2502 Specification
2502 Specification
SCHEDULE-III (VOLUME-‘A’)
TECHNICAL SPECIFICATION FOR A.C. STATIC THREE PHASE, FOUR WIRE, HAVING
DLMS PROTOCOL WITH OPTICAL & ADDITIONAL LPRF PORT 10-60A RATING
WHOLE CURRENT, CLASS 1.0 ACCURACY, KWH ENERGY METERS HAVING
POLYCARBONATE METER CASE AND BACKLIT LCD DISPLAY AGAINST TN-2502.
1.0 SCOPE:
a) This specification covers the design, engineering, manufacture, assembly stage -testing,
inspection and testing before supply of A.C. three phase, four wire, having DLMS
protocol whole current static energy meters of accuracy class 1.0 and current rating 10 -
60 Amps, with backlit LCD display as per requirement given in this specification. These
meter should be provided with one optical communication port & one LPRF port which
should be suitable for establishing local communication with CMRI. The meter shall be
supplied in suitable packing so as to withstand transit shock.
The three phase, four wire, three element type meter should be capable to record and
display energy in kWh, demand in kW and power factor for three phase four wire A.C
balanced / unbalanced loads for power factor range of zero lag – unity zero lead, as per
requirement given in this specification.
b) It is not the intent to specify completely herein all the details of the design and
construction of material. However the material shall conform in all respects of high
standards of engineering, design and workmanship and shall be capable of performing
in continuous commercial operation in a manner acceptable to the p urchaser, who will
interpret the meanings of drawings and specification and shall have the right to reject
any work or material which in his judgment is not in accordance therewith. The offered
materials shall be complete with all components, accessories necessary for their
effective and trouble free operation of the system for energy measurement. Such
components shall be deemed to be within the scope of Bidder’s supply irrespective of
whether those are specifically brought out in this specification and / or the commercial
order or not.
The bidder shall have BIS Certification for offered item as on date of bid opening and
copy of which must be submitted along with the bid, failing which offer of the bidder
shall be treated as non-responsive.
2.0 REQUIREMENT :
The requirement of 3 x 240 Volt 50 Hz A.C. Static Three Phase 10-60 Amp. rating whole
current Energy Meters of accuracy class 1.0 with one optical communication port & one
LPRF port is 1,50,000 Nos.
1
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
3.0 STANDARDS APLICABLE :
Unless otherwise specified elsewhere in this specification, the meter(s) shall conform
to relevant requirement including performance and testing thereof to the following
Indian / International Standards to be read with upto-date and latest amendments /
revisions thereof.
2
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
10 IEC – 15707 , 2006 Testing Evaluation, Installation and
Maintenance of A.C. Electricity Meters.
CODE OF PRACTICE.
11 IS:12346(1988) Specification for testing equipment for
AC Electrical energy meter
On installation and operation of meters
12 CEA Regulation dated 17.03.2006.
In case of any conflict or discrepancy the order of precedence shall be (i) IS (ii) IEC
(iii) CBIP technical report-325 (read with latest amendments). In case of any
difference between the provisions of these standards and the provisions of this
specification, the provisions contained in this specification shall prevail.
3
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
4
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
5
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
b. Meter case (base and cover) and extended terminal block cover (ETBC) should
be injection moulded in UV stabilized poly-carbonate. The base of meter shall
be of any colour& cover shall be transparent easy to reading of all the
displayed values/ parameters, nameplate details and calibrating LED. The
ETBC shall also be kept fully transparent. The moulded meter case should not
change in colour, shape, size, dimensions when subjected to 200 hrs on UV
test as per ASTMD 53. It should withstand 650 deg. C. glow wire test and heat
defection test as per ISO 75.
c. The manufacturer shall emboss/Laser marked/engraved on the base and cover the
name of the material they have used in an abbreviated form e.g. PCFR (to denote
what they have used - flame retardant poly carbonate).
d. The meter cover shall be permanently fixed to the base by heat staking /
ultrasonic welding in such a manner that cover can not be opened without
breaking i.e. the meter should be break to open type. The meter base and top
shall have distinct contour to identify, if any tampering attempt has been
made or opening of cover with some tool or by using hot wire or similar
device. In case any attempt to open the meter cover from base, there should
be visible evidence of opening / tampering of ultrasonic welding.
f. The meter case shall have the following properties of plastic material
S.No. Property Units Value Standards
1 Physical water absorption % Max. ASTMD 570/ IS:5133(part 2) :1969
0.35
2 Electrical Dielectric KV/M Min 16 ASTMD 149
strength at 90 deg. C. in M
oil.
3 Thermal HDT Deg.C Min. ASTMD 648/ ISO 75
125
4 Flammability
a) Rating FV 2 UL94/ IS:11000(part 2-sec-1)
b) Glow wire test 650 Passes IEC-60695-2-1-12 & IS:11000-2-1
deg.C.
6
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
Mechanical
5 a) Tensile strength MPa Min. 50 ISO 527 / any equivalent standard
5 b) Flexural strength MPa Min. 90 ISO 178 / any equivalent standard
c) Modulus of Elasticity MPa Min. ISO 178 / any equivalent standard
d) Izod impact strength KJ/ 2000 ISO 180/1A or any equivalent
notched 23 Deg. C. Sq.M Min. 8 standard
2. The terminal block should satisfy all the conditions specified in IS:13779 and
IEC 62052 - 11. The material of the terminal block should fulfill the
requirement of following tests
1. The flame retardant rating of V0 as per UL 94 testing
2. The glow wire test for temperature of 960 deg. C as per IS:11000 (Part -
2/Sec.1) or IEC 60695-2-1
3. Heat deflection temperature (HDT) test of 135 deg. C. as per ISO 75 or
ASTM D-648
4. Ball pressure test at 125 deg. C. as per IEC 60335-1
3. The base of the meter should extend to enclose the three sides (back and
two sides) of the terminal block.
4. The current circuit conductors of the meter shall be connected to its current
terminals from inside the meter terminal block adopting procedure
prescribed in either B-1 or B-2 of the recommended methods under
IS:13779. Any other method which meets these requirements in a better
manner/way shall also be considered. The bidder should elaborate the
arrangement adopted.
5. The meter terminal block shall have nickel/ tin-plated brassterminal inserts.
The terminals shall have suitable construction with barriers and cover to
provide firm and safe connections of incoming and outgoing leads. The
7
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
terminal screws shall have flat bottom so as not to pierce in the external
conductors. The terminals shall be of suitable rating to carry continuously
150% Imax. Current and made of electroplated (or tinned) brass. Any other
provision which meets this in a better manner / way shall also be
considered. The bidder should elaborate the provision adopted.
6. The manner of fixing the external conductors to the terminal block shall
ensure adequate and durable contact such that there is no risk of loosening
or undue heating. All parts of each terminal shall be such that the risk of
corrosion is minimized. Two screws shall be provided in each incoming and
outgoing terminal for effectively clamping the external leads. Each screw
shall engage at least 3 threads in the terminal. Electrical connections shall
be so designed that contact pressure is not transmitted through insulating
material. The manner of fixing of incoming and outgoing leads into the
terminals shall be through thimbles/lugs/reducer type terminals and the
supplier shall supply the same along with each meter without any extra cost.
7. The internal diameter of the terminal holes should be not less than 9.5 mm
and adequately designed for inserting 6 mm 2 to 25 mm 2 stranded
copper/aluminum armoured PVC cable and shall be capable of carrying
continuous current up to 150% of Imax. The holes in the insulation material
of the terminal block, which form an extension of the terminal holes, shall
be of sufficient size to accommodate the insulation of the conductors also.
The clearance and creepage distances shall not be less than values specified
in clause 6.6. of IS:13779:1999. Further, the supporting webs between the
two terminals of the terminal block should be sufficiently high to ensure
that the two neighboring terminals do not get bridged by dust or a flash
over does not take place.
8. The voltage circuit and the current circuit shall be solidly connected inside
the meter body without any link. A firm connection shall be established
within the meter case to energize the voltage circuit.
9. The termination of current circuit wires, if used, inside the meter (i.e. CT
primary conductor / shunt) on the terminal block should be through lugs
and washers of proper size. The shunt used shall be high precision, low
temperature coefficient, high stability of electric resistance, low watt loss
and are magnetically tamper proof. The loop length of the primary current
circuit should be kept minimum. Alternatively the CT primary conductor /
shunt may be flattened to form a ‘lug’ like shape for proper terminating on
terminal block without using lug or any other better arrangement may also
be provided.
8
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
10 The meter shall be supplied with extended terminal block cover (ETBC). The
ETBC shall be extended by minimum 50mm below the plane surface of the
terminal block with suitable sealing arrangement of terminal cover for
providing numbered double anchor polycarbonate lash wire seal, which
shall be supplied loose by the bidder as per the Tech. Spec. of
Polycarbonate Seal.
11 The ETBC shall be designed such that the meter’s internal parts are not
accessible for tempering etc. without breaking seals.
12 Suitable barriers in moulding shall be provided such that direct access to
incoming/outgoing terminals is not possible through gaps left in cable entry
holes after insertion of main/load side cables
13 The terminal cover shall be engraved / embossed/ laser marked with logo of
manufacturer & word JVVNL/logo of JVVNL which should be clearly visible .
14. The terminal cover of the meter should be hinged either at the top or left
side so that it opens from bottom to top or hinged at the left side so that it
opens from right to left of the meter.
7.3 Display Parameters and Type of Display:
A) The meter should have bright LCD electronic display with backlit having
minimum description of parameters (e.g. words like KWh, Kw, Power
factor etc)/ legends (alphabets) height X width of 5mmx3mm minimum
and with minimum 7 whole digits (numerals) of size 10mmX5mm in
auto scroll mode.
The decimal digit shall be of smaller but not less than 5 mm X 3 mm
and shall be clearly distinguished from integral digits or if the digits
size is same then the decimal digit shall be clearly distinguished from
the integral digits.
For clear visibility of the display of the meter reading at a distance, large
viewing area with large display icons is preferred.
10
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
The display of various parameters in push button mode shall be scrolling
one after another. The meter shall be capable to measure and display
continuously “Active Energy KWh” at all loads and power factors i.e. Zero
lag-Unity-zero lead.
Meter Data Display : The software shall show electrical condition existing at
the time of reading the meter in tabular forms as well as graphical format
(phase diagram) at BCS end.
C) Display Sequence:
The meter shall display the required parameters in two different
modes No additional display parameters (push button or
auto) will be acceptable. The details are as follows:-:-
a) Continuous display:
i. Current cumulative active forwarded energy (Total
Energy) without decimal digit.
ii. Cover open tamper status with date & time.
iii. Magnet tamper details with date & time till removal of
magnet.
b) Push Button display:
The following parameters in the similar sequence shall be
displayed one after the other, with press of push button each
time. Each parameter shall display for minimum 10 seconds for
respective measured values, except LCD Segment Check, which
shall have display for 5 Seconds under auto scrolling of push
button parameters. If the Push Button is pressed continuously for
5 minutes during power off condition then battery should become
disabled till next push button operation..
12
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
The meter shall have provision for registering energy (kWh & kVAh), maximum
Demand (kW & kVA) and average PF and billing date. The data shall be registered in
following five tariff registers:-
05.00 Hrs. to 06.00 Hrs.
06.00 Hrs. to 09.00 Hrs.
09.00 Hrs. to 18.00 Hrs.
18.00 Hrs. to 23.00 Hrs.
23.00 Hrs. to 05.00 Hrs.
This data for the last 12 months shall be download by CMRI.
Meter shall continuously monitor and calculate the average maximum demand of
each demand interval time of 30 minutes and maximum of these in a calendar month
shall be stored. The maximum demand shall automatically reset at 24.00 hrs. of the
last date of each calendar month for which minimum 30 years calendar shall be
programmed by the manufacturer. The cumulative kWh should also be recorded at
24.00 hrs. on the last date of each calendar month for previous Twelve months.
The meter shall have a test output device in the form of calibration LED of red colour
and minimum intensity 10 mCD (milli-Candela) accessible from the front and shall be
capable of being monitored conveniently with suitable testing equipment while in
operation at site. The location of calibration LED should be such that the calibration
pulses can be sensed easily through the sensor. The clearance of calibration LED
from any of the sides of window portion shall be approximately 20 mm.
The relation between test output and the indication on display shall comply with the
marking on the name plate (impulse per kwh).
The bidder shall state the necessary number of pulse count(s) to ensure
measurement accuracy of at least 1/10 th of class of the meter at the different test
points.
The resolution of the test output pulse(s) should be sufficient to enable conduction
of the starting current in less than 10 minutes and accuracy test at the lowest load
with desired accuracy within 5 minutes.
13
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
(A) Through Optical Communication Port:-:
The meters shall have a galvanically isolated optical communication
Port as per IEC 1107 provided on the front of the meter
downloading the history data to a CMRI/Base computer. It shall not
be possible to re-programme or make any change in the meter
through CMRI.
No editing shall be possible on CMRI and base computer by any means. The
software shall have capability to convert the entire data into ASCII format.
The protocol used in the meter shall have to be provided at the time of
supply for the purpose of automatic meter reading system.
It shall be responsibility of the meter manufacturer to provide the required
software and all the facilities free of cost to enable the use of optical port
and LPRF Communication facility for reading and retrieving the
data from the meter through CMRI and to necessary upgrades of software
shall be supplied free of cost for downloading simultaneously the existing
parameters and any parameters added in future specifications of meters.
The same CMRI should be capable of downloading, Reading the meter data
through wireless communication using LPRF point to point technology.
The CMRI should have the provision to connect the external RF
module through a 9 pin D-type serial connector so that module of
the different makes can be connected to CMRI to read & retrieve
the data of their respective make of meters.
Indication on CMRI shall be provided for confirmation of successful data
transfer from meter to CMRI. During this period the energy recording should
not be affected.
The software supplied by the bidder for common meter reading instrument
should read various makes of static energy meters and should be capable to
download the data in the computer station having manufacturer base computer
stations for the purpose of exchange of data.
14
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
Meter Sr. No.
Time & Date.
Instant per phase Voltage, Current & Power Factor
Current cumulative forwarded KWH energy(total)
Billing kWh (BP kWh) for the last 12 months at 0:00 hrs of the last day of the
month.
Overall MD KW with 30 min. integration on real time basis with date and time
stamp for the last 12 months.
Average power factor of the last consumption month upto pre-defined date &
time for the last 12 months.
Power on Hours and minutes for each of previous 12 months
The snap shot of total events (minimum 40 events) with date & time (either
occurrence or restoration consider as an event), except cover open tamper
which is non roll over Tamper, for following tamper condition:
(i) The tamper data as per Cl. 7.6 (c),(g) & (h) of this specification
Any other information if manufacturer proposes may indicate in their offer.
The meter shall also have a storage capacity for 75 days load survey with 30
minute IP for the following parameters (as per table 28 provided in
IS:15959:2011.)
1) Real time clock, date and time
2) Current Ir.
3) Current Iy.
4) Current Ib.
5) Voltage Vrn.
6) Voltage Vyn.
7) Voltage Vbn.
8) Block energy- Kwh.
9) Block energy- KVARh(lag)
10) Block energy- KVARh(lead)
11) Block energy- Kvah.
At BCS end twelve month billing data with all energies including demand and all
tamper event with their snap shot value should be provided.
The meter shall also have a storage capacity for at least 75 days in the non-volatile
memory for recording, logging, and downloading of Power On hours per day
starting from 00.00 to 24.00 hours. Such data shall be made available in the form of
bar chart as well as spreadsheet. The BCS shall have the facility to give complete
load survey data both in numeric and graphic form with option for either of them.
The meter shall possess a suitable fast reliable optical communication port for
automatic transfer of data to CMRI and through CMRI to the base computer.
15
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
The CMRI shall posses easily replaceable battery and shall be capable of storing data
for at least 200 Nos. meters at one time. It shall be possible to read the meter from
outside the meter & protection box. The data transfer (from meter to CMRI) rate of
billing data downloading shall be 60 Seconds and for total data within 5 minutes for
each meter.
The downloaded data along with date and time stamp of such reading shall remain
on CMRI with suitable encryption and it shall not be possible to preprogram or
manipulate the recorded data on the CMRI before downloading the same with the
serial number of CMRI on computer. The CMRI shall also download the name of
meter manufacturer and year of manufacture of meter. The Supplier shall supply
Software (compatible with Windows 98 system or higher) and training free of cost
for the use of software at multiple data collection and billing premises of the utility.
The CMRI shall have a polling feature to read multiple meters within range without
preprogramming the meter serial numbers on CMRI in advance.
After successful downloading of meters data to CMRI, the calibration LED shall
continuously glow for a period of one minute/ any other indication on CMRI for
confirmation of successful data transfer. During this period the energy recording
should not be affected.
Necessary upgrades shall be possible in CMRI software and shall be supplied free of
cost for downloading simultaneously the existing parameters and any parameters
added in future specifications of meters. A copy of operation manual for each CMRI
shall be supplied.
The Supplier shall provide meter reading protocols free of cost which shall not be
complicated and easily understandable by utility officials to introduce compatibility
between meters and CMRIs of different makes.
The bidder shall indicate relevant standard to which the protocol for communication
between meter and CMRI shall comply.
The meter reading instrument shall be capable of retrieving data and capable
of transferring them to the base computer service center for energy audit and
billing purpose. The bidder shall quote for the 10-60 Amp. meters with LCD
Display with communication facility for meter reading with LPRF
Communication Facility. The meter shall be compatible for spot billing.
The meter shall have facility for communicating with a Meter reading
instrument through LPRF with proper security & without error to facilitate
16
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
for auto-reading and downloading the billing and history data to base
computer. The interface for communication between CMRI & Base
computer shall be supplied free of cost. The software required for CMRI as
well on base computer system to use the remote reading feature with
necessary security provisions shall also be supplied free of cost with
following features:
I. The same CMRI should be capable of downloading and reading the meter data
through wireless communication using LPRF point to point technology
II. The CMRI should have the provision to connect the external RF module so that module
of the different makes can be connected to CMRI to read & retrieve the data of their
respective make of meters. . No internal module in CMRI will be accepted.
III. 1 No. DOS based CMRI with optical port interface as well as RF communication
Capability to read meters for communication between meter and CMRI along with
communication cable & its accessories shall be supplied free of cost for every 500 Nos.
meters supplied.
Minimum Salient features of CMRI shall be as under:-
i) Display - 16 lines.
ii) Internal flash memory(RAM) - 16.5 MB.(minimum)
iii) ROM - 8 MB(minimum)
iv) Speed of processor - 400 Mhz & above
v) Battery backup - 24 hours.
vi) Operating system - DOS
IV. The LPRF should be able to read meter at a aerial distance of minimum 100
Mtr in clear line to sight.
V. It shall be the responsibility of the meter manufacturer to provide the required
software and all the facilities required by purchaser to use the CMRI for
reading and retrieving the data from the meter and to download the data to P C
free of cost upto guarantee period
VI. Any other information if manufacturer proposes to record may indicate in their offer. The
BCS shall have the facility to give complete load survey data both in numeric and
graphic form with option for either of them.
VII. Certified standard- CBIP-111
VIII. The CMRI shall posses’ easily replaceable battery and shall be capable of storing data for at
least 200 Nos. meters at one time. It shall be possible to read the meter from outside the
18
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
meter and protection box. The data transfer (from meter to CMRI) rate for Billing data
downloading shall be less than 60 Sec. and for total data within 5 Minutes for each meter.
IX. The Supplier shall supply Software (compatible with Windows 98 system or higher) and
training free of cost for the use of software at multiple data collection and billing premises
of the utility.
The meter shall be provided with built in logic/ indication and sensor to
detect tamper beyond meter’s magnetic immunity level and display of
such occurrences. The meter accuracy or accuracy display shall not be
affected by permanent magnetic field up to meter’s magnetic immunity
level.
At the time of occurrence of magnetic tamper, meter should record
tamper event with Imax, rated voltage and unity P.F and at the time of
restoration it should logged with actual parameters
The accuracy of meter shall be checked before and after the application of
above device.
Also During application of Spark, no abnormality on functionality of meter
should be observed, otherwise sample will be treated as failed.
g) Cover Open Tamper: –
If the meter cover is opened, the meter shall log at BCS end this as tamper and shall
display “Open” with date and time of such opening (in power on as well as power off
condition) in blinking display on the LCD continuously with other display parameters
so that it is immediately noticed by the meter reader.
Occurrence time for logging of tamper shall be minimum 5 minutes. and restoration
of tamper shall be less than 2 minutes except magnetic(approx. 15 seconds) and
cover open tamper which shall be logged instantaneously.
Logging of snap shot values of tamper events at BCS end for occurrence &
restoration should be as per minimum logging time of occurrence/ restoration of
tamper events.
The meter cover shall be permanently ultrasonically welded to the meter base.
It shall not be possible to open the meter cover without permanently
damaging the meter cover or base, easily visible from the front. At least two
one way driving head sealing screws of Nickel plated steel or Nickel Plated
Brass shall be provided for proper fixing of meter cover. Each one way driving
head sealing screw shall have an independent sealing hole. However better
alternate arrangement other than unidirectional sealing screws for sealing
arrangement shall also be accepted after the approval of MM wing.
Manufacturer has to provide one polycarbonate seal on either side/front of
the meter and two hologram sticker seals on both sides of meter with word
JVVNL/ logo of JVVNL & manufacturer and the polycarbonate and sticker
seals having the same number as that of the meter Sr. No. and one no.
polycarbonate seal in loose condition to be provided for terminal cover of the
meter. The manufacturer will also provide the software (25 Nos. or more) as
per our requirement for tracking and recording of seals. The Serial Number of
20
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
Meter, Poly-carbonate Body Seal/ Sticker Seal and Loose Seal for Terminal
Cover shall be same.
21
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
l. Purchaser’s order Number & date
m. Guarantee period- 5 Years
n. Bar Coding of serial number, month & year of manufacture of the meter
o. Sign of insulation
p. Ultrasonic welded.
q. ISI mark with license number
r. DLMS Meter
s. All communication mode.
22
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
e. The meter should not have any form of mechanical adjustments such as
trim-pots potentiometer etc. for calibration. The meter shall be tested,
calibrated and sealed at manufacturer’s works before dispatch. Further,
no modification of calibration shall be possible at site by any means what
so ever. The meter should be software calibrated.
All important data such as such as calibration data, billing parameters, and
cumulative kWh should be stored in NVM internal to the main processing
circuit and it should not be possible to change it through any standard
serial communication. This may be verified by removing the non-volatile
memory of the meter and check the working of the meter during sample
testing or inspection.
f. The meter shall be provided with CT/shunt in all the 3 phases. The shunt
used shall be high precision, low temperature coefficient, high stability of
Electric Resistance, low watt loss and are magnetically tamper proof.
The bidder shall use SMPS or better design for Power Supply to PCB.
Specific confirmation shall be submitted by the bidders that accuracy of
measurement will not suffer due to utilization of shunt on account of
thermal variation and temperature coefficient up to an operational
temperature of 80 deg C.
g. LEDs shall be provided for following indications
1) Test output pulse – Red (imp/KWh)
2) Indication for healthy PT/Voltage supply for each phase Red-Yellow-
Green
LEDs can be alternatively provided as icons on the LCD display.
The location of calibration LED (preferably at the center) should be such
that the calibration pulses can be sensed easily through the sensor.
Each new supplied lot shall be tested on Zera test bench of 0.02 class
accuracy, the meters having accuracy results within +/- 0.5% shall be
preferred.
h. Each new supplied lot shall be tested on automatic test bench of 0.02 class
accuracy in meter lab.
i. Temperature rise – Under normal conditions of use at Imax. current and
1.2 times rated voltage, the winding and insulation shall not reach a
temperature, which might adversely affect the operation of these LT
Meters.
j. Specific confirmation shall be submitted by the bidders that accuracy of
measurement will not suffer due to utilization of shunt on account of
thermal variation and temperature coefficient upto an operational
temperature of 80 Deg.C.
23
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
m) The push button on meter cover should be designed such that it is not
possible to remove / take out the push button by any means. There should
not be any gap between push button & cover so that any possibility by
fiddling any sharp object or needle from outside of the meter around push
button is not possible.
9.0 General:
a. All electrically live screws shall be of brass/ nickel tin plated. All other
screws shall be electro plated.
b. The meter shall draw its power from all three phases, one phase and
neutral or any two phases
c. The terminal inserts shall be of heavily nickel /tinned brass.
d. The meter shall conform to the degree of protection IP 51 of
IS:12063/IEC.60529 and IEC 62052-11 clause 5.9, for protection against
ingress of dust, moisture and vermin
e. There should not be any creepage in the meter even at 120% & 70 % of
supply voltage.
f. The meter should be free from jumps during sudden switching of heavy
loads / or transient voltage spikes
Meter shall display direct reading and without multiplying factor.
24
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
10.
Electromagnetic Compatibility and Interference requirement:
25
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
f. The bidder should submit the list of all components used in the
meter along with the bid.
g. A detailed list of bought-out items which are used in the
manufacture of the meter should be furnished indicating the name
of firms from whom these items are procured. The bidder shall also
give the details of quality assurance procedures followed by him in
respect of the bought – out items
h. The details of testing facilities available for conducting the routine
and acceptance tests and other special tests on the meter shall be
furnished with the bid. The facility available if any for conducting
type test may also be furnished.
The components of the meters shall be as per specification
(Annexure-‘B’)
a)
The bidders shall be required to furnish valid type test reports in
respect of 3 phase static energy meter with optical port as per
requirement of IS13779:1999 from CPRI or ERDA only which should
not be older than three years as on the date of opening of techno-
commercial bid. For this purpose date of conducting (test starting
date) will be considered. Type test carried out after opening of
techno-commercial Bid shall not be considered.
ii) After receipt of first lot of meters, samples shall be selected for all the Type
Tests, additional type tests and Tamper Tests as incorporated in the technical
specification from CPRI(Bhopal/Bangalore)/ERDA only.
27
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
iii) Three samples for conducting tests as above shall be selected & sealed by a
Committee consisting of XEn(O&M) to be nominated by the circle SE,
XEN(M&P)to be nominated bythe concern SE(M&P) and ACOS from the first
lot received in the stores. The samples so selected shall be sealed by at least
3-4 seals/ stickers by the Committee Members. The selected samples shall
be sent to SE(MM) along with complete details of meters & seals (including
manufacturer’s seals) provided by the Committee members. The SE(MM) shall
further send the meters with complete details for type tests, additional type
tests and tamper tests, as per specification at CPRI (Bhopal/Bangalore)/ERDA
only. The complete type test report under a cover of registered letter shall be
sent directly to the purchaser.
iv) In addition to above selected samples, two lot of three sample of meter
with meter Box and two lot of samples of 6 Kg. raw material of each of
meter case, Meter Box and terminal block shall be drawn by the inspecting
officers during the 1st inspection & sealed by the aforesaid procedure which
shall be sent to CIPET/ any NABL accredited test house for verification of
properties of plastic material used for base and cover of meter case (base
& cover), Meter Box & Terminal Block as mentioned at clause 7.1 & 7.2 of
specification.
v) The type test charges shall be borne by the supplier. The purchaser however in
first instance may pay testing charges to the testing agency which shall be
recovered by Sr. AO(CPC) from the bill of the supplier alternatively a sum of
Rs. 3 Lac may be got deposited by the supplier with first inspection call.
vi) The supplies, at the option of purchaser, may be utilized in the field after
successful testing of sample meters in respect of the tests as mentioned at
clause 12.0 (d) (ix) below, at purchaser’s MT lab. The supplier can continue
supplying material in anticipation of successful type test(s) results. 70% of the
payment shall be released after receipt of successful purchaser’s MT lab tests
report and balance payment shall be released after receipt of successful type
test reports.
vii) In case of successful type test results, supplies shall be continued. However,
in case the meter(s)do not meet the requirement as per ISS/CBIP/
Specification in type test(s), three more samples shall be selected from the
supplies already received to get them type tested as per clause 12 (b) (iii). In
case material fails in CIPET, another set of three meters sample and
another lot of 6 kg sample already selected by inspecting officers be
tested as per Clause 12 (b) (iv) above at supplier’s cost. In case of repeat
failure in type test(s), the order of balance quantity including the quantity
lying unused in the stores/ field shall be cancelled. The guarantee period of
quantity already supplied & used shall be doubled and payment for used
meters shall be arranged after deducting 10% cost.
viii) However, purchaser may allow the supplier to re-offer the material after
change/ modification in the design of meters. The balance material shall be
accepted only after successful type testing. The type testing charges shall be
borne by the supplier.
28
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
ix) Besides above type tests, samples from each lot/ sub-lot shall be selected and
subjected to the following test(s) at purchaser’s lab on an automatic test
bench of ERSS 0.02 class. The samples shall be as per sampling plan indicated
at Annexure-H of IS:13779/1999 (considering lot of 10,000 Nos. meters) if
quantity offered for inspection is 20,000 Nos. or more , if less than this, the lot
shall remain 5,000 Nos.) on pro-rata basis. The samples shall be selected by
the committee consisting of XEn (SPO-IV) and T.A. To Chief Engineer (MM)
with the Computer PSUEDO –RANDOM method & be intimated to the
concerning ACOS. The samples so selected shall be sealed by seals/ stickers
by the ACOS and put in the primary packing of the meter (which shall be
sealed by sticker seals) and then all the meters selected to be put in the
primary packing corrugated box supplied with the meters and again sealed by
sticker seals by the committee members consisting concern ACOS & AEN(MST) at
ACOS Head Quarter. The selected samples shall be sent to SE(M&P), Jaipur
along with complete details of meters & seals. The supplies shall be utilized in
the field only after successful testing (in respect of under mentioned tests) of
sample meters:-
29
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
The acceptability criteria of the lot or otherwise shall be generally as per relevant ISS
:13779-99 (latest amended ) for only the tests at at Sr. No. 1, 2 & 3 above. In other
tests, as mentioned in specification, if any meter fails then the lot shall be
rejected.
x) In case of failure of samples of lot/ sub-lot in the test(s) detailed at clause No.
(vi) above, the similar testing shall be repeated on fresh samples selected by
the committee & fresh testing as mentioned at 1 to 4 above shall be carried
out. If the samples meet the requirement of above tests, the lot shall be
accepted and if it fails consecutive second time, the entire quantity of
respective lot/sub-lot shall be rejected and shall have to be replaced by the
supplier at his own cost. Repeated failure/ poor results in the testing may
render cancellation of order.
xi) Due notice shall be given to supplier for testing thereof to enable them to be
present for the same if so desired by them. If the supplier or his authorized
representative fails to attend the sample testing, the same shall be carried out
unilaterally by the purchaser and the results thereof shall be binding upon the
supplier.
xii) The purchaser also reserves the right to get additional samples for all or any of
the selected tests at purchaser's cost at any independent test house at any
stage of supply if so considered necessary to ensure that the quality of meters
being offered for inspection is same as already got type tested. In case of
failure, the guarantee period of the quantity already supplied by the supplier
shall be doubled and purchaser reserve the right to cancel the balance
quantity.
a. AC voltage test
b. Test of meter constant
c. Tests of limits of error as per cl. 11.11 of IS 13779 at 400%Ib,
600% Ib and 800 % Ib at pf 0.5 lag, 0.8 lead & unity.
d. Vibration test
e. Shock test
Vibration & shock test shall be carried out as acceptance test by
adopting procedure laid down in ISS: 13010/1990/IS-9000 and its
latest amendments.
f. Test of Voltage variation as per this specification.
g. Test of no load condition at 70% and 120 % of rated voltage.
The minimum test period shall be as per Clause 8.3.2 of IEC :
62053 – 21-2003.
h. Test of DC components in AC circuits - The limit of variation in
percentage error shall be 3.0% for class 1.0 meter as per Annex-
D of IS: 13779 for each phase circuit.
i. Diode test
j. Accuracy tests under all anti tamper conditions, clause 7.6 of
this specification.
k. Permanent magnet test (as specified in Clause 7.6(d) of this
specification)
31
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
32
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
15.0 Packing and forwarding of Energy Meters:
Each meter shall be packed in superior quality three ply corrugated cardboard
carton or thermocol packing box. Such single cartons shall be additionally
packed in five (5) ply corrugated cardboard carton accommodating 12 -24
meters for easy transportation, storage & handling. Foam/ any other
mechanism should be supplied between meter box base and meter box
cover so that during transportation meter box does not accidentally locks .
16.0 SAMPLES:
(a)Samples along with bid – The bidder shall furnish Eight meters and one meter box
conforming to this specification duly sealed along with routine test certificates in the
office of SE(MM),JVVNL, Jaipur one day prior to the date of opening of Tender. If the
samples are not received, the bid shall be considered as Non-responsive.
Out of the above Eight sample meters, Six sample meters (one set of 3 samples for
Electrical testing and another set of 3 samples for Environmental & Mechanical tests) and
one sample shall be tested as per IS 15959 for one port (optical p ort) at CPRI, Bhopal/
Bangalore or ERDA, Vadodara in the presence of firm’s representative. The testing
charges shall be borne by the bidder. The tentative testing charges Rs. 6.5 lac shall be
deposited by the bidder in the form of Demand Draft in favour of the Account Officer
(MM), Jaipur Discom, Jaipur.
In case sample meters submitted by the bidder with bid don’t conform the Type tests,
Addl. Type Tests and Tamper tests of specification/ IS, the financial bid of that bidder
shall not be opened.
(b) One sample meter with meter box shall be checked / tested for mechanical/ physical
features in Nigam’s Lab. Sample meter shall be broken to verify components of the meter.
Note:- The bidders are required to furnish one No. CMRI and LPR Module along with
communication cables so that the bid stage samples may be got checked/ verified.
(c) Bid stage samples shall be accepted in the office of SE(MM), JVVNL, Bani Park, Jaipur,
by the committee of following officers.
i. XEn(NABL), JVVNL, Jaipur.
ii. XEn-TA to CE(MM), JVVNL, Jaipur.
iii. XEn(SPO–IV), JVVNL, Jaipur
iv. AEn-II (SPO-IV Division), JVVNL, Jaipur.
The officers/committee which is authorised to accept the bid samples shall physically
examine & match the details of sample items i.e. its make, SL. No., Seal no. etc. with the
letter having the detail of the sample submitted by the bidder. RTC check shall also be
performed on all sample meters while physically examining & accepting the bid stage
samples. The received samples shall not be checked by powering up with AC supply.
33
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
After physically examining the details, the sample accepting officers/ committee & bidders
representative shall put their signatures with permanent marker or provide sticker seals
on the samples. There after samples of meter shall be pack ed by the committee, in the
same carton boxes in which these were received from the bidder. The committee
members & bidders representative will again put their signature/sticker seal on the
sample carton box at various positions. This sample acceptance a nd sealing procedure
shall be done one day before the bid opening date.
The committee shall prepare a sample sealing statement and hand over the sealed
samples to AEn in-charge of sample room, for safe custody in the sample room.
There shall be a separate sample room with proper lock and key arrangement in the office
of SE(MM) for safe custody of samples. It can only be opened by opening of two locks
simultaneously, key of one lock will remain in the custody of SPO -IV and key of other lock
will remain in the custody of AEn in-charge of sample room.
In-charge of the sample room shall maintain a register and shall enter the detail of
sample item, TN, Sl. No., Seal etc. in the register. When the independent test agency is
decided, the in-charge of the sample room shall hand over the samples to the same
committee which has accepted & sealed the samples for packing in big cartons for safe
transportation. The committee shall get the samples packed in its presence and then hand
over these packed samples to the courier agency for transporting these samples to the
independent Test House.
Whenever, the sample room will be opened, the reason of opening with date and time of
opening and closing and signature of persons in presence of room was opened will be
recorded in register also. In case of delay in sending the packed samples by courier
agency, the packed cartons will again be stored in the sample room.
At the independent test house the samples shall be opened in presence of Nigam’s
representative. After verification, the test house shall accept the sample for type test etc.
and issue acknowledgment of receipt to the Nigam’s representative.
(d) Additional type tests and Tamper Tests to be conducted on bid stage samples are as
under:
i) DC influence test as per IS:13779-1999 or as per relevant IEC standard in phase
circuit(s).
ii) The test of influence of supply voltage shall be carried out as per clause
No.12.7.2.1 of IS:13779/1999, except the interruption time should be variable from 10 ms
to 5 sec. instead of fixed time.
iii) Test of voltage variation as per this specification.
iv) Compliance of anti-tamper features as per Clause 7.6 of this specification.
The supplier shall furnish duly sealed three sample meters along with CMRI having all the
features conforming to specification within fifteen days from the date of receipt of PO, for
Electrical testing, verification of physical features and communication capability of meters
in Nigam’s lab. Sample meter shall be broken to verify components of the meter. In case
of major deviation in Electrical testing , physical features and communication capability,
34
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
the supplier be allowed to furnish second set of sample. In case of failure of second set of
sample order may be cancelled.
The delay in submission of before commencement samples beyond fifteen days from the
date of receipt of PO will be supplier’s account.
Before commencement, samples will be deposited by the supplier directly in the office of
the concerning Superintending Engineer (MM-II) of Discom.
Note:- : A committee comprising of M&P wing and IT wing will examine the
Communication capability of sample meter and CMRI with different make of meters
supplied in the Discom as per requirement of the technical specific ation at the time of
approval of pre commencement sample. The bidders are required to furnish one No. CMRI
and LPR Model along with communication cables at the time of sample submission so
that the bid stage sample may be got checked/verified.
(f) The samples furnished by bidders at various stages of tender and the samples
selected for store testing shall be tested on automatic testing bench, which has accuracy
of 0.02.
(a) It shall be governed by clause 1.40 of GCC except that the guarantee shall be for a
period of 5 years (for meter as well as CMRI) from the date of dispatch. The
meter/ CMRI found defective within the guarantee period shall be replaced by the
supplier free of cost within 45 days from the date of receipt of information. If
defective meter/ CMRI is not replaced within the specified period as above, the
cost of GP failed meters shall be deducted from firm’s financial hold and
Performance Bank Guarantee shall be operated to recover the cost.
The meter will be declared defective within guarantee period after testing in
the meter testing lab.
(b) If the performance period of the supplied material is over and some quantity
of guarantee period defective meters are still lying pending for want of
repair / replacement than fresh Bank Guarantee equal to the cost of these
guarantee period defective meters may be accepted by Nigam and original
PBG shall be released.
35
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
36
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
22.0 Prices:
Tenderer must quote ‘FIRM’ prices. The quoted prices shall be exclusive of
Goods and Service tax. If any duty and/ or tax is applicable at concessional
rate, the same shall be clearly mentioned.
23.0 Delivery
Commencement period 30 days from the date of receipt of purchase order and
completion within 7 months at equal monthly rate from the date of approval of pre
commencement sample. Firm is required to furnish pre commencement sample
within 15 days of receipt of purchase order. The delay in furnishing of pre
commencement sample beyond 15 days shall be on the part of the supplier and
such delayed period shall be reduced from the stipulated delivery schedule. It will
be ensured by Nigam to convey approval of pre-commencement sample within 15
days of receipt of sample.
----------------
37
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
ANNEXURE-A-3
COMPONENT SPECIFICATION
39
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
11. Power supply The power supply should be with
the capabilities as per the relevant
standards. The power supply unit of
the meter should not be affected
incase the maximum voltage of the
system appears to the terminals due
to faults or due to wrong
connections.
12 Mechanical The internal electrical components
parts should be of electrolytic copper &
should be protected from corrosion,
rust etc.
-
The other mechanical components
should be protected from rust,
corrosion etc. by suitable
plating/painting methods.
40
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
ANNEXURE-A
41
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
42
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
43
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
44
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
29 A) Display sequence
a) Continuous display:
i. Current cumulative active
forwarded energy (Total
Energy) without decimal
digit.
ii. Cover open tamper status
with date & time.
iii. Magnet tamper status
with date & time.
2. S.No. of Meter.
45
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
47
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
48
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
49
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
Time & Date
Current cumulative
forwarded KWH
energy(total)
Billing kWh (BP kWh) for
the last 12months.
Average power factor of
the last consumption
month upto pre-defined
date & time for the last
12 months
The snap shot of
occurrence with date
and time of last tamper
events for following
tamper conditions:
1. The tamper data as
per Cl. 7.6 (c), (g)&(h),
of specification
ii) Whether total reading time for each
meter does not exceed more than 60
seconds for billing data and 5 minutes
for total data.
32. Whether indications provided for following:
a) Red, Yellow, Blue LED for test output
pulse (Imp/kWh)
b) LCD icon for healthy RYB phases
33 a) Year since when the design offered is in
vogue
b) Whether the offered design is
completely type tested and certified by
BIS
34. a) Please confirm that meter does not get
damaged even if 450V is applied for 5
minutes between phase and neutral
and continue to record correctly after
restoration of normal supply?
b) Whether meter perform within class
1.0 accuracy up to 800% I b for power
factor range 0.5 lagging, 0.8 leading &
unity?
50
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
------------------
52
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
SECTION-III (VOLUME-‘B’)
TECHNICAL SPECIFICATION FOR DOUBLE ANCHOR TAMPER EVIDENT
POLYCARBONATE SEALS AGAINST TN-2502
SCOPE:
The specification covers the design, manufacture, testing at manufacturers
works, supply and delivery at destination stores of Double Anchor Tamper Evident
Poly-carbonate Seals for sealing of Meter body and terminal covers of energy
meters, Meter Box, CT-PT Units etc. with non-corrosive, non-magnetic stainless
steel sealing wire. These seals shall also be used for sealing the meters, metering
equipments and inspected materials.
The Double Anchor Tamper Evident Poly-carbonate Seals shall conform to
the Nigam’s specification as under:
1. Material of Double Anchor Tamper Evident Poly-carbonate Seals :
The raw material used for Double Anchor Tamper Evident Poly-carbonate
Seals shall be of M/s. Dow Caliber Ltd., Switzerland (Grade-201- 15), M/s.GE
Plastic, Singapore (Grade 143R), M/s. Dupont, Japan (Grade IV-20) or any other
manufacturer having better properties as under :-
Sr.No. Properties Poly-carbonate
1. Melting temperature 280 o C to 295 oC
2. USE Engineering
3. Softness Hard
4. Durability Weather effect resistance
5. Transparency Fully transparent (long
time transparency)
53
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
meter exposed to sun.
4 Minimum ambient temperature (-) 5 deg.C.
5 Average daily ambient air temperature 40 deg.C.
6 Maximum relative humidity 95%
7 Number of months of tropical monsoon 4 months.
condition
8 Maximum attitude above mean sea level 1000 meters.
9 Average annual rain fall 10-100 cm.
10 Maximum wind pressure. 200 kg/sq.m
3. Colour of Seal :
a) Design : The seal shall be Double Anchor (Push Fit) type tamper evident with
double locking. The seal should be patented/ design registered. There shall not
be any change in size, shape or design of the seal than the approved samples.
If the seal is found different than the approved design / shape / size, the same
shall be out rightly rejected. The double anchor should not be so soft that it
can be easily pressed before sealing, so that after pressing the seal can not be
opened.
c) Serial No. of the Seal : Non repeat seven digits Sr.Nos. with Code No. shall be
laser etched / embossed during moulding (it shall not be screen printed ) in
contrast colour on one side of capsule body (female ). The Sr. No. shall also be
laser etched / embossed on top of the male part . The laser etched printing
shall be through complete thickness of the polycarbonate.
d) Monogram : The seal shall have embossed/ laser etched printed word JVVNL
/monogram of JVVNL on front side and month and year of manufacture of seal in
figure embossed on the backside. The laser etched printing should be through
complete thickness of polycarbonate.
54
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
e) Seal Wire : The non-corrosive, non-magnetic stainless steel twisted wire (26
guage) confirming to IS : 280 shall be used . The seal wire shall not have affect
of magnet i.e. it should not attract to magnet. The length of the sealing wire
should be minimum 8” twisted two strand pull resistant stainless steel wire
fixed to the seal. The diameter of each individual stand should be of 0.4 to 0.5
mm. dia and overall diameter of the seal wire shall be0.9 to 1.0 mm. The No.
of turns shall be minimum 20 per inch. The seal wire should be inserted at the
female and male part during the process of moulding itself. It should be
continuous and visible throughout the length of the wire. The wire shall be
intact such that it can not be pulled out after sealing.
The seal wire insert hole should be just sufficient for passing the seal wire and
hole of larger dia is discouraged.
5. General Construction :
The seal shall be capable to withstand temperature upto 147 o C without any
damage / deformation.
The seal shall be designed for a single use only and if tampered with the help
of plier, knife or any other sharp instruments, the seal shall be damaged and due to
its transparent property, the sign of internal tampering shall be easily detected.
Also once opened, it cannot be re-used. The seal shall be made in such a way that,
it can be easily locked with the help of finger and thumb pressing no tools shall be
required to close the seal in the laboratory or at site. Both the parts shall be
designed in such a way that they cannot be separated and the attachment shall be
flexible and shall not break. After inserting the seal wire through female part, the
cap of the male part shall be fitted in the female part in such a way that it should
not leave any space to avoid insertion of any sharp tools for opening of seal body of
the female part in hot or cold condition. The seal shall have also the following
features:-
a) Tamper resistance and reliable.
b) Environmentally safe as it does not contain any lead.
c) Withstand long-term exposure to direct sunlight.
d) Required no tools for installation.
e) Transparent.
f) Heat resistance.
55
Spec.Three Phase Meters having DLMS Protocol TN-2502 -
ANNEXURE-‘B’
GUARANTEED TECHNICAL PARTICULARS FOR DOUBLE ANCHOR TAMPER EVIDENT
TRANSPARENT POLYCARBONATE SEALS AGAINST TN-2502
S.NO. PARTICULARS TO BE FURNISHED BY BIDDER
1 NAME & ADDRESS OF MANUFACTURER
2 WORK’S ADDRESS
57