Beginner's Guide To Learn Maintenance Notification in SAP PM
Beginner's Guide To Learn Maintenance Notification in SAP PM
Beginner's Guide To Learn Maintenance Notification in SAP PM
nudge.ai OPEN
SAPLoud
SAP PM
4.8 (96.25%) 48
votes
Business process:
Step 1: In the plant area if a technical object is not performing well and showing some abnormality in
operation, then production in charge informs the maintenance department to take necessary action.
They will inform the maintenance department through SAP in a systematic manner.
It could be possible that a maintenance engineer observes an exception
situation with a technical object and wants to take some action to resolve
the issue. Then maintenance engineer can also create the notification in
SAP.
Step 3: Then maintenance department take necessary action to resolve the issue. They will take
action according to priority of maintenance job and criticality of technical object.
Step 5: Then production in charge will check the technical system and its performance. If production
in charge is satisfied with the maintenance job then he will accept the maintenance job.
Step 6: Afterwards the maintenance engineer will update the maintenance history of that technical
object and activities performed such as greasing done, welding done, flange tightening done,
electrical isolation done etc.
Step 7: Finally inform the operations department. Operation department accepts the job.
I hope that business process very simple to understand. Now we will learn how to map this process
in SAP.
Here is the Step by Step basic guide to learn maintenance notification processing in SAP PM.
Step 1: Enter t code IW21 or click on the node as shown in below screen shot.
Step 2: This will open the initial screen of maintenance notification, where you can select the
notification type.
M1 – Maintenance notification
M2 – Malfunction Report
M3 – Activity Report
You can choose any of the notification type as per the business process. In General we use M1 for
Corrective maintenance, M2 for breakdown maintenance and M3 for Predictive maintenance.
Once you have selected notification type press enter button or else click on the tick mark button at
the left hand side upper corner (as shown in the screen shot).
Step 3: Now you will get the main screen of maintenance notification. Here, you can enter description
of maintenance request. You can enter maximum 40 characters. If you want to enter more
information then you will have to click on the white sheet. This sheet will open a new MS word screen,
where you can enter long text of maintenance request. Please see the screen shot for more
information.
Step 4: On the notification main screen there are few tabs such as Notification, malfunction
breakdown, Location data, Scheduling overview, items, tasks and activity.
Step 5: First we will go to Notification Tab. Here we can enter the technical object id (equipment
and/or functional location) which requires maintenance to be performed. You can select the
technical object from the drop down facility (as shown in screen shot).
Once the technical object, say Equipment is entered in the notification. All the master data from
equipment master will be copied to the notification. This data includes the functional location, main
work center, cost center, maintenance plant, planner group, planning plant, ABC indicator, asset
number, business area etc. This is the benefit of maintaining master data. Now you are not required
to enter the equipment related data again in notification. All the data automatically copied from
master data. If you want to change the copied data in maintenance notification then you can do it.
Purpose of maintaining the equipment in notification is to declare that this specific equipment has
some abnormality in plant area and maintenance department will record the maintenance history
with respect to this technical object.
Step 6: Depending upon the configuration settings an object information box can pop-up after
entering technical object.
If this pop is disabled then also you can see the history window by clicking on the information button
near to the technical object (as shown in the below screen shot).
Step 7: Here is the long text of the notification description. Here you can see that there is a Log line
and you cannot change the text once entered and saved.
This log line can be removed by configuration settings and the text can be made editable. This kind of
flexibility is necessary because when technicians work in night shift and a notification falls into their
bucket then it could be possible that they enter some wrong (spelling mistakes) or incomplete
information. If we make text editable, then we can make corrections.
Sometimes Log line can be avoided because many times production in charge can say that I have
raised the notification on time but maintenance department responded too late…..Please refer the log
line in notification long text. However in reality the maintenance department has responded on time
and took action on time in the field, only thing is that they updated the log later on. To avoid such kind
of arguments many companies do not want the log line.
But if operations in charge put a wrong information in the notification and change itlater on then log
line is essential. Every settings has its merits and demerits.
Step 8: The next sub-screen contains the catalog codes such as Damage, Cause, object parts. I have
written two articles on Catalog code and catalog profile. I request you to refer those articles. While
creating the notification the operation in charge can enter the catalog codes according to the
observations in the field. Later on these codes can be changes by the maintenance engineer.
Maintenance history is recorded by using these codes before closing the notification. These codes
are very important because we have standard SAP report such as IW65/ IW68/IW69.
Here you must note that if there is no code available for a certain catalog then you can enter simple
text also (as shown in screen shot).
Let us move to next Tab that is Reference tab.
Step 9: Reference tab contains the information about priority of maintenance job. Priority can be Very
High, High, Medium, Low. This priority can be configured in SPRO. Priority can be configured in such a
way that it decides the required start date and end required end date of notification.For ex: If Priority
is “Very High” then required start date can be the notification creation date and required end date can
be next day.
Next tab is “Malfunction, breakdown” tab.
Step 10: In the malfunction tab we can enter the malfunction start date/time and malfunction end
date/time. Also we have a breakdown check-box. If there is a breakdown in function of machine then
we can set this check box. There is a field to calculate the breakdown duration by subtracting the
malfunction start date/time and end date/time. These fields are mainly used in breakdown
maintenance process.
Here, selection of malfunction start and end date/time are very important. Production department
and maintenance department always have conflict over it. Therefore, it is recommended that both
departments should sit together and decide these date and time values. These fields must be filled
before closing the notification. These field values are used in MTTR and MTBR report. If nothing is
working out between production and maintenance department then you can remove this tab and field
from notification screen through configuration.
Step 11: This tab contains the Maintenance Plant, Location, plant section, ABC indicators etc. It also
contains the account assignment data such as cost center, asset number, company code etc. All
these fields are explained in Equipment master data article. All these fields are copied from
equipment master data automatically. If you want you can change the values here you can change
them.
Next tab is scheduling overview.
Step 12: In Scheduling overview we have three sub screens. First has the field Reported by and
notification date. In next sub-screen we have Malfunction start/ end date and time. This is already
discussed above. In the last sub-screen we have completion date/ time and reference date/ time.
Also Technical Inspection by and Technical Inspection on.
Reported by is basically the employee id, created by HR person. As a consultant I would recommend
to make this field as mandatory while creating the notification. With this field we can contact the
person who has reported the incident. It could be possible every employee in organization does not
has the SAP user id. Every department can have one user id, then this field can have the information
about the creator of the notification. Maintenance department can contact hat employee about the
details for the abnormal conditions in the plant area.
Notification date and time is another critical field on notification screen. Most of the time client asked
to make this field as grey (not editable). Otherwise it could be possible that a breakdown happens at
10 am and Operations department creates notification for maintenance department at 1:00 pm and
changes the notification creation time as 10 am. However, actual notification creation time is not 10
am. This initiates a new argument between maintenance department and operations department.
Therefore, this field should have system date and time and grey. So, that no one can edit the date and
time values. We can make this filed as grey in configuration.
Notification completion date/time, reference date/ time, technical inspection by and technical
inspection on are discussed in details in further steps. There fields are filled by maintenance
department.
Step 13: Once all these entries are maintained operation in charge can save the notification by
clicking on SAVE button or press Ctrl S. The system status of notification will be OSNO, which means
Outstanding Notification. The notification will acquire a number. This is a system generated number.
You can assign a number range to each notification type.
Step 14: Afterwards the maintenance engineer will run the report IW28/29. In that report engineer will
get the list of all pending notifications. Maintenance guy will click on the pending notification and
open the notification to understand the situation.
Step 15: Maintenance engineer will put the notification in process by clicking on the green flag the
top on application bar. Once this flag is clicked, status of notification is set to NOPR– Notification in
Process.
Step 16: After taking complete idea of maintenance job maintenance engineer can change the
priority of the job (if required). The required start/end date and time will change accordingly (Depends
on configuration setting).
Step 17: Afterwards the maintenance engineer can create task in task tab and assign the task to the
technicians in his team. Here maintenance engineer can select the code of task from the given set of
task. Tasks can be maintained in the catalogs in QS41 t code. He can also enter the description of
task to be performed by the technician such as “Tightening of flange”, “greasing of motor”. Planned
start date and time can also be maintained. There is a provision of entering the employee id of
technician who is responsible for maintenance job. Once task is created, notification system status
will become OSTS – Outstanding task.
Step 18: The maintenance technician can see the list of all task assigned into his name in the t code
IW66/67. Here he can process the task by clicking on the green flag at the bottom of task tab (as
shown in the screen shot). Once task is completed in the plant area the technician can enter the
completion date and time. Then technician can close the task by clicking on the black and white flag.
If task is not closed then Maintenance engineer cannot close the notification.
Step 19: Afterwards the maintenance engineer will coordinate with operations department to check
the health of technical object. Operations in charge will take a test run of the machine and accepts
the maintenance job. Such kind of business process step can be configured using “User Status”
option on notification header screen. Yu can provide a custom status like “Accepted”, “Completed”
etc.
Exclusive Bonus : Click here and get Top 100 SAP Plant Maintenance Interview Questions
and Answers.
Step 20: Once maintenance job is completed and accepted by operations department, the
maintenance engineer will enter important data in the notification. First he will enter data in schedule
overview tab. Most of the fields in scheduling overview are already entered on notification tab and
malfunction tab. I have already explained Reported by and notification date field in step 9 and
malfunction breakdown information step 13. There are few new fields such as completion date and
time and reference date and time. Completion date and time contains the date and time when
notification is actually closed in system and Reference date and time pops up while closing the
notification we can edit this date before closing the notification. Reference date and time is important
because it could be possible that maintenance department has completed the maintenance work on
10.08.2015, 4:00 PM, but they closed the notification on 11.08.2015 at 10:00 AM. Reference date and
time field gives the freedom to maintenance department to enter the actual date and time when
maintenance work was competed in the field and technical object was made available to production
department for operation.
There are two more fields in this tab, Technical inspection done by and Technical inspection done on.
In the first field you can enter the name of person responsible for technical inspection and second
field you can enter the date when inspection carried out.
Step 21: Then in the item tab maintenance engineer will enter the maintenance history in the form of
catalog codes and long text. Here you can enter the catalog codes such as damage, object part,
cause etc. You can get some good reports based on catalog codes like IW68/69.
Step 22: He can also enter the maintenance activities performed in activity tab in the form of Catalog
codes. Here he can enter the start/ end date/ time of maintenance job. There is a provision of
entering long text. You can get some good reports based on activities like IW65.
Step 23: Finally the maintenance engineer can close the notification by clicking on the black and
white flag (as shown in the screen shot) on the notification header. As soon as you click on the
completion flag system will ask you to enter the reference date and time (I have discussed in step
22).
This is all about processing of notification in SAP PM. Please provide your inputs to improve this
article. If you liked this article, please share this article with your friends and colleagues.
Author: Vaibhav
Vaibhav is an engineer by schooling and an SAP Consultant by training with 12
years of experience. He is certified in SAP PM and SAP MM. His expertise
includes SAP PM, SAP MM, SAP QM, and MS excel. His industry specialties are
Chemical, Automobile, Electronics and Infrastructure. He has lots of experience in
SAP Training and Consulting.
Tagged: maintenance notification processing notification in sap pm sap interview questions SAP PM Interview questions
««CLEAN function in MS Excel to remove non- 6 Concepts about SM37 t code in SAP, nobody will
printable characters from SAP Master Data teach you»»
9 Comments
Hi,
Can we change the status of the notification from M1 to M2 or vice versa from engg. end post the
selection of notification by user dept. (prod.dept) depending upon engg. evaluation. pl. reply.
Dear sir , I request you if you could make Beginner’s guide to learn Maintenance order in SAP PM.
Thanks ,
Prashant Meshram
Sir,