Degla CFM Remarks: The Following Action Code Are Given to Item Submitted: Approval of Item Does not Relieve the Contractor from complying with
A Approved as Submitted requirements of Contract documents Specifications and applicable
B Approved as Noted Codes.
C Revise & Resubmission Required. Contractors Name:
Contractors Signature:
It's not intended by the aforementioned response to constitute Engineer's Instruction for variation. In case the Contractor believes that this reply includes variation affecting the Time for Completion or the
Contract Price, the Contractor shall immediately notify the Engineer with the time & cost implications, if any
QA/QC Department
Method statement
WORK PROCEDURE FOR TERRAZZO WORKS Method No, : 19
Project name NH.07 - AMBERVILLE - NEWGIZA Date 12/02/2020
TERRAZZO WORKS
METHOD STATEMENT
Client: NEWGIZA
Project Manager: DEGLA CFM
Consultant: ECG
Contractor: Al Shams
0 Original Issue
• The scope of this Method Statement Covers the Terrazzo work for all buildings.
• The purpose of this Method Statement is to describe the material used, work
procedures and methods of inspection of the terrazzo work.
2.0 REFERENCE
A full and detailed description of the roles and responsibilities of all Al Shams staff is included within
the Project Quality Plan. For the works as covered by this method statement, the following personnel
have specific duties.
All plumping work and electrical conduits shall be submitted and approved.
Establish F.F.L as per required level as per approved shop drawings. A layer of
clean sand of the required thickness is to be spread, so as to adjust the surface
of f1oorings at the required level.
Clean surface from oil, dust and lose material.
Tiles shall be thoroughly soaked in water prior to setting.
Wet and tamps the sand layer with water just before Cement Tiles lying.
Lay Cement Tiles on 2-cm thickness mortar bed.
Fix tiles by pressing using rubber or wooden hammer to ensure that the required
bond is achieved. Terrazzo tiles should be leveled with the adjoining tiles and
Joints should be in straight line according to shop drawings.
Intersections and returns shall be accurately formed and cuts rubbed smooth
with fine stone. Cut edges shall be set against fixtures or other tile penetrations
with at least a 1 mm joint.
B. Skirting (Roof):
Clean surface to receive Terrazzo tiles from oil & dust.
Apply approved tile on cement mortar to the clean surface and install Terrazzo
skirting according to the required patterns as per shop drawings.
Skirting shall be fixed by pressing using rubber hammer to establish the
required bond between Terrazzo tiles and masonry.
After the tile fixed in walls shall be cleaned.
Quality control staff will ensure performing all work in accordance with Project technical
Specifications and General Quality Control Plan as follow:
● each activity should be performed by the assigned employee within the organization chart.
● all materials and equipment used in the activities should be approved, inspected prior to usage.
Work procedure should follow this method statement and preparatory technical meeting.
● All activities steps should follow ITP1.
7.1 Safety requirements will be addressed in accordance with the Project General Safety Plan
and contract.
7.2 Ensure that sides of excavation will be protected and soil stability of the surrounding areas
will be secured.
7.3 Barricade the excavation area with warning tapes and install Safety signs and notices to
create Safe Working area.
7.4 Tools and equipment will be inspected periodically by the Contractor to ensure that remain
in proper working order and calibration certifications is current.
7.5 During night works, a suitably trained supervisor will be on site for the full night duration
and adequate lighting shall be provided.
Contractor : Al Shams INSPECTION AND TEST PLAN for: Ref. ITP No. : 18 REV. :
00
TERRAZZO WORKS
1.1 APPROVAL OF Material Prior to start work Review Conforms to specification 96600 ES,SPECs H R
2 INSPECTION
2.1 Surface Preparation Prior to work progress I Conforms to specification 96600 ES,SPECs C I
2.2 Installation of Terrazzo Floorings Prior to work progress I Conforms to specification 96600 ES,SPECs C I
2.3 Installation of Terrazzo Skirting if required Prior to work progress I Conforms to specification 96600 ES,SPECs C I
2.4 Filling Sealant of Control joints (Roof) Prior to work progress I Conforms to specification 96600 ES,SPECs C I
3 TESTS
VERIFICATION CODES : (I - Inspection) / (C - Internal Checking Point) / (R - Review) / (W - Witness Point) / (H - Hold Point) / (T - Test)