MOHAMAD AZREEN SHAH BIN AZIZ SHAH

Location: Selangor,MY
Email: [email protected]
Mobile: +6014 5059207

Professional Experiences
TRANSLIFT SDN BHD Selangor, MY
Mechanical Project Engineer November 2013 - Present

• Involved in lifting equipment including lifting procedure, prepare lifting plan using
AutoCAD and technical planning for lifting activities.
• Experienced in lifting for heavy equipment and transportation of equipment.
• Experienced in mechanical static equipment (vessel, exchanger, reactor, etc.) and rotating
equipment (pump, compressor, fin fan cooler, etc.).
• Experienced in alignment of equipment for static and rotating and involved in problem solving
for miss-align equipment.
• Experienced in internal installation for equipment.
• Experienced of making document for site activities such as method statement, schedules,
execution plan and daily report.
• Experienced in interpreted engineering drawing, calculation and problem solving.
• Involved in meeting with owner and main-contractor.
• Responsible for managing site operation and keep the client well inform about site activities.

DELLAFORGE ENGINEERING SDN BHD Selangor, MY


Trainee Engineer June 2013 - November 2013

• Involved in the production and manufacturing works.


• Involved in engineering drawing using AutoCAD and Solidwork.
• Experienced in monitoring big project such as stop log for Kemaman Dam and LCCT 2 roofing
project.
• Involve in maintenance works for upgrading activities such as pump, piping, generator, impeller
and propeller.
• Dealing with supplier and vendor.
• Being exposed to the office and management works including making report, standard operation
procedure, manual instruction and procurement documentation.

Page 1 of 3
Education and Certification
• University Tun Hussein Onn, Malaysia - B. Sc. (Hons) in Mechanical Engineering,2013
• CIDB Green Card
• Authorized Entrance and Standby Person (AESP) for Confined Space
• Oil and Gas Safety Passport
• Basic Sea Survival and Emergency Training

Skills

Proficiency (0=Poor - 10=Excellent)


Microsoft Application (Word, Excel, PowerPoint) 7
Autocad 6
Solidwork 4
MathLAB 3
Dev C++ 2

• Experience in reading and analysis of engineering drawing.


• Well spoken and written in English and Bahasa Malaysia.

Project Highlight
Refinery and Petrochemical Integrated Development (RAPID) Project, Johor, MY (Package 33).
December 2019 – Present
• Cooling tower package including assembly, installation, alignment and accessories erection.
• Mechanical equipment installations consist of static and rotating equipment, alignment and
preservation.

MRCSB Turnaround, Melaka, MY.


October 2019 – November 2019
• Sulfur Pit rectification (cleaning and parts changing).

AROMA Complex Turnaround, BASF-Petronas Complex (BPC), Kuantan, MY.


February 2019 – September 2019
• Critical lifting for re-oriental exchanger.
• Removal and reinstatement of equipment including pump replacement and alignment.

Refinery and Petrochemical Integrated Development (RAPID) Project, Johor, MY (Package 4).
December 2016 - December 2018
• Mechanical equipment installations consist of static and rotating equipment, alignment and
preservation.
• Heavy lifting for plant equipment including lifting study, lifting plan and machineries.

Page 2 of 3
RGT1 Minimum Send Out Capability Improvement Project, Regasification Terminal, Melaka, MY.
June 2016 - December 2016
• Compressor package for RGT platform including assembly, installation, alignment and
accessories erection.

Terengganu Gas Terminal (TGAST) Project, Terengganu, MY.


December 2015 - May 2016
• Mechanical equipment installations consist of static and rotating equipment, alignment and
preservation.
• Heavy lifting for plant equipment including lifting study, lifting plan and machineries.

Malaysia LNG, Bintulu, MY.


August 2015 - November 2015
• Re-installment and reinstatement of Loading Arm at MLNG Berth 2.

BASF Lemongrass Project, Kuantan, MY.


February 2015 - July 2015
• Equipment installation package including alignment and preservation.
• Cooling tower package.

Sabah Ammonia and Urea (SAMUR) Project, Sabah, MY.


December 2013 - November 2014
• Equipment installation package for ammonia plant including alignment and preservation.