XXX

The document is a bill of materials for plumbing works on a construction project. It lists the quantities, units, costs and totals for pipes, fittings, valves, accessories, plumbing fixtures and equipment needed. These include PPR and PVC pipes of various diameters, elbows, tees, caps, traps, clean out plugs and reducers. It also includes items like water meters, gate valves, check valves, angle valves, back flow valves and floor drains. The estimated total material cost is PHP 3,077,444.69 with additional costs for labor, consumables and grand total of PHP 3,877,580.31.

Uploaded by

gen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
107 views2 pages

XXX

The document is a bill of materials for plumbing works on a construction project. It lists the quantities, units, costs and totals for pipes, fittings, valves, accessories, plumbing fixtures and equipment needed. These include PPR and PVC pipes of various diameters, elbows, tees, caps, traps, clean out plugs and reducers. It also includes items like water meters, gate valves, check valves, angle valves, back flow valves and floor drains. The estimated total material cost is PHP 3,077,444.69 with additional costs for labor, consumables and grand total of PHP 3,877,580.31.

Uploaded by

gen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

PROJECT: xxxxxx

LOCATION: xxxxxx
SUBJECT: PLUMBING WORKS - BILL OF MATERIALS
DATE: xxxxxx
QUANTITY MATERIAL
NO. ITEM
QTY UNIT COST TOTAL
I PIPES AND FITTINGS
A. Water Line
1.0 32mm Ø x 4m - PPR Pipe 30 pcs 970.00 29,100.00
2.0 25mm Ø x 4m - PPR Pipe 30 pcs 580.00 17,400.00
3.0 20mm Ø x 4m - PPR Pipe 30 pcs 375.00 11,250.00
4.0 32mm Ø Elbow - PPR 120 pcs 40.00 4,800.00
5.0 32mm Ø Tee - PPR 120 pcs 55.00 6,600.00
6.0 25mm Ø Tee - PPR 120 pcs 30.00 3,600.00
7.0 32mm Ø Elbow - PPR 120 pcs 25.00
8.0 25mm Ø Elbow - PPR 120 pcs 25.00 3,000.00
9.0 25mm Ø Cap - PPR 120 pcs 15.00 1,800.00
10.0 20mm Ø Tee - PPR 120 pcs 20.00 2,400.00
11.0 20mm Ø Elbow - PPR 120 pcs 15.00 1,800.00
12.0 20mm Ø Cap - PPR 120 pcs 10.00 1,200.00
B. Sanitary and Vent Line
1.0 150mm Ø x 3m - PVC Pipe 40 pcs 1,550.00 62,000.00
2.0 100mm Ø x 3m - PVC Pipe 40 pcs 750.00 30,000.00
3.0 75mm Ø x 3m - PVC Pipe 40 pcs 550.00 22,000.00
4.0 50mm Ø x 3m - PVC Pipe 40 pcs 275.00 11,000.00
5.0 50mm Ø P-Trap - PVC 120 pcs 150.00 18,000.00
6.0 100mm Ø Clean Out Plug 120 pcs 100.00 12,000.00
150mm Ø x 100mm Ø Reducer 120 pcs 220.00 26,400.00
7.0 Wye
100mm Ø x 50mm Ø Reducer 120 pcs 120.00 14,400.00
9.0 Wye
10.0 100mm Ø x 100mm Ø Wye 120 pcs 225.00 27,000.00
11.0 50mm Ø x 50mm Ø Wye 120 pcs 150.00 18,000.00
12.0 75mm Ø x 50mm Ø Elbow 120 pcs 100.00 12,000.00
13.0 50mm Ø x 50mm Ø Elbow 120 pcs 90.00 10,800.00
C. Storm Drainage Lines
1.0 150mm Ø x 3m - PVC Pipe 40 pcs 1,200.00 48,000.00
2.0 100mm Ø x 3m - PVC Pipe 40 pcs 800.00 32,000.00
3.0 75mm Ø Dome Type Strainer 100 pcs 650.00 65,000.00
III VALVES AND ACCESSORIES
1.0 Water Meter 100 pcs 1,200.00 120,000.00
2.0 32mm Ø Gate Valve 100 pcs 950.00 95,000.00
3.0 25mm Ø Gate Valve 100 pcs 750.00 75,000.00
4.0 32mm Ø Check Valve 100 pcs 950.00 95,000.00
5.0 25mm Ø Angle Valve 100 pcs 300.00 30,000.00
6.0 150mm Ø Back Flow Valve 100 pcs 1,500.00 150,000.00
7.0 100mm x 100mm Floor Drain 100 pcs 600.00 60,000.00
7.0 300mm x 300mm Floor Drain 100 pcs 900.00 90,000.00
III PLUMBING FIXTURES
1.0 Refer to Architectural - - - -
IV EQUIPMENT
1.0 Booster Pump - 1HP 100 unit 18,000.00 1,800,000.00
V CONCRETE WORKS
A. Septic Tank
Class B concrete mix with 12mm 7.21 cu.m 6,500.00 46,836.56
Ø rebars
B. Catch Basin
Class B concrete mix with 12mm 1.81 cu.m 6,500.00 11,773.13
Ø rebars
C Trench Drain
Class B concrete mix with 12mm 1.89 cu.m 6,500.00 12,285.00
Ø rebars
TOTAL MATERIAL COST 3,077,444.69
LABOR COST (20% of Total Material Cost) 615,488.94
CONSUMABLES (5%) 184,646.68
GRAND TOTAL 3,877,580.31

NOTE:
1. Cost Estimates are for reference only. Verify actual site condition and layout prior construction.

PREPARED BY: DATE:

ANNE LORRAINE S. MUTIA


Registered Architect / Registered Master Plumber