Mock Up
Mock Up
6 CPVC pipe BOP is not as per GFC available at site and need to be corrected as per GFC. DONE
Duct support & CPVC pipe clash found in Mock up.L&T to identify why clash occurs as all NOTED:-25mm shifted and reinstalled as per
7
services GFC released through BIM clash free model. GFC Drawing.
CPVC pipes does not have detrimental effects
of water i.e., corrosion resistant ( refer IS:
15778 clause 9.2)
CPVC pipe installed are also not exposed to
sun.
8 Pipe marking missing and need to be painted before installation as per the specs. Surface of CPVC pipe is also smooth in nature.
( refer IS 15778 clause 9.1.1)
IS code & ASTM standards also does not
specifies about paint.
So, we will follow above codes and standards
for CPVC pipe installation.
9 Alignment of rod was not proper at few locations and need to be adjusted. DONE