Inspection & Test Plan For Drywall

This document is an inspection and test plan from Shanghai Construction Group to Wong & Ouyang for a drywall project at Galaxy Resort Casino Development in Cotai City, Macau. It outlines inspection stages, activities, and controlling documents required for the pre-construction and construction stages. Key aspects that will be inspected include material approval and delivery, setting out of frames, installation works, and completion checks prior to application of finishes. The purpose is to ensure quality of construction and compliance with approved documents.

Uploaded by

exia1992
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views2 pages

Inspection & Test Plan For Drywall

This document is an inspection and test plan from Shanghai Construction Group to Wong & Ouyang for a drywall project at Galaxy Resort Casino Development in Cotai City, Macau. It outlines inspection stages, activities, and controlling documents required for the pre-construction and construction stages. Key aspects that will be inspected include material approval and delivery, setting out of frames, installation works, and completion checks prior to application of finishes. The purpose is to ensure quality of construction and compliance with approved documents.

Uploaded by

exia1992
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

GALAXY ENTERTAINMENT GROUP

银河娱乐集团有限公司
To : WONG & OUYANG (HK) LTD From: 上海建工集团(澳门)有限公司 Shanghai Construction Group(Macau)Limited
Name: Zhou Yi Dong /Zhou Gong Jun
Attn.: Wayne So/ Winson Liem Signature:

 w/ encl.  w/o encl. Date: 3-Feb-20


CONTRACTOR SUBMISSION
Material Method Statement Others: Inspection & Test Plan
Contract No.: 3C005N077 Ref. No.: 3C005N077-HWT-ITP-00-0002 Revision: 01

Spec./ BQ/ Drawings Ref.: Attachment :  Yes, 1 page


pages  No
Contractor's alternative proposal:  Yes  No
Involve extra time/ cost under the contract  Yes  No

Subject : Inspection & Test Plan for Drywall


Description :
Inspection & Test Plan for Drywall

 WONG & OUYANG


Party expected to  RLB
reply:  ARUP (Struct)  Others, pls specify:-
 AURECON
Initial of : Expected approval date:_____________________
For Materials Submission Only:
 Brand/ Manufacturer:___________________________________________  Info. from Manufacturer

 Supplier:____________  Country of Origin:______________  Job Ref.

 Catalogue  Certificate  Sample to:  Site  Office:  Ref. Letter from Authorities

Purpose of Submission : Previous Ref.:

 For Review/ Approval  For Record  For Endorsement

COMMENT FROM THE CONSULTANT


Consultant: Ref. no.: Attachment:  Yes, ___ Pages  No
 WONG & OUYANG  ARUP(Struct)  AURECON  RLB  Other, pls specify:
 Approved Approved with Comment  Reject and Re-submit Consultant Name : WONG & OUYANG / ARUP / AURECON Date:
COMMENT: Signature :

WONG & OUYANG Galaxy - (Endorse if approved)


Name : Name:
Signature : Date: Signature : Date:

cc: External Internal


w/e w/o w/e w/o w/e w/o w/e w/o
  Galaxy   WONG & OUYANG (Site)    
  ARUP (Struct)   ARUP (Site)    
  AURECON   AURECON (Site)    
  RLB   RLB    
w/e - with enclosure w/o - without enclosure
Galaxy Resort Casino Development, Cotai City, Macau Phase 2
3C005N077 – Nominated Sub‐Contract for
Hotel Tower(West) Fit Out

Inspection Test Plan
Drywall Construction
Verifying Document Inspection Code
Item Particular / Activity Inspection Stage Inspection / Testing Activities Required Controlling Document Description NSC MC RSS M&E Remarks
Cont
A. Pre‐construction Stage
Method Statement ,Shop Drawing & Prior work commencement Approval by consultant  ‐Approved MethodStatement Approval by consultant
1 Calculation  ‐Approved Sh口p Drawing R HP HP N/A

Inspection & Test  Plan Prior work commencement Approval by consultant  ‐Approved Inspection & Test Plan Approval by consultant


2 R HP HP N/A

Material Approval Prior work commencement Approval by consultant  ‐Submission Form Approval by consultant


3 ‐ Product Data Sheet R HP HP N/A

B. Construction Stage
Receipt of material Material delivery Check material conforming to approval record Delivery note Check list
1 IV RI RI N/A

Setting out Prior installation of hanger and Ensure correct drywall alignment and demarcation Approved shop drawing Check list


2 frame IV CP RI RI

Installation of drywall frame (Before board Prior rockwool filling Check spacing and workmanship of stud frame Method statement Check list


3 installation) IV CP RI N/A

Get confirmation from Main Contractor for the Prior drywall closeup Check if clash with existing MEP services and rock wool Confirmation from Main RIN & Check list


4 completion of E&M services (conduit inside infill completed Contractor IV HP HP RI
drywall)
Wall boarding to both side of dry wall Prior finishes application Ensure smooth board surface Method statement Check list
5 IV RI RI N/A

Completion of drywall prior to finishes application After drywall close‐up Check quality of joint taping, applied sealant and Method statement RIN & Check list


6 surface condition of painting works IV HP HP N/A

Verification Code:
Legend:
IV: Inspection & Verification NSC: Nominated Sub-Contractor
RI: Random Inspection MC: Main Contractor
T: Test RSS: Resident Site Staff of the Supervision
RIN: Request for Inspection Form
CP: Control Point
HP: Hold Point