Quotation For Erection

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

PEMBANGUNAN FACTORY

PROJECT :
GEDUNG No. 38
LOCATION : BANJARAN, WEST JAVA
ITEM : FACTORY
QUOTE No : IDN 11.19 (Rev. 02) BILL OF QU
AREA : 1/1/2020
EAVE HEIGHT : 7,00 m & 15,50 m
SLOPE : 15%

DESCRIPTION UNIT VOLUME

Column,rafter, bracing… kg 227,475


Anchor bolt sets 356
Roof panel (Seam profile) m2 6,509
Wall panel m2 5,588
Skylight m2 827
Insulation Air Bubble m2 7,335
Trim/Flashing m length 4,144
Gutter m length 292
Downspout m length 376

Note :
1. Harga yang ditawarkan sudah termasuk Erection Work
2. Crane, Scaffolding, boomlift, small tools and man power
3. Preliminiers work
4. Touch up painting work (supply paint by BMB Steel)
BILL OF QUANTITY

UNIT PRICE WITH CRANE UNIT PRICE WITHOUT CRANE


Rp. Rp.
3,200 2,500
35,000 35,000
16,000 16,000
26,000 26,000
16,000 16,000
8,000 8,000
20,000 20,000
20,000 20,000
20,000 20,000
SUMMARY
B22-NV - Khu ĐTM Trung Hòa - Nhân Chính
Quận Thanh Xuân - Hà Nội
Tel: +84 4 39 412 177
www.bmbsteel.com.vn
BM
Best Metal Building System

TOTAL PRICE WITH CRANE TOTAL PRICE WITHOUT CRANE


Rp. Rp.
727,921,144 568,688,394
12,460,000 12,460,000
104,137,680 104,137,680
145,281,058 145,281,058
13,228,800 13,228,800
58,683,240 58,683,240
82,872,000 82,872,000
5,840,000 5,840,000
7,528,000 7,528,000
1,157,951,922 998,719,172

You might also like