Time Schedule

The document outlines the milestones and schedule for the construction of the Vung Ang 1 Thermal Power Plant. It provides timelines for various stages of construction including signing contracts, beginning construction, milestones like drum lifting and first firing for each unit, reliability runs, and handover dates for each unit extending into 2015.

Uploaded by

Tung Nguyen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
50% found this document useful (2 votes)
464 views12 pages

Time Schedule

The document outlines the milestones and schedule for the construction of the Vung Ang 1 Thermal Power Plant. It provides timelines for various stages of construction including signing contracts, beginning construction, milestones like drum lifting and first firing for each unit, reliability runs, and handover dates for each unit extending into 2015.

Uploaded by

Tung Nguyen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

Activity ID Activity Name Original Start Finish Note 2 2009 2010 2011 2012 2013 2014 015

Duration M M M O M O
MA J J A S O ND J FMA M J J A S O ND J FMA M J J A S O ND J F A J J A S N D J FMA J J A S N D J F M A M J J A S O N D JF
Vung Ang 1 Thermal Power Plant - Level II 0

Milestones 1501 09-Apr-09 A 27-Jan-15

Milestones 1501 09-Apr-09 A 27-Jan-15

MIL020 EPC Contract Signed 0 09-Apr-09 A EPC Contract Signed


MIL040 EPC Contract Effective 0 09-Apr-09 A EPC Contract Effective
MIL060 EPC Contract Commencement Date 0 27-Apr-09 A EPC Contract Commencement Date
MIL380 Raw Watter Supply 0 15-Jun-11 Change Raw Watter Supply
MIL370 Heavy Fuel Oil Supply 0 15-Nov-11 Change Heavy Fuel Oil Supply
MIL390 Coal Supply 0 10-Dec-11 Change Coal Supply
MIL080 Start Piling 0 01-Dec-09 A Start Piling
MIL085 Start Unit 1 Boiler House Foundation 0 01-Dec-09 A Start Unit 1 Boiler House Foundation
MIL090 Start Unit 1 Boiler Main Steel Structure 0 18-May-10 Start Unit 1 Boiler Main Steel Structure
MIL100 Unit 1 Boiler Pressure Part Erection Start 0 25-Oct-10* Unit 1 Boiler Pressure Part Erection Start
MIL120 Unit 1 Drum Lifting 0 21-Feb-11* Unit 1 Drum Lifting
MIL130 Backfeed & Energize 0 26-Sep-11 Backfeed & Energize
MIL220 Unit 1 Commissioning Start 0 06-Oct-11 Unit 1 Commissioning Start
MIL180 Unit 1 Boiler First Firing 0 10-Jan-12* Unit 1 Boiler First Firing
MIL260 Unit 1 Reliability Run Start 0 27-Jun-12* Change Unit 1 Reliability Run Start
MIL300 Unit 1 Completed (PAC) 0 27-Jul-12* Change Unit 1 Completed (PAC)
MIL340 Unit 1 Completed (FAC) 0 27-Jul-14* Unit 1 Complet
MIL140 Unit 2 Boiler Pressure Part Erection Start 0 25-Apr-11* Unit 2 Boiler Pressure Part Erection Start
MIL160 Unit 2 Drum Lifting 0 22-Aug-11* Unit 2 Drum Lifting
MIL240 Unit 2 Commissioning Start 0 17-Feb-12 Unit 2 Commissioning Start
MIL200 Unit 2 Boiler First Firing 0 11-Jul-12* Unit 2 Boiler First Firing
MIL280 Unit 2 Reliability Run Start 0 28-Dec-12* Change Unit 2 Reliability Run Start
MIL320 Unit 2 Completed (PAC) 0 27-Jan-13* Change Unit 2 Completed (PAC)
MIL360 Unit 2 Completed (FAC) 0 27-Jan-15*

Common 153 27-Jun-12 26-Jan-13 26-Jan-13, Common

Reliability Run 153 27-Jun-12 26-Jan-13 26-Jan-13, Reliability Run

OP1000 Unit 1 Reliability Run 30 27-Jun-12 26-Jul-12 Change Unit 1 Reliability Run
OP2000 Unit 2 Reliability Run 30 28-Dec-12 26-Jan-13 Change Unit 2 Reliability Run

Power Island
Islan 0

Boiler and S
Some Auxiliaries 924 03-Aug-09 A 01-Mar-13 01-Mar-13, Boiler and Some Auxiliaries

Milestones 363 12-Oct-11 01-Mar-13 01-Mar-13, Milestones

H080 Unit 1 Boiler Hydro 0 12-Oct-11 Unit 1 Boiler Hydro


H085 Unit 1 Boiler First Fire 0 10-Jan-12 Unit 1 Boiler First Fire
H105 Unit 1 Steam blowout 0 20-Jun-12 Unit 1 Steam blowout
H140 Hand-over- Unit 1 Boiler 0 10-Sep-12 Hand-over- Unit 1 Boiler
H230 Unit 2 Boiler Hydro 0 19-Mar-12* Unit 2 Boiler Hydro
H240 Unit 2 Boiler First Fire 0 11-Jun-12* Unit 2 Boiler First Fire
H280 Unit 2 Steam blowout 0 17-Jan-13 Unit 2 Steam blowout
H300 Hand-over- Unit 2 Boiler 0 01-Mar-13 Hand-over- Unit 2 Boiler

Procurement
Procurem 0 18-Jun-10 18-Jun-10 18-Jun-10, Procurement
H070 Award of Boiler and Some Auxiliaries 0 18-Jun-10 Award of Boiler and Some Auxiliaries

Detailed Engineering
E 167 03-Aug-09 A 30-Mar-10 30-Mar-10, Detailed Engineering
UHA010 Main Structure Boiler Design 210 03-Aug-09 A 27-Feb-10 change Main Structure Boiler Design
UHA030 Unit 1 Boiler Piling Dwgs IFC 0 30-Nov-09 A Unit 1 Boiler Piling Dwgs IFC
UHA035 Unit 1 Boiler Fdn Dwgs IFC 0 02-Mar-10 Unit 1 Boiler Fdn Dwgs IFC
BW005 Boiler & Aux Design, 240 03-Aug-09 A 30-Mar-10 Boiler & Aux Design,

Actual Work Milestone TASK filter: All Activities


© Primavera Systems, Inc.
Remaining Work Summary
Date: 10-Mar-10 Critical Remaining Work Vung Ang 1 Thermal Power Plant - Level II 1/12
Activity ID Activity Name Original Start Finish Note 2 2009 2010 2011 2012 2013 2014 015
Duration M M M O M O
MA J J A S O ND J FMA M J J A S O ND J FMA M J J A S O ND J F A J J A S N D J FMA J J A S N D J F M A M J J A S O N D JF
UHA180 Unit 2 Boiler Piling Dwgs IFC 0 30-Nov-09 A Change Unit 2 Boiler Piling Dwgs IFC
UHA190 Unit 2 Boiler Fdn Dwgs IFC 0 02-Mar-10 A Change Unit 2 Boiler Fdn Dwgs IFC

Manufacture & Shipping


Manufactu 564 29-Oct-09 A 15-Oct-11 15-Oct-11, Manufacture & Shipping
UHA020 Boiler House Manufacture & Shipment 226 02-Dec-09 A 15-Jul-10 Boiler House Manufacture & Shipment
BW010 Boiler & Aux Manufacture & Shipment 430 29-Oct-09 A 28-Feb-11 Boiler & Aux Manufacture & Shipment
BW110 Unit 1 Boiler Steel - 1st Delivery to Vung Ang Port 0 08-May-10 Unit 1 Boiler Steel - 1st Delivery to Vung Ang Port
BW115 Unit 1 Boiler Steel - 1st Delivery - Transit to Site 2 08-May-10 10-May-10 Unit 1 Boiler Steel - 1st Delivery - Transit to Site
BW120 Unit 1 Boiler Steel - 1st Delivery On Site 0 10-May-10 Unit 1 Boiler Steel - 1st Delivery On Site
BW130 Unit 1 Boiler Steel - Last Delivery - Transit to Site 2 10-Aug-10 11-Aug-10 Unit 1 Boiler Steel - Last Delivery - Transit to Site
BW125 Unit 1 Boiler Steel - Last Delivery to Vung Ang Port 0 10-Aug-10 Unit 1 Boiler Steel - Last Delivery to Vung Ang Port
BW135 Unit 1 Boiler Steel - Last Delivery on Site 0 11-Aug-10 Unit 1 Boiler Steel - Last Delivery on Site
BW045 Unit 1 Steam Drum - Transit to Site 2 25-Nov-10 26-Nov-10 Unit 1 Steam Drum - Transit to Site
BW040 Unit 1 Steam Drum Delivered to Vung Ang Port 0 25-Nov-10 Unit 1 Steam Drum Delivered to Vung Ang Port
BW050 Unit 1 Steam Drum Delivered to Site 0 26-Nov-10 Unit 1 Steam Drum Delivered to Site
BW060 Unit 1 Balance of Boiler - Transit to Site 2 26-Feb-11 28-Feb-11 Unit 1 Balance of Boiler - Transit to Site
BW055 Unit 1 Balance of Boiler Delivered to Vung Ang Port 0 26-Feb-11 Unit 1 Balance of Boiler Delivered to Vung Ang Port
BW065 Unit 1 Balance of Boiler Delivered on Site 0 28-Feb-11 Unit 1 Balance of Boiler Delivered on Site
BWA170 Unit 1 - FD Fans Delivered to Vung Ang 0 15-Jun-11* Unit 1 - FD Fans Delivered to Vung Ang
BWA175 Unit 1 - ID Fans Delivered to Vung Ang 0 15-Jun-11* Unit 1 - ID Fans Delivered to Vung Ang
BWA180 Unit 1 - PA Fans Delivered to Vung Ang 0 15-Jun-11* Unit 1 - PA Fans Delivered to Vung Ang
BWA185 Unit 1 -Start Up Boiler - Delivered to Vung Ang 0 15-Jun-11* Unit 1 -Start Up Boiler - Delivered to Vung Ang
BW210 Unit 2 Boiler Steel - 1st Delivery to Vung Ang Port 0 08-May-10 Unit 2 Boiler Steel - 1st Delivery to Vung Ang Port
BW215 Unit 2 Boiler Steel - 1st Delivery - Transit to Site 2 08-May-10 10-May-10 Unit 2 Boiler Steel - 1st Delivery - Transit to Site
BW220 Unit 2 Boiler Steel - 1st Delivery On Site 0 13-Aug-10 Unit 2 Boiler Steel - 1st Delivery On Site
BW230 Unit 2 Boiler Steel - Last Delivery - Transit to Site 2 12-Nov-10 13-Nov-10 Unit 2 Boiler Steel - Last Delivery - Transit to Site
BW225 Unit 2 Boiler Steel - Last Delivery to Vung Ang Port 0 12-Nov-10 Unit 2 Boiler Steel - Last Delivery to Vung Ang Port
BW235 Unit 2 Boiler Steel - Last Delivery on Site 0 13-Nov-10 Unit 2 Boiler Steel - Last Delivery on Site
BW200 Unit 2 Steam Drum Delivered to Site 0 12-Mar-11* Unit 2 Steam Drum Delivered to Site
BW205 Unit 2 Balance of Boiler Delivered to Site 0 13-Aug-11 Unit 2 Balance of Boiler Delivered to Site
BWA270 Unit 2 - FD Fans Delivered to Vung Ang 0 15-Oct-11* Unit 2 - FD Fans Delivered to Vung Ang
BWA275 Unit 2 - ID Fans Delivered to Vung Ang 0 15-Oct-11* Unit 2 - ID Fans Delivered to Vung Ang
BWA280 Unit 2 - PA Fans Delivered to Vung Ang 0 15-Oct-11* Unit 2 - PA Fans Delivered to Vung Ang
BWA285 Unit 2 -Start Up Boiler - Delivered to Vung Ang 0 15-Oct-11* Unit 2 -Start Up Boiler - Delivered to Vung Ang

Construction
Construct 715 01-Dec-09 A 12-Sep-12 12-Sep-12, Construction
UHA040 Unit 1 Boiler Foundation work 180 01-Dec-09 A 30-May-10 Change Unit 1 Boiler Foundation work
H020 Unit 1 Boiler Erection of Steelwork 235 18-May-10* 15-Feb-11 Change Unit 1 Boiler Erection of Steelwork
H060 Unit 1 Boiler & Aux Erection & Pre-commissioning 358 17-Nov-10 07-Jan-12 Unit 1 Boiler & Aux Erection & Pre-commissioning
H040 Unit 1 Steam Drum Lift 0 21-Feb-11 Unit 1 Steam Drum Lift
UHA200 Unit 2 Boiler Foundation work 180 01-Jan-10 A 23-Oct-10 Change Unit 2 Boiler Foundation work
UHA230 Unit 2 Boiler Erection of Steelwork 235 06-Jul-10 05-Apr-11 Change Unit 2 Boiler Erection of Steelwork
H220 Unit 2 Boiler & Aux Erection & Pre-commissioning 413 20-May-11 12-Sep-12 Unit 2 Boiler & Aux Erection & Pre-commissioning
H210 Unit 2 Steam Drum Lift 0 22-Aug-11 Unit 2 Steam Drum Lift

Precom & Commission 284 09-Jan-12 08-Feb-13 08-Feb-13, Precom & Commission
H100 Unit 1 Boiler & Aux Testing and Commissioning 162 09-Jan-12 14-Jul-12 Unit 1 Boiler & Aux Testing and Commissioning
H260 Unit 2 Boiler & Aux Testing and Commissioning 109 04-Oct-12 08-Feb-13 Unit 2 Boiler & Aux Testing and Commissioning

Turbine/Generator and Some Auxiliairies


Turbine/Ge 925 30-Jul-09 A 01-Mar-13 01-Mar-13, Turbine/Generator and Some Auxiliairies

Milestones 495 08-Apr-11 01-Mar-13 01-Mar-13, Milestones


UMA090 Steam Turbine Building Complete 0 08-Apr-11 Steam Turbine Building Complete
MK160 T/O - Unit 1 Turbine 0 01-Aug-12 T/O - Unit 1 Turbine
MK300 T/O - Unit 2 Turbine 0 01-Mar-13 T/O - Unit 2 Turbine

Actual Work Milestone TASK filter: All Activities


© Primavera Systems, Inc.
Remaining Work Summary
Date: 10-Mar-10 Critical Remaining Work Vung Ang 1 Thermal Power Plant - Level II 2/12
Activity ID Activity Name Original Start Finish Note 2 2009 2010 2011 2012 2013 2014 015
Duration M M M O M O
MA J J A S O ND J FMA M J J A S O ND J FMA M J J A S O ND J F A J J A S N D J FMA J J A S N D J F M A M J J A S O N D JF
Procurement
Procurem 0 30-Jul-09 A 30-Jul-09 A 30-Jul-09 A, Procurement
MK200 Award of Turbine Island 0 30-Jul-09 A Award of Turbine Island

Detailed Engineering
E 399 17-Aug-09 A 10-Mar-11 10-Mar-11, Detailed Engineering

UMA020 Steam Turbine Building Design 155 01-Sep-09 A 07-Apr-10 Steam Turbine Building Design
UMA030 Steam Turbine Piling Dwgs IFC 0 01-May-10 A Change Steam Turbine Piling Dwgs IFC
UMA035 Steam Turbine Fdn Dwgs IFC 0 15-May-10 Change Steam Turbine Fdn Dwgs IFC
SA010 Air Con & Vent Sys Design, 300 27-Feb-10 11-Feb-11 Air Con & Vent Sys Design,
MK030 Turbine-Gen Design, 572 17-Aug-09 A 10-Mar-11 Turbine-Gen Design,
MA010 Turbine & Aux Design, 491 17-Aug-09 A 10-Mar-11 Turbine & Aux Design,

Manufacture & Shipping


Manufactu 675 11-Jan-10 A 02-Apr-12 02-Apr-12, Manufacture & Shipping
SA020 Air COn & Vent Sys Manufacture&Shipment 314 03-Apr-10 04-Apr-11 Air COn & Vent Sys Manufacture&Shipment
MK040 Turbine-Gen Manufacture & Shipment 630 11-Jan-10 A 17-Jan-12 Turbine-Gen Manufacture & Shipment
MK055 Unit 1 Soleplates/Anchor Bolts/Embeds Delivered to Site 0 01-Feb-11 Unit 1 Soleplates/Anchor Bolts/Embeds Delivered to Site
MK065 Unit 1 LP CASINGS/STATOR Delivered to Site 0 01-Jun-11 Unit 1 LP CASINGS/STATOR Delivered to Site
BWAT110 Unit 1 - HP Turbine By-Pass Valve - Delivered to Vung Ang 0 15-Jun-11* Unit 1 - HP Turbine By-Pass Valve - Delivered to Vung Ang
MK070 Unit 1 HIP CASING, BEARING, HOUSING Delivered to ... 0 02-Jul-11 Unit 1 HIP CASING, BEARING, HOUSING Delivered to Site
MK075 Unit 1 REMAINING STG Delivered to Site 0 01-Aug-11 Unit 1 REMAINING STG Delivered to Site
BWAT120 Unit 1 - Chemical Dosing System - Delivered to Vung Ang 0 15-Sep-11* Unit 1 - Chemical Dosing System - Delivered to Vung Ang
BWAT130 Unit 1 - Sampling System - Delivered to Vung Ang 0 15-Sep-11* Unit 1 - Sampling System - Delivered to Vung Ang
MA020 Turbine & Aux Manufacture & Shipment 451 25-Oct-10 02-Apr-12 Turbine & Aux Manufacture & Shipment
MK255 Unit 2 Soleplates/Anchor Bolts/Embeds Delivered to Site 0 01-Aug-11 Unit 2 Soleplates/Anchor Bolts/Embeds Delivered to Site
MK265 Unit 2 LP CASINGS/STATOR Delivered to Site 0 02-Dec-11 Unit 2 LP CASINGS/STATOR Delivered to Site
MK270 Unit 2 HIP CASING, BEARING, HOUSING Delivered to ... 0 02-Jan-12 Unit 2 HIP CASING, BEARING, HOUSING Delivered to Site
BWAT210 Unit 2 - HP Turbine By-Pass Valve - Delivered to Vung Ang 0 16-Jan-12* Unit 2 - HP Turbine By-Pass Valve - Delivered to Vung Ang
BWAT220 Unit 2 - Chemical Dosing System - Delivered to Vung Ang 0 16-Jan-12* Unit 2 - Chemical Dosing System - Delivered to Vung Ang
BWAT230 Unit 2 - Sampling System - Delivered to Vung Ang 0 16-Jan-12* Unit 2 - Sampling System - Delivered to Vung Ang
MK275 Unit 2 REMAINING STG Delivered to Site 0 01-Feb-12 Unit 2 REMAINING STG Delivered to Site

Construction
Construct 682 07-Apr-10 24-Nov-12 24-Nov-12, Construction
UMA040 Steam Turbine Piling and Foundation 208 07-Apr-10* 04-Dec-10 Steam Turbine Piling and Foundation
UMA060 Steam Turbine Steelworks 183 24-May-10 22-Dec-10 Steam Turbine Steelworks
UMA070 Steam Turbine Building Walls and Finishes 156 25-Aug-10 22-Feb-11 Steam Turbine Building Walls and Finishes
UMA080 Steam Turbine Building Roofings 155 11-Oct-10 08-Apr-11 Steam Turbine Building Roofings
SA040 Air Con & Vent Sys Installation & Pre-comm 365 05-Apr-11 02-Jun-12 Air Con & Vent Sys Installation & Pre-comm
MK060 Unit 1 T/G Bldg Base Mat & T/G Pedestal 313 16-Jun-10 15-Jun-11 Unit 1 T/G Bldg Base Mat & T/G Pedestal
MK080 Unit 1 Assemble & Align Turbine Generator 313 16-Jun-11 14-Jun-12 Unit 1 Assemble & Align Turbine Generator
MA040 Unit 1 Turbine &Aux Erection & Pre-commissioning 313 02-Apr-11 31-Mar-12 Unit 1 Turbine &Aux Erection & Pre-commissioning
MK210 Unit 2 T/G Bldg Base Mat & T/G Pedestal 313 27-Nov-10 26-Nov-11 Unit 2 T/G Bldg Base Mat & T/G Pedestal
MK220 Unit 2 Assemble & Align Turbine Generator 312 28-Nov-11 24-Nov-12 Unit 2 Assemble & Align Turbine Generator
MA100 Unit 2 Turbine& Aux Erection & Pre-commissioning 313 13-Sep-11 11-Sep-12 Unit 2 Turbine& Aux Erection & Pre-commissioning

Precom & Commission 293 04-Jan-12 16-Feb-13 16-Feb-13, Precom & Commission
SA060 Air Con & Vent Sys Testing and Commissioning 262 04-Jan-12 03-Nov-12 Air Con & Vent Sys Testing and Commissioning
MK120 Unit 1 Turbine Testing and Commissioning 72 28-Apr-12 20-Jul-12 Unit 1 Turbine Testing and Commissioning
MK140 Unit 1 T/G on Turning Gear 0 20-Jul-12 Unit 1 T/G on Turning Gear
MK260 Unit 2 Turbine Testing and Commissioning 72 26-Nov-12 16-Feb-13 Unit 2 Turbine Testing and Commissioning
MK280 Unit 2 T/G on Turning Gear 0 16-Feb-13 Unit 2 T/G on Turning Gear

Boiler Auxi
Auxiliaries 771 28-Dec-09 A 26-Oct-12 26-Oct-12, Boiler Auxiliaries

Procurement
Procurem 0 22-Jan-10 A 22-Jan-10 A 22-Jan-10 A, Procurement
EBC010 Award of Boiler Auxiliaries 0 22-Jan-10 A Award of Boiler Auxiliaries

Detailed Engineering
E 192 28-Dec-09 A 30-Sep-10 30-Sep-10, Detailed Engineering
EBC015 Coal Mill Sys Design, 238 28-Dec-09 A 30-Sep-10 change Coal Mill Sys Design,

Actual Work Milestone TASK filter: All Activities


© Primavera Systems, Inc.
Remaining Work Summary
Date: 10-Mar-10 Critical Remaining Work Vung Ang 1 Thermal Power Plant - Level II 3/12
Activity ID Activity Name Original Start Finish Note 2 2009 2010 2011 2012 2013 2014 015
Duration M M M O M O
MA J J A S O ND J FMA M J J A S O ND J FMA M J J A S O ND J F A J J A S N D J FMA J J A S N D J F M A M J J A S O N D JF
Manufacture & Shipping
Manufactu 501 01-Mar-10 A 15-Oct-11 15-Oct-11, Manufacture & Shipping
EBC020 Coal Mill Sys Manufacture & Shipment 242 01-Mar-10 A 07-Dec-10 change Coal Mill Sys Manufacture & Shipment
BWA110 Unit 1 - Pulverizer - Delivery to Vung Ang 0 15-Jun-11* Unit 1 - Pulverizer - Delivery to Vung Ang
BWA120 Unit 1 - Coal Feeder - Delivery to Vung Ang 0 15-Jun-11* Unit 1 - Coal Feeder - Delivery to Vung Ang
BWA210 Unit 2 - Pulverizer - Delivery to Vung Ang 0 15-Oct-11* Unit 2 - Pulverizer - Delivery to Vung Ang
BWA220 Unit 2 - Coal Feeder - Delivery to Vung Ang 0 15-Oct-11* Unit 2 - Coal Feeder - Delivery to Vung Ang

Construction
Construct 386 03-Dec-10 28-May-12 28-May-12, Construction
EBC040 Unit 1 Coal Mill Sys Erection & Pre-commissioning 339 03-Dec-10 02-Jan-12 Unit 1 Coal Mill Sys Erection & Pre-commissioning
EBC250 Unit 2 Coal Mill Sys Erection & Pre-commissioning 339 29-Apr-11 28-May-12 Unit 2 Coal Mill Sys Erection & Pre-commissioning

Precom & Commission 214 03-Jan-12 26-Oct-12 26-Oct-12, Precom & Commission
EBC160 Unit 1 - Coal Mill Sys Testing and Commissioning 130 03-Jan-12 01-Jun-12 Unit 1 - Coal Mill Sys Testing and Commissioning
EBC260 Unit 2 - Coal Mill Sys Testing and Commissioning 130 29-May-12 26-Oct-12 Unit 2 - Coal Mill Sys Testing and Commissioning

Turbine/Generator BOP
Turbine/Ge 762 01-Oct-09 A 15-Oct-12 15-Oct-12, Turbine/Generator BOP

Procurement
Procurem 252 03-Nov-09 A 30-Oct-10 30-Oct-10, Procurement

LBA030 IFB Spec/ER/Scope of Work - Critical Piping & supports 0 03-Dec-09 A IFB Spec/ER/Scope of Work - Critical Piping & supports
LBG030 IFB Spec/ER/Scope of Work - Non-Critical Piping & Sup... 0 30-Oct-10 IFB Spec/ER/Scope of Work - Non-Critical Piping & Supports
LALC025 IFB Spec/ER/Scope of Work - Condensate Pumps 0 03-Nov-09 A IFB Spec/ER/Scope of Work - Condensate Pumps
LALC030 IFB Spec/ER/Scope of Work - Boiler Feed Pumps 0 03-Nov-09 A IFB Spec/ER/Scope of Work - Boiler Feed Pumps
LALB010 Award of Turbune/Gererator Auxiliaries 0 29-Jan-10 A Award of Turbune/Gererator Auxiliaries

Detailed Engineering
E 315 01-Oct-09 A 22-Jan-11 22-Jan-11, Detailed Engineering
LBA020 Main Piping Sys Design 343 01-Oct-09 A 03-Dec-10 Main Piping Sys Design
LBG010 Aux Piping Sys Design, 315 31-Dec-09 A 01-Jan-11 Aux Piping Sys Design,
BAA010 Duct IPB Design, 360 30-Nov-09 A 22-Jan-11 Duct IPB Design,
LALC020 Feedwater & Cond Sys Design 364 12-Oct-09 A 07-Dec-10 Feedwater & Cond Sys Design

Manufacture & Shipping


Manufactu 501 01-Jan-10 A 15-Oct-11 15-Oct-11, Manufacture & Shipping
LBA050 Main Piping Sys Manufacture & Shipment 200 04-Dec-10 25-Jul-11 Main Piping Sys Manufacture & Shipment
LBG020 Aux Piping Sys Manufacture & Shipment 500 20-Feb-10 A 14-Oct-11 Aux Piping Sys Manufacture & Shipment
BWAP110 Unit 1 - Main Steam Piping - Delivery to Vung Ang 0 15-Jun-11* Unit 1 - Main Steam Piping - Delivery to Vung Ang
BWAP120 Unit 1 - Hot Reheat Piping - Delivery to Vung Ang 0 15-Jun-11* Unit 1 - Hot Reheat Piping - Delivery to Vung Ang
BWAP130 Unit 1 - Cold Reheat Piping - Delivery to Vung Ang 0 15-Jun-11* Unit 1 - Cold Reheat Piping - Delivery to Vung Ang
BAA020 Duct IPB Manufacture & Shipment 365 01-Jan-10 A 11-Feb-11 Duct IPB Manufacture & Shipment
LALC050 Feedwater & Cond Sys Manuf & Shipment 200 08-Oct-10 28-May-11 Feedwater & Cond Sys Manuf & Shipment
BWAF110 Unit 1 Feedwater Piping - Delivery to Vung Ang 0 15-Jun-11* Unit 1 Feedwater Piping - Delivery to Vung Ang
BWAP210 Unit 2 - Main Steam Piping - Delivery to Vung Ang 0 15-Oct-11* Unit 2 - Main Steam Piping - Delivery to Vung Ang
BWAP220 Unit 2 - Hot Reheat Piping - Delivery to Vung Ang 0 15-Oct-11* Unit 2 - Hot Reheat Piping - Delivery to Vung Ang
BWAP230 Unit 2- Cold Reheat Piping - Delivery to Vung Ang 0 15-Oct-11* Unit 2- Cold Reheat Piping - Delivery to Vung Ang
BWAF210 Unit 2 Feedwater Piping - Delivery to Vung Ang 0 15-Oct-11* Unit 2 Feedwater Piping - Delivery to Vung Ang

Construction
Construct 420 07-Dec-10 17-Jul-12 17-Jul-12, Construction
LBA040 Unit 1 Main PipingSys Erection&Pre-commissioning 234 08-Mar-11 05-Dec-11 Unit 1 Main PipingSys Erection&Pre-commissioning
LBG040 Unit 1 Aux Piping Sys Erection&Pre-commissioning 236 18-Apr-11 17-Jan-12 Unit 1 Aux Piping Sys Erection&Pre-commissioning
BAA040 Unit 1 Duct IPB Installation & Pre-commissioning 236 12-Feb-11 14-Nov-11 Unit 1 Duct IPB Installation & Pre-commissioning
LALC040 Unit 1 Feedwater&CondSys Installation & Pre-comm 236 07-Dec-10 07-Sep-11 Unit 1 Feedwater&CondSys Installation & Pre-comm
LBA080 Unit2 Main Piping Sys Erection&Pre-commissioning 236 26-Jul-11 25-Apr-12 Unit2 Main Piping Sys Erection&Pre-commissioning
LBG080 Unit 2 Aux Piping Sys Erection&Pre-commissioning 236 17-Oct-11 17-Jul-12 Unit 2 Aux Piping Sys Erection&Pre-commissioning
BAA080 Unit 2 Duct IPB Installation & Pre-commissioning 236 14-Jul-11 13-Apr-12 Unit 2 Duct IPB Installation & Pre-commissioning
LALC080 Unit 2 Feedwater&CondSys Installation & Pre-comm 236 19-May-11 17-Feb-12 Unit 2 Feedwater&CondSys Installation & Pre-comm

Precom & Commission 288 08-Sep-11 15-Oct-12 15-Oct-12, Precom & Commission
LBA060 Unit 1 Main Piping Sys Testing and Commissioning 65 06-Dec-11 18-Feb-12 Unit 1 Main Piping Sys Testing and Commissioning
LBG060 Unit 1 Aux Piping Sys Testing and Commissioning 77 18-Jan-12 16-Apr-12 Unit 1 Aux Piping Sys Testing and Commissioning
BAA060 Unit 1 Duct IPB Testing and Commissioning 78 15-Nov-11 13-Feb-12 Unit 1 Duct IPB Testing and Commissioning

Actual Work Milestone TASK filter: All Activities


© Primavera Systems, Inc.
Remaining Work Summary
Date: 10-Mar-10 Critical Remaining Work Vung Ang 1 Thermal Power Plant - Level II 4/12
Activity ID Activity Name Original Start Finish Note 2 2009 2010 2011 2012 2013 2014 015
Duration M M M O M O
MA J J A S O ND J FMA M J J A S O ND J FMA M J J A S O ND J F A J J A S N D J FMA J J A S N D J F M A M J J A S O N D JF
LALC060 Unit 1 Feedwater & Cond Sys Testing and Comm 103 08-Sep-11 05-Jan-12 Unit 1 Feedwater & Cond Sys Testing and Comm
LBA100 Unit 2 Main Piping Sys Testing and Commissioning 65 26-Apr-12 10-Jul-12 Unit 2 Main Piping Sys Testing and Commissioning
LBG100 Unit 2 Aux Piping SysTesting and Commissioning 77 18-Jul-12 15-Oct-12 Unit 2 Aux Piping SysTesting and Commissioning
BAA100 Unit 2 Duct IPB Testing and Commissioning 78 14-Apr-12 13-Jul-12 Unit 2 Duct IPB Testing and Commissioning
LALC100 Unit 2 Feedwater & Cond Sys Testing and Comm 103 18-Feb-12 16-Jun-12 Unit 2 Feedwater & Cond Sys Testing and Comm

Coal Handling
Handl Plant 660 03-Aug-09 A 27-Feb-12 27-Feb-12, Coal Handling Plant

Procurement
Procurem 68 03-Aug-09 A 17-Oct-09 A 17-Oct-09 A, Procurement
EA030 Tender Period 27 03-Aug-09 A 13-Aug-09 A Tender Period
EA050 Evaluation Period 55 27-Aug-09 A 17-Oct-09 A Evaluation Period
EA070 Award of Coal Handling System Contract 0 17-Oct-09 A Award of Coal Handling System Contract

Detailed Engineering
E 218 09-Nov-09 A 17-Sep-10 17-Sep-10, Detailed Engineering
UEA010 Coal Handling Jetty Topside Design, 270 09-Nov-09 A 17-Sep-10 Coal Handling Jetty Topside Design,
UEA030 Coal Handling Jetty Piling Dwgs IFC 80 01-Mar-10 A 31-May-10 Change Coal Handling Jetty Piling Dwgs IFC
UEA035 Coal Handling Jetty Topside Fdn Dwgs IFC 0 15-Jun-10 Change Coal Handling Jetty Topside Fdn Dwgs IFC
EAC010 Conveyor Sys Design, 265 09-Nov-09 A 13-Sep-10 Conveyor Sys Design,
EAD010 Stacker/Reclaimer Design 240 09-Nov-09 A 16-Aug-10 Stacker/Reclaimer Design
EAE030 Storage Area Piling Dwgs IFC 0 05-Mar-10 A Storage Area Piling Dwgs IFC
EAE035 Storage Area Fdn Dwgs IFC 0 15-Mar-10 Storage Area Fdn Dwgs IFC
EAE020 Storage Area Design 124 01-Apr-10* 02-Aug-10 Storage Area Design

Manufacture & Shipping


Manufactu 402 24-Mar-10 14-Oct-11 14-Oct-11, Manufacture & Shipping
UEA020 Coal Handling Jetty Topside Manufacture, Shipment 481 02-Apr-10 14-Oct-11 Coal Handling Jetty Topside Manufacture, Shipment
EAC020 Conveyor Sys Manufacture & Shipment 475 02-Apr-10 07-Oct-11 Conveyor Sys Manufacture & Shipment
EAD020 Stacker/Reclaimer Manufacture & Shipment 377 02-Apr-10 15-Jun-11 Stacker/Reclaimer Manufacture & Shipment
UZR020 Coal Jetty Downside Manf & Shipment 310 24-Mar-10 27-Jan-11 Coal Jetty Downside Manf & Shipment
EA080 Coal Handling Steel Delivery 0 25-Mar-11 Coal Handling Steel Delivery
EA090 Coal Handling Mechanical Delivery 0 20-May-11 Coal Handling Mechanical Delivery
EA100 Coal Handling Electrical Delivery 0 15-Jul-11 Coal Handling Electrical Delivery

Construction
Construct 463 25-Mar-10 10-Jan-12 10-Jan-12, Construction
UEA040 Coal Handling Jetty Piling and Deck Structure 372 30-Mar-10 05-Apr-11 change Coal Handling Jetty Piling and Deck Structure
UEA060 Coal Handling Jetty Topside Erection 116 29-Aug-11 10-Jan-12 Coal Handling Jetty Topside Erection
EAC040 Conveyor Sys Erection & Pre-commissioning 183 29-Apr-11 28-Nov-11 Conveyor Sys Erection & Pre-commissioning
EAD040 Stacker/Reclaimer Erection & Pre-commissioning 164 09-May-11 15-Nov-11 Stacker/Reclaimer Erection & Pre-commissioning
EAE040 Storage Area Piling 124 25-Mar-10 16-Aug-10 Change Storage Area Piling
EAE060 Storage Area Construction 569 01-May-10 20-Nov-11 Storage Area Construction

Precom & Commission 74 16-Nov-11 27-Feb-12 27-Feb-12, Precom & Commission

EAC060 Conveyor Sys Testing and Commissioning 78 29-Nov-11 27-Feb-12 Conveyor Sys Testing and Commissioning
EAD060 Stacker/Reclaimer Testing and Commissioning 78 16-Nov-11 14-Feb-12 Stacker/Reclaimer Testing and Commissioning

WTP and W
WWTP 715 08-Dec-09 A 13-Sep-12 13-Sep-12, WTP and WWTP

Procurement
Procurem 20 08-Dec-09 A 06-Jan-10 A 06-Jan-10 A, Procurement
WWTP020 Evaluation Period 26 08-Dec-09 A 06-Jan-10 A Evaluation Period
WWTP040 Award of Water & WasteTreatment System Contract 0 06-Jan-10 A Award of Water & WasteTreatment System Contract

Detailed Engineering
E 354 06-Jan-10 A 24-May-11 24-May-11, Detailed Engineering
GA010 Raw Water Sys Design, 300 06-Jan-10 A 21-Dec-10 Raw Water Sys Design,
GC010 Demin Water Sys Design, 280 06-Jan-10 A 27-Nov-10 Demin Water Sys Design,
GK010 Potable Water Sys Design, 270 14-Jul-10 24-May-11 Potable Water Sys Design,
RU010 Waste Water Sys Design, 320 06-Jan-10 A 13-Jan-11 Waste Water Sys Design,

Manufacture & Shipping


Manufactu 414 25-Mar-10 A 16-Aug-11 16-Aug-11, Manufacture & Shipping
GA020 Raw Water Sys Manufacture & Shipment 400 12-Apr-10 21-Jul-11 Raw Water Sys Manufacture & Shipment
WWTP100 Water Treatment and Waste Water Treatment Sys Deliv... 60 29-Apr-11 07-Jul-11 Water Treatment and Waste Water Treatment Sys Delivered to Site

Actual Work Milestone TASK filter: All Activities


© Primavera Systems, Inc.
Remaining Work Summary
Date: 10-Mar-10 Critical Remaining Work Vung Ang 1 Thermal Power Plant - Level II 5/12
Activity ID Activity Name Original Start Finish Note 2 2009 2010 2011 2012 2013 2014 015
Duration M M M O M O
MA J J A S O ND J FMA M J J A S O ND J FMA M J J A S O ND J F A J J A S N D J FMA J J A S N D J F M A M J J A S O N D JF
GC020 Demin Water Sys Manufacture & Shipment 360 25-Mar-10 A 18-May-11 Demin Water Sys Manufacture & Shipment
GK020 Potable Water Sys Manufacture & Shipment 295 04-Sep-10 13-Aug-11 Potable Water Sys Manufacture & Shipment
RU020 Waste Water Sys Manufacture & Shipment 415 20-Apr-10 16-Aug-11 Waste Water Sys Manufacture & Shipment

Construction
Construct 596 20-Feb-10 A 12-Jun-12 12-Jun-12, Construction

GA040 Raw Water Sys Erection & Pre-commissioning 248 20-Jul-11 03-May-12 Raw Water Sys Erection & Pre-commissioning
GC140 Demin Water Sys Erection & Pre-commissioning 166 18-May-11 26-Nov-11 Demin Water Sys Erection & Pre-commissioning
GK040 Potable Water Sys Erection & Pre-commissioning 260 15-Aug-11 12-Jun-12 Potable Water Sys Erection & Pre-commissioning
RU040 Waste Water Sys Erection & Pre-commissioning 260 15-Aug-11 12-Jun-12 Waste Water Sys Erection & Pre-commissioning
CIVC010 Water Treatment Plant - Civil Work - PVC 326 20-Feb-10 A 11-Jan-11 Water Treatment Plant - Civil Work - PVC
CIVC030 Waste Water Treatment Plant - Civil Work - PVC Scope 334 01-Mar-10 28-Jan-11 Waste Water Treatment Plant - Civil Work - PVC Scope
CIVC050 Tank Wall - Civil Work - PVC 263 01-Dec-10 20-Aug-11 Tank Wall - Civil Work - PVC

Precom & Commission 230 28-Oct-11 13-Sep-12 13-Sep-12, Precom & Commission
GA060 Raw Water Sys Testing and Commissioning 48 04-May-12 28-Jun-12 Raw Water Sys Testing and Commissioning
GC160 Demin Water Sys Testing and Commissioning 30 28-Oct-11 01-Dec-11 Demin Water Sys Testing and Commissioning
GK060 Potable Water Sys Testing and Commissioning 78 13-Jun-12 11-Sep-12 Potable Water Sys Testing and Commissioning
RU060 Waste Water Sys Testing and Commissioning 80 13-Jun-12 13-Sep-12 Waste Water Sys Testing and Commissioning

Balance Of Plant 54 11-Dec-09 A 27-Feb-10 27-Feb-10, Balance Of Plant

Procurement
Procurem 54 11-Dec-09 A 27-Feb-10 27-Feb-10, Procurement
BOP020 Tender Period 10 11-Dec-09 A 21-Dec-09 A Tender Period
BOP040 Evaluation Period 35 23-Dec-09 A 27-Feb-10 Evaluation Period
BOP010 REQUEST FOR BID REVISION 0 29-Jan-10 A REQUEST FOR BID REVISION
BOP060 Award of BOP Contract 0 27-Feb-10 Award of BOP Contract

Cooling Wa
Water System 515 15-Dec-09 A 14-Dec-11 14-Dec-11, Cooling Water System

Procurement
Procurem 0 15-Dec-09 A 15-Dec-09 A 15-Dec-09 A, Procurement

P010 Award Contract - Cooling Water Sys 0 15-Dec-09 A Award Contract - Cooling Water Sys

Detailed Engineering
E 239 15-Dec-09 A 20-Nov-10 20-Nov-10, Detailed Engineering
P020 Cooling Water Sys Design, 292 15-Dec-09 A 20-Nov-10 Cooling Water Sys Design,

Manufacture & Shipping


Manufactu 12 09-May-11 25-May-11 25-May-11, Manufacture & Shipping
P035 Cooling Water Sys Piping Delivery 0 09-May-11 Cooling Water Sys Piping Delivery
P030 Cooling Water Pumps Delivery 0 25-May-11 Cooling Water Pumps Delivery

Construction
Construct 390 15-Apr-10 20-Oct-11 20-Oct-11, Construction
CIVC020 Cooling Water System - Civil Work - PVC 329 15-Apr-10 09-Mar-11 Change Cooling Water System - Civil Work - PVC
P040 Cooling Water Sys Installation&Pre-commissioning 280 29-Nov-10* 20-Oct-11 Cooling Water Sys Installation&Pre-commissioning

Precom & Commission 40 20-Oct-11 14-Dec-11 14-Dec-11, Precom & Commission

P060 Cooling Water Sys Testing and Commissioning 48 20-Oct-11 14-Dec-11 Cooling Water Sys Testing and Commissioning

Heavy Fuel Oil Handling Plant 627 25-Feb-10 30-Jul-12 30-Jul-12, Heavy Fuel Oil Handling Plant

Detailed Engineering
E 197 19-Mar-10 28-Dec-10 28-Dec-10, Detailed Engineering
EN010 Heavy/Fuel Oil Sys Design, 244 19-Mar-10 28-Dec-10 Heavy/Fuel Oil Sys Design,

Manufacture & Shipping


Manufactu 127 20-Sep-10 18-Mar-11 18-Mar-11, Manufacture & Shipping

EN020 Heavy/Fuel Oil Sys Manufacture& Shipment 155 20-Sep-10 18-Mar-11 Heavy/Fuel Oil Sys Manufacture& Shipment

Construction
Construct 602 25-Feb-10 25-Jun-12 25-Jun-12, Construction
CIVB040 Havy Fuel Oil Storage Area (Bach Dang) 505 25-Feb-10 06-Oct-11 Havy Fuel Oil Storage Area (Bach Dang)
EN040 Unit 1 Heavy/Fuel Oil Sys Installation & Pre-comm 241 19-Mar-11 24-Dec-11 Unit 1 Heavy/Fuel Oil Sys Installation & Pre-comm
EN050 Unit 2 Heavy/Fuel Oil Sys Installation & Pre-comm 242 17-Sep-11 25-Jun-12 Unit 2 Heavy/Fuel Oil Sys Installation & Pre-comm

Precom & Commission 156 26-Dec-11 30-Jul-12 30-Jul-12, Precom & Commission
EN060 Unit 1 Heavy/Fuel Oil Sys Testing and Commissioning 30 26-Dec-11 28-Jan-12 Unit 1 Heavy/Fuel Oil Sys Testing and Commissioning
EN070 Unit 2 Heavy/Fuel Oil Sys Testing and Commissioning 30 26-Jun-12 30-Jul-12 Unit 2 Heavy/Fuel Oil Sys Testing and Commissioning

Inter-Plant Piping and Thermal Insulation 651 19-Mar-10 24-Sep-12 24-Sep-12, Inter-Plant Piping and Thermal Insulation

Actual Work Milestone TASK filter: All Activities


© Primavera Systems, Inc.
Remaining Work Summary
Date: 10-Mar-10 Critical Remaining Work Vung Ang 1 Thermal Power Plant - Level II 6/12
Activity ID Activity Name Original Start Finish Note 2 2009 2010 2011 2012 2013 2014 015
Duration M M M O M O
MA J J A S O ND J FMA M J J A S O ND J FMA M J J A S O ND J F A J J A S N D J FMA J J A S N D J F M A M J J A S O N D JF
Detailed Engineering
E 202 19-Mar-10 04-Jan-11 04-Jan-11, Detailed Engineering
PIP010 Inter-Plant Piping Design, 250 19-Mar-10 04-Jan-11 Inter-Plant Piping Design,

Manufacture & Shipping


Manufactu 122 01-Oct-10 24-Mar-11 24-Mar-11, Manufacture & Shipping

PIP020 Inter-Plant Piping Manufacture&Shipment 150 01-Oct-10 24-Mar-11 Inter-Plant Piping Manufacture&Shipment

Construction
Construct 304 25-Mar-11 23-May-12 23-May-12, Construction
PIP040 Inter-Plant Piping Installation & Pre-comm 365 25-Mar-11 23-May-12 Inter-Plant Piping Installation & Pre-comm

Precom & Commission 217 25-Nov-11 24-Sep-12 24-Sep-12, Precom & Commission
PIP060 Inter-Plant Piping Testing and Commissioning 261 25-Nov-11 24-Sep-12 Inter-Plant Piping Testing and Commissioning

Hydrogen S
System 710 19-Mar-10 15-Dec-12 15-Dec-12, Hydrogen System

Detailed Engineering
E 198 19-Mar-10 29-Dec-10 29-Dec-10, Detailed Engineering
R010 Gas Storage Sys Design, 245 19-Mar-10 29-Dec-10 Gas Storage Sys Design,
MKG010 Hydrogen Gen Plant Design, 235 19-Mar-10 17-Dec-10 Hydrogen Gen Plant Design,

Manufacture & Shipping


Manufactu 119 28-Sep-10 16-Mar-11 16-Mar-11, Manufacture & Shipping

R020 Gas Storage Sys Manufacture& Shipment 135 11-Oct-10 16-Mar-11 Gas Storage Sys Manufacture& Shipment
MKG020 Hydrogen Gen Plant Manufacture& Shipment 135 28-Sep-10 03-Mar-11 Hydrogen Gen Plant Manufacture& Shipment

Construction
Construct 313 04-Mar-11 15-May-12 15-May-12, Construction
R040 Gas Storage Sys Installation & Pre-comm 365 17-Mar-11 15-May-12 Gas Storage Sys Installation & Pre-comm
MKG040 Hydrogen Gen Plant Erection & Pre-comm 365 04-Mar-11 02-May-12 Hydrogen Gen Plant Erection & Pre-comm

Precom & Commission 162 03-May-12 15-Dec-12 15-Dec-12, Precom & Commission
R060 Gas Storage Sys Testing and Commissioning 184 16-May-12 15-Dec-12 Gas Storage Sys Testing and Commissioning
MKG060 Hydrogen Gen Plant Testing and Commissioning 184 03-May-12 03-Dec-12 Hydrogen Gen Plant Testing and Commissioning

Compressed Air System


Compresse 594 19-Mar-10 05-Jul-12 05-Jul-12, Compressed Air System

Detailed Engineering
E 202 19-Mar-10 04-Jan-11 04-Jan-11, Detailed Engineering

SCA010 Compressed Air Sys Design, 250 19-Mar-10 04-Jan-11 Compressed Air Sys Design,

Manufacture & Shipping


Manufactu 147 08-Oct-10 05-May-11 05-May-11, Manufacture & Shipping
SCA020 Compressed Air Sys Manufacture& Shipment 180 08-Oct-10 05-May-11 Compressed Air Sys Manufacture& Shipment
SCA030 Air Compressor Delivery 0 07-Feb-11 Air Compressor Delivery

Construction
Construct 300 13-May-11 05-Jul-12 05-Jul-12, Construction

SCA040 Compressed Air Sys Installation & Pre-comm 360 13-May-11 05-Jul-12 Compressed Air Sys Installation & Pre-comm

Precom & Commission 120 28-May-10 16-Nov-10 16-Nov-10, Precom & Commission
SCA060 Compressed Air Sys Testing and Commissioning 148 28-May-10 16-Nov-10 Compressed Air Sys Testing and Commissioning

Electrostatic Precipitator
Electrostat 642 26-Jan-10 A 19-Jul-12 19-Jul-12, Electrostatic Precipitator

Procurement
Procurem 0 26-Feb-10 26-Feb-10 26-Feb-10, Procurement

QHO010 Award Contract - Electrostatic Precipitator 0 26-Feb-10* Award Contract - Electrostatic Precipitator

Detailed Engineering
E 193 26-Jan-10 A 03-Jun-11 03-Jun-11, Detailed Engineering
BWE010 Electrostatic Prec Design 235 26-Jan-10 A 03-Jun-11 change Electrostatic Prec Design

Manufacture & Shipping


Manufactu 270 26-Jun-10 15-Jul-11 15-Jul-11, Manufacture & Shipping

BWE020 Electrostatic Prec Manufacture& Shipment 320 26-Jun-10 04-Jul-11 change Electrostatic Prec Manufacture& Shipment
BWE030 U1 Electrostatic Precipitator Delivery 0 15-Mar-11* U1 Electrostatic Precipitator Delivery
BWE050 U2 Electrostatic Precipitator Delivery 0 15-Jul-11* U2 Electrostatic Precipitator Delivery

Construction
Construct 487 24-Feb-10 14-Jan-12 14-Jan-12, Construction
QHO040 U1 Electrostatic Precipitat Installation & Pre-comm 157 04-Jun-11 03-Dec-11 U1 Electrostatic Precipitat Installation & Pre-comm
QHO065 U2 Electrostatic Precipitat Installation & Pre-comm 157 16-Jul-11* 14-Jan-12 U2 Electrostatic Precipitat Installation & Pre-comm
QHO050 ESP Control building 0 24-Feb-10 Change ESP Control building

Precom & Commission 139 07-Jan-12 19-Jul-12 19-Jul-12, Precom & Commission
QHO060 U1 Electrostatic Precipitator Testing and Comm 30 07-Jan-12 10-Feb-12 U1 Electrostatic Precipitator Testing and Comm
QHO075 U2 Electrostatic Precipitator Testing and Comm 30 15-Jun-12 19-Jul-12 U2 Electrostatic Precipitator Testing and Comm

Actual Work Milestone TASK filter: All Activities


© Primavera Systems, Inc.
Remaining Work Summary
Date: 10-Mar-10 Critical Remaining Work Vung Ang 1 Thermal Power Plant - Level II 7/12
Activity ID Activity Name Original Start Finish Note 2 2009 2010 2011 2012 2013 2014 015
Duration M M M O M O
MA J J A S O ND J FMA M J J A S O ND J FMA M J J A S O ND J F A J J A S N D J FMA J J A S N D J F M A M J J A S O N D JF
Sea Watter Flue Gas Desulphurization Plant (SW... 860 02-Dec-09 A 29-Mar-13 29-Mar-13, Sea Watter Flue Gas Desulphurization Plan

Procurement
Procurem 76 02-Dec-09 A 20-Mar-10 20-Mar-10, Procurement
HT010 REQUEST BID REVISION 1 02-Dec-09 A 29-Jan-10 A REQUEST BID REVISION
HT020 Tender Period 9 03-Dec-09 A 12-Dec-09 A Tender Period
HT040 Evaluation Period 39 12-Dec-09 A 19-Mar-10 Evaluation Period
HT060 Award of SWFGD Contract 0 20-Mar-10 Award of SWFGD Contract

Detailed Engineering
E 186 20-Mar-10 13-Dec-10 13-Dec-10, Detailed Engineering
HT070 SWFGD Design, 230 20-Mar-10 13-Dec-10 change SWFGD Design,

Manufacture & Shipping


Manufactu 295 24-Jun-10 17-Aug-11 17-Aug-11, Manufacture & Shipping
HT080 SWFGD Manufacture & Shipment 240 11-Nov-10 17-Aug-11 change SWFGD Manufacture & Shipment
HT090 1st Delivery - Absorber System 0 24-Jun-10 1st Delivery - Absorber System
HT095 Final Deliver - SWFGD System 0 17-Aug-11 Final Deliver - SWFGD System

Construction
Construct 569 20-Mar-10 01-Jun-12 01-Jun-12, Construction

HT100 Unit 1 - SWFGD Erection & Pre-comm 330 25-Sep-10 14-Oct-11 Unit 1 - SWFGD Erection & Pre-comm
HT200 Unit 2 - SWFGD Erection & Pre-comm 330 14-May-11 01-Jun-12 Unit 2 - SWFGD Erection & Pre-comm
CIVC60 SWFDG civil work 251 20-Mar-10 25-Nov-10 SWFDG civil work
HT300 SWFGD Control Building 0 09-Sep-11 SWFGD Control Building

Precom & Commission 362 10-Nov-11 29-Mar-13 29-Mar-13, Precom & Commission
HT120 Unit 1 - SWFGD Testing and Commissioning 236 10-Nov-11 10-Aug-12 Unit 1 - SWFGD Testing and Commissioning
HT220 Unit 2 - SWFGD Testing and Commissioning 236 28-Jun-12 29-Mar-13 Unit 2 - SWFGD Testing and Commissioning

Fire Protec
Protection System 333 01-Mar-10 16-Jun-11 16-Jun-11, Fire Protection System

Procurement
Procurem 43 01-Mar-10 29-Apr-10 29-Apr-10, Procurement
SGA030 REQUEST BID REVISION 0 01-Mar-10 REQUEST BID REVISION
SGA040 RECEIVE NEW BIDS 0 31-Mar-10 RECEIVE NEW BIDS
SGA060 Evaluation Period 10 15-Apr-10 26-Apr-10 Evaluation Period
SGA080 Award of Fire Detection & Prot Contract 0 29-Apr-10 Award of Fire Detection & Prot Contract

Detailed Engineering
E 97 29-Apr-10 15-Sep-10 15-Sep-10, Detailed Engineering
SGA090 Fire Detection & Prot Design 120 29-Apr-10 15-Sep-10 change Fire Detection & Prot Design

Manufacture & Shipping


Manufactu 123 08-Jun-10 01-Dec-10 01-Dec-10, Manufacture & Shipping

SGA100 Fire Detection & Prot Manuf & Shipment 125 08-Jun-10 30-Oct-10 change Fire Detection & Prot Manuf & Shipment
SGA110 Delivery of Fire Protection System 0 01-Dec-10 Delivery of Fire Protection System

Construction
Construct 131 01-Nov-10 05-May-11 05-May-11, Construction
SGA120 Fire Detection & Prot Erection & Pre-comm 160 01-Nov-10 05-May-11 Fire Detection & Prot Erection & Pre-comm

Precom & Commission 30 06-May-11 16-Jun-11 16-Jun-11, Precom & Commission

SGA140 Fire Detection & Prot Testing and Commissioning 36 06-May-11 16-Jun-11 Fire Detection & Prot Testing and Commissioning

Ash Handling
Handli Plant 667 02-Dec-09 A 03-Jul-12 03-Jul-12, Ash Handling Plant

Procurement
Procurem 48 02-Dec-09 A 10-Feb-10 A 10-Feb-10 A, Procurement
HDA010 REQUEST BID REVISION - ASH HANDLING 0 02-Dec-09 A REQUEST BID REVISION - ASH HANDLING
HDA020 RECEIVE NEW BIDS - ASH HANDLING 0 12-Jan-10 A RECEIVE NEW BIDS - ASH HANDLING
HDA060 Evaluation Period 15 12-Jan-10 A 10-Feb-10 A Evaluation Period
HDA080 Award of Ash Handling & Disposal Sys Contract 0 10-Feb-10 A Award of Ash Handling & Disposal Sys Contract

Detailed Engineering
E 220 10-Feb-10 21-Dec-10 21-Dec-10, Detailed Engineering
HDA090 Ash Handling & Disposal Design, 270 10-Feb-10 21-Dec-10 change Ash Handling & Disposal Design,

Manufacture & Shipping


Manufactu 362 28-Jun-10 22-Nov-11 22-Nov-11, Manufacture & Shipping
HDA100 Ash Handling & Disposal Manuf & Shipment 440 28-Jun-10 22-Nov-11 change Ash Handling & Disposal Manuf & Shipment
HDA110 Mechanical Delivery - Ash Handling 0 29-Aug-11 Mechanical Delivery - Ash Handling
HDA130 Electrical and Control Delivery - Ash Handling 0 10-Oct-11 Electrical and Control Delivery - Ash Handling

Construction
Construct 220 02-May-11 02-Mar-12 02-Mar-12, Construction

Actual Work Milestone TASK filter: All Activities


© Primavera Systems, Inc.
Remaining Work Summary
Date: 10-Mar-10 Critical Remaining Work Vung Ang 1 Thermal Power Plant - Level II 8/12
Activity ID Activity Name Original Start Finish Note 2 2009 2010 2011 2012 2013 2014 015
Duration M M M O M O
MA J J A S O ND J FMA M J J A S O ND J FMA M J J A S O ND J F A J J A S N D J FMA J J A S N D J F M A M J J A S O N D JF
HDA120 Ash Handling & Disposal Sys Erection & Pre-comm 181 05-Aug-11 02-Mar-12 Ash Handling & Disposal Sys Erection & Pre-comm
CIV140 Slag discharge Pump Station 38 02-May-11 14-Jun-11 Slag discharge Pump Station
CIV150 Slag discharge system 64 02-May-11 14-Jul-11 Slag discharge system
CIV160 Fly ash silo foundation 64 02-May-11 14-Jul-11 Fly ash silo foundation

Precom & Commission 87 03-Mar-12 03-Jul-12 03-Jul-12, Precom & Commission


HDA140 Ash Handling & Disposal Sys Testing and Comm 105 03-Mar-12 03-Jul-12 Ash Handling & Disposal Sys Testing and Comm

Miscellaneous Works
Miscellaneo 59 29-Jan-10 A 30-Apr-10 30-Apr-10, Miscellaneous Works

Procurement
Procurem 59 29-Jan-10 A 30-Apr-10 30-Apr-10, Procurement

OTH010 REQUEST BID REVISION - MISC WORKS 6 29-Jan-10 A 05-Feb-10 A REQUEST BID REVISION - MISC WORKS
OTH020 RECEIVE NEW BIDS - MISC. WORKS 14 08-Feb-10 A 25-Feb-10 RECEIVE NEW BIDS - MISC. WORKS
OTH030 EVALUATION - MISC WORKS 21 26-Feb-10 26-Mar-10 EVALUATION - MISC WORKS
OTH040 CONTRACT NEGOTIATION - MISC WORKS 16 27-Mar-10 14-Apr-10 CONTRACT NEGOTIATION - MISC WORKS
OTH050 Award of MISC WORKS Contract 0 30-Apr-10* Award of MISC WORKS Contract

Vehicle and Mobile Equipment 130 30-Apr-10 03-Nov-10 03-Nov-10, Vehicle and Mobile Equipment

Manufacture & Shipping


Manufactu 130 30-Apr-10 03-Nov-10 03-Nov-10, Manufacture & Shipping
VEH020 Vehicles - Procurement & Shipment 160 30-Apr-10 02-Nov-10 Vehicles - Procurement & Shipment
VEH040 Delivery 0 03-Nov-10 Delivery

Fire Engine and Accessories 453 30-Apr-10 01-Feb-12 01-Feb-12, Fire Engine and Accessories

Manufacture & Shipping


Manufactu 130 30-Apr-10 02-Nov-10 02-Nov-10, Manufacture & Shipping
SG020 Fire Fighting Equipment - Procurement & Shipment 160 30-Apr-10 02-Nov-10 Fire Fighting Equipment - Procurement & Shipment

Construction
Construct 323 03-Nov-10 01-Feb-12 01-Feb-12, Construction
SG040 Fire Fighting Equipment - Installation 391 03-Nov-10 01-Feb-12 Fire Fighting Equipment - Installation

Worshop and
a Laboratory Equipment 453 30-Apr-10 01-Feb-12 01-Feb-12, Worshop and Laboratory Equipment

Manufacture & Shipping


Manufactu 130 30-Apr-10 02-Nov-10 02-Nov-10, Manufacture & Shipping
STA020 Workshop Equipment - Procurement & Shipment 160 30-Apr-10 02-Nov-10 Workshop Equipment - Procurement & Shipment
STG020 Laboratory Equipment - Procurement & Shipment 160 30-Apr-10 02-Nov-10 Laboratory Equipment - Procurement & Shipment

Construction
Construct 323 03-Nov-10 01-Feb-12 01-Feb-12, Construction
STA040 Workshop Equipment - Installation 391 03-Nov-10 01-Feb-12 Workshop Equipment - Installation
STG040 Laboratory Equipment - Installation 391 03-Nov-10 01-Feb-12 Laboratory Equipment - Installation

Switchyard and Transformers 18 07-Oct-09 A 25-Dec-09 A 25-Dec-09 A, Switchyard and Transformers

Procurement
Procurem 18 07-Oct-09 A 25-Dec-09 A 25-Dec-09 A, Procurement
SW020 RECEIVE NEW BID - SWYD AND TRANSFORMERS 0 07-Oct-09 A RECEIVE NEW BID - SWYD AND TRANSFORMERS
SW040 Evaluation Period 10 08-Oct-09 A 29-Oct-09 A Evaluation Period
SW060 Award of Switchyard & Transformers Contract 0 25-Dec-09 A Award of Switchyard & Transformers Contract

Switchyard 615 25-Dec-09 A 23-Mar-12 23-Mar-12, Switchyard

Milestones 0 23-Mar-12 23-Mar-12 23-Mar-12, Milestones


BAT980 Switchyard Complete and Hand-over 0 23-Mar-12 Switchyard Complete and Hand-over

Detailed Engineering
E 115 25-Dec-09 A 31-May-10 31-May-10, Detailed Engineering

UAA020 SWYD Design - Fdn 44 09-Feb-10 A 16-Apr-10 SWYD Design - Fdn


BAT005 SWYD Design (Electrical), 135 25-Dec-09 A 31-May-10 change SWYD Design (Electrical),

Manufacture & Shipping


Manufactu 295 06-Feb-10 A 03-Mar-11 03-Mar-11, Manufacture & Shipping
BAT015 SWYD Manuf & Shipment 340 06-Feb-10 A 03-Mar-11 SWYD Manuf & Shipment
BAT900 220 kV Switchyard Delivery 0 10-Nov-10 220 kV Switchyard Delivery
BAT910 CABLING Delivery 0 01-Jan-11 CABLING Delivery

Construction
Construct 272 15-Apr-10 09-May-11 09-May-11, Construction
UAA040 SWYD Foundation and Concreting works 390 15-Apr-10* 09-May-11 Change SWYD Foundation and Concreting works
BAT920 Switchyard Erection & Pre-comm 104 10-Dec-10 23-Mar-11 Switchyard Erection & Pre-comm

Actual Work Milestone TASK filter: All Activities


© Primavera Systems, Inc.
Remaining Work Summary
Date: 10-Mar-10 Critical Remaining Work Vung Ang 1 Thermal Power Plant - Level II 9/12
Activity ID Activity Name Original Start Finish Note 2 2009 2010 2011 2012 2013 2014 015
Duration M M M O M O
MA J J A S O ND J FMA M J J A S O ND J FMA M J J A S O ND J F A J J A S N D J FMA J J A S N D J F M A M J J A S O N D JF
UAA050 Switchyard Control building 198 15-Oct-10 30-Apr-11 Change Switchyard Control building

Precom & Commission 130 23-Mar-11 20-Sep-11 20-Sep-11, Precom & Commission
BAT960 Switchyard Testing and Comm 156 23-Mar-11 20-Sep-11 Switchyard Testing and Comm

Main Transformers
Trans 696 25-Dec-09 A 16-Jul-12 16-Jul-12, Main Transformers

Milestones 211 24-Sep-11 16-Jul-12 16-Jul-12, Milestones


BAT040 U1 Main Common Power Ready 0 24-Sep-11* U1 Main Common Power Ready
BAT180 Unit 1 Main XFMRs Complete 0 04-Feb-12 Unit 1 Main XFMRs Complete
BAT240 Unit 2 Common Power Ready 0 17-Jan-12 Unit 2 Common Power Ready
BAT280 Unit 2 Unit & Main T/Fs Complete 0 16-Jul-12 Unit 2 Unit & Main T/Fs Complete

Detailed Engineering
E 275 25-Dec-09 A 15-Mar-11 15-Mar-11, Detailed Engineering
BAT000 Main XFMRs Design, 135 25-Dec-09 A 31-May-10 Main XFMRs Design,
BAT020 Main XFMRs Manuf & Shipment 340 06-Feb-10 A 15-Mar-11 Main XFMRs Manuf & Shipment

Manufacture & Shipping


Manufactu 0 28-Apr-11 28-Apr-11 28-Apr-11, Manufacture & Shipping

BAT010 Main XFMRs Delivery 0 28-Apr-11 Main XFMRs Delivery

Construction
Construct 497 11-Feb-10 A 16-Jan-12 16-Jan-12, Construction
BAT120 Unit 1 Main XFMRs Erection & Pre-comm 124 15-Mar-11 05-Aug-11 Unit 1 Main XFMRs Erection & Pre-comm
BAT220 Unit 2 Unit and Main T/Fs Erection & Pre-comm 136 11-Aug-11 16-Jan-12 Unit 2 Unit and Main T/Fs Erection & Pre-comm
CIVB060 Main transformer, aux. transformer foundations 455 11-Feb-10 A 16-May-11 Main transformer, aux. transformer foundations

Precom & Commission 246 06-Aug-11 16-Jul-12 16-Jul-12, Precom & Commission

BAT160 Unit 1 Main XFMRs Testing and Comm 156 06-Aug-11 03-Feb-12 Unit 1 Main XFMRs Testing and Comm
BAT260 Unit 2 Unit and Main T/Fs Testing and Comm 156 17-Jan-12 16-Jul-12 Unit 2 Unit and Main T/Fs Testing and Comm

Electrical B
BOP & Communication & Security Syst... 78 25-Jan-10 A 16-Apr-10 16-Apr-10, Electrical BOP & Communication & Security System

Procurement
Procurem 78 25-Jan-10 A 16-Apr-10 16-Apr-10, Procurement

ELE010 REQUEST BID REVISION - eBOP 0 25-Jan-10 A REQUEST BID REVISION - eBOP
ELE020 RECEIVE NEW BIDS - eBOP 0 02-Feb-10 A RECEIVE NEW BIDS - eBOP
ELE030 Evaluation Period 24 02-Mar-10* 29-Mar-10 Evaluation Period
ELE050 Award of Electrical Balance of Plant 0 16-Apr-10* Award of Electrical Balance of Plant

Electrical B
Balance of Plant 693 16-Apr-10 19-Dec-12 19-Dec-12, Electrical Balance of Plant

Detailed Engineering
E 235 16-Apr-10 18-Mar-11 18-Mar-11, Detailed Engineering
AT010 T/F Aux Design, 230 16-Apr-10 08-Jan-11 T/F Aux Design,
MJ010 Diesel Generator Design, 250 16-Apr-10 01-Feb-11 Diesel Generator Design,
CAB015 Cabling Design, 230 16-Apr-10 08-Jan-11 Cabling Design,
BB015 MV Switchgears Design, 150 25-Sep-10 18-Mar-11 MV Switchgears Design,
BF015 LV Switchgears Design, 270 16-Apr-10 24-Feb-11 LV Switchgears Design,
BT-BR010 DC & UPS Equipment Design 250 16-Apr-10 01-Feb-11 DC & UPS Equipment Design

Manufacture & Shipping


Manufactu 280 16-Apr-10 20-May-11 20-May-11, Manufacture & Shipping
AT020 T/F Aux Manuf & Shipment 130 07-Sep-10 14-Jan-11 T/F Aux Manuf & Shipment
AT030 DELIVERY - Unit 1 Aux XFMR 0 25-Dec-10 DELIVERY - Unit 1 Aux XFMR
AT110 DELIVERY - Unit 2 AUX XFMR 0 25-Dec-10 DELIVERY - Unit 2 AUX XFMR
MJ020 Diesel Generator Manuf & Shipment 170 22-Sep-10 07-Apr-11 Diesel Generator Manuf & Shipment
MJ030 DELIVERY - Diesel Generator 0 25-Feb-11 DELIVERY - Diesel Generator
CAB020 Cabling Manuf & Shipment 150 05-Oct-10 28-Mar-11 Cabling Manuf & Shipment
CAB010 DELIVERY - MV CABLE 0 22-Jan-11 DELIVERY - MV CABLE
CAB030 DELIVERY - LV CABLE 0 05-Feb-11 DELIVERY - LV CABLE
CAB035 DELIVERY - CONTROL CABLE 0 26-Mar-11 DELIVERY - CONTROL CABLE
BB020 MV Switchgears Manuf & Shipment 220 16-Apr-10 28-Dec-10 MV Switchgears Manuf & Shipment
BB030 DELIVERY - MV Switchgears 0 05-Feb-11 DELIVERY - MV Switchgears
BF020 LV Switchgears Manuf & Shipment 190 12-Oct-10 20-May-11 LV Switchgears Manuf & Shipment
BT-BR020 DC & UPS Equipment Manuf & Shipment 165 06-Nov-10 17-May-11 DC & UPS Equipment Manuf & Shipment

Actual Work Milestone TASK filter: All Activities


© Primavera Systems, Inc.
Remaining Work Summary
Date: 10-Mar-10 Critical Remaining Work Vung Ang 1 Thermal Power Plant - Level II 10/12
Activity ID Activity Name Original Start Finish Note 2 2009 2010 2011 2012 2013 2014 015
Duration M M M O M O
MA J J A S O ND J FMA M J J A S O ND J FMA M J J A S O ND J F A J J A S N D J FMA J J A S N D J F M A M J J A S O N D JF
BT-BR025 DELIVERY - DC SYSTEM 0 04-Feb-11 DELIVERY - DC SYSTEM
BT-BR035 DELIVERY - UPS 0 08-Feb-11 DELIVERY - UPS

Construction
Construct 351 14-Jan-11 19-May-12 19-May-12, Construction
AT040 Unit 1 T/F Aux Erection & Pre-comm 313 14-Jan-11 22-Nov-11 Unit 1 T/F Aux Erection & Pre-comm
AT120 Unit 2 T/F Aux Erection & Pre-comm 313 05-Feb-11 04-Feb-12 Unit 2 T/F Aux Erection & Pre-comm
MJ040 Diesel Generator Erection & Pre-comm 234 08-Apr-11 05-Jan-12 Diesel Generator Erection & Pre-comm
CAB040 Cabling Installation & Testing 364 05-Feb-11 04-Apr-12 Cabling Installation & Testing
BB040 MV Switchgears Erection & Pre-comm 130 19-Mar-11 17-Aug-11 MV Switchgears Erection & Pre-comm
BF040 LV Switchgears Erection & Pre-comm 313 21-May-11 19-May-12 LV Switchgears Erection & Pre-comm
BT-BR040 DC & UPS Eqpt Installation & Pre-comm 234 18-Mar-11 15-Dec-11 DC & UPS Eqpt Installation & Pre-comm

Precom & Commission 350 18-Aug-11 19-Dec-12 19-Dec-12, Precom & Commission
AT080 Unit 1 T/F Aux Testing and Comm 156 22-Nov-11 25-Apr-12 Unit 1 T/F Aux Testing and Comm
AT160 Unit 2 T/F Aux Testing and Comm 156 06-Feb-12 04-Aug-12 Unit 2 T/F Aux Testing and Comm
MJ060 Diesel Generator Testing and Comm 77 06-Jan-12 04-Apr-12 Diesel Generator Testing and Comm
BB060 MV Switchgears Testing and Comm 183 18-Aug-11 17-Mar-12 MV Switchgears Testing and Comm
BF060 LV Switchgears Testing and Comm 183 21-May-12 19-Dec-12 LV Switchgears Testing and Comm
BT-BR060 DC & UPS Eqpt Testing and Comm 79 16-Dec-11 16-Mar-12 DC & UPS Eqpt Testing and Comm

Communication and Security System


Communica 193 16-Apr-10 19-Jan-11 19-Jan-11, Communication and Security System

Detailed Engineering
E 86 16-Apr-10 17-Aug-10 17-Aug-10, Detailed Engineering

CX010 SCADA Design, 50 16-Apr-10 12-Jun-10 SCADA Design,


CY010 Telecom Design, 50 16-Apr-10 12-Jun-10 Telecom Design,
CY020 Telecom Manuf & Shipment 86 10-May-10 17-Aug-10 Telecom Manuf & Shipment
CYA010 Tel, Internet & PABX Design, 86 10-May-10 17-Aug-10 Tel, Internet & PABX Design,

Manufacture & Shipping


Manufactu 86 16-Apr-10 17-Aug-10 17-Aug-10, Manufacture & Shipping

CX020 SCADA Design, Manuf & Shipment 86 10-May-10 17-Aug-10 SCADA Design, Manuf & Shipment
CYA020 Tel, Internet & PABX Manuf & Shipment 50 16-Apr-10 12-Jun-10 Tel, Internet & PABX Manuf & Shipment

Construction
Construct 85 18-Aug-10 18-Dec-10 18-Dec-10, Construction
CX040 SCADA Installation & Pre-comm 106 18-Aug-10 18-Dec-10 SCADA Installation & Pre-comm
CY040 Telecom Installation & Pre-comm 106 18-Aug-10 18-Dec-10 Telecom Installation & Pre-comm
CYA040 Tel, Internet & PABX Installation & Pre-comm 106 18-Aug-10 18-Dec-10 Tel, Internet & PABX Installation & Pre-comm

Precom & Commission 22 20-Dec-10 19-Jan-11 19-Jan-11, Precom & Commission


CX060 SCADA Testing and Comm 27 20-Dec-10 19-Jan-11 SCADA Testing and Comm
CY060 Telecom Testing and Comm 27 20-Dec-10 19-Jan-11 Telecom Testing and Comm
CYA060 Tel, Internet & PABX Testing and Comm 27 20-Dec-10 19-Jan-11 Tel, Internet & PABX Testing and Comm

Integrated C
Control and Monitoring System 850 30-Jul-09 A 15-Nov-12 15-Nov-12, Integrated Control and Monitoring System

Procurement
Procurem 0 30-Jul-09 A 30-Jul-09 A 30-Jul-09 A, Procurement
CJ020 Award of ICMS Contract 0 30-Jul-09 A Award of ICMS Contract

Detailed Engineering
E 393 20-Aug-09 A 05-Mar-11 05-Mar-11, Detailed Engineering
CJ030 DCS Design, 485 20-Aug-09 A 05-Mar-11 DCS Design,

Manufacture & Shipping


Manufactu 278 11-Dec-10 05-Jan-12 05-Jan-12, Manufacture & Shipping
CJ040 DCS Manufacture & Shipping 335 11-Dec-10 05-Jan-12 DCS Manufacture & Shipping
CJ045 Delivery on Site - I & C 0 10-Aug-11 Delivery on Site - I & C
CJ065 Delivery on Site - CEMS 0 29-Aug-11 Delivery on Site - CEMS
CJ070 Delivery on Site - MMS 0 20-Sep-11 Delivery on Site - MMS
CJ075 Delivery on Site - CCTV System 0 31-Oct-11 Delivery on Site - CCTV System
CJ120 Delivery on Site - Unit 1 Termination Cabinets 0 15-Jul-11 Delivery on Site - Unit 1 Termination Cabinets
CJ130 Delivery on Site - Unit 1 System & Network Cabinets 0 07-Sep-11 Delivery on Site - Unit 1 System & Network Cabinets
CJ220 Delivery on Site - Unit 2 Termination Cabinets 0 15-Nov-11 Delivery on Site - Unit 2 Termination Cabinets
CJ230 Delivery on Site - Unit 2 System & Network Cabinets 0 05-Jan-12 Delivery on Site - Unit 2 System & Network Cabinets

Actual Work Milestone TASK filter: All Activities


© Primavera Systems, Inc.
Remaining Work Summary
Date: 10-Mar-10 Critical Remaining Work Vung Ang 1 Thermal Power Plant - Level II 11/12
Activity ID Activity Name Original Start Finish Note 2 2009 2010 2011 2012 2013 2014 015
Duration M M M O M O
MA J J A S O ND J FMA M J J A S O ND J FMA M J J A S O ND J F A J J A S N D J FMA J J A S N D J F M A M J J A S O N D JF
Construction
Construct 198 19-Jul-11 19-Apr-12 19-Apr-12, Construction
CJ100 Unit 1 ICMS Installation & Cold commissioning 90 19-Jul-11 31-Oct-11 Unit 1 ICMS Installation & Cold commissioning
CJ110 Unit 1 DCS Installation & Cold commissioning 60 28-Jul-11 05-Oct-11 Unit 1 DCS Installation & Cold commissioning
CJ210 Unit 2 DCS Installation & Cold commissioning 60 09-Dec-11 16-Feb-12 Unit 2 DCS Installation & Cold commissioning
CJ200 Unit 2 ICMS Installation & Cold commissioning 90 06-Jan-12 19-Apr-12 Unit 2 ICMS Installation & Cold commissioning

Precom & Commission 291 06-Oct-11 15-Nov-12 15-Nov-12, Precom & Commission
CJ180 Unit 1 DCS Testing and Comm 30 06-Oct-11 09-Nov-11 Unit 1 DCS Testing and Comm
CJ190 Unit 1 ICMS Testing and Comm 180 01-Nov-11 28-May-12 Unit 1 ICMS Testing and Comm
CJ280 Unit 2 DCS Testing and Comm 30 17-Feb-12 22-Mar-12 Unit 2 DCS Testing and Comm
CJ290 Unit 2 ICMS Testing and Comm 180 20-Apr-12 15-Nov-12 Unit 2 ICMS Testing and Comm

Stack 440 13-Nov-09 A 04-Aug-11 04-Aug-11, Stack

Milestones 14 22-Apr-11 12-May-11 12-May-11, Milestones


UHN090 Unit 1 Stack - Ready For Fire 0 22-Apr-11 Unit 1 Stack - Ready For Fire
UHN100 Unit 2 Stack - Ready For Fire 0 12-May-11 Unit 2 Stack - Ready For Fire

Procurement
Procurem 71 13-Nov-09 A 26-Feb-10 26-Feb-10, Procurement
UHN010 REQUEST BID REVISION - STACK 0 13-Nov-09 A REQUEST BID REVISION - STACK
UHN020 RECEIVE NEW BIDS - STACK 0 27-Nov-09 A RECEIVE NEW BIDS - STACK
UHN030 Evaluation Period 26 27-Nov-09 A 16-Feb-10 A Evaluation Period
UHN050 Award of Stack Contract 0 26-Feb-10* Award of Stack Contract

Detailed Engineering
E 369 26-Feb-10 04-Aug-11 04-Aug-11, Detailed Engineering
UHN080 Stack Design & Constuction 450 26-Feb-10 04-Aug-11 Stack Design & Constuction

Other Civil Works 921 30-Jul-09 A 26-Feb-13 26-Feb-13, Other Civil Works

Procurement
Procurem 0 30-Jul-09 A 30-Jul-09 A 30-Jul-09 A, Procurement

SITE020 Award of Civil Detail Design 0 30-Jul-09 A Award of Civil Detail Design

Detailed Engineering
E 454 03-Aug-09 A 14-May-11 14-May-11, Detailed Engineering
UZJ50 Fence and Gate 120 02-Oct-09 A 10-Feb-10 A Fence and Gate
UZJ70 Admin Building Design 0 30-Jun-10 Change Admin Building Design
UCA020 Main Control & Anc Buildings Design 234 03-Aug-09 A 03-Jul-10 Main Control & Anc Buildings Design
CIV050 Road & Drainage Dwgs IFC 0 12-Oct-10 Road & Drainage Dwgs IFC
UZA070 Permanent Road and Drainage 200 02-Nov-09 A 01-Apr-10 Change Permanent Road and Drainage
UZK070 Landscaping 225 02-Oct-10 14-May-11 Landscaping

Construction
Construct 921 03-Aug-09 A 26-Feb-13 26-Feb-13, Construction
SITE030 Clearance and Levelling 182 03-Aug-09 A 14-May-10 Clearance and Levelling
SITE050 Temporary Facilities 261 30-Nov-09 A 29-Oct-10 Temporary Facilities
UZJ060 Fence and Gate 236 26-Feb-10 A 26-Mar-11 Change Fence and Gate
UZA080 Permanent Road and Drainage 707 24-Nov-10 26-Feb-13 Permanent Road and Drainage
UCA040 Main Control & Anc Buildings Piling & Foundation 123 20-May-10 09-Oct-10 Main Control & Anc Buildings Piling & Foundation
UCA060 Main Control & Anc Buildings Construction 335 15-Sep-10 15-Aug-11 Main Control & Anc Buildings Construction
CIV170 Adminnistration & service area 579 01-Jun-10 31-Dec-11 Change Adminnistration & service area
CIV120 Infrastructure 782 12-Aug-10* 08-Feb-13 Infrastructure
CIV180 Landscaping 262 10-Apr-12 08-Feb-13 Change Landscaping

Actual Work Milestone TASK filter: All Activities


© Primavera Systems, Inc.
Remaining Work Summary
Date: 10-Mar-10 Critical Remaining Work Vung Ang 1 Thermal Power Plant - Level II 12/12