4,500 90 4,500
BIN 2 BIN per Baragay 36 36 None None
(Barangay
Intelligence
Network) 50 36 36 BAYANIHAN
FOOD
FOOD
SOURCES TO
GAPS (PROJECTED –
TARGET POPULATION FILL THE
PROJECTED NEEDS CURRENT RESOURCES CURRENT) GAPS
Seedlings 2976 5 packs per 50 14880 744000 500 25000 14380 719000 DA
farmer
Masterlist
Organic Fertilizers 2083 has 1 sack/ hectare 350 2083 729050 5 1750 2078 727300 DA
Veterinarian 1 0 1 LGU
Agriculturist 1 1 0 0
Manpower to 45 50
conduct RDNA
GAPS
TARGET CURRENT
PROJECTED (PROJECTED - SOURCES TO
POPULATION RESOURCES
Resources STANDARDS UNIT COST (PHP) NEDED CURRENT) FILL THE
Families Persons QTY COST QTY COST GAPS
QTY COST (PHP) (PHP)
Training on 20 persons 15,000 4 persons 16 persons 15,000 MDRRM Fund
Management of the
Dead and Missing
Mass grave site 3m*2m per grave 600sq.m 600,000 1 hectare
Formaldehyde 800/gallon 50gallons 40,000 50gallons 40,000 MDRRM fund
½ gallon per corpse
Embalming equipment 3 sets 25,000 3 sets 75,000 3 sets 75,000 RHU fund
and tools
N95 Mask 1mask per 1 person 105.00 100 10,500 100 10,500 RHU Fund
per day
Surgical Gloves/ Clean 1 gloves per person 15.00 100 1,500 100 1,500
Gloves per day
Logbook 50.00 1 50.00 1 50.00
DNA Kits 1 DNA kit per 14,500 100 1,450,000. DOH
person 00
camera 16,000 1 16,000 1 16,000
Temporary mortuary
Embalmer 1 per 20 cadaver 2,000/ cadaver 5 embalmer 200,000 5 embalmer 200,000 RHU fund
Truck 1.2 M 1 1.2M 1 1.2M
GAPS
TARGET CURRENT
UNIT (PROJECTED - SOURCES
POPULATION PROJECTED NEDED RESOURCES
Resources STANDARDS COST CURRENT) TO FILL
Families Persons (PHP) QTY COST QTY COST (PHP) THE GAPS
QTY COST (PHP)
Temporary Learning Spaces 25,000 260 6,500,000.00 260 6,500,000.00 DepEd
(Tents and/or make shift
classrooms)
QTY COST (PHP) QTY COST (PHP) QTY COST QTY COST (PHP)
(PHP)
A. Food
Food 5000 25000 3 kilos of 200.00 5,000 445,000.00 8,822 1,764,400.00 500 170,000.00 8322 1,594,400.00 DSWD
packs rice, 4 can Region 8,
goods LGU purchase
additional
food packs
B. Non
Food
Item
Sleeping family size 250.00 2500 625000 0 2500 625000 LGU DRR
kit fund
(sleeping
mat,
pillow &
blanket)
Waterpro water proof, 300.00 150 45,000.00 0 150 45000 LGU DRR
of rechargable, fund
Flashligh high quality
t
Designation Name
In Worst Scenario
2,083.53 has agricultural area is destroyed (rice, corn, banana, root crops, orchard)
Reduced fish catch during coastal recovery period at least 80% of 63,000 annual income of fishermen is
reduced.
Objectives
MAO
Assist the MAO on the conduct of masterlisting of affected farmers and fisherfolks.
Submit masterlist to MAO.
Protocols
MAO staff should conduct Rapid assessment on damages right after the surge
Masterlist of farmers and fisherfolks conducted by the CSO and ABC should be submitted to
MAO for validation.
Beneficiaries of intervention must be a member of registered association
Distribution of planting materials will be based on the percentage of damage validated
CP Form 6: Needs and Activities Inventory
Manpower to conduct RDNA • Be on standby MAO, CSO, ABC Upon receipt of the warning
from PAGASA
Training to conduct RDNA in agriculture • Conduct Training MAO 1st quarter of 2018
RESOURCES INVENTORY
RESOURCE
Resources Qty Unit AGENCY / OFFICE REMARKS
ALLOCATION
SOURCES TO
GAPS (PROJECTED –
TARGET POPULATION FILL THE
PROJECTED NEEDS CURRENT RESOURCES CURRENT) GAPS
Tractor 2,083 has 1 per 1000 has 979000 2 1958000 1 979000 1 979000 LGU
Seedlings 2976 5 packs per farmer 50 14880 744000 500 25000 14380 719000 DA
Masterlist
Veterinarian 1 0 1 LGU
Agriculturist 1 1 0 0
Manpower to 45 50
conduct RDNA
Designation Name
LEAD Municipal Social Welfare & Development Officer Meldred C. Matol, RSW
(MSWDO)
Barangay Captain
SCENARIO:
The Municipality of Dulag experience various hazards, like typhoon, which could result to
devastating storm surge. In massive impact of storm surge, food supply can cut-off 18 coastal
barangays with 4,411 families or 17,430 population from regular supply of food and the means
to prepare their daily meals. There is lack of fresh and nutritious food for senior citizens, lost
basic cooking utensils were lost, and damage shelter. Failure to respond could result to increase
the malnutrition rate among 0-59 months old, illness and death among senior citizen, and
hunger among the affected population.
The Food and Non-Item (FNI) Cluster generally aims to save lives by providing food and
non-food items to the storm surge affected population during emergency response phase, and
support the restoration of pre-disaster food security level during recovery phase:
Each member agency has their respective roles and responsibilities per disaster phase.
The MSWD Office as Cluster Lead heads the operation of the cluster and does all the main
coordinating function.
All activities of the FNI Cluster aim to provide affected population with identified food
and non-food items using the preposition goods allocated by the Department of Social
Welfare and Development (DSWD) Region 8, and those purchased by the Local
Government Unit (LGU). The lacking FNI will be source through augmentation from
DSWD and other non-government organizations.
A) Municipal Social Welfare and Development Office (MSWDO) will head and lead
the coordinating functions of the Cluster. Specifically, the MSWD office will do the
following for each Disaster Phase:
i. Pre-Disaster Phase
1. Inventory of preposition food and non-food item.
2. Submit a status report on all food and non-food items to MDRRM
council.
1. Pre-Disaster Phase
a. Assist in the inventory of available food and non-food item.
b. Purchase additional FNI as per agreement with MDRRMC
c. Provide manpower and repacking of food packs
d. Organize distribution team
1. Pre-Disaster Phase
PROTOCOL
1. Upon activation of the contingency plan, all cluster members convene in VAWC
office of Barangay Combis, Dulag as the Operation Center within 24 hours after the
calamity to undertake coordination work.
2. The Food and Non-Food Item Cluster will be lead by the MSWD Office, supported
by General Service Office (GSO) for logistical needs.
6 Security Personnel
6 Warehouse Receive FNI delivery from DSWD, NGO and other institutions
Personnel
Maintain warehouse inventory report
RESPONSIBLE
NEEDS ACTIVITIES/ARRANGEMENTS TO MEET THE NEEDS TIMEFRAME
AGENCIES/OFFICES
4,852 Food packs enough for 5 Request pre-position of goods in DSWD Region 8 for 4,352 MSWDO Before typhoon
days
Maintain pre position of 500 food packs in LGU MSWDO Within 6 months
period
Warehousing Determine safe and secured warehouse area GSO August 2018
GSO
Engage distribution team on training about proper handling and distribution of Ace Sadiua, MSWDO
FNI
Social Welfare Assistant
4 wheel vehicles Coordinate with logistics cluster for hauling of FNI to beneficiaries
1000 pack Food packs (5 kilos MSWDOffice Dulag Operation Center 500 will be dispose
rice, 8 can goods) within June 2018
Thelma Arguta Brgy. Buntay, Dulag Leyte
10 boxes Assorted can goods MSWDOffice Dulag Operation Center 2019 expiration period
500 set Cooking ware MSWDOffice 2nd floor Dulag Cultural Center
Thelma Arguta Brgy. Buntay, Dulag Leyte
SCENARIO:
OBJECTIVES:
RESPONSIBILITIES:
RHU
1. Identify dead bodies.
2. Conduct DNA testing, if necessary
3. Preserve unidentified/unclaimed bodies.
4. Issue death certificate
5. Turn-over dead bodies to the DILG.
6. List down dead bodies.
7. Take photograph of the dead bodies as soon as possible.
DILG
1. Maintain list of both dead and missing persons.
2. Turnover dead bodies to the bereaved families.
3. Facilitate burial rites of unclaimed bodies.
MSWDO
1. Provide burial assistance to indigent families.
PROTOCOLS:
Disaster Phase
1. Deploy prepositioned MDM cluster to assist the affected areas.
2. Collect status report and request of the MDM cluster.
3. Submit status reports, requests and proposed actions to the Incident Commander.
4. Coordinate with other response clusters for their needs.
Post Disaster
1. Prepare and submit all operations to the Incident Commander.
ACTIVITIES /
RESPONSIBLE AGENCIES /
NEEDS ARRANGEMENTS TO MEET TIME FRAME
OFFICES
THE NEEDS
Training on Management of the • Conduct training MDRRMO, DILG, RHU • 4th quarter of 2018
Dead and Missing
Mass grave site Maintain the area GSO • regularly
Formaldehyde • Purchase RHU • 7 days before landfall
Embalming equipment • Purchase RHU • 7 days before landfall
N95 Mask • Preposition RHU • 7 days before landfall
Surgical Gloves • Preposition RHU • 7 days before landfall
Logbook • Preposition RHU • 7 days before landfall
DNA Kits • Request DOH, NBI • 7 days before landfall
camera • Preposition MDRRMO • 7 days before landfall
Temporary mortuary • Designation of the area DILG • 7 days before landfall
Embalmer • Execute a MOA RHU, MDRRMO • 4th quarter of 2018
Truck • Preposition MDRRMO • 7 days before landfall
RESOURCES INVENTORY
RESOURCE
Resources Qty Unit AGENCY / OFFICE REMARKS
LOCATION
Personnel trained on MDM 4 MDRRMO, DILG, Regular employees
RHU
Mass grave site 1 hectare Brgy. Highway
Surgical Gloves 5 boxes RHU RHU On stock
Logbook 1 pc RHU RHU On stock
camera 1 pc MDRRMO MDRRMO Serviceable
Temporary mortuary Dulag Plaza
Truck 1 pc GSO Serviceable
NEEDS PROJECTION AND RESOURCE GAP IDENTIFICATION
GAPS SOURCES
TARGET CURRENT
UNIT PROJECTED (PROJECTED - TO FILL
POPULATION RESOURCES
Resources STANDARDS COST NEDED CURRENT) THE GAPS
Families Persons (PHP) QTY COST QTY COST
QTY COST (PHP) (PHP)
Training on 20 persons 15,000 4 persons 16 15,000 MDRRM
Management of the persons Fund
Dead and Missing
Mass grave site 3m*2m per grave 600sq.m 600,000 1 hectare
Formaldehyde 800/gallon 50gallons 40,000 50gallons 40,000 MDRRM
½ gallon per corpse fund
Embalming equipment 3 sets 25,000 3 sets 75,000 3 sets 75,000 RHU fund
and tools
N95 Mask 1mask per 1 person 105.00 100 10,500 100 10,500 RHU Fund
per day
Surgical Gloves/ Clean 1 gloves per person 15.00 100 1,500 100 1,500
Gloves per day
Logbook 50.00 1 50.00 1 50.00
DNA Kits 1 DNA kit per 14,500 100 1,450,00 DOH
person 0.00
camera 16,000 1 16,000 1 16,000
Temporary mortuary
Embalmer 1 per 20 cadaver 2,000/ 5 200,000 5 200,000 RHU fund
cadaver embalmer embalmer
Truck 1.2 M 1 1.2M 1 1.2M
11. EDUCATION CLUSTER
MEMBERS: MSWDO
SCENARIO:
Buildings and properties of the schools suffered heavy damages that resulted to the
disruption of classes for more than two months.
OBJECTIVES:
The Education Cluster aims to ensure safety of learners and school personnel. It also aims to
provide continued access to quality of education to all affected learner. The cluster shall:
1. DEPED
To ask assistance to stakeholders and any other concerned agencies regarding the
needs of the schools.
2. MSWDO
Education Cluster will lead each Disaster Phases in coordination with the (MSWDO) Municipal
Social Welfare and Development Office Specifically, they will do the following for each Disaster
Phase:
1. Pre-Disaster Phase
Issue initial alerts and warnings as projected by relevant agencies (DOST, PAGASA,
NDRRMC, MDRRMC) to the affected schools.
Prepare baseline reports of projected affected areas (e.g. enrolment, classrooms, and
personnel)
Reinforce alerts issued to education cluster members as may be appropriate upon
advice made by MDRRMC.
Enforce the strict implementation of school safety and preparedness protocols, such
as ensuring protection of schools property.
Provide advisory on preemptive evacuation, if necessary.
Project the possible impact of the impending threat to the following: safety of learners
and schools personnel, destruction of properties, and disruption of educational
services.
Adhere to the policies on suspension of classes based on EO 66 (s. 2012).If learners
and schools personnel are already in school upon suspension, Schools should
consider their safety before allowing them to leave the school premises.
Convene the Education Cluster for response planning and pre-positioning.
Preposition of goods (make shift or tent) for temporary learning spaces.
Temporary Learning Spaces (Tents and/or Preposition of the materials needed School, PTA, Stakeholders Upon receipt of the warning
make shift classrooms)
Pyscho-social Services Experiential Learning and Debriefing School and MSWDO 4th week of 2018
training
Vehicles to transfer properties to safest Borrow vehicle from LGU, Barangay Each School Upon warning from the PAGASA.
area. Officials and volunteers
Communication Equipment Purchase hand held radios for the schools DepEd Third Quarter (September 2018)
Learning Materials Evacuate learning materials from the Teachers Upon receipt of warning
affected schools
Clearing Eqquipment Preposition clearing equipment Students, Teachers, PTA, Right after the disaster (Storm Surge)
RESOURCES INVENTORY
RESOURCE
Resources Qty Unit AGENCY / OFFICE REMARKS
LOCATION
Pyscho-social Services 32 persons Deped Deped Trained
Vehicles to transfer properties to safest 3 vehicles units LGU, barangay LGU, barangay Functional
area.
GAPS
CURRENT
TARGET POPULATION UNIT (PROJECTED - SOURCES
PROJECTED NEDED RESOURCES
Resources STANDARDS COST CURRENT) TO FILL
Families Persons (PHP) QTY COST QTY COST THE GAPS
QTY COST (PHP) (PHP)
Temporary Learning 25,000 260 6,500,000.00 260 6,500,00 DepEd
Spaces (Tents and/or make 0.00
shift classrooms)
Learning Materials
Designation Name
LEAD Municipal Social Welfare & Development Officer Meldred C. Matol, RSW
(MSWDO)
Bureau of Fire
SCENARIO:
The Municipality of Dulag experience various hazards, like typhoon, which could
result to devastating storm surge. In massive impact, community infrastructures, houses
and its basic amenities will be totally destroyed, basic services will be disrupted. This will
affect seventeen (17) coastal barangays with 4,411 families or 17,430 population. These
includes:
1. Families in high risk areas have access to safe and secured evacuation
facilities.
2. Evacuees have access to basic amenities and services while in the
evacuation areas.
3. Rapid assessment report of evacuation site is completed and
responded.
4. Internally displaced families are guided in returning to their
communities.
5. Provide recommendation on the appropriate approach towards
shelter recovery and rehabilitation.
The Camp Management cluster shall have the following roles and responsibilities:
PROTOCOLS
The Camp Management Protocols included three phases of evacuation that includes
pre, during and post evacuation.
PRE-EVACUATION
- bathing cubicles
- kitchen counters
- water points
- hand pumps
- volunteers
DURING EVACUATION
- Volunteers
5 Candao
13 Rizal
14 Salvacion
a. 6 kilos of rice
b. 10 pcs can goods
a. Powdered milk
b. Vegetables
c. Dried fish
c. Laundry area
d. Waste disposal (garbage bins, compost pits)
e. Drainage
10. Health
a. Health station per camp (regular disease monitoring and medical consultation)
b. Psycho-social services
c. First aid kit
11. Protection
a. Police and barangay tanod visibility
12. EDUCATION
- temporary learning centers
13. LIVELIHOOD
- Cash for work/food for work programs
POST EVACUATION
RESPONSIBLE
NEEDS ACTIVITIES/ARRANGEMENTS TO MEET THE NEEDS TIMEFRAME
AGENCIES/OFFICES
5,000 Food packs enough for 5 - Families bring their food for the 1st day in evacuation center BDRRMO Before and after typhoon
days
- Barangay provide the food packs for the 2 nd day in the evacuation center BDRRMO
- LGU provide food packs for the 3 rd day in the evacuation center. For the
barangays who failed to prepare, LGU will provide the food packs.
MSWDO
- MSWD office request food packs from DSWD base on the actual number of
evacuees.
MSWDO
Maintain preposition of 500 food packs in LGU MSWDO Within 6 months period
Storage room in evacuation Determine safe and secured room within the evacuation area MSWDO August 2018
centers
Assign a personnel to manage the storage MSWDO
August 2018
August 2018
Water bladder/tank Purchase of water bladder MDRRMO Oct. 2018 - Dec. 2019
Camping bed (Polyester) Purchase of camping bed MDRRMO Oct. 2018 - Dec. 2019
Sleeping kit (sleeping mat, pillow Purchase of sleeping kit MDRRMO Oct. 2018 - Dec. 2019
& blanket)
Pop-up divider Purchase of pop-up divider MDRRMO Oct. 2018 - Dec. 2019
Emergency shelter kit (tarpaulins Purchase of emergency shelter kit MDRRMO Oct. 2018 - Dec. 2019
& rope)
Generator & fuel container Purchase generator and preposition fuel MDRRMO
Trash cans and bags Assign recovery facility and garbage area within the evacuation site MDRRMO
RHU (Sanitary
Inspector)
Charging station Install electrical connection for evacuees GSO
Signage Create and install signages within the evacuation center MSWDO - Camp Oct. 2018 - 2019
manager
- Water station/Drinking water
- Kitchen
- Bath area
- Exit
- Laundry area
- Charging station
- Information board
Safety & security personnel Coordinate with the Barangay Captain and PNP for the respective PNP
assignment of safety and security personnel
- Tanod
- Police
Staff care personnel Coordinate with HRMO to assign LGU staff to focus on caring for the staff HRMO
who attends to the needs of the IDPs
MSWDO
RHU personnel (Nurse and BHW) Coordinate with RHU officer to delegate nurse for each evacuation center. RHU Oct. - Dec. 2018
BHW from the barangay of IDPs will be assign in the same evacuation center
Camp management training Coordinate with MDRRMO & DSWD for camp management training MSWDO Oct. - Dec. 2018
Camp management team Identify LGU personnel to compose the camp management team 1 & 2. MSWDO Oct. - Dec. 2018
Camp management team Identify safe and secured room to serve as temporary working space for the MDRRMO Oct. - Dec. 2018
temporary office space in the camp management team.
evacuation center MSWDO
Approved memorandum of Camp management cluster consultation meeting, draft and signing of MOA
agreement with owner or that specify number of facilities and classrooms the IDPs can use during the
management of the identified evacuation. Also, indicate the responsibility of the LGU (Municipality,
evacuation centers Barangay) , IDPs after using the facilities.
CP Form 7: Resource Inventory
5,000 pack Food packs (5 kilos rice, 10 can MSWDO & DSWD 1000 food packs - LGU
goods)
4,000 food packs -
DSWD
5,000 pack Hygiene kit MSWDO & RHU 1,000 hygiene kit -
DSWD
2,500 set Camping bed (Polyester) MSWDO & GSO DRR budget
2,500 set Sleeping kit (sleeping mat, pillow & MSWDO & GSO DRR budget
blanket)
500 set Pop-up divider MSWDO & GSO DRR budget
5,000 set Emergency shelter kit (tarpaulins & MDRRMO & MSWDO DRR budget
rope)
GSO
- Kitchen
- Bath area
- Exit
- Laundry area
- Charging station
- Information board
- Police
110 participants Camp management training MDRRMO & MSWDO DRR budget
11 Rooms per evacuation Camp management team temporary MSWDO Evacuation center
center office space in the evacuation center
QTY COST (PHP) QTY COST (PHP) QTY COST (PHP) QTY COST (PHP)
A. Food
Food packs 5000 25000 3 kilos of rice, 4 200.00 5,000 445,000.00 8,822 1,764,400.00 500 170,000.00 8322 1,594,400.00 DSWD Region 8, LGU
can goods purchase additional food
packs
B. Non Food
Item
Hygiene kit 2 sanitary napkin, 100.00 4000 400,000.00 0 4000 400000 LGU DRR fund
soap, diaper for
babies DSWD Region 8, LGU
purchase additional
hygiene kits
1000 sanitary 200.00 1000 200,000.00 0 1000 200000 LGU DRR fund
napkin, soap,
diaper for adult DSWD Region 9, LGU
purchase additional
hygiene kits
Water water bladder for 50,000.00 10 500,000.00 0 10 500000 LGU DRR fund
bladder/tan potable water
k
Camping 600.00 2500 1,500,000.0 0 2500 1500000 LGU DRR fund
bed 0
(Polyester)
Sleeping kit family size 250.00 2500 625000 0 2500 625000 LGU DRR fund
(sleeping
mat, pillow
& blanket)
Waterproof water proof, 300.00 150 45,000.00 0 150 45000 LGU DRR fund
Flashlight rechargable, high
quality
TOTAL 7,136,400.00
COST
Command and Control
1. Features of Emergency Operations Center
The Emergency Operations Center is the repository of information and main hub
for coordination of the MDRRMC Dulag, Leyte. It serves as the main
communication link for all responding units, receives emergency and non-
emergency calls, monitors the security and surveillance cameras municipal wide,
dispatches calls to concerned responding unit, receives data and reports from
responding units.
Manning and Structure: The EOC shall be operated by the following personnel
according to the organization structure:
EOC Manager
EOC Manager
Leah C. Caminong
Leah C. Caminong
Public
Public Info/Media
Info/Media Center
Center
Jeannebeth Martin
Jeannebeth Martin
Report
Report Development
Development
Jeffrey Pabro
Jeffrey Pabro Liaison Group
Nelson lauzon
Logistics Finance/
Finance/ Admin
Admin
Operations
Operations Coordinator
Coordinator Planning
Planning Coordinator
Coordinator Logistics Coordinator
Coordinator Coordinator
Coordinator
Meldred
Meldred Matol
Matol Gina Vacal
Gina Vacal Roubel Dugos
Roubel Dugos
Christine
Christine Padil
Padil
Activation: The EOC shall be activated upon the issuance of alert level from the
Provincial DRRMO and based on the findings of the Pre-Disaster Risk
Assessment (PDRA).
Features of Incident Management Team
The Municipal Incident Management Team that will carry out the tactical operations of the clusters is as follows:
Incident Commander
PSI.Ariel Salarda
Liaison Officer
Eduardo Kempis
Safety Officer
SFO3 Serenio
Public Agute JrOfficer
Information
PO3 Sheryl Nablo
Admin/Finance Section
Logistics Section Chief
Operations Section Chief Planning Section Chief Chief
Virginia De Paz
Ronald Peregrino SPO3 Virgilio Tan Ronald Gobangco
Single command shall be used in managing the typhoon. All the operational teams identified in the clusters shall work under the supervision of the
Operations Section Chief.
2. Interoperability
1. Deactivation
The contingency plan shall be deactivated once the situation has improved and when heightened alert is no longer
required. The recommendation for deactivation shall emanate from the Incident Commander going up to the MDRRMC
Chairperson / Local Chief Executive through the Emergency Operations Center. Once deactivated, operation shall still
remain until such time that the Emergency Operation Center shall be back to “white alert” status. At this point, the
emergency operation shall be terminated.
2. Non-Activation
In case that storm surge will not happen within the timeline written in this plan, the contingency plan shall not be
activated. In this case, the plan shall be maintained as a perpetual plan for future use in the event that a storm surge shall
occur.