50% found this document useful (2 votes)
1K views17 pages

STP Calculation

The document provides design calculations for a 70 cubic meter per day sewage treatment plant based on a FAB media aeration process. It includes calculations for the sizing of various tanks in the treatment process, including an equalization tank, FAB tank, secondary settling tank, chlorine contact tank, sludge holding tank, and treated water collection tank. It also includes calculations to determine the required air flow of 50 cubic meters per hour for biological treatment based on the total oxygen demand.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
50% found this document useful (2 votes)
1K views17 pages

STP Calculation

The document provides design calculations for a 70 cubic meter per day sewage treatment plant based on a FAB media aeration process. It includes calculations for the sizing of various tanks in the treatment process, including an equalization tank, FAB tank, secondary settling tank, chlorine contact tank, sludge holding tank, and treated water collection tank. It also includes calculations to determine the required air flow of 50 cubic meters per hour for biological treatment based on the total oxygen demand.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 17

DESIGN CALCULATION FOR 70M 3/DAY CAPACITY SEWERAGE TREATMENT

PLANT BASED ON FAB MEDIA AERATION PROCESS

 DESIGN BASIS

The STP shall be designed based on the following parameters

[1] RAW WATER CHARACTERISTIC : -

 Daily average flow : 70 M3/Day

 PH : 5.5 – 8.5

 BODS : 350 mg/l

 S. Solids : 250 mg/l

 COD : 600 mg/l

 Oil and Grease : 50 mg/l

[2] EFFLUENT DISCHARGE STANDARD AFTER TREATMENT: -

 PH : 6.0 – 8.5

 BODS : Less than 20 mg/l

 S. Solids : Less than 10 mg/l

 COD : Less than 100 mg/l

 Oil and Grease : Less than 10 mg/l


 PART – I: - R.C.C. TANKS

[1] EQUALIZATION CUM COLLECTION TANK: -

 Total flow = 70M3/Day

 Average flow on hourly basis = 70


M3/Hour
20

(10Hours operational) = 3.50 M3/Hour

 Peak flow = 5 times of average flow

 Dimension of Tank = 8.4M x 4.0M x 2.2M


(L) (B) (Liquid Depth)

Effective Volume of the Tank = 73.92 M3


[2] FAB TANK: -

 Total Flow = 70M3/Day

 BOD = 350 mg/l

 BOD Load in Kg = Total flow x BOD Concentration


1000
= 70 x 350
1000
= 24.5 kg

 Loading capacity of Fab media = 3.65

 Qty. of Fab media = BOD load


loading capacity of fab media

= 24.5
3.65

= 6.71 M3

Say = 7.00 M3

 Volume of fab tank = Qty of fab media


0.18

= 7.00
0.18

= 38.8 M3

Say = 40.0 M3

 Total liquid depth considered = 3.8M

 Size of Tank = 4.0m x 3.0m x 3.8m Liquid Depth


Effective Volume of the Tank = 45.6 M3
[3] SECONDARY SETTLING TANK: -

 Total flow = 70M3/Day

 Surface loading rate required = 10 M3/M2/Day

 Area required = Total flow


Surface Loading Rate (Overflow Rate)

= 70
M2
10

 Area Required = 7.0 M2

 Tank configuration = Square Tank at top & Hopper


Bottom is Desirable

 Size of Tank = 3.0m x 2.5m

Area Proposed = 7.5 M2


[4] CHLORINE CONTACT TANK : -

 Total flow = 70M3/Day

 Average flow on hourly basis = 70


M3/Hour
20

= 3.50 M3/Hour

Say = 3.5 M3/hour

 Hydraulic retention time desirable = 1.5 Hours

 Volume required = Av. Flow x Hydraulic Retention Time

= 3.5(M3/Hour) x 1.5Hour

= 5.25 M3

Say = 6.0 M3


Volume of Chlorine Contact Tank
(CCT) = 6.00M3

 Liquid depth considered = 3.4M

 Surface area = Volume 6.0


= = 1.76 M2
Liquid Depth 3.4

= 2.0 M2

 Dimension of Chlorine Contact Tank = 1.0M x 2.5M x 3.4M Liquid Depth

Effective Volume of the Tank = 8.5 M3


[5] SLUDGE HOLDING TANK : -

 Total flow = 70M3/Day

 Inlet BOD = 350 mg/l

 Outlet BOD = Less than 20 mg/l

 BOD to be removed per day = Flow rate x (Int. BOD – Out. BOD)
Kg/day
1000

= 70 (350-20)
Kg/day
1000

= 23.1 Kg/day

 Excess sludge generation rate = 25 – 30% of total BOD to be removed

= 0.30 x 23.1 Kg/day

= 6.93 Kg/day

Say = 7.0 Kg/day_ _ _ _ _ _ _ _ _ (1)

 Suspended solids to be removed


per day = Flow rate x (Int. BOD – Out. BOD) 240
mg/l (Concentration) (day) 1000

70 x 0.240 Kg/day

70 (250-10)
= 1000 19.2 Kg/day_ _
_ _ _ _ _ _ _ (2)

= 16.8 Kg/day

Say = 17.0 Kg/day_ _ _ _ _ _ _ _ _ (1)

 Total sludge to be removed = (1) + (2)

= 7.00 + 17.0 Kg/day

= 24.0 Kg/day_ _ _ _ _ _ _ _ _ (2)


Considering the sludge density as 6 – 8% thickening

 Total sludge to be removed / day = 24.0


0.06

= 400.00 litres / day

Say = 400.00 litres / day

 Minimum Storage Required = 20Days(depend on site conditions)

 Volume Tank of Required = Total sludge to be removed / day x


minimum storage required

= 400 x 20 litres

= 8000 litres

= 8.0 M3

Say = 8.00 M3

 Volume of Tank Required = 8.00 M3

Dimension of Sludge holding Tank = 1.0M x 2.5M x 3.8M Liquid Depth

Effective Volume of the Tank = 9.5 M3


[6] TREATED WATER COLLECTION TANK: -

 Total flow = 70M3/Day

 Average flow on hourly basis = 70


M3/Hour
20

(10Hours operational) = 3.50 M3/Hour

 Dimension of Tank = 5.4M x 3.4M x 3.8M


(L) (B) (Liquid Depth)

Effective Volume of the Tank = 69.768 M3


 PART – II: - CALCULATION FOR AIR REQUIREMENT IN STP

 AIR REQUIRED FOR BIO LOGICAL TREATMENT

 Total flow of waste water = 70 KL/Day

 BOD to be removed = 350 mg/l

 Total BOD to be removed (in Kgs) = 70 x 350 Kg =


1000 24.5Kg
 Oxygen required per Kg of BOD to be
removed = 1.4 Kgs / Kg BOD

 Total oxygen required = 1.4 x 24.5 Kgs / day


= 34.3 Kgs / day

Say = 35.0 Kgs / day

 Considering oxygen transfer efficiency as 12%, 21% oxygen content in atmospheric


air & 1.18 density of air.

 The total air requirement = Total oxygen required


Oxy. tran. effici. x Oxy. M3/Hour
con. in air x density of air

= 35
M3/Hour
0.12 x 0.21 x 1.18 x 24

= 49.04 M3/hour

Say = 50.00 M3/hour_ _ _ _ _ _ _ _ _ (1)


 AIR REQUIREMENT IN EQUALIZATION TANK & SLUDGE HANDLING
TANK FOR MIXING

1. AIR REQUIREMENT IN EQUALIZATION TANK


(Area Wise)

 Total No.Of Diffuser Using in the Tank = Area Of the tank


(Area Wise) Area Per Diffuser

= 33.6
3.6

= 9.33
Say = 10
 Air Required Per Diffuser = 4 M3/hour

 Total Air Required In the Equalisation = No.Of Diffuser x Air Required Per
Tank Diffuser

= 10 x 4 M3/hour

= 40 M3/hour_ _ _ _ _ _ _ _ _ (2)
2. AIR REQUIREMENT IN SLUDE HOLDING TANK
(Area Wise)

 Total No.Of Diffuser Using in the Tank = Area Of the tank


(Area Wise) Area Per Diffuser

= 2.5
3.6

= 0.69
Say =1

 Air Required Per Diffuser = 4 M3/hour

 Total Air Required In the Equalisation = No.Of Diffuser x Air Required Per
Tank Diffuser

= 1 x 4 M3/hour

= 4 M3/hour

 Air requirement in sludge holding tank = 4.0M3 Approx. _ _ _ _ _ _ _ _ _ (3)

Hence

 Total air requirement = (1) + (2) + (3)

= 50 + 40 + 4 M3/Hour

= 94 M3/Hour

 Total air requirement = 94M3/Hour

Providing 2Nos. Air Blowers (1W + 1S) of flow rate / capacity 95 M 3/Hour at 5 m head
PART – III: - CALCULATION FOR THE VARIOUS EQUIPMENTS SIZES

[1] MULTI GRADE SAND FILTER: -

 Total Flow = 70M3/Day

 Hours of operation = 14 Hrs.

 Capacity = Total Flow


Hour of Operation

= 70
M3/Hour
14

= 5.0 M3/Hour

 Filtration rate considered = 18 M3/M2/Hour


(Normally taken as 18-20 M3/M2/Hour)

 Surface area of filter bed = Total capacity


Filtration rate

= 5.0
M2
18

= 0.2777M2

A = 0.3 M2

 Assuming diameter of multi grade sand filter vessel is ‘d’


We know that


A = d2
4


0.20 = d2
4

 d2 = 4 X 0.3 = 0.3821M
3.14
d = .618 m

Say = 650 mm
 Diameter of Multi Grade Sand Filter Vessel = d = 650 mm

Providing 1No. Multi Grade Filter Having 650 mm dia and 1500 mm height
[2] ACTIVATED CARBON FILTER: -

 Total Flow = 70M3/Day

 Hours of operation = 14 Hrs.

 Capacity = Total Flow


Hour of Operation

= 70
M3/Hour
14

= 5.0 M3/Hour

 Filtration rate considered = 17 M3/M2/Hour


(Normally taken as 18-20 M3/M2/Hour)

 Surface area of filter bed = Total capacity


Filtration rate

= 5.0
M2
17

= 0.2941M2

A = 0.30M2

 Assuming diameter of multi grade sand filter vessel is ‘d’


We know that


A = d2
4


0.21 = d2
4

 d2 = 4 X 0.3 = 0.3821M
3.14
d = .618m

Say = 650mm

 Diameter of Multi Grade Sand Filter Vessel = d = 650 mm

Providing 1No. Activated Carbon Filter Having 650 mm dia and 1500 mm height
 PART – IV: - PUMPS FOR STP 70M3/DAY CAPACITY

[1] EQUALIZED WASTE WATER TRANSFER PUMP: -

 Total incoming flow = 70M3/Day

 Taking 14Hrs of operation time for pump

 Flow rate / capacity of filter feed pump = Total incoming flow


Hours of operation

= 70
M3/Hour
20

= 3.5 M3/Hour

Say = 3.5 M3/Hour

 Head = 6M

Providing 2Nos. equalized wastewater transfer pump (1W + 1S) of capacity 4.0M 3/Hour at
6 m head
[2] FILTER FEED PUMPS: -

 Total incoming flow = 70M3/Day

 Taking 14Hrs of operation time for pump

 Flow rate / capacity of filter feed pump = Total incoming flow


Hours of operation

= 70
M3/Hour
14

= 5.0 M3/Hour

Say = 5.0 M3/Hour

 Head = 25M

 Providing 2Nos. filter feed pumps (1W + 1S) of flow rate / capacity 5.0 M 3/Hour
at 25 m head
[3] DIGESTED SLUDGE Re-Circulation PUMP: -

 Sludge generation per day = 70 x 3500


1000
= 245 Kg / day

 Considering of 1% = 245
0.01

= 24500
 Pump capacity required taking 8hrs of
operation tank = 24500
Litres/Hour
10

= 24.5
M3/Hour
10

= 2.45 M3/Hour

= 3.0M3/Hour

 Head = 8M

 Providing 2Nos. (1W + 1S) digested sludge Re-Circulation pump of capacity


3.0M3/Hour at 8 m head