EPM
EPM
EPM
2005
Commercial Vehicle Business Unit
Version : 4
CONTENTS
S.No Item Name No of Pages S.No Item Name No of Pages
INTRODUCTION
In year 2002-03, Enterprise Process Manual comprising of 18 Enterprise Level Processes was published.
In the year 2003-04 it was reviewed and 19th process (Organisational Governance) was added. In this year
Enterprise Processes Manual - Part II, comprising Turtle diagrams of 90 + next level sub-processes was also
published.
In the year 2004-05, all the 19 Enterprise Level Processes & their sub-processes were reviewed by
respective Processes Owners and Facilitators along with the users across all the locations.
The changes recommended by the processes owners have been incorporated. This manual is a compilation
of documentation of 19 Enterprise Level Processes and their sub-processes, duly vetted by respective
process owners & facilitators. The 19 Top Level (Enterprise level) Processes have been documented
in the form of Process Maps and Process Definition Sheets, whereas all the Sub Processes have been
documented in the form of Turtle Diagram.
This manual supersedes all earlier versions of Enterprise Process Manual and Sub-process Manual
31.3.2005 A.1
TATA Motors, CVBU Introduction
Sub-process Sub-process
/Activity Decision /Activity End of Cycle
XXXX XXXX
31.3.2005 A.2
TATA Motors, CVBU Introduction
31.3.2005 A.3
TATA Motors, CVBU Introduction
Method / Measures/
Practices Indicators
Each Sub-process has been assigned a unique identification number. It is derived as follow :
Sub Process ID = Main Process ID suffixed by Sr. No within the process. For example, 2 Sub processes of Strategic
Planning process (CVBU-EL-02) are numbered as CVBU-EL-02-01 and CVBU-EL-02-02
31.3.2005 A.4
TATA Motors, CVBU Introduction
Management of Processes :
Copies of the manual are being issued to the Owners / Process Chiefs of the Processes included in the
Manual and Divisional / Functional Heads at each location, for their reference for management of processes
Holder of the controlled copy is responsible for safe custody of the copy and hand over to the successor in the event of the transfer /
separation and inform BES. BES maintains a copy number wise distribution list.
A booklet, “ Enterprise Process Management Guide”, has also been prepared and circulated to provide inputs to Process / Sub-
process Owners on systematic process management
Updation of Manual :
All the Process Owners are requested to review their respective processes and their Process Definition Sheets, in the month of
April or May every year and communicate the page wise changes, if any, to BES, Pune by the month end.
On receipt of changes, BES will incorporate the same in the respective pages along with revision number. BES will then send
controlled copies of the revised / additional pages to all the Holders of the Manual. The controlled copyholders responsible for
replacing revised pages in their respective copy and destroying old pages.
31.3.2005 A.5
Commercial Vehicles Business Unit Enterprise Process Model
Performance Improvement
VALUE CREATION PROCESSES
and
Processes
Leadership & Corporate Citizenship
SUPPORT PROCESSES
31.3.2005 BB
TATA Motors, CVBU List of Top Level Process Owners
Mr Ravi Kant,
1 CVBU-EL-01 - Leadership and Corporate Citizenship Mumbai
Executive Director (CVBU)
Mr K C Girotra
4 CVBU-EL-04 - Performance Improvement and Change Management Lucknow
Vice President (Lucknow Works &
31.3.2005 C.1
TATA Motors, CVBU List of Top Level Process Owners
15 CVBU-EL-15 Mr P P Kadle
- Human Resource Management Executive Director (Finance & Corporate Affairs) Mumbai
along with HR Team
Mr Probir Mitra Pune
16 CVBU-EL-16 - Information and Knowledge Management General Manager (Information Technology)
Mr U K Mukherjee Mumbai
Mr Rajesh Kumar Mumbai
31.3.2005 C.2
TATA Motors, CVBU Abbreviations
31.3.2005 D.1
TATA Motors, CVBU Abbreviations
31.3.2005 D.2
TATA Motors, CVBU Abbreviations
31.3.2005 D.3
TATA Motors, CVBU Abbreviations
Head ( TS / STDI ) Head ( Technical Specification / Standards I) KPAs Key Performance Areas
FS Free Service KPI Key Performance Indicators
HQ Head Quarter KPM Key Performance Measure
HR Human Resource KRA Key Result Area
HRA House Rent Allowance L&L Listening & Learning
Hrs Hours LEC Locational Ethics counsellor
HVAL Heavy Vehicle Axles Limited LIC Life Insurance of Corporation
HVTL Heavy Vehicle Transmission Limited LKO Lucknow
IB International Business LL Lot By Lot
IBM Global Software Company LOB Line OF Business
Ind Industrial Loc Locational
IR Industrial Relations LOI Letter of Intent
IRC Industrial Relations Committee LT Long Term
IRR Internal Return Ratio MAP Moving Average Price
IS Institutional Sales or Indian Standards MASOP Material Accounting System for Outside Processing
ISO International Organization for Standardization Matls Materials
IT Information Technology MBE Management By Ethics
JDC Joint Development Council MBPA Modification Break Point Advice
JIT Just In Time MC Management Committee
31.3.2005 D.4
TATA Motors, CVBU Abbreviations
31.3.2005 D.5
TATA Motors, CVBU Abbreviations
PFMEA Process Failure Mode Effect Analysis PSY Pariwar Suraksha Yojana
PHQ Parts Head Quarter Q&A Questions and Answers
PI Perpetual Inventory QA Quality Assurance
PIN Process Identification Number QC Quality Control
PL Pre launch Production Batch of New Product QCD Quality, Cost , Delivery
PLA Personal Ledger Account ( Type of Excise Account) QFD Quality Function Deployment
Plng or Plg Planning QI Quality Index
PM Plant Maintenance QMS Quality Management System
PM Fund Prime Minister's Fund QP Quality Plan
PMS Performance Management System R&D Research & Development
PMs Product Managers in IB RECON (Engine) Reconditioning (Cell), Sub unit of Tata Motors
PO Purchase Order Repro Reprocessing List generated in SAP
PP Pre Production Batch of New Product Resp Respective
PPAP Product Planning Approval Of Parts RG 23 Excise Register 23
PPC Production Planning and Control RM Regional Manager
PPM Parts Per Millions RMCSA Risk Management through Control Self Assessment
PPR Product Performance Report RO Regional Office
Proc Process ROI Return on Investments
Prodn or Prod Production RPM Regional Parts Manager
PSD Productivity Services Department Rs Rupees
PSG Product Strategy Group RSM Regional Sales Manager
31.3.2005 D.6
TATA Motors, CVBU Abbreviations
31.3.2005 D.7
TATA Motors, CVBU Abbreviations
31.3.2005 D.8
TATA Motors, CVBU Leadership and Corporate Citizenship
31.3.2005 1.1
TATA Motors, CVBU Leadership and Corporate Citizenship
In-Process/ Efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
Adherence to stakeholders’ engagement plan Percentage Corporate Citizenship Index, Community Index Index
Adherence to SPP process, Adherence to Percentage CSI, DSI, Employee Satisfaction (OHS) Index
Action Plan
TBEM Assessment Score No
ROCE Percentage
Divisions Involved EDs and Plant & Functional Heads
End Customer All Stakeholders
Core Values Embedded Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
ISO /TS16949(2002) Clause Ref. 5.1
Process Revision / Modification History
Date of Modifn. Modification No. Details of Modification Issued / Modified by Approved By
01/06/03 00 New Release BES, Pune
31/03/05 01 Revised Process Owners / Facilitators
31.3.2005 1.2
TATA Motors, CVBU Leadership and Corporate Citizenship
Derive Mission
Understand Set Direction Formulate LT/ST Organise
Strategy Build, Motivate, Review and
stakeholder and Plan align and
Identify Initiatives & Empower adjust to
needs financial, social allocate
Champions Teams for achieve plan
and higher and resources
Communicate and accelerated Adapt to new
level environmental Create Matrix
build change challenges
objectives objectives Org structure
commitment.
Encourage /
Organise Internal / Encourage Create a
participate / Develop, reward
External Assessment Innovation, culture of high
Implement CSR and recognize
/ Surveys analyse & Sharing and performance
Initiatives , Be employees
Improve Learning
a Role Model
31.3.2005 1.3
TATA Motors, CVBU Revisit Vision & Mission & Set Direction
31.3.2005 1.4
TATA Motors, CVBU Empowering Employees
31.3.2005 1.5
TATA Motors, CVBU Managing Social Responsibility
Key Steps in –
'Managing Social responsibility’
1. Define and communicate policies to address Quality,
Environmental and Community Development aspects Outputs
Inputs 2. Select Key communities ,decide focus areas, w Policy Statements
w National & International laws and assign responsibly and provide budget w Community Devp initiatives
requirements for products 3. Encourage participation from employees at all the w Compliance with legal/ regulatory
w National and state legislations on levels and seek participation of community requirements
Pollution and factory operations members in implementation of initiatives w Improvement in Employee
w Expectations of key communities 4. Ensure compliance with legal and regulatory satisfaction
w TCCI Agenda requirements w Enhanced CVBU’s image in public
5. Collect and review feed back to ascertain Attainment of
objectives
31.3.2005 1.6
TATA Motors, CVBU Strategic Planning
STRATEGIC PLANNING
31.3.2005 2.1
TATA Motors, CVBU Strategic Planning
31.3.2005 2.2
TATA Motors, CVBU Strategic Planning
Conduct Finalise
Business Operating Develop
environment & next Review
Plans (and
List out key Determine capability Finalise CAPEX level
Environm Revisit analysis BSCs & update if
challenges Strategic strategic Revenue
ent Vision Initiatives required)
for Path-3 Objectives Budgets,
Scanning / Mission / Strategy for BSCs and
Short term & Phase CVBU BSC
Values Planning, IB / Dom. Functions Initiatives
Long term Strategy and
MKT, NPI, & Plants monthly
Strategic
Finance, HR, Initiatives
Strategy Board, ERC, MFG, All SCs All SCs
SC, OC SC, MC, SC
Planning BRC Materials, Int. Audit
OC, BRC SC, MC, OC,
Auto planning Board
Evaluation &
Improvement
Inputs business environment analysis -
- International/ domestic manufactures and
their products
- Volumes and Market share treds Inputs Capability analysis-
- Customer needs and preferences - Manpower
- Competition strategies in terms of new - Manufacturing facilities
products, marketing schemes suppliers and dealers
- Regulatory requirements - design and development
- Likely Technological advancements in
products
- Benchmarks and competitor information on
product performance
- Enterprise Risks
- Domestic & International economics
31.3.2005 2.3
TATA Motors, CVBU Strategic Planning
31.3.2005 2.4
TATA Motors, CVBU Strategy Deployment
31.3.2005 2.5
TATA Motors, CVBU Internal & External Communication
31.3.2005 3.1
TATA Motors, CVBU Internal & External Communication
§ Vision, Mission, Core Values Ø Determine communication needs and set objectives for [ Improved Stakeholders'
and Directions of CVBU communication to various Stakeholders confidence
Ø Determine media, frequency and Stakeholder/Location wise [ Enhance Company Image.
§ Past Performance and Future Plans
responsibility
§ Product and Service Standards Ø Manage Internal communication
§ Quality, Environment and other Ø Manage External communication
Policies Ø Collect and analyse feedback
§ Tata Code of Conduct Ø Measure effectiveness
In-Process / Efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
Adherence to communication schedule % No of Employees covered, No of Communication meetings No
Actual Vs Budget % Communication Effectiveness Index OHS Index
Actual Vs Budget Percentage
Divisions Involved - Corporate Communication, Locational HR, Plant / Functional Heads
End Customer- All Stakeholders
Core Values Embedded- Integrity, Passion for Engineering, Corporate Citizenship, Customer Focus
ISO / TS16949 (2002) Clause Ref. 5.5.3
Process Revision / Modification History-
Date of Modfn. Modification No. Details of Modification Modified by Approved By
01/06/03 00 New Release BES, Pune
31/03/05 01 Review trough process team. Process Team
31.3.2005 3.2
TATA Motors, CVBU Internal & External Communication
Press release
Press conferences, interviews
External Communication
31.3.2005 3.1
3.3
TATA Motors, CVBU Manage Internal Communication
Inputs
w Corporate Communication Key Steps in –
Outputs
Guidelines / Policies 'Internal Communication Process'
w House Magazines
w Data and analysis from the 1- Determine communication needs
w Wall Posters
Business Units, Finance and 2- Analyze and design communication
w E mails
employees 3- Approval from concerned agencies/EDs/VPs
w Updation on Intranets
w SIAM reports 4- Release the communication
w Town Hall and communication
w Employee needs and expectations 5- Follow-up with Employees
meetings
w OHS 6- Monitor and Review
w External sources – media/events
31.3.2005 3.1
3.4
TATA Motors, CVBU Manage Internal Communication
31.3.2005 3.5
TATA Motors, CVBU Manage Internal Communication
Key Steps in –
Inputs
'Manage Communication Survey'
w Corporate Communication
1. Determine communication survey needs Outputs
Guidelines / Policies
2. Analyze and design survey questionnaire w Survey Questionnaire
w Data from the Business Units and
3. Prototype testing with few employees w Survey findings
employees
4. After modifications, Conduct the survey w Action Plan
w Employee needs and expectations
5. Analyze and put up findings to SC
w OHS and
6. Prepare action plan to tackle concerns
w Communication Index findings
7. Monitor and review the process of survey
31.3.2005 3.6
TATA Motors, CVBU Performance Improvement and Change Management
Head CVBU /
CVBU-EL-04-01 Process Design & Improvement
Head Respective Plant
31.3.2005 4.1
TATA Motors, CVBU Performance Improvement and Change Management
In-Process / Efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
Adherence to Audit/Assessment schedule % TBEM Score, No of certified Auditors/ Assessors No.
Initiatives planned Vs achieved No Performance Improvement achieved vis-à-vis Target %
Adherence to review schedule % Reduction in NCs No.
Divisions Involved - SC, All the Plant / Functional/Divisional Heads, Certified Assessors
End Customer- Process Owners, Stake holders
Core Values Embedded- Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
ISO /TS16949(2002) Clause Ref. 8.5.1, 7.1.4
Process Revision / Modification History-
Date of Modfn. Modification No. Details of Modification Modified by Approved By
01/06/03 00 New Release BES, Pune
31/03/05 01 Modification process review Process Team
31.3.2005 4.2
TATA Motors, CVBU Performance Improvement and Change Management
B Process Owner
Div/Dept Head
Minor change/
simplification
SC / resp Process Owner
Inputs-
- Strategic Objectives Statutory Changes
- Comparison of Performance with
Drive Initiative to get
Competition/Benchmark on key Factors
desired result
- TBEM Assessment Feed back Study findings
- Audit feedback and prioritize OFI
Initiative Owner
- Feedback from Statutory audits
- Best practices from other Minor/
organizations. urgent
- Recommendations from changes Process Owner
Consultants Divisional Head
Major Changes
31.3.2005 4.3
TATA Motors, CVBU Process Design & Improvement
Key Steps in –
Inputs 'Process Design and Process Improvement'
w Request/ feed back from 1. Ascertain need and assign responsibility
agencies involved ( Incl. Internal 2. “As is study”and evaluate alternatives
Customers) 3. Define new / improvised process Outputs
w Assessment / Audit reports 4. Seek approval for resources w New/ Improved processes and
w New or changing Business needs / 5. Devp. Of computerized system where procedures
Statutory requirements required, User training , pilot run and finalize
w Strategic intent for adopting global process and procedures .
best practices 6. Plan Implementation
7. Monitor process for efficiency and effectiveness
31.3.2005 4.4
TATA Motors, CVBU Conduct Internal Assessment / Audit
31.3.2005 4.5
TATA Motors, CVBU Performance Improvement Thru Initiatives
Key Steps in –
'Performance Improvement through Initiative'
1. Define Initiative, measures, and owner
2. Assemble team define objectives and set targets. Outputs
Inputs w Achievement of quantum
3. Primary Data Collection
w Balanced Score Card improvement in the performance
4. Idea generation, evaluation and action plan
preparation.
5. Implementation and progress reviews
6. Share achievements and learning
31.3.2005 4.6
TATA Motors, CVBU Market Development
Market Development
Principal Process Owner: Mr Shyam Mani - VP (Sales & Marketing ); Mr P G Shankar - Head (CVBU International Business)
CVBU-EL-05-01 Prepare Marketing Business Plan Product Managers / Sales / Regional Managers
CVBU-EL-05-02 Forecast Demand at Product - Segment Level Head of Market Research / Country Managers
CVBU-EL-05-03 Determine Customer Groups & Market Segments Product Managers / Sales / Regional Managers
CVBU-EL-05-05 Promote Products of Tata CV entire Range Product Managers / Sales / Regional Managers
31.3.2005 5.1
TATA Motors, CVBU Market Development
In-Process / Efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
Monthly and Quarterly Reviews of Market % Key Accounts Touched Nos.
Share & Volumes achieved vis-à-vis Nos. New Segment / Markets developed Nos.
Targets (Growth in Sales) Market Share & Volumes achieved % / Nos.
Divisions Involved - Product Mgt. , SHQ (Dom / IB), ROs, AOs, Country Offices, Dealer Development Cell and Channel Partners /SC
End Customer - Channel Partners and Customers of TATA Commercial Vehicles
Core Values Embedded Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
ISO /TS16949(2002) Clause Ref. 5.2
Process Revision / Modification History-
Date of Modfn Modification No. Details of Modification Issued / Modified by Approved By
01/06/03 00 New Release BES, Pune
31/03/05 01 Modification through process review Process Team
31.3.2005 5.2
TATA Motors, CVBU Market Development
Requirements to -
Process Owner : Mr. Shyam Mani (Domestic) / Mr P G Shankar (IB)
- Budget Requirements to - NPI Process
Process objective : Understand CV Markets (Dom / IB), Explore Opportunities and
Finance & Budgeting - Human Resource Mgt
Strengthen Presence in Chosen Countries / Segments and Geographies
- Market Requirement to - Channel Partner Mgt.
S &OP and Sales Planning - Services Design
- After Sales Services
No Preparation of Implementation
Marketing and Review of-
Derive Operational Data Gathering Preparation of - Plan for NPI for tapping niche Plan - Sales, Service
Vision through various VOC / - Annual Business market / new Dom., IB segments Spares
- Review Dom. / QFD exercises Plan for (PMs / NPI Group / CMs) -Region-wise, Country Performance of
IB Strategy and Analysis CVDom / IB wise (n+2), Segment Channel Partners
- Scan Dom / - Product Plan Sales / Service / Spares Network wise Monthly Volumes (Dealers /
- Evolve application Enhancement Plan Distributors- IB /
International matrix for TATA -ST Plan (1Yr.) Targets and Market
CV markets - MT Plan (Sales Head / PMs) Share Targets TASS, TSS, etc)
product suitability in
- Country - wise the select regions / (2-3 years), (Seek feedback
Manpower Requirement Plan
Ball Park Market countries after - Product Pricing (Sales Head / CHRD) Are the Yes - Communication to from Sales
Analysis based on scanning product / Plan resources ROs and Channel Planning
Market Scope profitability - Resource Channel Partner Management adequate? Partners Process)
Requirement Plan (Dealers / Distributors - -Analyze the gaps
- Short List Chosen Plan (Sales Head / PMs / DD/ CMs) and consider
IB...)
Segments / countries corrective actions
in Dom / IB areas Sales Promotion Initiatives
(SHQ / Plan / Schemes (SHQ/ PMs / CMs ) as inputs to next
Product Managers (Sales/PMs/RMs/CMs) marketing review
(PMs) / (MTR/ Final)
Country Managers ( SHQ / PMs / Evolve VOC/ QFD exercises /
(CMs)) (SHQ / PMs / CMs) Cms) Customer Clinics / Feedback (Sales / PMs /
Programs CMs)
(SHQ/MR/RMs/CMs/AMs)
Inputs -
Inputs- -Industry / Country-wise Demabd Forecasts, Inputs - Inputs -
-CVBU Strategic Objectives -Dealer / Distributor Sign-off & adequacy, -Plant Production Reports -Sales Process Customer
-Market Share targets -Customer Feedback -RSO / ShipYard Stocks and
-QFD feedback & other MR / Country Survey Reports Pipeline,
Dom / IB Requirement -Customer Category
-Govt. Regulations in various geographies -Channel Partner ( Dealer /
-Volume Targets -Technological Innovations Conversion rates,
(Dom / IB) - Govt. & Industrial Requirements, Distributor-IB Stocks & -Market Coverage Plan
-Profitability -Plant Capacities & Capabilities Requirement
31.3.2005 5.3
TATA Motors, CVBU Market Development
Outputs
Inputs
w Product gaps to NPI
w Product Segment level Mkt. Research
w Network expansion requirements
Data / Country Scan reports
Key Steps in sub-process- w Non-product requirements to
w CVBU Business Strategy (Dom / IB)
'Prepare Marketing Business Plan'' CS/NVB
w Competition Data
1. Seek and Analyze data w Marketing Budgets to Regional
w Customer Complaints
2. Prepare Product - segment Level Product Managers
w VOC / QFD Reports
Business Plan (Dom/IB) w Human Resource requirement
w Product Demo / Road Show Reports
3. Execution of plan to C-HRD
w Government / Country Regulations
w Sales targets to Sales
w New Product Launches Planned
w Plan for NPI, Product variants
w Past Trend of Sales Volumes
execution
w Business Drivers
Inputs
w Economic growth rate projections
and other Macro – economic Outputs
parameters Key Steps in sub- process - w Industry / Country Volumes forecast
w Country Scan reports 'Forecast demand at Product-Segment Level' w for- Long Term (5 years)
w Historical data (Time Service 1. Seek data and study various inputs - Annual (1 year)
Software) for Short term ( ST) 2. Prepare Forecasting framework - Short Term (Quarterly, Monthly)
forecasting 3. Analyze accuracy of forecasts
w Market share targets (Dom /IB)
w Sector wise growth estimates (Region
/ Country)
w Market Survey Reports
31.3.2005 5.5
TATA Motors, CVBU Determine Customer Groups & Mkt. Segments
Inputs
Inputs
!wPerformance
SIAM / Countrywide
Targets guidelines
for Channel
w Partners
Emerging( Dom
Customer
/ IB )& Market Key Steps in sub- process - Outputs
trends (Dom/
!Business IB) as per
Guidelines 'Determine Customer Groups & w Product based segments
w CP
CVBU strategy (Dom/IB)
Agreement Market Segments' w Geography based Region-
!wGovernance
Listening &Guidelines
Learning feedback on 1. Study various inputs & evolve Country-wise structures
Product, Procedure
!Controlled Usage Manual segmentation Plan w End-use based sectors for
and Geography 2. Determine Market Segments sectoral solutions
w NVB services 3. Determine Customer Groups
w Cluster Analysis
w Competition Segmentation
31.3.2005 5.6
TATA Motors, CVBU Determine Customer Groups & Mkt. Segments
31.3.2005 5.7
TATA Motors, CVBU Promote Products of Tata CV entire Range
Inputs
wInputs
CVBU Focus areas Key Steps in sub process -
w! Performance Targets for Channel
Purchase Drivers 'Promote Products of Tata CV entire Range' Outputs
w Partners ( Dom / IB
Industry Forecast )
– Short Term 1. Study Emerging Customers & Market Trends w Increase in Sales volume and Market
w!Business Guidelines as per
Sales Pipeline 2. Allocate budget for CV products – Overall Share
w CP Agreement
Targets for marketing product target achievement w Region wise budgets for Product
!Governance
segment Guidelines 3. Plan Market Devpt. & Design Schemes Promotion
w!Controlled
MarketingProcedure
Budget 4. Plan & Execute Sales Promotion Initiatives
Manual
w Emerging Customer & Market Trends 5. Measure effectiveness
w Analysis of Application Matrix
31.3.2005 5.8
TATA Motors, CVBU Vendor Management
Vendor Management
Principal Process Owner: Mr. P M Telang - President (Pune and Dharwad Works)
31.3.2005 6.1
TATA Motors, CVBU Vendor Management
In-Process / Efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
Cycle Time of Vendor / Part Development Lead Time for new Vendor Development
Quality of Supplies Percentage No of Self Certified Vendors / % CQ suppliers Nos., Percentage
Monitoring Progress vis-à-vis targets Parts with 2 or less Vendors / Vendor Rating Percentage
varience wrt Target Cost / Budget Nos. / Rs
Divisions Involved - ADD, Auto Materials, QA, MPC, SPD
End Customer - Head of Manufacturing, CVBU SC
Core Values Embedded Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
ISO / TS16949(2002) Clause Ref. 7.4
Process Revision / Modification History
31.3.2005 6.2
TATA Motors, CVBU Vendor Management
31.3.2005 6.3
TATA Motors, CVBU Development of New Vendors
Key Steps in -
Inputs Outputs
'Development of New Suppliers'
6 Make or Buy decision 6 Reliable supplier for Direct inputs
1. Maintain existing Suppliers data base
6 Indents for new parts in vehicle manufacturing &
2. Identify the need for a new source
6 Request from materials agency for assembly fulfilling QCDDMS rating
3. Assess capability of prospective Suppliers including
an alternate source. norms
management & technological capability
6 Information on suppliers gathered
4. Select Supplier & organise site visit
through exhibition, advertisements
5. Seek approval & allot Supplier code
31.3.2005 6.4
TATA Motors, CVBU Development of Item
Key Steps in -
Inputs 'Development of Item '
1. Identify sources Outputs
6 Indent from planning Agency
2. Get quotations 6 Transfer of developed item to
6 Recommendation from
3. Negotiate & finalize price Materials Agency
Materials Agency
6 Drawing / specifications 4. Procure samples
6 Quality standards 5. Complete PPAP
6. Procure pilot lot
7. Transfer of items
31.3.2005 6.5
TATA Motors, CVBU Tooling Assistance to Vendor
Key Steps in -
'Financial / Tooling Assistance' Outputs
Inputs
1. Assess tooling requirement & decide make or buy 6 Providing Tooling to Supplier
6 Budget approval
2. Negotiate Tool cost with Supplier
6 Request for Tooling from Suppliers
3. Procure Tooling
6 Corporate guidelines
4. Handover Tooling to Supplier
5. Annual verification of Tooling
31.3.2005 6.6
TATA Motors, CVBU Procurement From Suppliers
Inputs
Key Steps in -
6 Production forecast Outputs
'Procurement from Suppliers'
6 SPD , CKD & other plant call up 6 Scheduling agreements and
1. Annual Review of Rates & Suppliers
6 Item transfer note from amendments
performance
development agency 6 Procurement as per schedule
2. Obtain price / quota approval
6 Price revision approvals
3. Raise POs and amendments
4. Resolve Supplier issues
31.3.2005 6.7
TATA Motors, CVBU Monitor and Improve Vendor Performance
Key Steps in -
Inputs 'Monitor and Improve Vendor Performance' Outputs
6 Monthly Q, C, D data for each 1. Monthly monitoring of PPM level 6 Vendor rating
Supplier 2. Review of vendor rating 6 CQ suppliers
6 Warranty feedback 3. CQ certification of new Vendors
6 PDI report 4. Monitoring and Audit of CQ Vendors
5. Performance based rewards & recognition
31.3.2005 6.8
TATA Motors, CVBU Channel Partner Management
CVBU-EL-07-02 Select and Appoint New Channel Partner Head - DD Head- CS Head - LOB4 Head-IB
CVBU-EL-07-03 CP Performance Monitoring & Audit Head - DD Head- CS Head - LOB4 Head-IB
31.3.2005 7.1
TATA Motors, CVBU Channel Partner Management
Process Objective
- Develop & Maintain Bank of Reliable and Motivated Channel Partners for Sales & Service
INPUT KEY STEPS OUTPUT
§ CVBU Strategy Ø Assess Territory/ Segment-wise requirement of Channel Partners ü Territory-wise Network of
§ Long Term & Short Term Business Plans Ø Induction of new Channel Partners wherever required Dealers, Service Stations and
§ Territory/ Segment-wise Market Ø Set Targets Spare Parts Distributors
Potential and Market Share Targets Ø Provide Process and Training Support ü Channel Partner Satisfaction
§ Existing Channel Partners (CP) Ø Monitor Performance against Targets ü Customer Satisfaction
Performance Ø Performance Based Rewards and Recognition to Channel partners
§ CSI / DSI Survey Findings Ø Periodic audit at CP
§ Competition Data Ø Collect feedback from Channel Partners as well as from Customers
In - Process / Efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
Appointment of CPs as per Schedule, No CPs Nos. No. of CPs available Nos.
where Sales/ Service Processes Introduced No of Outlets available
Dealer & Customer complaints monitoring Nos. DSI and CSI Index
Monthly Sales, Service and Spare Nos. Market Share & Volumes achieved %, Nos.
Parts Performance of CPs
Divisions Involved - Dealer Development, Vehicle Financing, Customer Support, LOBs, Sales, Service HQ
End Customer - Channel Partners
Core Values Embedded Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
ISO / TS16949(2002) Clause Ref. 7.2, 8.21
Process Revision / Modification History
Date of Modfn. Modification No. Details of Modification Issued / Modified by Approved By
01/06/03 00 New Release BES, Pune
31/03/05 01 Modification through process review Process Team
31.3.2005 7.2
TATA Motors, CVBU Channel Partner Management
Process Owner : Heads of Sales (Dom /IB), Customer Support and NVB
Process objective : Develop and Maintain a bank of reliable and
motivated Channel Partners for Sales and Service.
Ascertain region- Receive & -Due diligence - Seek Review compliance Commencement
country wise Scrutinize site visits & Acknowledgement for Progress of Business (COB)
requirement Applications, interview TCOC, w.r.t. -Sign off Agreements
of new channel Analyze Financial -Set Schedule and Schedule With CP as per
Partners and Capability and Findings Yes Issue LOI prevailing regulations
invite applications short list OK? in the region/country
DD/CS/
DD / CS / NVB / DD/CS/NVB/IB NVB/IB No
IB Reject / Refund DD/CS/NVB/IB DD/CS/NVB/IB DD / CS / NVB / IB
EMD
Review Territory-country -Set / Review -Monitor and Performance Periodic audit Organise Dealer
No of systems/ meet and Third
and Product Segment performance review monthly/ based Reward /
wise expectations quarterly/ yearly Recognition at the processes at Party Surveys
Channel Partners (Volume, Quality performance Channel Partner CP’s end
Scenario and CP Channel & Financial ) for against Targets meet / other
Promotion policies partners Yes each CP functions
-Set Targets and Adequate?
Initiatives
Sales/DD/CS Sales / DD /CS/ Sales / DD DD/CS/NVB/IB
DD/Sales/CS/NVB/IB /NVB/IB NVB/IB /CS / NVB/IB Internal Audit DD/ CS /NVB
Inputs-
-CVBU strategy (Dom /IB)
-LT & ST business Plans Inputs-
-Territory / Country product segment Territory / Country
wise potential & market share Targets. Potential and Past
-Existing CP’s performance Performance
-CSI / DSI survey findings
-Competition Data
31.3.2005 7.3
TATA Motors, CVBU Assess Requirement of Channel Partners
Inputs
w CVBU Marketing Plan (Dom /IB ) Outputs
w Competitors network reach in CV w Probable locations for new Sales
(Dom/IB) Market (Sales & Service) Key Steps in sub - process -
outlets / workshops
w CVBU’s strategic directions Global / 'Assess requirement of Channel Partners'
w Product Segment wise and Region-
domestic presence in chosen 1. Study and analyze existing network Capacity &
country wise requirement of new
product segments/ markets reach and identify gaps
Channel Partners
w Benchmark / Competition data 2. Assess the need for CVBU Channel Partners (Dom
w Service network expansion plan.
w CSI findings / Global)
w Un-presented territory with market 3. Develop and Implement Sales / Service network
potential (Dom/IB) expansion plan
w Growth potential of territory /
country & market share (Sales &
Service)
w Country-Region-wise Sales /
Service Market Share targets Unit
Performance Measure
Efficiency:
w No of CPs identified Vs Target Nos.
How it operates (Methods/ Practices)
w % increase in reach planned % of districts /
1. Study and analyze existing network capacity & reach and identify
countries represented
gaps w.r.t. CVBU Marketing ( Dom / IB ) Plan.
6 Map TML Network reach and identify gaps w.r.t competition network & Efficiency:
2.wheeler network. Identify locations. w CSI w.r.t. availability of Channel Partner Index
6 Prepare CP-wise annual plan for Sales, Service and Spares, identify gaps w DSI / TSI w.r.t. territory Index
2. Assess the need for presence of CVBU Channel Partners in the niche w Coverage of territory where competitor is No. of Locations
present
market /region/country
6 Study long term strategic directions and guidelines given by SC
6 Niche market study and competitive position of CVBU in terms of channel Sub process : Assess Requirement of Channel Partners
presence is carried out. Sub Process Ref : CVBU-EL-07-01 (version 1.1)
Process Owner : Heads of DD Cell / CS / NVB / IB
6 Prepare Network expansion ( Domestic / Global ) plan for Sales, Service
Frequency : Yearly
and submit to SC for approval. EPM Linkage – CVBU-EL- 07 (Channel Partner Management)
3. Develop and Implement Sales / Service network ( Dom / IB) expansion Preparation Date : 31/03/04
Plan Modification Date : 31/03/05
31.3.2005 7.4
TATA Motors, CVBU Select & Appoint New Channel Partner
Outputs
Inputs- Key Steps in sub- process -
w Increase in network (Dom/IB) reach
w Corporate Guidelines and approval 'Select & Appoint New Channel Partner’
w Addition of new CPs to network
w Network Expansion (Dom /IB) Plan 1. Identify suitable prospects
w Increase in Sale of vehicles / spare
w Existing CP’s performance in the 2. Assess on-site : due diligence
parts through CP
region / country 3. Recommend suitable candidates for LOI
w Improvement in CSI / DSI
w CSI / DSI findings 4. Verify LOI compliance and approve COB
w Letter of Intent
w Competition Data 5. Authorization to start business
w Commencement of Business (COB)
31.3.2005 7.5
TATA Motors, CVBU CP Perfomance Monitoring & Audit
Outputs
Inputs Key Steps in sub - process- w Monthly/Quarterly/Annual CP
w Performance Targets for Channel 'CP Performance Monitoring & Audit' performance reports
Partners ( Dom / IB ) 1. Set performance expectations w Workshop profitability
w Business Guidelines as per 2. Monitor & review monthly / quarterly/ w Adherence to TCOC
CP Agreement annual performance vis-à-vis targets w Compliance to TS requirements
w Governance Guidelines 3. Render Training Support w Adherence to Governance /
w Controlled Procedure Manual 4. Recognize high performance Performance Guidelines/TCOC
5. Conduct periodic audit and organize w Audit Recommendation
third party surveys w Compliance to TS requirements
31.3.2005 7.6
TATA Motors, CVBU New Product Introduction
31.3.2005 8.1
TATA Motors, CVBU New Product Introduction
In-Process / Efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
Adherence to time schedule while Colour indicator : New Products / variants introduced against target Nos.
driving of project. Green - 0 to 2 months New Products / variants cycle time against target % Variation
Yellow - 2 to 4 months
Red - 4 months and above
Achievement of Quality targets % w.r.t. target
Actual Vs Budgeted Project and Product cost % Adherence
Divisions Involved - Product Strategy Group, SC, NPI, MKTG, ERC, Auto planning, ADD, PE, MPC, SSG
End Customer -
Core Values Embedded Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
ISO / TS16949(2002) Clause Ref 5.4.2, 7.3
Process Revision / Modification History-
Date of Modfn. Modification No. Details of Modification Issued / Modified by Approved By
01/06/03 00 New Release BES, Pune
31/03/05 01 Modification through process review Process Team
31.3.2005 8.2
TATA Motors, CVBU New Product Introduction
31.3.2005 8.3
TATA Motors, CVBU Development of NPI Product Plan
Inputs
w CVBU Strategy Key Steps in-
w New product proposals from 'Development of NPI Product Plan'
Marketing and ERC 1. Evaluate opportunities and prepare Outputs
w Market Research inputs on Indian proposals w Approved Product plan of NPI
as well as International market 2. Prepare segment wise list of options. Projects
3. Prioritize projects
potential and competition
4. Approval of NPI plan
w Resource availability
31.3.2005 8.4
TATA Motors, CVBU Monitoring Execution of NPI Project
Key Steps in -
'Execution of NPI Project' Outputs
Inputs
1. Form CFT of representatives from related Functions/ w Introduction of new product as per
w Product Specs & Features
Departments Time schedule, targeted Project
w CAPEX Budget approvals
2. Periodic review of activities by Functional Heads and Product cost and meeting
w Targets for Quality and Cost of
3. Periodic review by Project manager customer deliverables
product
4. Periodic Internal Audit of documentation by NPI
w Project Cost & time targets and
Project office
Gantt chart
5. Phase gate clearances ( DR0…DR5)
6. Productionisation
31.3.2005 8.5
TATA Motors, CVBU Budgeting of NPI Project
31.3.2005 8.6
TATA Motors, CVBU Product design and development
31.3.2005 8.8
TATA Motors , CVBU Service Design
Service Design
Principal Process Owner: Mr S M Sharma - Head (Customer Support), Mr S Y Deshpande - AGM (Customer Support
31.3.2005 9.1
TATA Motors, CVBU Service Design
31.3.2005 9.2
TATA Motors, CVBU Service Design
-Analyse data, -Review Priorities -Study needs Define -Test / Pilot Run -Establish
identity performance improvements -Evolve alternatives Process -Review and Controls and
challenges & of current / new service -Project cost incorporate Review
Delivery Mechanism
key customer Services, NVB introduction, benefits channel and changes, if
Expectations performance, -Select alternative -Define
responsibilities necessary Measures are
regarding Pricing -Define -Analyse -Plan and Acquire indicators
services strategies and requirements anticipated risks resources -Assign
-Identify new incentives -assess resource -Training of Responsibilities
proposal Prepare requirement and -Introduce
Channel Partner new
Business Plan seek SC approval
/improvement
NVB HQ / service
Service HQ NVB HQ / NVB HQ / NVB HQ / NVB HQ NVB HQ/ NVB HQ/
Service HQ Service HQ Service HQ /Service HQ Service HQ Service HQ
31.3.2005 9.3
TATA Motors, CVBU Understand Customer Needs
Input Outputs
6 Capturing customer voice at various w Identified Needs / preferences /
touch points such as requirements of –
a. Customer visiting Dlr/TASS Key Steps in sub - process- -Present Customers
b. Customer visits/ contacts 'Understanding Customer Needs' -Potential Customers
c. Customer meets/ mechanic 1. Analyse inputs and decide upon attributes -Competition Customers
meets for data collection -Future Customers
d. Campaigns 2. Gather feedback from customer w Opportunities for Improvement
e. Technical seminars 3. Assess customer feedback and
f. training meets analyse Satisfiers and Dis-satisfiers
6 Competition offerings 4. Prioritise needs
6 CSI & DSI Survey Findings
6 Channel Partners Feedback
6 Regulatory Requirements
31.3.2005 9.4
Design of New Service / Improvement
TATA Motors, CVBU in Existing Service Process
Inputs
Customer needs & expectations Key Steps in sub - process -
6 Changes in Service Environment 'Design of New Service'
1. Define Service features Outputs
6 Competition Offering
2. Naming the process & process owner 6 New / Improved service process
6 Best Practices / Benchmark Data
6 Budget Allocated 3. Process Mapping
6 New proposals from RPMs / 4. Define Delivery Channel
RSMs / Channel Partners 5. Define Service Standards
6 Past Performance data/Feedback 6. Seek Approval
6 CMVR Regulations
31.3.2005 9.5
TATA Motors, CVBU Pilot Run of New Service
31.3.2005 9.6
TATA Motors, CVBU Introduction of New Service
31.3.2005 9.7
TATA Motors, CVBU Sales and Operations Planning
CVBU-EL-10-01 Prepare Monthly/Annual Business Plan (Dom & IB) S & OP committee
31.3.2005 10.1
TATA Motors, CVBU Sales and Operations Planning
Process Objective- Translate Sales Requirement into Production Plan for On-time Delivery
INPUT KEY STEPS OUTPUT
Sales and Marketing Ø Preparation of Annual Production Plan for Vehicles and Spares ü Fulfillment of Market Demand
§ Budget from ABPs, Market including International Business ü Plant-wise, Model-wise
forecast, Requirements from Ø Compilation of model-wise, month-wise Plan, including Export production plan for
LOBs & Product Managers IB Ø Review and Finalization of plant-wise Production plan
§ Plant feedback Manufacturing
Ø Scheduling of day-wise production and dropping plan
Plants
Ø Review of Production Booking & monthly review of Delivery performance.
§ Manufacturing strategy,
Market forecast, plant wise Ø Mid term review of sales and production plans
capacity, Vendor Capabilities Ø Annual review of S&OP process for it's effectiveness
§ Back log of previous month,
Priorities of Sales
Availability of Vessels for
In - Process / Efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
Daily, Monthly delivery against plan % Delivery Vs Plan for vehicles , parts No
Release of production set on Target No.of Days Delivery Vs Plan for CKD/SKD and aggregates %
Delivery compliance Report No.of Days Variation in schedules on Production %
Divisions Involved - Sales (Domestic & IB), LOBs, APC, Logistics, Institutional Sales, GMs manufacturing from plants, PMs (IB)
End Customer- Manufacturing Plants , Sales
Core Values Embedded- Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
ISO /TS16949(2002) Clause Ref. 5.4, 7.2
Process Revision / Modification History
Date of Modfn. Modification No. Details of Modification Issued / Modified by Approved By
01/06/03 00 New Release BES, Pune
25/11/04 01 Modification Process Team
31.3.2005 10.2
TATA Motors, CVBU Sales and Operations Planning
Evaluate the effectiveness & relevance of S&OP process Annually in EPM review meetings for improvement
Modify the production plan for rest of the year Mid term review (MTR) of Sales Plan
during the year/month
-Prepare Annual -Review / Finalize
Production plan for plantwise No
Vehicle & Spares -Compile Plant/ Manufacturing Plan
(Domestic / IB) & model/month wise including Inter Day wise Daily review of
Recon, Ind demand for Plant Transfers Production Production Continue
Production as
Aggregates Vehicles & Spares Schedule & Booking Yes with the
Mid term review of (including Export) per schedule? Plan
Dropping Plan
Sales Plan
* S&OP/ APC S&OP / APC S & OP / APC Plant APPC Plant Mfg.
* S & OP consists of Sales (Domestic & IB), LOBs, PMs (IB), In-charge of Auto Produn & APC of respective plants, Logistics,Institution Sales
31.3.2005 10.3
Annual/Monthly Production Planning &
TATA Motors, CVBU Delivery Performance Review
31.3.2005 10.4
TATA Motors, CVBU Production Scheduling & Sequencing
31.3.2005 10.5
TATA Motors, CVBU Manufacturing
In-Process/ efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
Daily / Monthly adherence to schedule Percentage No of Vehicles manufactured No
Rejection / Rework / Process audit, Cpk Values, As Applicable QI, Rejection / Rework, Warranty complaints/ As Applicable
Internal PDI PDI defects / COPQ
Daily /Monthly Prodn Plan, Inventories, Production Nos, Rs. Asset Turn , Safety Index %, Index
Inventory Levels , Productivity Rs. / Index Inventory No of days /Rs.
Variable conversion cost , Direct Matl Cost Rs. Warranty cost , Break even point Rs. , Nos
Variable conversion cost Rs.
Divisions Involved - S&OP, Manufacturing, Despatch, Materials, QA, PSD,APL, CPL, APPC, Maintenance
End Customer- Sales Head
Core Values Embedded- Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
ISO /TS16949(2002) Clause Ref. 7.5
Process Revision / Modification History-
Date of Modfn. Modification No. Details of Modification Issued / Modified by Approved By
01/06/03 00 New Release BES, Pune
05/02/05 01 Commonising process documents across locations Process Team
31.3.2005 11.2
TATA Motors, CVBU Manufacturing
-Deliver product to
-Annual -Review and acquire Prepare / Review Daily / -Production Casting, RSOs / Direct
forecasting for -Facilities -Derive Monthly shift wise schedule of Forging, delivery to Dealers
material, -Machines,tooling & Production Plan Production and Components// & Institutional
manpower and equipments and man power at Manpower deployment Aggts. and Vehicle customers/Govt./Port for
plant capacity -Inspection/Testing shop level. plan -Monitor productivity and Export
requirement equipment -Review & quality. CLIP -Despatch of
-Man power reallocate Score & conversion components to
manpower cost elements, WIP SPDs / Other plants
APC/ Steering APL /
Committee Manufacturing/QA Production PPC / Prodn Prodn/PSD/QA
Dispatch
Inputs-
-Capital &
Revenue budget Inputs- Inputs- Product Delivery
approvals -Balance -SPC/ Control plan (Refer Next Page)
-Line Capabilities Inputs- Requirement wrt -CQ Audit findings
Inputs- -Manpower Gaps -Monthly mthly plan. -Quality feedback
-Business -Process plan Production -Line Capabilities (drive away chassis)
Plan -Process flow program -Attendance -Pre Delivery Inspn Inputs-
-Volume chart and Quality (S&OP) data -Warranty -Sales
Forecast, control plans Including -Matl Supply complaints Order from
-Production -productivity and requirement -Daily -Data on Internal SHQ / Ros
strategy, cost targets from LOB 4 Production Report failures -Credit
-New Product -Imrovement -Bill of Productivity -SLAs & SQDCM Availability on
Variants Initiatives Material Target targets Dealer’s A/C
31.3.2005 11.3
TATA Motors, CVBU Manufacturing
Scheduling of Material
Rejections / Scrap/
Raise Pos on Vendors Provide Monthly Release Schedules on Receipt, Inspection, obsolete items
and STOs on Plants Vehicle Dropping Plan Vendors and follow up Binning, Storage of despatch / disposal Material Audit, Stock
for Mfg units / Shops Material Verification and
Materials/MPC Prod Plng & Con Matls / FLG CRDO / Stores/ QA Issue Matl / tools to reconciliation
Line, Despatch matl to
plants and Vendors for
processing
Inputs
§ Production Plan for the Year/Month
§ Veh. Dropping Sequence for the Month / 3-days/ day
§ Approved Vendor base (Vendor - Parts - SOB)
§ Daily Shortage List from stores
§ Stock Condition of components
§ Despatch information on aggregates
Product Delivery
Receive Vehicles / spares Storage and
from Works / other RSOs Delivery of vehicles/ Spares PDI and Delivery of vehicle
to Dealer / TSS / Inter RSO / spares to Customer
Check/ Inspect as per RWH Transfers inter RSO
Chassis Check Sheet and transfers as advised by Dealer / TSS
Acknowledge RO
Despatch Resp. RSO / RWH
Transporter Payment
Monitor Despatches Vehicle / Spares Requirement
Resp Plants from Dealers / TSS
31.3.2005 11.4
TATA Motors, CVBU Material Scheduling & Logistics
Inputs Outputs
Key Steps in-
6 Production Plan for the Year/ Month 6 POs on Vendors.
'Material Scheduling & Logistics'
6 Vehicle Dropping Sequence for the 1. Pos on Vendors/ STOs on plants 6 Schedules on Vendors.
Month / 3-days / day 2. Release schedules on Vendors 6 Availability of material for production.
6 Approved Vendor base (Vendor- 3. Follow up with Vendors/ plants
Parts-SOB) 4. Receipt, Inspection & Storage of material
6 Daily Shortage List from stores 5. Issue / Despatch Materials
6 Stock Condition of components 6. Material Stock Reconciliation as per norms
6 Despatch information on aggregates
31.3.2005 11.5
TATA Motors, CVBU Produce Vehicles/Aggregates/Components
Inputs
w B/O materials, aggregates and
components Key Steps in -
w In-house materials, aggregates and 'Produce Vehicles/Aggregates/Components '
components 1. Prepare production schedule
w Production schedule 2. Allocate manpower Outputs
w Estimate sheets/routings 3. Ensure availability of material, tooling, w Vehicle, aggregate, component
w Support from other functions equipment as per quality norms and S&OP
w Quality plan/work instructions/Control 4. Production of parts, aggregates and vehicles
Plans 5. Monitoring of quality, productivity, safety and
w Resources, manpower, direct material, cost
Indirect material/tools, machines,
equipments and vehicles.
31.3.2005 11.6
TATA Motors, CVBU Vehicles, SKD/ CKD & Spares Despatch
Inputs
w S & OP (Spares, SKD/ CKD, Vehicles)
from SHQ/ Plant APPC Key Steps in -
w Chassis, SKD/ CKD, finished 'Vehicle, SKD/ CKD and Spares Despatch ' Outputs
components and aggregates 1. Prepare dispatch plan for rollout w Vehicle despatch
w Packing List, Packing List materials, 2. Make materials ready for dispatch w Spare parts despatch as per call up
Packing materials 3. Picking and Packing (for Spares/ CKD/ SKD) w SKD/ CKD Dispatch
w Approved transporters 4. Document preparation for dispatch
5. Dispatch
31.3.2005 11.7
TATA Motors, CVBU Analysis Of Customer Complaints
Key Steps in -
Inputs 'Analysis Of Customer Complaints '
w Warranty reports / field analysis from 1. Receive complaints & failed parts Outputs
service 2. Preliminary review by Service and w Corrective/ Preventive Action
w Vehicle PDI reports allocation to concerned agencies (Modified product / processes)
w Complaints through DAC/ PCR/ CIR 3. Root cause investigation and analysis w Break Point for introduction of
w Failed parts for analysis 4. Identification and initiation of corrective modifications
w In plant Dealer PDI action w Investigation reports
w Customer Satisfaction survey 5. Monitoring and Review w Opportunities of improvements for
w Customer Grievances 6. Issue of break point ERC / NPI & CS
w Customer Interactions through 7. Documentation w Complaint trend
meets, campaigns, visits, etc. 8. Feedback from field
31.3.2005 11.8
TATA Motors, CVBU Implementation of Design Modifications
31.3.2005 11.9
TATA Motors, CVBU Maintenance
31.3.2005 11.10
TATA Motors, CVBU Sales Planning
Sales Planning
CVBU-EL-12-01 Set Sales Targets and Prepare Sales Plan Sales and Product Management Heads
CVBU-EL-12-02 Manage Off- Take / Shipment Targets Sales and Product Management Heads
CVBU-EL-12-03 Manage Pipeline and Retail Sale Area Managers / Country Managers
31.3.2005 12.1
TATA Motors, CVBU Sales Planning
In-Process / Efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
Daily Pipeline C0-C1-C2-C3 Nos. Monthly Pipeline C0-C1-C2-C3 Nos.
Monthly Review of Conversion Rate C0 to C1 Nos. Annual Sales volume Nos.
to C2 to C3
Divisions Involved - LOB Heads, SHQ, ROs, AOs, Dealer Development Cell and Channel Partners
End Customer- Channel Partners and Customers of TATA Commercial Vehicles
Core Values Embedded- Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
ISO /TS16949(2002) Clause Ref. 5.4, 7.2
Process Revision / Modification History-
Date of Modfn. Modification No. Details of Modification Issued / Modified by Approved By
01/06/03 00 New Release BES, Pune
31/03/05 01 Modification through process review Process Team
31.3.2005 12.2
TATA Motors, CVBU Sales Planning
Process Owner : Mr Shyam Mani – VP (Sales & Marketing), Mr P G Shankar – Head (CVBU-IB)
Process objective : Strengthen and Support Sales and Distribution.
w Market Requirement to Sales
& Operation planning
w Plant Level Manufacturing
Plans
31.3.2005 12.3
TATA Motors, CVBU Set Sales Targets and Prepare Sales Plan
31.3.2005 12.4
TATA Motors, CVBU Manage Off-take / Shipment Targets
31.3.2005 12.5
TATA Motors, CVBU Manage Pipeline and Retail Sale
31.3.2005 12.6
TATA Motors, CVBU Maintain Customer Database
Inputs
w Requirement of customer related Outputs
data (Market Coverage Sheets) Key Steps in sub- process w Updated Customer Database file
w Marketing Research and Sales 'Maintain Customer Database' with Dealership
Planning 1. Seek Customer Information w CDB in Web-based CRM system
w Invoices for vehicles 2. Record Customer Information &
w Referrals from existing customers Requirement in Customer Information Form
w Data from Financiers, RTO, Demo, 3. Compile and Update Data Base
Publications, etc. 4. Maintain Data Base
31.3.2005 12.7
TATA Motors, CVBU After Sales Service
CVBU-EL-13-01 Deliver Post- Sales Services RMs/ RSMs/ RPMs/ Channel Partners
31.3.2005 13.1
TATA Motors, CVBU After Sales Service
In - Process / Efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
Response Time, Cycle time of Warranty Days. % Adherence to set Standards. Average time for Complaint Percentage /
Claim Settlement/ Bill Settlement Resolution / Claim Settlement / Bill Settlement / Repairs / Service No of days
Customer Complaints Nos. CSI and DSI Index, %
Divisions Involved - Service HQ, Regional Offices, NVB HQ
End Customer- Channel Partners and Customers of TATA Commercial Vehicles
Core Values Embedded- Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
ISO /TS16949(2002) Clause Ref. 7.5.1.8
Process Revision / Modification History
Date of Modfn. Modification No. Details of Modification Issued / Modified by Approved By
01/06/03 00 New Release BES, Pune
31/03/05 01 Modification through process review Process Team
31.3.2005 13.2
TATA Motors, CVBU After Sales Service
-Feedback to Product /
Services Design for
Improvement
-Review
-Provide Channel
-Assessment -Settle -Continue with
Communication Service to the Partner
-Set / Review of Resources Channel the Process
/ Training to Customer performance
KPIs / Standards required w.r.t. Partner’s Bills -Coduct
Channel (Free / paid / vis-à-vis
for Service region / and Claims periodic audit
Partners and Warranty) Need to
demographic -Aggregate No Channel
their -Collect & targets change
-Communicate coverage Service Partners
employees send customer -Analyse service
New process and desired Delivery -Analyse
regarding feedback RO Channel standards
new / revised Feedback Customer &
delivery of -Attend Partner ?
service standards from all Channel Partner
services customer feedback
Service HQ / regions feedback
complaints and take
Service HQ NVB HQ / centrally
ROs ROs corrective
/ NVB HQ Channel Service HQ /
action Service HQ / NVB HQ
Partner ROs NVB HQ
Yes
Inputs-
-Divisional BSC,
-Segmentwise Customer requirements.
-CSI / DSI Surveys,
-Feedback from Customer /
Channel Partner
-New services & Service Standards,
-Competition and Benchmark Data
31.3.2005 13.3
TATA Motors, CVBU Deliver Post - Sales Services
Inputs
w Policy on warranty, free service & Key Steps in sub- process - Outputs
repairs 'Deliver Post–Sales Services' w Repair / rectification of complaints
w Norms/ guidelines on infrastructure 1. Provide Free / Warranty services on customer vehicles
trained manpower 2. Provide Paid Services & Repairs w Maintenance service to customer
w Guidelines to channel partners 3. Gather Customer feedback vehicles
w Service interval info specific to each 4. Input on product performance & w Data on product performance &
model complaints to plant failures.
w Customer requirements.
31.3.2005 13.4
TATA Motors, CVBU Warranty & Free Service Handling
Outputs
Key Steps in sub-process- w Acceptance / rejection of Warranty
Inputs 'Warranty & Free Service Handling' claim
w Tata Motors guidelines for Free 1. Set Guidelines on Warranty / Free Service w Replacement of failed parts
w Service / Warranty 2. Warranty Handling & delivery of FS by w Settlement of warranty claims & free
w Warranty claims & free service Channel Partners service bills Improvement in
bills through VCM 3. Scrutinize Warranty Claims & FS Bills customer satisfaction
4. Failed parts managements system w PPRs to plant for product
5. Conducting weekly warranty meetings improvements
w Improvement in dealer satisfaction
31.3.2005 13.5
TATA Motors, CVBU Spare Parts Management
31.3.2005 13.6
TATA Motors, CVBU Complaint Management
31.3.2005 13.7
TATA Motors, CVBU Facilities and Environment Management
31.3.2005 14.1
TATA Motors, CVBU Facilities and Environment Management
In-Process/ efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
Adherence to Schedule Percentage No of Facilities / Toolings provided No
Value of Quality parameters Various Value of Quality parameters for end products / effluent Various
Equipment Uptime and Environment Compliance with safety Statutory and Environmental
% %
Control Parameters Norms, SLA compliance
Stage wise Actual Vs Budgeted Costs Rs Cost of Toolings / Facilities / pm index Rs
Divisions Involved - Projects, Construction, Plant Engineering, Production / Tool Engineering
End Customer- Manufacturing and Community
Core Values Embedded- Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
ISO /TS16949(2002) Clause Ref. 6.3
Process Revision / Modification History-
Date of Modfn. Modification No Details of Modification Issued / Modified by Approved By
01/06/03 00 New Release BES, Pune
31/03/05 01 Modification through process review Process Team
31.3.2005 14.2
TATA Motors, CVBU Facilities and Environment Management
31.3.2005 14.3
Organize and Upgrade Facilities
TATA Motors, CVBU (Plant, Machines, Tooling, Equipments, Vehicles etc.)
Key Steps in -
Inputs 'Organize and Upgrade Facilities' Outputs
w Indents from Planning dept. / other 1. Compile requirements and seek capital budget
dept. for new facilities or up w Availability of facilities ( Plant,
approval Machines, Equipments,Tooling,
gradation of facilities.
2. Procure Bought out Facilities Vehicles etc.).
w New Product Introduction schedule
3. Procurement of tooling. w Up gradation of Tooling and Facilities
w Capacity enhancement plan
4. Install, Commission and Capitalize Facilities
31.3.2005 14.4
TATA Motors, CVBU Asset Management
Outputs
Inputs w Updated Asset data base
w Asset data base Key Steps in- w Asset verification report
w Asset shifting advises 'Asset Management' w Disposal of obsolete / surplus
w Asset disposal proposals 1. Verification of assets Assets
w Manufacturer’s 2. Maintain Assets
Guidelines 3. Disposal of Assets
31.3.2005 14.5
Create Infrastructure
TATA Motors, CVBU (Bldg., Water Supply, Sanitation, Electricity, Telephone Network)
31.3.2005 14.6
TATA Motors, CVBU Operate & Maintain infrastructure
Inputs
Operate
Key Steps in – Outputs
w Operational requirements of Users
'Operate & Maintain infrastructure' w Uninterrupted service to offices /
w Regulatory requirements ( Pollution
1. Assess / review resource requirements
Control, Safety norms, Electricity plants
2. Off-loading or on-loading decision
Rules etc. ) w Government approvals
3. Organize resources
Maintenance
4. Operate and maintain facilities w Customer’s satisfaction
w Break down reports or User complaints
5. Audit by Government agencies
w Preventive maintenance requirements
w Regulatory requirements
31.3.2005 14.7
TATA Motors, CVBU Environment Management
31.3.2005 14.8
TATA Motors, CVBU Human Resource Management
CVBU-EL-15-04 Learning and Development Mr.N K Dutt and locational training/MPD heads
31.3.2005 15.1
TATA Motors, CVBU Human Resource Management
31.3.2005 15.2
TATA Motors, CVBU Human Resource Management
Manage Corporate HR services- Process Owner : Mr P P Kadle ED (Fin & Corp Affairs)
Process objective : Source and enhance Human Capital.
w HR Service for Corporate offices, Attract and retain talent,Create and
Regional & Area offices maintain culture of High Performance,
(similar to that for the Plants) Improve Quality of Life of employee.
w Compensation Management for TM and
-Review and -Acquire and EG grade officers of all the locations Outputs-
Finalise HR allocate Guidelines/mandate to Loc HR for -Motivated &
Policies, Set Resources Compensation of S & below Grades competent work
Targets w Asses Work level of Sr. Officer Budget
force as per requirement
w Organization Development -ESI and Drivers of Proposal
-Develop w Special training programs for TM and Satisfaction/
Initiatives and w EG Grades of all the location Dissatisfaction
Assign Head- Head Corp.HR
Responsibilities Corporate HR
HR Council
Manage HR /IR Services at resp. plants Periodic Review of
performance and Annual Review and
w Manage Family Size (Recruitment & Placement, reallocate Resource Budget
Opt-sizing and Separations) Resource Preparation
w Productivity Services - Manpower Planning, job
Evaluation, Productivity Measurement through PSD Head - Corp. HR HR Council
Inputs- w Manage Industrial Relations
-CVBU Strategy w Manage safety
-Business Plan w Employee Training and Development
Budget Approval -Statutory w Manage Employee Welfare Services (Transport,
Continue with
requirements -Tata Group Canteen, Housing, Medical, Cumminity
Process
Gudelines Centres etc)
-Industry Environment w Performance Mgt(PMS) *Talent/Potential
-OHS feedback Management, Compensation
-Third party survey Management
findings w Manage Employee Database
Conduct OHS
Resp Plant HR
31.3.2005 15.3
TATA Motors, CVBU Develop & Manage HR Strategies
Inputs
w HR vision, mission,
Key Steps in-
w Tata Motors long term and short term
'Develop & manage HR Strategies' Outputs
w Business plan & Objectives.
w Industry climate
1. Revisit HR Vision & Mission w HR Vision & Mission
w Statutory/ legal requirements.
2. Strategic Analysis w HR strategies and policies
w Group HR directives
3. Develop Long term and Short term Plan. w CVBU, HR BSC
w Employee feedback through surveys
4. Develop action plans and BSCs and w Plant HR BSC
Internal Customer’s expectations
seek budget approvals w HR Initiatives
5. Implement & Review HR plans and Policies
and feed back
w Current HR capabilities
31.3.2005 15.4
TATA Motors, CVBU Manage Industrial Relations
Key steps in –
'Manage Industrial Relations'
Inputs Outputs
1. Create structure for managing IR
w HR policies HR Strategy w Better understanding between
2. Collective bargaining and good relationship with
w Model standing order Management, Union &
union.
w Workmen related acts employees.
3. Produce career growth opportunities
w Union w Disciplined work environment
4. Foster co-operation and manage employee
welfare
31.3.2005 15.5
TATA Motors, CVBU Manage Family Size
31.3.2005 15.6
TATA Motors, CVBU Learning and Development
31.3.2005 15.7
TATA Motors, CVBU Performance Management System
31.3.2005 15.8
TATA Motors, CVBU Succession Planning
Key steps in -
'Succession Planning'
Inputs 1. Identify positions for succession planning. Outputs
w PMS, TWL, Talent 2. Identify competencies required for the w Identified successors for
management analysis successors. key positions.
3. Identify / Review probable candidates
4. Develop successors and monitor readiness.
31.3.2005 15.9
TATA Motors, CVBU Manage Employee Welfare
Inputs
Key Steps in- Outputs
w HR policies
'Manage employee welfare' w Welfare services
w Regulatory norms
1. Identify welfare service requirements. w Identified Successors for key
w Expressed and implied needs of
2. Design welfare services. positions.
employees requirements.
3. Provide welfare services
w Budget
4. Collect feedback analyse and improve
31.3.2005 15.10
TATA Motors, CVBU Employee and organisational survey
31.3.2005 15.11
TATA Motors, CVBU Information and Knowledge Management
CVBU-EL-16-04 Manage Information Storage & Retrieval CIO supported by TTL Project Heads
CVBU-EL-16-05 Manage Facilities & Network Operations CIO supported by TTL Project Heads
31.3.2005 16.1
TATA Motors, CVBU Information and Knowledge Management
31.3.2005 16.2
TATA Motors, CVBU Information and Knowledge Management
31.3.2005 16.3
TATA Motors, CVBU Information Resource Management
31.3.2005 16.4
TATA Motors, CVBU IT Governance
31.3.2005 16.5
TATA Motors, CVBU Manage support System
31.3.2005 16.6
TATA Motors, CVBU Manage System Security
Inputs Outputs
w IT Roadmap w Information Security Policy /
Key Steps in-
w Enterprise Data Standards Procedures
'Manage System Security'
w Enterprise Quality w Installation Reports
1. Establish systems security strategies
Standards w Information Asset
and levels
w Application Specific classification
2. Test ,evaluate and deploy systems
Security Requirements w Secured Systems
security and controls
w Documented IT process w Segregation of Duties
and procedures w Signoff document - Vendors
31.3.2005 16.7
TATA Motors, CVBU Manage Information Storage & Retrieval
Key Steps in -
Inputs ' Manage Facilities & Network Operations' Outputs
w IT Roadmap 1. Manage Centralized facilities w Reliable facilities and network
w Information Security Policies / 2. Manage Distributed facilities operations
Procedures 3. Manage network operations
31.3.2005 16.9
TATA Motors, CVBU Manage Information Services
Inputs
w IT Roadmap
w Business Processes Key Steps in - Outputs
w KPMs and KPIs 'Manage Information Services ' w Storage & Disposal policies
w IT Security Policy 1. Manage libraries and information centers w Categorized document libraries
w Storage and Retrieval Norms 2. Manage business records and documents
w Statutory requirements
31.3.2005 16.10
TATA Motors, CVBU Manage Information Audits
Inputs
w IT Roadmap
w Information Management
Key Steps in -
Process
'Formation Management/Audits' Outputs
w Organizational Databases
1. Perform IT security Audits w Audit Reports
w Information Technology
2. Perform IT Infrastructure Audits
Management Systems and
3. Perform Information Quality Audits
Infrastructure
w Quality Standards
(ISO,CMMI…)
31.3.2005 16.11
TATA Motors, CVBU Knowledge Management
Inputs
w Senior Management -
Strategic direction
w Employees - Suggestion Scheme,
Share Café, Value Engineering
Workshops Key Steps in -
w Customers - QFD, Planned 'Knowledge Management' Outputs
Interactions with customers e.g. 1. Understand Knowledge requirements w Knowledge Repositories
Kulbir Singh Project, Product Review 2. Encourage Knowledge Sharing w Integrated Intranets
Meetings between Marketing, Service, 3. Exchange and use knowledge w Communities of Practice
QA, ERC & Mfg. 4. Build Knowledge Repositories where
w Channel Partners - Dealers’ meets, necessary
Workshop Managers’ meet
w Vendors - Vendors’ meets,
Involvement in Product Development
w Others - Consultants, ISO / TS / BSC
Audits, TBEM External and Internal
Assessment Processes
Performance Measure Unit
Efficiency
How it operates (Methods/ Practices) Effectiveness
1. Senior Management and process owners continuously communicate the w Number of ideas shared and replicated on
6 Business requirements to the respective stakeholders Share Café
2. Encourage knowledge sharing through… w User base of various intranets
6 Suggestion Scheme, Share Café w Number of suggestions in a year
6 Cross Functional / Locational Assignments w Number of Procedures / Processes
6 Dealer meets, Vendor meets mapped
6 QFD w Number of Product Modifications
6 Involvement of suppliers during product development, etc
3. Exchange and Use knowledge
6 Various meetings (CFT / CLT / SDT) Sub process : Knowledge Management
6 Modify Design / Process / Procedure Sub Process Ref : CVBU-EL-16-08 (version 1.1)
4. Build Knowledge Repositories Process Owner : Functional Heads/ Process
5. Monthly Reports in functions / divisions / departments Owners)
6 ISO / TS / EPM Documentation EPM Linkage – CVBU-EL-16 ( Information &
6 Audit / Assessment Reports Knowledge Management )
Preparation Date : 31/03/04
Modification Date : 31/12/05
31.3.2005 16.12
TATA Motors, CVBU Finance and Budgeting
31.3.2005 17.1
TATA Motors, CVBU Finance and Budgeting
31.3.2005 17.2
TATA Motors, CVBU Finance and Budgeting
31.3.2005 17.3
TATA Motors, CVBU Revenue Budgeting
Inputs
w Vehicle sales plan Key Steps in –
w Non vehicle business plan 'Revenue Budgeting' Outputs
w Plant level production plan 1. Preparation of functional budget at plant w Plant / Div-CX / BC wise budget
w Manpower requirement & proposed level and Corporate level w Budget updation in system
salary/wage revision 2. Consolidation of budget w MIS report.
w Cost saving target 3. Inclusion of Union Budget impact w Cost saving report
w R&D Budget 4. Review and Approval of budget. w Absorption rate for determining
w Publicity budget 5. Communication of approved budget to standard cost of aggregates /
w Depreciation policy. Functional Heads components / assemblies
w Union budget 6. Monitoring and review of budget.
w Directives from Board of Directors
w Capital Budget
31.3.2005 17.4
TATA Motors, CVBU Product Costing (Auto)
Inputs
w Sales/ production plan for the
budget year
w Revenue budget for the year. Key Steps in –
w Bill of material. (BOM) 'Product Costing' Outputs
w Technical part list converted to BOM 1. Update year opening price adjusted to Product cost
w Routing for parts/assemblies (SMH) budget parameters as planned price for w For Vehicle
w Actual expenses for each cost bought out parts w For Aggregate and assemblies
centre for current year period. 2. Release budgeted cost centre rates. w For components
w Total expenses, which are 3. BOM explosion w MIS for variance analysis
apportioned to Auto (e.g. common 4. Analysis of cost sheet (Cost sheet
service, HO expenses, R&D should be free of errors--- status KA)
expenses) 5. Mark and release the cost for inventory
w Cost centre master data valuation and production booking.
w Financial account data
w Asset master data
Performance Measure Unit
Efficiency
How it operates (Methods/ Practices) w Correctness of product cost. %
1. Cost centre rate is based on actual basis (BC rate of last quarter) and activity involved
(SMH required) to achieve the planned production. Effectiveness
2. Condition of supply is being factored in BOM while entering in the system w Availability of cost data for product %
3. BOM consists aggregation of components, subassemblies, and assemblies to vehicle. booking and stock valuation.
4. While BOM explosion system looks for planned material cost of each input material. At w Absorption of Expenses over output.
each level material cost is aggregated.
5. For in house manufactured components (indicated by E99 or E98),Cost centre routing is Sub process : Product Costing (Auto)
picked and conversion cost is calculated based on cost centre rate. At each higher level Sub Process Ref : CVBU-EL-17-02
conversion cost is aggregated. (version 1.1)
6. Aggregate cost at each level is product cost . Process Owner : Corporate Finance/Plant –
7. Product cost will get released at component level, and for each aggregate where it is Business Plg
considered for in house product booking. EPM Linkage : CVBU-EL-17 (Finance
8. Product is also available at current month average material price as well as weighted &Budgeting)
average material price. (This product cost is used for MIS purpose) Preparation Date : 31/03/04
Modification 1 : 30/12/04
Modification 2 : 18/01/05
31.3.2005 17.5
TATA Motors, CVBU Product Costing
Key Steps in –
'Product Costing'
Inputs 1. Work out planned cost
w Asset master data. 2. Work out actual product cost based on
w Cost center master data. 6 Actual Production Outputs
w Financial account data. 6 Actual consumption of Matl & labor w Cost of product
w Cost/work center data 3. Analyze Variance w MIS.
w R&D (actual+projected) 4. Prepare MIS and Profitability report w Cost audit report
w Bill of Material for products. 5. Consolidation of Cost and MIS Report.
w MAP’s 6. Cost monitoring, cost audit.
7. Non auto (tooling, electronic etc) costing
31.3.2005 17.6
TATA Motors, CVBU Product Costing (Non Auto – Foundry)
Inputs Outputs
Key Steps in –
w Revenue Budget w Cost of product
'Product Costing'
w Production Plan 1. Work out Activity Rates –( Melting, w Informing Cost to internal
w Asset master data. Core, Mould and Finishing ) customers for the purpose of
w Cost center master data. 2. Update activity rates transfer accounting
w Cost centre wise Manpower data 3. Take cost roll-up (item wise cost w Excise duty payment for Transfers
w Bill of Material for products. bifurcated in to Variable & Fixed cost) w Inventory valuation
w Quotations for sale to External
Customers
w Contribution & Profitability analysis
on outside sale
31.3.2005 17.7
TATA Motors, CVBU Product Costing (Non Auto – Prodn. Engineering)
Inputs
w Cost centre master data.
w Cost centre wise expenditure Key Steps in –
Budget for the year 'Product Costing' Outputs
w Cost centre wise Labour Hours 1. Updation of Cost Centre Rates w Cost of Tooling
budget for the year 2. Consumption of Direct material w MIS – Performance sheet,
w Release of Work Order based on for actual cost variance analysis at overall level
Indents from APL/Technical (estimate for outside quote) w Quotations for outside Sale
Services & Pos received from 3. Labour Hour booking for actual cost w Contribution & profitability analysis
Outside customers for (estimate for outside quote) on outside Sale of Tooling
manufacture of Tooling
w BOM release for manufacture of
Tooling against WOs.
31.3.2005 17.8
TATA Motors, CVBU Product Pricing- (Vehicle)
Inputs
w Sales forecast of new product
w New vehicle specifications
w Works cost data from Plants Key Steps in -
w Tax applicability 'Product Pricing' Outputs
w Competitor price data 1. Determine New vehicle price. w Updated vehicle price lists
w Marketing and pricing strategy for 2. Approve and Implement new prices available to internal & external
new products 3. Review and revise existing customers
w Profitability targets product prices w Invoicing of vehicles
w Mktg, sales & distribution cost data
w Current price list
w Information about existing product
strategy
31.3.2005 17.9
TATA Motors, CVBU Direct taxation
Inputs
Key steps in –
w Income tax act & Rules 'Direct taxation'
w Case laws / tax journals 1. Analyzing Union budget, Income Tax act, Rules, Outputs
w Double taxation avoidance Treaties and case laws w Legal compliance
agreement 2. Tax planning w Avoidance of penalty / interest
w Union budget 3. Ensuring compliance of tax law and procedures payment
w Financial accounts 4. Computation of income w Tax saving
w Directives from Board of Directors 5. Payment of taxes to Govt. and filing of Return w Assessment / appeal order
w Details of transaction data from 6. Handling assessment / appeal / notices
Divisions having tax impact
w Expert opinion on legal issues
31.3.2005 17.10
TATA Motors, CVBU Product Pricing - (Spare Parts)
Inputs
w Vehicle sales forecast
w New vehicle specifications/
spare part list
w Spare parts master
Key Steps in – Outputs
w Serviceable parts list and
'Spare parts Pricing' w Updated spare parts price
technical part list
1. Determine spare parts price lists available to internal &
w Purchase contract from Plants
2. Approve and Implement new prices external customers
for OE suppliers
3. Review and revise existing spare parts prices
w Duties / Tax applicability
w Cost data for shop made parts
w Marketing and pricing strategy
w Profitability targets
w Current price list
31.3.2005 17.11
TATA Motors, CVBU Financial Accounting
Inputs
w Accounting standards and
pronouncements, Indian Key Steps in –
Companies and Taxation act 'Financial Accounting' Outputs
w US GAAP 1. Controlling authorisation for passing w Management Information Reports .
w TB from HR & Payroll & BHPC accounting entries in the system w Quarterly Results as per SEBI.
and other Legacy system . 2. Correct accounting for income and expense w Consolidation Accounts as per
w TB and other FI data from 3. Consolidation of accounts at corporate level AS21.
Subsidiaries and Associates 4. Preparation of accounts as per Schedule VI w Annual Report
w Data from Vendors for incoming requirement and quarterly accounts w Book on Explanatory Note.
Materials thru VCM . as per AS 25 w Form 20 as per US GAAP
w Data from Customers on 5. Preparation of accounts as per US GAAP w MD & A as per US GAAP
Warranty and PDI claims 6. Review of financial statement w Prospectus and other Financial
w Proof / documents pertaining 7. Regulatory compliance documents
income / expense booking
w Bank statement and related info
from Banks thru Internet.
31.3.2005 17.12
TATA Motors, CVBU Financial Accounting
Key Steps in –
'Financial Accounting'
Inputs 1. Statement of Balances from all TML
w Common Chart of Accounts locations Outputs
w Transactions & Trial balances of 2. Financial accounting schedules for all w Company’s consolidated final
various locations assets & liabilities accounts duly audited.
w Accounting Standards 3. Bank Reconciliation w Final accounts to meet requirements
w Information & data from 4. Variance analysis of major P & L and of US GAAP.
subsidiaries & associates Balance Sheet items
5. Reconciliation of TML accounts with
subsidiaries & associates.
31.3.2005 17.13
TATA Motors, CVBU Indirect Taxation
Inputs
Excise Duty.
6 Excise rules & tariffs
6 Union budget
6 Vendor master Key steps in –
6 Duty paid excise invoices from vendors Outputs
'Indirect taxation'
6 Product price list. 1. Analyzing tax rules and regulations and
6 Dispatch cum excise documents w Cenvat credits
their implications in the business
Sales Tax w Cost price of Product
2. Payment of taxes to vendors
6 Invoices of suppliers w Refund claims
3. Collection of taxes from customers
6 Customer master w Legal judgments
4. Set off adjustment of service tax against
6 Form C/D/H ,and entitlement w Assessment report by government
payment of excise duty
certificates w MIS on contingent liability, status of
6 Sales tax rules 5. Payment of taxes to Govt.
cases under appeal
6 Commercial invoices of TML 6. Filing of returns and claiming of refunds
Service Tax
6 Service tax rules
6 Invoices of the service providers
6 Our invoices for services rendered Performance Measure Unit
Efficiency
How it operates (Methods/ Practices) w Timely availment of Cenvat credit/set off
1. After budget session Works finance analyses rules & tariffs related to excise duty, sales tax, service tax, & local taxes concessions. %
2. Works finance updates master data related to above
w Timely payments of taxes. %
3. Implication and effect on product pricing is worked out and conveyed to Sales & Marketing Dept
4. Taxes are paid to vendors based on PO terms & conditions against excise on commercial invoices through supplier w Timely fillings of returns / claims %
payment system
Effectiveness
5. Works finance avails Cenvat duty credit against excise duty paid on inputs
6. Excise duty & sales tax are collected from customers on sold products & separately accounted for w Adherence to statutory requirements. %
7. Service tax collected on services rendered and paid on services availed. Reduction of contingent liability for excise Rs. crores
8. Works finance makes payments of excise duty for vehicles/components dispatched through PLA or RG23 after netting and sales tax related matters
off Cenvat credit available
9. Set off is being availed on service tax paid on services availed against payment of excise duty
Sub process : Indirect Taxation
10. Excise duty is being paid on 5th of next month, Returns are being submitted by 10th of next month
11. Works finance makes payments of sales tax to state/central government every month.
Sub Process Ref : CVBU-EL-17-05 (version 1.1)
12. Works finance makes payment of service tax collected on 25th of next month, Returns are being submitted half yearly Process Owner : Corporate/Plant Level
13. Local taxes (Octroi etc) are being paid by Works finance EPM Linkage : CVBU-EL-17
14. Works finance files submissions, returns and claims refunds in case of concessions (Finance & Budgeting)
15. Coordinating with Legal Dept. for disputed cases Preparation Date : 31/03/04
16. Works finance prepares schedules, answers to queries of auditors from Excise Dept. and statutory Auditors Modification date : 24/12/04
31.3.2005 17.14
TATA Motors, CVBU Direct taxation
31.3.2005 17.15
TATA Motors, CVBU Receivable Management
Key Steps in –
'Receivable Management'
Inputs 1. Receipt updation and bank reconciliation
w Customer, Price and Tax master 2. Monitoring and controlling credit limits Outputs
data 3. Incentive payout to dealers / customers w MIS on on receivables
w Sales order 4. Dealer / customer account reconciliation w MIS on incentive payout
w Payment terms and condition of 5. Follow up and recovery of dues w Quarterly sign off with dealers/
order as agreed by management 6. Provisioning of bad debts and write off customers
w Incentive Schemes for 7. Inventory reconciliation and valuation for RSO w MIS on dealership
Dealers/Customers stock financial position
w Invoice 8. Management of Sales tax payment and
assessment
31.3.2005 17.16
TATA Motors, CVBU Receivable Management
Key Steps in –
'Accounts Payment Mgmt' Outputs
Inputs Scope: (vendor payments for material & services.) w Cheques to suppliers,
w Approval of new vendor. 1. Maintenance of master data. contractors
w Service entry sheet/GINs 2. Receipt of invoices from suppliers w Accepted Hundies
w Purchase orders. 3. Invoice verification, payment run w Debit notes.
w Advance request. 4. Process recoveries from suppliers, w Payment advise spool to
w Supplies,invoice. reconciliation. HDFC for supplier payments.
w Recovery advice. 5. Disbursement of payments. w Financial statements
6. Financial accounting & audit. w Reconciled accounts.
31.3.2005 17.17
TATA Motors, CVBU Resource Management
Key Steps in –
Inputs 'Resource Management'
Internal 1. Resource Planning
w Long term plan, annual plan 2. Finalize Resource outflow from Revenue Outputs
w MTR Review Budget w Plans for utilization of funds
w Monthly Sales and Plant Data 3. Work out monthly, income & expenses and w Plans for investment/loans
w Daily expense and collection allocate resources w MIS
data 4. Track daily collection and expenses w Monthly cash flow estimate
w Capex Plans 5. Take decisions on loans & investments w External obligations
External 6. Channelise funds(invest or borrow)
w Market Related, Interest 7. Prepare MIS reports (Board, ED’s, Finance
Rates, Funds Availability committee)
31.3.2005 17.18
TATA Motors, CVBU Risk Management
31.3.2005 17.19
TATA Motors, CVBU Employee Services
31.3.2005 17.20
TATA Motors, CVBU Statutory Audit
31.3.2005 17.21
TATA Motors, CVBU Manage Investor Relations
31.3.2005 17.22
TATA Motors, CVBU EVA Drilldown
Key Steps in –
Inputs 'EVA Drilldown'
w LOB-wise Sales Volumes 1. Delineating CVBU EVA drivers between Plant
w Net Realizations & Marketing Outputs
w Plant-wise model-wise sales 2. LOB-wise Revenue drivers, Variable Cost w Revenue & Cost driver sheet for
volumes Drivers LOB
w Material consumption 3. Basis of Fixed Cost (Mktg.) allocation w Cost driver sheet for plant,
w Expenses incurred 4. Plant-wise Cost Drivers business unit and LOB
w Activity carried (SMH) 5. Material consumption w Quarterly Report / Half yearly
w Manpower break up 6. Expenses under diff heads at the shop level report for business unit / LOB.
w Written down value of assets and 7. Driver drill down sheets for each sales region,
WIP plant and business unit.
31.3.2005 17.23
TATA Motors, CVBU Vehicle Financing
31.3.2005 18.1
TATA Motors, CVBU Vehicle Financing
In-Process/ Efficiency Measure Unit of Measure Output Measure / Effectiveness Measure Unit of Measure
Delay in contract booking Delay in contract booking Recovery as per Schedule (TMF) %
New Product sale increase, Increase in customer base Nos. Vehicles financed through TMF, Nos.
No. of contracts booked, CMS at branches % increase in marketshare over
Nos. previous quarter, Retention of Market Share, NPAs as % of SOH %
Repossessed vehicles, No. of contracts Processed
Loan Disbursals, Penalty collected Rs. financing Profit, ODMR, BHPC share increase in new product Rs., %, %
Divisions Involved Vehicle Finance, Dealer Development, Dealer, TSS
End Customer- Customers of Vehicles
Core Values Embedded- Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
ISO / TS 16949 (2002) Clause Ref..
Process Revision / Modification History-
Date of Modfn. Modification No Details of Modification Issued / Modified by Approved By
01/06/03 00 New Release BES, Pune
31/3/04 01 Updation of changes w.r.t. organizational restructuring BES, Pune
31.3.2005 18.2
TATA Motors, CVBU Vehicle Financing
Financing Through
Inputs- External Financers
- CVBU’s overall strategy
(Market Expansion for vehicles, Revenue &
Profit target, Increases in Non Cyclic Business),
- Financing requirements from End Customers Dealer / TSS
(Territory wise, Segmentwise, Customer profitwise,
- Overall financing Industry scenario (Territory &
Segment wise Players, Interest rates, Financing
norms)
- Competitor activities
- financial Health of Dealers,
- Available of Finance and cost & risk of
financing for TMF
- Dealer Network Expansion Plans
- Regulatory Requirements
31.3.2005 18.3
TATA Motors, CVBU Vehicle Financing
No Yes
Outputs- Accident Insurance
Repossession and
Sale of Vehicle case ? Claiming and
Auction of Vehicle
through Dealer/TSS, settlement
TMF
Recovery schedule, TMF
Hire Purchase Yes No
Agreement payment
From
Page-1 received?
Passing
Inputs- Inputs- Ownership to
-Territory wise potential Customer Proposal Inputs- Customer/
and target for TMF through Dealer / Insurance Co. /
Fund requirements TSS, Repayment Successful
Guidelines from Credit Availability, from Bidder
Corporate Finance Vehicle Finance Customers TMF
Past Performance of Policies
Agents
Government Regulations To
Page-1
31.3.2005 18.4
TATA Motors, CVBU Channel Development
Inputs
w Feedback regarding market Key Steps in –
'Channel Development' Outputs
penetration from RMs/ sales Staff w Market Reach
w Pipeline sales information. 1. Analyse the input data and information
2. Based on the above analyses, open new w Market Share
w Customer database from TML sales.
w Information of competitors branches for TMF
3. Appoint new service providers – dealers,
DMAs and collection agents
31.3.2005 18.5
TATA Motors, CVBU Offer New Products
Key Steps in –
Inputs 'Offer New Product'
w Information of competitors 1. Study the input data including data Outputs
w Availability of cheap funds competitors w New Schemes of Finance
w Feedback regarding customer 2. Design/ evolve new offerings to attract more w Market Share
preferences from RMs/ sales Staff customers – in terms of interest rates,
w Pipeline sales information. tenure, amount and discounts
3. Introduce new offerings for customers
31.3.2005 18.6
TATA Motors, CVBU Disbursements
31.3.2005 18.7
TATA Motors, CVBU Collection
Key Steps in –
Inputs 'Collection'
Outputs
w MIS on live contracts. 1. Arrange collection of receivables through
w Improved cash-flow cycle
w MIS on overdues. CMS, retainers and dealers
w Reduction in overdues
w BHPC Unix-based IT application 2. In case of defaults beyond 2 months, initiate
w Growth in profits, Reduction in NPAs
system repossession activities
w Asset repossession
3. In case of persistent defaults, initiate legal
action with help of legal department
31.3.2005 18.8
TATA Motors, CVBU Risk Management
Key Steps in –
Inputs
'Risk Management' Outputs
w Information on customer profile from
1. Analyse input data for nature of w Reduction in NPAs
dealers/sales staff.
violations by customers w Asset repossession
w CVBU marketing strategy
2. Create/ update norms based on
w Continual decision making on TMF
inputs
margins
3. Deploy above norms
31.3.2005 18.9
TATA Motors, CVBU Organisational Governance
Organisational Governance
CVBU-EL-19-02 Manage Business Ethics Chief Ethics Counsellor / Location Ethics Counsellors
31.3.2005 19.1
TATA Motors, CVBU Organisational Governance
§ Statutory Requirements Ø Get and analyse inputs. Create / review governance structure, ü Assurance of good
§ Audit findings. Define responsibilities & authorities. governance to stake holders.
§ Stakeholder expectations Ø Manage Business risk ü Statutory compliance.
§ Survey findings. Ø Manage Business Ethics ü Enforcement of TCOC for
§ TCOC Ø Organize internal audits/statutory audits & surveys. assuring ethical conduct of
§ GEO guidelines business.
Review audit/survey findings, Procedure Improvement feedback to BOD
ü Checks & controls for
mitigating business risks.
In-Process Measure Unit of Measure Output Measure / End Measure Unit of Measure
% functions covered under BRM Nos. Implementation of internal audit accepted recommendation. R-Y-G
risk assessment by internal audit. Percentage No. of TCOC concerns resolved in target time Nos.
Accuracy of the reports Percentage Observations made by external auditors/assessors.
Timeliness of reviews & reports Percentage No. of concerns resolved in target time No
100% grievances from investors resolved. Percentage
.Functions/Dept. covered under risk management. 100% independent directors
%legal compliance, risk control rating. 100 % statutory compliance Percentage
Improvement in MBE & OHS indicators. Percentage
Divisions Involved - Corporate/Locational Finance & Internal Audit.
End Customer - Other Functions
Core Values Embedded Integrity, Customer Focus, Passion For Engineering and Corporate Citizenship
ISO / TS16949(2002) Ref. 5.4
Process Revision / Modification History
Date of Modfn. Modification No. Details of Modification Issued / Modified by Approved By
31/3/04 00 New Release BES, Pune
31/3/05 01 Modification through process review Process Team
31.3.2005 19.2
TATA Motors, CVBU Organisational Governance
31.3.2005 19.3
TATA Motors, CVBU Manage Organisational Governance
Inputs
Key Stepsin – Outputs
w Stakeholder expectations
'Organizational Governance' w Governance committees
w Guidelines, Rules and
1. Stakeholder engagement for getting w Remuneration policy for directors
Regulations, Statutory requirement
expectations and concerns w Infrastructure for Investor Grievance
w Tata Code of Conduct
2. Create/ Review Organization Structure for w Infrastructure for Code of Conduct
w Group Purpose Statement
governance w Governance policies, guidelines,
w BRC/Strategy inputs
3. Conduct meetings and reviews reports
w Audit Committee Charter
4. Organize audits and surveys
w Internal Audit Charter
31.3.2005 19.4
TATA Motors, CVBU Manage Business Ethics
Key Steps in –
Inputs 'Manage Business Ethics'
w Tata Code of Conduct(TCoC) Outputs
1. Establish framework for MBE
w Tata GEO’s guidelines for impl. of w Enforcement of TCoC
2. Training and communication to all employees,
TCoC w MBE findings
suppliers and dealers
w The CEC, LEC & DEC feedback w OHS findings
3. Concerns resolution mechanism
w Survey Findings 4. Reporting and sharing
5. Evaluations and improvement
31.3.2005 19.5
TATA Motors, CVBU Manage Business Risk
Inputs
w Key business process of each Key Steps in- Outputs
function/ department 'Manage Business Risk' w Documented key Procedures
w Business Risk Management 1. Identify and evaluate Business risk , set controls w Checks and controls for mitigating
Guidelines from Tata Motors Audit 2. Self assessment by process owner & Report. risks
Committee 3. Independent review of selected processes by w Internal Audit Assessment feedback
w Standard business risk control Internal Audit.
rating chart. 4. Action on Audit feedback, process review
31.3.2005 19.6