100% found this document useful (1 vote)
661 views10 pages

STP Calculation

This document provides calculations for sizing the septic tank and primary sedimentation tank for the Ngwe Moe Hospital project. It includes assumptions about the number of units, population, hydraulic and BOD loading, and influent BOD concentration. Dimensions are calculated for the primary sedimentation tank based on design flow rates and standards. The document also provides calculations for an activated sludge system, including sizing the aeration tank volume based on design flows, BOD loading and concentrations, and operational parameters. Daily sludge wasting flow rates are estimated.

Uploaded by

Ye Myat Thu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
661 views10 pages

STP Calculation

This document provides calculations for sizing the septic tank and primary sedimentation tank for the Ngwe Moe Hospital project. It includes assumptions about the number of units, population, hydraulic and BOD loading, and influent BOD concentration. Dimensions are calculated for the primary sedimentation tank based on design flow rates and standards. The document also provides calculations for an activated sludge system, including sizing the aeration tank volume based on design flows, BOD loading and concentrations, and operational parameters. Daily sludge wasting flow rates are estimated.

Uploaded by

Ye Myat Thu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

SEPTIC TANK SIZING

Project Name: Ngwe Moe Hospital


Calculated by: Myat Thurein Date: 03/09/2019
Assumptions:
No. of units 100.00 units
capita per unit 4.00 person
total capita 400.00

Hudraulic PE 150.00 l /cap/day 33.0 gal 65lcpcd is the least hydraulic PE


3
Hydraulic Loading 60.00 m

Cl 3.4.3.1 BOD PE 55.00 70 gpcpd Some guidelines suggest, 55~77 gpcpd


BOD loading 22000.00 g/day

Influent BOD 367 BOD load/Hydraulic Load If Influent BOD is too high, it is advisable to dilute before
treatment
Design of Septic Tank calculate as below or read from T 2,3,4
no. of WC 40.00
rate of discharge 9.00 l
Peak flow rate 252.00 l /min assume 70% of the fixtures discharge simutanously
Primary Sedimentation Tank Design
Rectangular Basin
Code Reference Ten States Standard
Step 1 List Ten State Standard
BOD removal % 33% 121 BOD
2
surface settling rate,v 700 gal/d.ft 600~1200
3 2
28.5 m /m d 24.5~49
depth 3 m >3
3
weir loading 250 m /d.m 250~373
10000 gal/d.ft 20000~30000
inlet velocity 0.3 m/s
free board 0.3 m

Step 2 Determin tank dimension


3
Average Desgn Flow 60.00 m /day
3
Peak=2.5 Average Flow 150 m /day
No. of Basin 1
2
Surface Area, A= Q/v 2.11 m
Aspect Ratio 4 >3
Width 0.73 m
Length 2.90 m

Select Width & Length


Width 1 m
Length 3 m
2
Actual Area 3 m
3
Actual Volume 9 m

Step 3 Check detetion time


t = V/Q
at average flow 3.60 h
at peak flow 1.44 h

Step 4 Check overflow rate @ peak flow


3 2
v x 2.5 71.25 m /m d

Step 5 Determine lengh of outlet weir


length = flow / weir loading rate 0.2 m
read from graph
Activated Sludge System
Prject data Q, S0, X0

Project Name Ngwe Moe Hospital


Calculated by Myat Thurein
Date 03-Sep-19
Input data
3
average design flow 60.00 m /day
3
peak design flow 28.00 m /day
Raw water BOD5 367 mg/l
Raw water TSS 367 mg/l
Effluent BOD5 20.00 mg/l
Efluent TSS 24.00 mg/l
Operational parameter and biological kinetic coefficients;
F/M 0.20
Y 0.50 mg VSS/mg BOD5
kd 0.06 /d
MLSS 3000.00 mg/l
MLVSS 2400.00 mg/l
VSS/TSS 0.80
qc 10.00 days
X 2400.00
TSS concentration in RAS , Xu 9300.00 mg/l
BOD5/BODU 0.67
Assumptions
1 BOD removal in primary clarifier 33%
2 TSS removal in primary clarifier 67%
3 Sg of primary sludge 1.05
4 solid content 4.4%
5 Oxygen consumption 1.42 mg/mg of cell oxidized
Calculations
Step 1 Calculation of BOD & TSS loading to the plant
Design Flow, Q 60 m3/d
BOD loading 22 kg/d
TSS loading 22 kg/d
Step 2 Calculate characteristics of primary sludge
BOD removed 7 kg/d
TSS removed 15 kg/d
Sg sludge 1.05
Solid concentration 0.044 kg/kg
sludge flow rate 0 m3/d
Step 3 Calculate flow, BOD and TSS in primary effluent (secondary influent)
flow, Q 60 m3/d
BOD 15 kg/d
S0 247 mg/l
TSS 7 kg/d
122 mg/l
Step 4 Soluble BOD5 escaping treatment, S
Effulent BOD = influent soluble BOD escaping treatment,S + BOD of effulent Suspended solid
Assume 63% biodegradable.
Biodegradable effulent solids 15.12 SS mg/l
21.47 O2 mg/l
BOD5 of effulent SS 14.39 mg/l
influent soluble BOD escaping treatment,
S 5.61 mg/l
Step 5 Calculate the treatement efficiency
biological treatment based on soluble BOD
E= (S0-S)S0 x 100% 98%
Overall plant efficiency including primary treatment
E= (BOD - 20)/BOD 95%
Step 6 Calculation of reactor volume
3
Q 59.68 m /d
S0 246.98 mg/l
S 5.61 mg/l
𝜃𝑐𝑄𝑌(𝑆0 − 𝑆) 18.76 m
3
𝑉=
𝑋 (1 + 𝑘𝑑 ∙ 𝜃𝑐 )

Step 7 Determine the dimension of Aeration tank


no. of areation tank 1.00
Aspect Ratio 2.00
Depth 2.00 m (3~9 m Ten States Standards)
free board 0.60 m
Width 2.17 m
Length 4.33 m
Depth 2.60 m
Qty 1 nos
Step 8 Calculating sludge wasting flow rate from aeration tank
qc 10.00 days
3
Qe 59.68 m /d
Xe = 0.8 SS 19.20
X= MLVSS 2400.00 mg/l
MLSS 3000.00 mg/l
𝑉𝑋
𝜃𝑐 =
𝑄𝑤𝑎 𝑋 + 𝑄𝑒𝑋𝑒 3
Qwa 1.1 m /d
Step 9 Estimate the quantity of sludge to be wasted daily
(a) observed yeild,
𝑌𝑜𝑏𝑠 = 𝑌/(1 + 𝑘𝑑 ∙ 𝜃𝑐 ) 0.31
(b) increase in the mass of MLVSS
𝑃𝑥 = 𝑌𝑜𝑏𝑠 𝑄𝑜(𝑆𝑜 − 𝑆) ∙10 -3 5 kg/d
( c) increase in the mass of MLSS
Pss= MLVSS/0.8 6 kg/d
(d) TSS lost in the effluent,Pe
Pe = (Q-Qwa) TSSe 1 kg/d
( e) amount of sludge that must be wasted
Pss - Pe 4 kg/d
Step 10 Estimate return of activated sludge
VSS in aerator 2400 mg/l
VSS in RAS= TSS x 0.8 7440 mg/l
VSSa(Q+Qr)=VSSrQr
3
Qr 28 m /d
Step 11 Checking Hydraulic Retention Time (HRT = q)
q = V/Q 0.314 day
7.54 h (5~15h)
Step 12 Check F/M ratio
𝑆0 − 𝑆
𝑈= 0.32
𝜃𝑋

Step 13 Check organic loading rate and mass of ultimate BODu utlized
𝑄 𝑆0 3
𝐿𝑜𝑎𝑑𝑖𝑛𝑔 = 0.79 kg BOD 5/m d
𝑉
BOD5 = 0.67 BODu , BOD5 = Q(S0-S)
𝐵𝑂𝐷𝑢 = 𝑄(𝑆0 − 𝑆)/0.67 21 kg/d

Step 14 Compute theoretical oxygen requirements


1.42 mg O2 per mg of cell oxidized
𝑄 (𝑆0−𝑆) 15.11 kg/d
𝑂2 = 𝑔 - 1.42 px
1000𝑘𝑔 𝑓

Step 15 Compute Air Volume required


rair 1.20 kg/m3
O2 content 23%
aeration efficiency 8%
safety factor 2
3
Air = O2 / (r air x O2 % x eff) 678.33 m /day
Air Flow Rate 28.26 CMH
Required Air Flow Rate 56.53 CMH

Step 16 Check the volume of air per BOD5 removed


3
(a) air supply per BOD5 removed 47.09 m of air/kg BOD5
(b) air supply per m3 of water treated 3 3
11.37 m of air/m of wastewater
( c) air supply per m3 of aeration tank 3 3
36.17 m /m d
Design of Secondary Clarifier
Project Name: Ngwe Moe Hospital
Calculated by: Myat Thurein Date: 03/09/2019

Step 4 Calculating design flow to secondary clarifier


3
Average Design flow 59.68 m /d from ASS Step 3
3
Return sludge flow 28 m /d
3
MLSS wasted 1.12 m /d
3
X, MLSS concentration 3.00 kg/m
Q = average design flow + return sludge flow - MLSS wasted
3
86.98 m /d

Step 5 Computing Area and Diameter of clarifier


No. of clarifier used 1
3
Q each 86.98 m /d
4 CMH
2
SF, limiting solid flux 1.3 kg/m h read from graph, tangent to desired underflow
2
A=QX/SF 8 m
diameter 2 m

Step 6 Checking Surface overflow rate


3 2
Overflow rate = Q/A 10.4 m /m d <15 m3/m2d

Step 7 Checking clarifier area for clarification requirement


Q/A 0.43 m/h ~4700 mg/l
read from graph
Step 8 Checking surface overflow rate at peak design flow
3
Peak flow 28.00 m /day
3
Return sludge flow 28 m /day

3 2
Overflow rate 3.37 m /m d

Step 9 Determine recycle ratio at assume MLSS concentration


MLSS 3000.00 mg/l
X 122 mg/l
Xu 9300.00 mg/l
(Q+Qr)MLSS=QX+QrXu
(Q+Qr)MLSS=Qr(Xu-MLSS)
a = Qr/Q = (MLSS-X)/(Xu-MLSS) 0.46

Step 10 Esitmating required depth for thickening zone


D req = Dunder
assume r + Dcondition,
normal
clear wate solid thickning + D sludge storage
2nd Clarifier retain 30% of mass of solid in aeration basin and
(a) Computing total mass of solids in each aeration basin
MLSS 3000.00 mg/l
solid in each aeration tank
Solid = MLSS/1000 x Vol of eash basin 56 kg
solid in 2nd clarifier 30% of solid in aeration basin
no. of days for sustain peak flow 2 days
(b) solid in each clarifier 34 kg
( c) depth of sludge zone
concentration in sludge zone 7000 mg/l
Area x Depth = mass/ concentration
Depth for solid thicking 0.58 m

Step 11 Estimating the depth of sludge storage zone


peak flow 2.5 average flow
7 days sustain peak BOD loading 1.5 of BOD average
(a) calculate the VS under sustain BOD loading
3
Q peak 28.00 m /day
S0 370 mg/l
S 8.42 mg/l
Yobs 0.3125
𝑃𝑥 = 𝑌𝑜𝑏𝑠 𝑄𝑜(𝑆𝑜 − 𝑆) ∙10 -3 3.17 kg/d
(b) mas of solid stored for sustain days
VSS/TSS 0.80
Px/0.8 x 2d 8 kg
(c ) calculate solid stored per clarifier 8 kg
(d) total solid stored in eash clarifier 42 kg
(e ) depth for sludge storage 0.71 m
Step 12 Calculating the required depth
assume, settling zone depth 1.5 m (1.5~2)
Required depth of clarifier 2.79 m
free board 0.65 m
Total depth of clarifier 3.44 m
11.3 ft
Step 13 Checking Hydraulic Detention Time
Clarifier Size
dia (m) 2
depth (m) 3 from Step 12
3
Volume of Clarifier 9.42 m
q = V/Q
q normal flow 2.60 hr
q peak flow 8.02 hr
Chart Title
4.5 6
4
5
3.5
3 4
from ASS Step 3 2.5
3
2
1.5 2
1
1
0.5
0 0
0 2000 4000 6000 8000 10000

Initial Settling Velocity m/h Solid Flux kg/m2 h

read from graph, tangent to desired underflow, 9300mg/l

Q, S0, X0 Aeration Tank Q e, S, Xe


Clarifier
X

Q r, S, Xr
Return Activated Q ea, Xr
< design 2400 mg/l
Slug (RAS) sludge wasting
form return slug
line
Clorination Tank Design
Detention time: 30 min
Volume Flowrate 60.00 m3/day
Clorination tank vol 1.25 m3
Length 1m
Depth 2m
Width 0.625 m