APS Preventive Maintenance PM SOP Sample 2019
APS Preventive Maintenance PM SOP Sample 2019
APS Preventive Maintenance PM SOP Sample 2019
003
Version
Rotary Pump Annual Number
15 Jan 2019 v1
Maintenance Page 1 of 5
Required PPE:
Potential Hazards:
The slurry pumps have rotating components. Keep hands clear unless the unit is off and locked
out and tagged out.
Electrical shock hazards exist when working on these pumps. Be sure the pump motor is locked
out and tagged out before performing maintenance on this equipment.
The slurry pumps have hot surfaces, which could cause severe burns. Avoid contact with these
hot surfaces.
Maintenance Page 2 of 5
Steps Awareness
Remove pump
faceplate.
Maintenance Page 3 of 5
Steps Awareness
2. Check that the shaft will not rotate without Detectible shaft rotation indicates gear backlash
transmitting motion to the other shaft. which can be caused by worn gears or gears loose
on shaft.
Maintenance Page 4 of 5
Steps Awareness
3. Add Bel-Ray No-Tox 90/140 Gear Oil to the Pump Oil Capacities
gearbox through the fill opening. See chart
• Model 15 1.3 ounces
at right for oil capacities.
• Model 30 2.0 ounces
• Model 60 6.0 ounces
• Model 130 6.0 ounces
Maintenance Page 5 of 5
History of Revisions