1. The document is a maintenance schedule plan for site NC-03 that lists equipment, planned maintenance dates, and actual maintenance completion dates. 2. It includes columns for multiple scheduled maintenance checks at intervals like 500 hours, 1050 hours, 2050 hours, etc. 3. For each maintenance check, the plan schedules estimated dates and tracks actual completion dates to record when maintenance is finished.

Uploaded by

Abhay Tripathi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
161 views26 pages

Maintenance

1. The document is a maintenance schedule plan for site NC-03 that lists equipment, planned maintenance dates, and actual maintenance completion dates. 2. It includes columns for multiple scheduled maintenance checks at intervals like 500 hours, 1050 hours, 2050 hours, etc. 3. For each maintenance check, the plan schedules estimated dates and tracks actual completion dates to record when maintenance is finished.

Uploaded by

Abhay Tripathi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 26

Appendix 8

ICEC/CICI Maintenance Schedule Plan

SITE: NC-03 MONTH: Aug/16 to Onwords

PLANNING DATA - To be entered by Site Due HMR Estimated Date shall be displayed by the System automatically, once the data is entered in the highlighted columns

1st Schedule (50 & 500 hrs (I) or 2nd Schedule (550 Hrs / other similar 3rd Schedule (1050 Hrs-II / other similar 4th Schedule (1550 Hrs / other similar 5th Schedule (2050 Hrs / other similar 6th Schedule (2550 Hrs / other similar 7th Schedule (3050 Hrs / other similar 8th Schedule (3550 Hrs / other similar 9th Schedule (4050 Hrs / other similar 10th Schedule (4550 Hrs / other similar
11th Schedule (5050 Hrs / other similar type) 11th Schedule (5050 Hrs / other similar type) 11th Schedule (5050 Hrs / other similar type) 11th Schedule (5050 Hrs / other similar type) 11th Schedule (5050 Hrs / other similar type) 11th Schedule (5050 Hrs / other similar type)
whichever the frequency fixed) type) type) type) type) type) type) type) type) type)

Service
Frequency i.e., Likely
HMR at
Sr. ASSET M/c. Sr. Equipment Planning whether 500 Hours
the time of On completion of On completion of On completion of On completion of On completion of On completion of On completion of On completion of On completion of On completion of On completion of On completion of On completion of On completion of
No CODE No. Description Date hours or run per On completion of On completion of
Planning DUE maintenance, the DUE maintenance, the DUE maintenance, the DUE maintenance, the DUE maintenance, the maintenance, the DUE maintenance, the DUE maintenance, the DUE maintenance, the DUE maintenance, the maintenance, the maintenance, the maintenance, the maintenance, the
whichever be the day Estimated Estimated Estimated Estimated DUE HMR/ Estimated Estimated Estimated Estimated Estimated maintenance, the actual DUE HMR/ Estimated maintenance, the actual DUE HMR/ Estimated DUE HMR/ Estimated DUE HMR/ Estimated
type MIN FREQ HMR/ actual HMR/KMR HMR/ actual HMR/KMR HMR/ Estimated Date actual HMR/KMR HMR/ actual HMR/KMR HMR/ actual HMR/KMR actual HMR/KMR HMR/ actual HMR/KMR HMR/ actual HMR/KMR HMR/ actual HMR/KMR HMR/ actual HMR/KMR DUE HMR/ KMR Estimated Date DUE HMR/ KMR Estimated Date actual HMR/KMR with actual HMR/KMR with actual HMR/KMR with actual HMR/KMR with
Date Date Date Date KMR Date Date Date Date Date HMR/KMR with Date to be KMR Date HMR/KMR with Date to be KMR Date KMR Date KMR Date
KMR with Date to be KMR with Date to be KMR with Date to be KMR with Date to be KMR with Date to be with Date to be KMR with Date to be KMR with Date to be KMR with Date to be KMR with Date to be Date to be entered by Date to be entered by Date to be entered by Date to be entered by
entered by Site entered by Site
entered by Site entered by Site entered by Site entered by Site entered by Site entered by Site entered by Site entered by Site entered by Site entered by Site Site Site Site Site

1084/12-07-16 2570/28-01-17
2048/10-12-16
11103841 M/C Sr. No- E/O E/O
1 1408 10 KVA DG 13/01/16 0 500 10 50 18/01/2016 58/22-02-16 558 4/15/2016 586/03-05-16 1058 6/23/2016 1584 9/1/2016 1537/28-10-2016 2037 12/15/2016 E/O 2548 1/20/2017 3070 01-03-017
1008/02-07-16 2375/01-01-17
A/F A/F

2078/28-12-16
11103759 M/C- Sr. No- 1073/29-07-16 E/O
2 1409 10 KVA DG 13/01/16 0 500 10 50 18/01/2016 41/24-02-16 541 4/15/2016 565/03-05-16 1065 6/23/2016 1573 9/20/2016 1566/19-11-2016 2066 12/20/2016 2578 2/10/2017
E/O with A/F 2172/03-01-17
A/F

11103427 M/C Sr. No- 1074/29-03-


3 7422XXK 30 KVA DG 29/12/15 0 500 15 50 02/01/2016 56/12-01-16 556 2/17/2016 538/24-02-16 1038 3/27/2016 1574 5/1/2016 1582/19-05-16 2082 6/21/2016 282/14-09-2016 782 14-10-216 783/15-10-2016 1283 11/15/2016 1286/16-11-2016 1786 12/15/2016 1783/23-12-2016 2283 1/30/2017 2288/30-01-2017 2788 3/1/2017
16(A/F with E/O)

1023/14-03-16 2671/20-07-16 3703/18-10- 4258/13-11-


11103426 M/C Sr. No- (A/F) E/O 2016 E/O 2016 E/O 5354/03-01-2017 E/O
4 7441XXK 30 KVA DG 29/12/15 0 500 15 50 02/01/2016 67/12-01-16 567 2/14/2016 538/15-02-16 1038 3/20/2016 1616 4/23/2016 1621/28-04-16 2121 6/1/2016 2133/22-06-16 2633 7/25/2016 3171 8/22/2016 3186/10-09-16 3686 10/2/2016 4203 11/18/2016 4758 12/15/2016 4773/07-12-2016 5273 1/5/2017 5854 1/25/2017 5890/27-01-2017 6390 2/28/2017
1116/21-03-16 2326/02-07-16 3351/01-10- 4369/18-11- 5292/31-12-2016 A/F
(E/O) A/F 2016 A/F 2016 A/F

11103428
M/C Sr. No- 1607/09-05-16 2621/08-09-16 3656/17-12-16
5 7456XXK 30 KVA DG 29/12/15 0 500 15 50 02/01/2016 55/14-01-16 555 2/15/2016 566/22-02-16 1066 3/26/2016 1093/04-04-16 1593 5/7/2016 2107 6/11/2016 2121/27-06-16 2621 7/30/2016 3121 10/10/2016 3137/15-11-2016 3637 12/16/2016 4156 1/20/2017 4169/20-01-2017 4669 2/20/2017
(A/F with E/O) (A/F with E/O) (A/F with E/O)

1045/10-03-16 2041/28-05-16 3056/17-08-16


11103423 M/C Sr. No- (E/O) (E/O) (E/O) 4132/24-11-16
6 7435XXK 62.5 KVA DG 29/12/15 0 500 15 50 02/01/2016 45/12-01-16 545 2/29/2016 544/09-02-16 1044 4/16/2016 1545 4/12/2016 1541/20-04-16 2041 5/23/2016 2541 7/1/2016 2553/04-07-2016 3053 8/8/2016 3556 9/20/2016 3632/13-10-2016 4132 11/13/2016 4632 12/25/2016 4659/03-01-2017 5159 2/1/2017
1096/14-03-16 2114/01-06-16 3153/24-08-16 (A/F with E/O)
(A/F) (A/F) (A/F)

2628/23-09-16 3642/22-12-16
11103425 M/C Sr. No- 1566/04-05-16 E/O (E/O)
7 7453XXK 62.5 KVA DG 29/12/15 0 500 15 50 02/01/2016 61/18-01-16 561 2/23/2016 567/18-02-16 1067 3/20/2016 1061/19-03-16 1561 4/21/2016 2066 6/6/2016 2093/29-07-2016 2593 9/5/2016 3128 10/22/2016 3145/18-11-2016 3645 12/19/2016 4142 1/25/2017 4137/23-01-2017 4637 2/23/2017
(A/F with E/O) 2601/21-09-16 3612/20-12-16
A/F (A/F)

1037/14-03-16
4715/17-10-
11103424 M/C Sr. No- (A/F) 2115/09-05-16 5758/12-01-2017
8 7454XXK 62.5 KVA DG 29/12/15 0 500 15 50 02/01/2016 53/18-01-16 553 2/23/2016 545/18-02-16 1045 3/20/2016 1606 4/19/2016 1615/13-04-16 2115 5/10/2016 2615 6/11/2016 2641/17-06-2016 3141 7/20/2016 3146/12-07-2016 3646 8/17/2016 3708/09-08-2016 4208 9/12/2016 4220/01-09-16 4720 9/27/2016 2016 (A/F with 5215 11/18/2016 5228/12-12-2016 5728 1/20/2017 6258 2/10/2017
1106/17-03-16 (A/F with E/O) (A/F with W/s & E/O)
W/s & E/O)
(E/O)

9 11100639 40 KVA DG 21/09/16 3622 500 10 3902 10/11/2016 3902/10-11-2016 4402 12/5/2016 4403/12-12-2016 4903 1/20/2017 4911/2401-2017 5411 1/20/2017

62.5 KVA DG 26/01/17 1965 300 10 2265 15/01/2017 2292/19-01-2017 2592 2/10/2017

1793/04-12-15
M/C Sr. (E/O) 2835/19-01-16 3835/03-08-16 4852/4-10-2016 (A/F 5852/18-11-2016 (A/F
10 11103756 125 KVA DG 11/09/15 0 500 22 50 12/09/15 89/15-09-15 589 10/7/2015 596/12-10-15 1096 11/4/2015 1115/04-11-15 1615 11/27/2015 2293 12/26/2015 2300/28-12-15 2800 1/19/2016 3335 6/20/2016 3335/12-06-2016 3835 8/20/2016 4335 8/25/2016 4366/26-08-2016 4866 9/17/2016 4366/26-08-16 4866 10/5/2016 5352 10/26/2016 5344/25-10-2016 5844 11/25/2016 6352 12/19/2016 6396/27-01-2017 6896 3/1/2017
No-6439 2012/14-12-15 ( E/O with A/F) ( E/O with A/F) with W/s & E/O) with W/s & E/O)
(A/F)

1089/04-12-15 2100/23-01-16 3621/14-09-16


4418/9-11-2016
M/C Sr. (E/O) (E/O) E/O
11 11103755 125 KVA DG 17/09/15 0 500 22 50 19/09/2015 294/01-10-15 794 10/24/2015 612/23-10-15 1112 11/13/2015 1589 12/27/2015 1590/30-12-15 2090 1/22/2016 2600 8/23/2016 2600/27-06-2016 3100 9/1/2016 3109/19-08-2016 3609 9/30/2016 4121 10/5/2016 4133/22-10-2016 4633 11/22/2016 (A/F with W/s & 4918 12/10/2016 4930/14-12-2016 5430 1/20/2017 5457/23-01-2017 5957 1/20/2017
No-6241 1228/14-12-15 2253/25-02-16 3340/02-09-16
E/O)
(A/F) (A/F) A/F

1072/16-12-15 1588/10-06-16
M/C Sr. (E/O) (E/O)
12 11103238 250 KVA DG 03/08/15 0 500 10 50 07/08/2015 60/12-09-15 560 10/22/2015 540/26-10-15 1040 12/8/2015 1572 4/30/2016 2088 9/11/2016
No-6464 1401/25-01-16 1588/10-06-16
(A/F) (A/F)

M/C Sr.
13 11103239 250 KVA DG 20/08/15 0 500 10 50 24/08/2015 294/12-10-15 794 1/20/2016 679/09-01-16 1179 8/30/2016
No-6462

1723/14-12-15 2705/28-04-16
M/C Sr. (E/O) (E/O)
14 11103240 250 KVA DG 28/08/15 0 500 22 50 30/08/2015 150/01-10-15 650 10/23/2015 604/23-10-15 1104 11/13/2015 1155/18-11-15 1655 12/11/2015 2223 1/5/2016 2213/05-01-16 2713 4/15/2016 3205 8/2/2016 3203/03-12-2016 3703 3/3/2017
No-6461 1835/29-12-15 2852/10-06-16
(A/F) (A/F)

11103393 CJK-
15 15090492 320 KVA DG 0

1st Schedule (50 & 250 hrs (I) or 2nd Schedule (300 Hrs / other similar 4th Schedule (800 Hrs / other similar 5th Schedule (1050 Hrs / other similar 6th Schedule (1300 Hrs / other similar 7th Schedule (1550 Hrs / other similar 8th Schedule (1800 Hrs / other similar 9th Schedule (2050 Hrs / other similar 10th Schedule (2300 Hrs / other similar
3rd Schedule (550 Hrs-II / other similar type) 11th Schedule (2550 Hrs / other similar type) 11th Schedule (2550 Hrs / other similar type) 11th Schedule (2550 Hrs / other similar type) 11th Schedule (2550 Hrs / other similar type) 11th Schedule (2550 Hrs / other similar type) 11th Schedule (2550 Hrs / other similar type)
whichever the frequency fixed) type) type) type) type) type) type) type) type)

Service
Frequency i.e., Likely
HMR at
Sr. ASSET M/c. Sr. Equipment Planning whether 250 Hours
the time of On completion of On completion of On completion of On completion of On completion of On completion of On completion of On completion of On completion of On completion of On completion of On completion of On completion of On completion of
No CODE No. Description Date hours or run per On completion of On completion of
Planning DUE maintenance, the DUE maintenance, the DUE maintenance, the DUE maintenance, the DUE maintenance, the maintenance, the DUE maintenance, the DUE maintenance, the DUE maintenance, the DUE maintenance, the maintenance, the maintenance, the maintenance, the maintenance, the
whichever be the day Estimated Estimated Estimated Estimated DUE HMR/ Estimated Estimated Estimated Estimated Estimated maintenance, the actual DUE HMR/ Estimated maintenance, the actual DUE HMR/ Estimated DUE HMR/ Estimated DUE HMR/ Estimated
type MIN FREQ HMR/ actual HMR/KMR HMR/ actual HMR/KMR HMR/ Estimated Date actual HMR/KMR HMR/ actual HMR/KMR HMR/ actual HMR/KMR actual HMR/KMR HMR/ actual HMR/KMR HMR/ actual HMR/KMR HMR/ actual HMR/KMR HMR/ actual HMR/KMR DUE HMR/ KMR Estimated Date DUE HMR/ KMR Estimated Date actual HMR/KMR with actual HMR/KMR with actual HMR/KMR with actual HMR/KMR with
Date Date Date Date KMR Date Date Date Date Date HMR/KMR with Date to be KMR Date HMR/KMR with Date to be KMR Date KMR Date KMR Date
KMR with Date to be KMR with Date to be KMR with Date to be KMR with Date to be KMR with Date to be with Date to be KMR with Date to be KMR with Date to be KMR with Date to be KMR with Date to be Date to be entered by Date to be entered by Date to be entered by Date to be entered by
entered by Site entered by Site
entered by Site entered by Site entered by Site entered by Site entered by Site entered by Site entered by Site entered by Site entered by Site entered by Site Site Site Site Site

1425/26-09- 1931/13-01-
IND14G0 530/21-01-16 1070/12-05-16 2016-E/O 2017-E/O
16 11103333 MLT-5 KVA 14/09/15 0 250 10 50 19/09/2015 98/10-10-15 348 11/15/2015 251/12-12-15 501 1/7/2016 780 2/16/2016 812/28-03-16 1062 4/30/2016 1320 6/6/2016 1324/11-06-2016 1574 7/5/2016 1675 11/26/2016 1677/28-12-2017 1927 1/12/2017 2181 2/8/2017
0429 (E/O with A/F) (E/O with A/F) 1588/19-12- 2101/28-01-
2016 A/F 2017 A/F

1909/22-10-
591/28-03-16 1364/24-08-16 2173/26-11-
IND14L0 2016 E/O
17 11103334 MLT-5 KVA 24/11/15 0 250 10 50 29/11/2015 79/10-12-15 329 1/5/2016 318/30-01-2016 568 2/25/2016 (E/O with Air 841 4/22/2016 842/24-05-2016 1092 6/20/2016 1104/29-07-2016 1354 8/23/2016 (E/O with Air 1614 9/29/2016 1661/28-09-2016 1911 10/20/2016 2159 11/22/2016 2016-E/O 2423 1/10/2017 E/O/28-01-2017 Mtr Prob. 2/28/2017
0539 1871/17-10-
Filter) Filter) 2105/13-11-
2016 A/F
2016 A/F
1464/20-07- 1711/16-08-16 2289/22-11-16
IND14K0 707/06-03-16 2016 (E/O) (E/O & (E/O &
18 11103332 MLT-5 KVA 14/09/15 0 250 10 50 19/09/2015 161/10-10-15 411 11/5/2015 456/12-12-15 706 2/10/2016 957 4/1/2016 940/20-04-16 1190 5/15/2016 1193/01-06-2016 1443 6/25/2016 1714 8/19/2016 1961 9/26/2016 1983/01-10-2016 2233 11/5/2016 2539 12/25/2016 E/O/05-01-2017 Mtr Prob. 2/28/2017
0698 (E/O with A/F) 1554/29-07- 1554/29.07.201 2137/04.11.201
2016 (A/F) 6Air Filter) 6Air Filter)

1075/16-11-16 1330/07-12-16
IND16C0109
555/20-09-16 (E/O & (E/O &
19 MLT-5 KVA 14/04/16 0 250 10 50 20/04/2016 41/10-05-16 291 6/5/2016 300/02-07-2016 550 8/6/2016 805 10/22/2016 1325 12/15/2016 1580 1/2/2017 1614/31-12-2017 1864 2/20/2017
(E/O with A/F) 945/06.11.2016 1450/19.12.201
Air Filter) 6 Air Filter)

20-11-15 (4 ) & 07-01-2016 08-02-2016 09-03-2016 26-05-2016 19-06-2016 24-07-2016 03-9-2016 24-10-2016 26-12-2016
11103247
17-10-2015 (5) 21-04-2016 (5 )
20 R O PLANT 28/08/16 0 28-12-15 (1 ) (5 Nos ) Filter (5 Nos ) Filter (5 Nos ) Filter (5 Nos ) Filter (5 Nos) (5 Nos) (5 Nos) (5 Nos) (5 Nos)
Filter Changed Filter changed Filter Changed
Changed Changed Changed Changed Filter Changed Filter Changed Filter Changed Filter Changed Filter Changed

21 11103396 CHILLER PLANT 16/01/16 0

Electrical Air
22 11102415 Compressor GA- 01/03/16 4682 1000 1 1000
90

_________________
Site P&M Incharge

Form No : FF/HOAP/G00/CICI/HCPE/0008 Rev 0 Dt 29-06-15


ICEC/CICI Filters & Oil - Changed & Next Due Record

SITE :DMRC NC-03 Noida Peoject Month : JANUARY-2017

Engine Oil & Filter Fuel filter Water Seprator/Mud Filter Air Filter primary Air Filter Secondary Any Other________
Sr. No Asset Code Equipment Sr. No Equipment Description Last changed Date & Next Due Last changed Date & Next Due Last changed Date & Next Due Last changed Date Next Due Last changed Date Next Due Next Due Remarks
Last changed Date & HMR/KMR
HMR/KMR HMR/KMR HMR/KMR HMR/KMR HMR/KMR HMR/KMR & HMR/KMR HMR/KMR & HMR/KMR HMR/KMR HMR/KMR

For Casting Yard/ Site


1 11103841 Equp Sr.No-1408 10 KVA POWER GENERATOR-01 2570/28-01-2017 3070 2570/28-01-2017 3070 N/A N/A 2375/01-1-2017 3375 TP-04

2 11103759 Eqp Sr.No-1409 10 KVA POWER GENERATOR-02 2078/28-12-2016 2578 2078/28-12-2016 2578 N/A N/A 2172/03-01-2017 3172 N/A N/A TP-08
3 11103427 Eqp. Sr.No-7422XXK 30 KVA POWER GENERATOR-01 2288/30-01-2017 2788 2288/30-01-2017 2788 2288/30-01-2017 3288 1365/22-11-2016 2365 N/A N/A TP-04
4 11103426 Eqp. Sr.No-7441XXK 30 KVA POWER GENERATOR-02 5890/27-01-2017 6390 5890/27-01-2017 6390 5354/03-01-2017 6354 5292/31-12-2016 6292 N/A N/A TP-10
5 11103428 Eqp. Sr.No-7456XXK 30 KVA POWER GENERATOR-03 4169/20-01-2017 4669 4169/20-01-2017 4669 4169/20-01-2017 5169 3656/17-12-2016 4656 TP-10
6 11103423 Eqp. Sr.No-7435XXK 62.5 KVA POWER GENERATOR-01 4659/03-01-2017 5159 4659/03-01-2017 5159 4132/24-11-2016 5132 4132/24-11-2016 5132 N/A N/A TP-03
7 11103425 Eqp. Sr.No-7453XXK 62.5 KVA POWER GENERATOR-02 4137/23-01-2017 4637 4137/23-01-2017 4637 3642/22-12-2016 4642 3612/20-12-2016 4612 N/A N/A TP-07
8 11103424 Eqp. Sr.No-7454XXK 62.5 KVA POWER GENERATOR-03 5758/12-01-2017 6258 5758/12-01-2017 6258 5758/12-01-2017 6758 5758/12-01-2017 6758 N/A N/A Fan Belt Changed-1106/17.03.2016 TP-05
9 11102101 62.5 KVA POWER GENERATOR-04 2292/19-01-2017 2592 2292/19-01-2017 2592 1965/27-12-2016 2965 1965/27-12-2016 2965 N/A N/A TP-05
10 21500167 40 KVA POWER GENERATOR 4911/24-01-2017 5411 4911/24-01-2017 5411 TP-10
11 11103755 Eqp Sr. No-6241 125 KVA POWER GENERATOR-01 5457/23-01-2017 5957 5457/23-01-2017 5957 5457/23-01-2017 6457 5457/23-01-2017 6457 N/A N/A N/A Labour Camp

12 11103756 Eqp Sr. No-6439 125 KVA POWER GENERATOR-02 5852/18-11-2016 6352 5852/18-11-2016 6352 5852/18-11-2016 6852 5852/18-11-2016 6852 N/A N/A N/A CY

13 11103238 11103238 250 KVA POWER GENERATOR-02 1588/10.06.2016 2088 1588/10.06.2016 2088 1072/16.12.2015 2072 1588/10.06.2016 2588 1588/10.06.2016 2588 N/A B/P-1

14 11103239 11103239 250 KVA POWER GENERATOR-03 679/09.01.2016 1179 679/09.01.2016 1179 1083/21-01-2017 2083 1001/27-08-2016 2001 Cleaned 1000 N/A B/P-2

15 11103240 11103240
250 KVA POWER GENERATOR-01 3203/03-12-2016 3703 3203/03-12-2016 3703 3178/19-11-2016 4178 2852/10.06.16 3852 2852/10.06.16 3852 N/A Office Area

16 11103393 CJK-15090492 320 KVA POWER GENERATOR-01 Gantry Area

Engine Oil & Filter with O Ring Fuel filter Oil Filter Stainer Air Filter primary Air Filter Secondary Any Other________
Sr. No Asset Code Equipment Sr. No Equipment Description Last changed Date & Next Due Last changed Date & Next Due Last changed Date & Next Due Last changed Date Next Due Last changed Date Next Due Next Due Remarks
Last changed Date & HMR/KMR
HMR/KMR HMR/KMR HMR/KMR HMR/KMR HMR/KMR HMR/KMR & HMR/KMR HMR/KMR & HMR/KMR HMR/KMR HMR/KMR

17 11103333 Eqp. Sr. No-IND14G00429 Portable Lighting Tower-01 1931/13-01-2017 2181 1931/13-01-2017 2181 1931/13-01-2017 2181 2101/28-01-2017 2601 TP-01

18 11103334 Eqp. Sr. No-IND14I00539 Portable Lighting Tower-02 1/28/2017 250 1/28/2017 250 1/28/2017 250 2105/13-11-2016 2605 CY

19 11103332 Eqp. Sr. No-IND14K00698 Portable Lighting Tower-03 1/5/2017 250 1/5/2017 250 1/5/2017 250 2137/04-11-2016 2637 TP-10

20 11104225 Eqp. Sr. No-IND16C0109 Portable Lighting Tower-04 1614/31-12-2016 1864 1614/31-12-2016 1864 1614/31-12-2016 1864 1450/19-12-2016 1950 CY

Form No : FF/HOAP/G00/CEC/HCPE/0012
CONTINENTAL ENGINEER

Plant &Mac

P&M Cost Details

Site :All Site (DM

Repairs & Maintenance cost


Sr. No Asset Code Asset description (Spares, consumable oil & lube)

FA-11103841
1 Equipment Sr. No- Diesel Generator -10 KVA 550
1408

FA-11103759
2 Equipment Sr. No- Diesel Generator -10 KVA 2457
1409

FA-11103426
3 Equipment Sr. No- Diesel Generator -30 KVA 8310
7441
FA-11103426
3 Equipment Sr. No- Diesel Generator -30 KVA 8310
7441

FA-11103428
4 Equipment Sr. No- Diesel Generator -30 KVA 4512
7456

FA-21500167
5 Diesel Generator -40 KVA 6129
FA-11103423
6 Equipment Sr. No- Diesel Generator - 62.5 KVA 4314
7435

FA-11103425
7 Equipment Sr. No- Diesel Generator - 62.5 KVA 4314
7453

FA-11103424
8 Equipment Sr. No- Diesel Generator - 62.5 KVA 8787
7454
FA-11102101
9 Diesel Generator - 62.5 KVA 3364

FA-11103755
10 Equipment Sr. No- Diesel Generator - 125 KVA 8572
6241

FA-11103240
11 Equipment Sr. No Diesel Generator-250KVA 713
-6461

FA-11103239
12 Equipment Sr. No Diesel Generator-250KVA
-6462
FA-11103333
13 Equipment Sr. No Portable Lighting Tower 5 KVA 2072
-IND14G00429

FA-11103332
14 Equipment Sr. No Portable Lighting Tower 5 KVA 2268
-IND14K00698

FA-11104225
15 Equipments Sr. no- Portable Lighting Tower 5 KVA 1876
IND16C0109
16 11103243 100 Ton Gantry 756

17 11103244 100 Ton Gantry 756

18 11103352 80 Ton Gantry 8151

19 11104142 80 Ton Gantry 756

20 11103247 R O Plant 21354

21 11500998 Bar Cutting Machine 240

22 Needle Vibrator 1155

Total 91404
Site P & M Incharge
Form No : FF/HOAP/G00/CICI/HCPE/0016
ONTINENTAL ENGINEERING CORPORATION

Plant &Machinery

P&M Cost Details -January-2017

Site :All Site (DMRC NC-03)

Agency repairs /
Special Services Date Material Description Unit Qty.
Cost

1/3/2017 Air Filter EA 1

0 1/7/2017 Distilled water Ltr 2

Total 3

12/26/2016 Engine Oil Ltr 1

Engine Oil Ltr 6

12/28/2016 Fuel Filter-3499915000 EA 1

0 Lube Filter-03.040.19.0.00 EA 1

1/3/2017 Air Filter-08.319.03 EA 1

1/7/2017 Distilled water Ltr 2

Total 12

12/31/2017 Air Filter-04.0586..03.0 EA 1

Engine Oil ( K Oil Premium) Ltr 11

Fuel Filter (P)-3H.132.01.0.00 EA 1

1/3/2017 Fuel Filter (S)--3H.132.02.0.00 EA 1

Lube Oil Filter-0427001000 EA 1


0
Engine Oil ( K Oil Premium) Ltr 2
0

Fuel Filter (P)-3H.132.01.0.00 EA 1

1/27/2017 Lube Oil Filter-0427001000 EA 1

Engine Oil ( K Oil Premium) Ltr 11

Total 30

1/7/2017 Distilled water Ltr 2

Fuel Filter (P)-3H.132.01.0.00 EA 1

Fuel Filter (S)--3H.132.02.0.00 EA 1

0 1/19/2017 Lube Oil Filter-0427001000 EA 1

Water Seprator EA 1

Engine Oil ( K Oil Premium) Ltr 11

Total 17

1/3/2017 Engine Oil ( K Oil Premium) Ltr 2

1/7/2017 Distilled water Ltr 2

1/9/2017 Engine Oil ( K Oil Premium) Ltr 1

1/13/2017 Engine Oil ( K Oil Premium) Ltr 5

1/20/2017 Engine Oil ( K Oil Premium) Ltr 1

0 1/23/2017 Engine Oil ( K Oil Premium) Ltr 2

Engine Oil ( K Oil Premium) Ltr 12

Lube Filter-LF16072 EA 1
1/24/2017
Fuel Filter(P)-4899920000 EA 1

Fuel Filter(S-)4899920000 EA 1

Total 28
Engine Oil ( K Oil Premium) ltr 13

lube Oil Filter (4H.270.01.0.00) EA 1


1/3/2017
Fuel Filter (P)-3H.132.01.0.00 EA 1
0
Fuel Filter (S)- 3H.132.02.0) EA 1

1/7/2017 Distilled water Ltr 2

Total 18

1/7/2017 Distilled water Ltr 2

Engine Oil ( K Oil Premium) ltr 13

lube Oil Filter (4H.270.01.0.00) EA 1


0 1/23/2017
Fuel Filter (P)-3H.132.01.0.00 EA 1

Fuel Filter (S)- 3H.132.02.0) EA 1

Total 18

1/4/2017 Engine Oil ( K Oil Premium) Ltr 5

1/6/2017 Engine Oil ( K Oil Premium) Ltr 2

1/7/2017 Engine Oil ( K Oil Premium) Ltr 2

1/7/2017 Distilled water Ltr 2

Engine Oil ( K Oil Premium) ltr 13

lube Oil Filter (4H.270.01.0.00) EA 1

Fuel Filter (P)-3H.132.01.0.00 EA 1


0 1/12/2017
Fuel Filter (S)- 3H.132.02.0) EA 1

Air Filter-4H119801000 EA 1

Cotton Waste KG 5
1/16/2017 Engine Oil ( K Oil Premium) Ltr 2

1/18/2017 Engine Oil ( K Oil Premium) Ltr 1

1/19/2017 Engine Oil ( K Oil Premium) Ltr 2

Total 38

1/9/2017 Distilled water Ltr 2

Engine Oil ( K Oil Premium) Ltr 9

lube Oil Filter (4H.270.01.0.00) EA 1


0 1/19/2017
Fuel Filter (P)-3H.132.01.0.00 EA 1

Fuel Filter (S)- 3H.132.02.0) EA 1

Total 14

1/9/2017 Distilled water Ltr 2

Engine Oil ( K Oil Premium) Ltr 17

Fuel water seprator-06.474.05 EA 1

0 1/23/2017 Fuel Filter-48.117.04.0.00 EA 1

Lube Filter-06.436.01.00 EA 2

Air Filter-6H.411.02.0.00 EA 1

Total 24

12/27/2016 Engine Oil ( K Oil Premium) Ltr 3

Total 3

1/21/2017 Water Seprator-F6.004.09.0.00 EA 1

Total 1

Fuel Filter- KG0021752970 EA 1

12/28/2016
Oil Filter-KG0021751290 EA 1

O Ring of Oil Filter-


12/28/2016 EA 1
KG0012002340

Oil Filter Stainer-KG0037300880 EA 1

Engine Oil ( Kohler) CAN 1

1/13/2017 Engine Oil ( Kohler) Ltr 0.5

1/15/2017 Engine Oil ( Kohler) Ltr 0.5

Total 6

12/30/2016 Engine Oil ( Kohler) Ltr 0.5

1/3/2017 Oil Filter Stainer-KG0037300880 EA 1

1/10/2017 Engine Oil ( Kohler) Ltr 1

Fuel Filter- KG0021752970 EA 1

Oil Filter-KG0021751290 EA 1
1/5/2017
O Ring of Oil Filter- EA 1
KG0012002340

Engine Oil ( Kohler) CAN 1

Total 6.5

1/20/2017 Engine Oil ( Kohler) Ltr 0.5

Fuel Filter- KG0021752970 EA 1

Oil Filter-KG0021751290 EA 1

O Ring of Oil Filter-


12/31/2016 EA 1
KG0012002340

Oil Filter Stainer-KG0037300880 EA 1

Engine Oil ( Kohler) CAN 1

Total 5.5
1/8/2017 Greasing & Maintainence KG 3

Greasing on Top Gearage &


12/18/2016 KG 1
maintainence

Total 4

1/8/2017 Greasing & Maintainence KG 3

Greasing on Top Gearage &


1/22/2017 KG 1
maintainence

Total 4

1/8/2017 Greasing & Maintainence KG 3

1/10/2017 Gear Oil from winch Gear Box Ltr 50

Greasing on Top Gearage &


1/22/2017 KG 1
maintainence

Total 54

1/8/2017 Greasing & Maintainence KG 3

Greasing on Top Gearage &


1/22/2017 KG 1
maintainence

Total 4

P H Booster- INDION 1150 KG 30


Jan/17
Antiscalant Chemical- MDC220 Ltr 30

Dec/16 Micron Cartidate Filter 20"BB EA 5

Total 65

1/8/2017 Cutting Blades EA 2

Total 2

1/17/2017 COVER-4812-0507-89 EA 1

Total 1

0
Total Amount Remarks

525.555

24

549.555

237.52

1425.12

127.095

117.935

525.555

24

2457.225

736.235

2612.72

428.23

428.23

294.265

475.04
428.23

294.265

2612.72

8309.935

12

428.23

428.23

294.265

736.235

2612.72

4511.68

237

24

237

1185

237

474

2844

297.7

296.555

296.555

6128.81
3087.76

297.7

452.275

452.275

24

4314.01

24

3087.76

297.7

452.275

452.275

4314.01

1187.6

475.04

475.04

24

3087.76

297.7

452.275

452.275

1041.95

105.5
475.04

237.52

475.04

8786.74

24

2137.68

297.7

452.275

452.275

3363.93

24

4037.84

1685.44

143.125

996.15

1685.44

8571.995

712.56

712.56

0 B/P-2

391.59
296.555

22.9

380.14

588.53

196.178575

196.178575

2072.07215

196.178575

380.14

392.35715

391.59

296.555

22.9

588.53

2268.250725

196.178575

391.59

296.555

22.9

380.14

588.53

1875.893575
566.775

188.925

755.7

566.775

188.925

755.7

566.775

7395

188.925

8150.7

566.775

188.925

755.7

6183

10305

4866.25

21354.25

240

240

1155

1155

91404
DG DEPLOYMEN

TP-01 TP-02 TP-03 TP-04

P-674 P-709 P-746 P-778 P-833


KFI CEC
CEC
40 KVA 10 KVA
62.5 KVA P-727 P-804
P-727 20 KW 2 KW
20 KW
CEC
Om Sai April-16
to
April-17 30 KVA
40/62.5 P-817
KVA
KFI 20 KW
20 KW KFI
40 KVA
P-767 40 KVA
Jan-17 20 KW P-829
to
April-17 20 KW

Jan-17
to
April-17 April-16
to
KFI April-17

CEC
40 KVA
P-771 62.5 KVA
20 KW P-805
20 KW
Dec-16
to
Mar-17
Location DG Load
Labour Camp 125 KVA 20 KW SUMMA
Office Area 250 KVA 100 KW S.No Description
Batching Plant-01 250 KVA 150 KW Viaduc
Batching Plant-02 250 KVA 150 KW 1 10 KVA DG
Gantry Area 320 KVA 150 KW 2 30 KVA DG
3 40 KVA DG
4 40/62.5 KVA DG
40 KVA DG HIRED -07 Nos
M/s. Kolmet Finance (I) Pvt. Ltd. 5 62.5 KVA DG
21.04.16 to 20.04.17 - 04 Nos Labour Ca
04.12.16 to 03.03.17 -01 No 6 125 KVA DG
26.11.16 to 25.02.17 -02 Nos.
26.01.17 to 25.04.17-02 Nos. Casting y
M/s. Om Sai Infratech 7 125 KVA DG
18.01.17 to 17.04.17-01 No. 8 250 KVA DG
9 320 KVA DG
TOTAL
DG DEPLOYMENT AT NC-03

TP-05 TP-06 TP-07 TP-08 TP-09

P-870 P-906 P926 P949 P968


CEC KFI CEC

40 KVA
62.5 KVA P-869 62.5 KVA
P-835 P-906
20 KW 20 KW 20 KW

KFI
Nov-16
40 KVA to
Feb-17
P-841
20 KW
KFI

April-16 40 KVA
to P-872
April-17
20 KW

Nov-16
to
Feb-17

KFI

40 KVA
P-884
20 KW

April-16
to
April-17

CEC

10 KVA
P-677
10 KVA
P-677
2 KW

SUMMARY
Description Qty. Min. Load Max. Load Remarks
Viaduct
10 KVA DG 2 1KW 2KW
30 KVA DG 3 2KW 20KW
40 KVA DG 1 2KW 20KW
40/62.5 KVA DG 10 2KW 20KW Hired
62.5 KVA DG 4 2KW 20KW
Labour Camp
125 KVA DG 1 15KW 25KW
Casting yard
125 KVA DG 1 15KW 25KW
250 KVA DG 3 20KW 100KW
320 KVA DG 1 50KW 150KW
TOTAL 26
12/31/2016

TP-10

P1004
CEC

40 KVA
P-969
20 KW

CEC

30 KVA
P-974
20 KW
CEC

30 KVA
P-989
20 KW
KFI

40 KVA
Depo

20 KW

Jan-17
to
April-17