AC-3001-Equipment Schedule
AC-3001-Equipment Schedule
AC-3001-Equipment Schedule
- EXTERNAL STATIC PRESSURE OF THE AHU'S IS TO BE VERIFIED BY CONTRACTOR UPON THE FINAL WORKSHOP DRAWING.
- MOTOR POWER CONSUMPTION TO BE VERIFIED BY CONTRACTOR UPON THE FINAL WORKSHOP DRAWING.
- MAX FACE VELOCITY ON THE COOLING COIL HAS TO BE 2.5 M/S .
- PROVIDE HIGH EFFICIENCY MOTORS .
- OVERALL PRESSURE DROP THROUGH UNIT SHALL BE BASED ON DIRTY FILTERS.
- FILTER EFFICIENCY BASED ON ASHRAE 52-2 TEST METHOD. NOTES
ROOF TOP AIR COOLED CONDENSING UNITS
KW VOLTS/PH/HZ. KW
NOTES:
- UNIT CAPACITIES ARE BASED ON OUTDOOR CONDITIONS OF (DB=46°C), HOWEVER ALL UNITS MUST CONTINUE TO OPERATE UP TO 52°C.
- THE CONTRACTOR SHALL ENSURE PROPER MATCHING OF OUTDOOR UNITS, INDOOR UNITS AND REFRIGERANT PIPING NETWORK.
- ELECTRIC POWER CONSUMPTION TO BE VERIFIED BY CONTRACTOR UPON THE FINAL SHOP DRAWING.
KW VOLTS/PH/HZ. KW
NOTES:
-UNIT CAPACITIES ARE BASED ON OUT DOOR CONDITIONS OF (DB=46°C )
-THE CONTRACTOR SHALL ENSURE PROPER MATCHING OF OUTDOOR UNITS, INDOOR UNITS AND REFRIGERANT PIPING NETWORK.
-ELECTRIC POWER CONSUMPTION TO BE VERIFIED BY CONTRACTOR AFTER FINAL SUBMITTAL APPROVAL.
NOTES:
-EXTERNAL STATIC PRESSURE OF ALL INDOOR UNITS TO BE VERIFIED BY CONTRACTOR ON THE APPROVED WORK SHOP DRAWING.
-THE CONTRACTOR SHALL ENSURE PROPER MATCHING OF OUTDOOR UNITS, INDOOR UNITS AND REFRIGERANT PIPING NETWORK.
-ELECTRIC POWER CONSUMPTION TO BE VERIFIED BY CONTRACTOR AFTER FINAL SUBMITTAL APPROVAL.
Enquiry No. : Application No :
-INDOOR UNITS SELECTION SHALL BE AT MEDIUM SPEED.
CONSULTANT REG. No : GRADE : CONSULTANT REG. No : GRADE :
-CONCEALED INDOOR UNITS SHALL BE DOUBLE SKIN TYPE.
CONSULTANT STAMP SUB CONSULTANT STAMP
-MAXIMUM NOISE LEVEL ALLOWABLE SHALL BE 35 db(A) & SIGNATURE & SIGNATURE
DX SPLIT UNITS
COOLING CAPACITY
EXTERNAL STATIC ELECTRIC POWER TOTAL
AIR FLOW PRESSURE REMARK
NO. UNIT NO. TYPE QTY. TOTAL SENSIBLE SUPPLY POWER
KW KW L/S Pa V/PH/HZ. KW
TECHNICAL MANAGER : TECHNICAL MANAGER
1 SPU-01 WALL MOUNTED 1 3.31 2.52 200 25 240/1/50 1.91 REGISTRATION No. : REGISTRATION No :
ISSUE STATUS
NOTES: For Revision For Approval For Construction For Tender For As Built For Info.
03 DEC.2019 ISSUED FOR APPROVAL W.H W.H
-EXTERNAL STATIC PRESSURE OF ALL INDOOR UNITS TO BE VERIFIED BY CONTRACTOR ON THE APPROVED WORK SHOP DRAWING.
02 OCT.2019 ISSUED FOR APPROVAL W.H W.H
-THE CONTRACTOR SHALL ENSURE PROPER MATCHING OF OUTDOOR UNITS, INDOOR UNITS AND REFRIGERANT PIPING NETWORK.
01 SEP.2019 ISSUED FOR APPROVAL W.H W.H
EXHAUST FANS 00 AUG.2019 ISSUED FOR APPROVAL W.H W.H
MRS.KHALID AL-RUMAIHI
2 EAF-02 1 WALL MOUNTED GROUND FLOOR B2-GR-02 50 200 240/1/50 0.18
B1-PH-08,B1-PH-07,B1-FF-09,
CONSULTANT
3 EAF-03 1 AXIAL INLINE UPPER ROOF B1-FF-06,B1-GR-10, 455 200 240/1/50 0.37
B1-GR-15,B1-GR-07,
4 EAF-04 1 AXIAL INLINE UPPER ROOF B1-BS-12 140 200 240/1/50 0.18
PROJECT
PRIVATE VILLA (B+G+1+PH)
5 EAF-05 1 AXIAL INLINE UPPER ROOF B1-BS-08 100 200 240/1/50 0.18
TITLE:
6 EAF-06 1 AXIAL INLINE UPPER ROOF B1-BS-04 85 50 240/1/50 0.18 EQUIPMENT SCHEDULES
HVAC SYSTEM
7 EAF-07 1 AXIAL INLINE UPPER ROOF B1-FF-16,B1-GR-04,B1-BS-11 250 50 240/1/50 0.18
LOCATION: PIN NO:
UMM AL ROUS / LEGTAIFIYA 66090115
8 EAF-08 1 AXIAL INLINE UPPER ROOF B1-BS-05 42 50 240/1/50 0.18
SCALE REF. DWG. NO. SIZE REV.
AC-3001
N.T.S A1 03
NOTE:
-EXTERNAL STATIC PRESSURE OF THE FAN'S TO BE VERIFIED BY CONTRACTOR ON THE FINAL WORK SHOP DRAWING. DRAWN PREPARED CHECKED APPROVED DATE
-MOTOR POWER CONSUMPTION TO BE VERIFIED BY CONTRACTOR AFTER FINAL SHOP DRAWING APPROVAL.
A.M A.N W.H W.H DEC.2019
-PROVIDE HIGH EFFICIENCY MOTORS .