HIRM
HIRM
Module 4A:
Hazard Identification & Risk Mitigation
Worksheet
Copyright © 2015 CAAS. No part of it may be used, circulated, quoted, or reproduced for distribution outside CAAS without prior written permission. Every care has been taken to ensure that the
information contained here is accurate. Nonetheless, CAAS does not warrant the currency, accuracy or completeness of the information contained in this document, nor does CAAS accept liability
for loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from reliance on the information contained in this presentation.
Intermediate Objectives
1
10/01/2017
DMO H UE C C UE H ANSP
ATO H UE C H UE UC C UE H SAR-FF
OPS
AMO H UE C C UE H AGA
Airline
Line
C UE H C UE H Ground Control
Maint
Hangar
C UE H C UE H Ground services
Maint
C UE H
Engine
Maint
C UE H Fuel Suppliers Hangar
C UE H
Comp
Maint
C UE H
Cargo /
DG handling MRO
Engine
MRO
Component MRO
D efine H >US>C in
C UE H Comp C UE H AIS
your own
operational
context - within C UE H Engine C UE H CNS
the aviation
system
C UE H Aircraft C UE H ATM
DM O H UE C C UE H ANSP
ATO H UE C H UE UC C UE H SAR-FF
OPS
AM O H UE C C UE H AGA
Line
C UE H C UE H Ground Control
Maint
H angar
C UE H C UE H Ground services
Maint
Engine
C UE H C UE H Fuel Suppliers
Maint
Comp Cargo /
C UE H C UE H
Maint D G handling
2
10/01/2017
Airline
Hangar MRO
Engine MRO
Component MRO
1. Hazard Approach -
UC-1
SRA Table - Hazard Approach Individual SRM Tasks
H TE UC Task # Thread
TE-1
UC-1 1 H-1 > TE-1 > UC-1
TE-1
UC-2 2 H-1 > TE-1 > UC-2
UC-2
H-1 Nil UC-3 3 H-1 > UC-3
UC-4 4 H-1 > TE-2 > UC-4
TE-2
UC-5 5 H-1 > TE-2 > UC-5
H-1 UC-3
UC-4
TE-2
UC-5
1. HAZARD (H) Approach
3
10/01/2017
H-1
TE-1
SRA Table - UC Approach Individual SRM Tasks
UC TE H Task # Thread
H-2
H-1 1 H-1 > TE-1 > UC-1
TE-1
H-2 2 H-2 > TE-1 > UC-1
UC-1 UC-1
H-3 3 H-3 > TE-2 > UC-1
TE-2
H-4 4 H-4 > TE-2 > UC-1
H-3
TE-2
H-4
4
10/01/2017
1. Hazard Elimination –
5
10/01/2017
2. Risk Mitigation –
6
10/01/2017
Table A Hazard Identification & Risk Mitigation (HIRM) Worksheet [Risk mitigation illustration] Oct 14
1. OPERATION/ PROCESS: Pest control within A320 aircraft fuselage/ cabin.
2. HAZARD / THREAT [H/T]: Rat (s) infestation within an operational A320 aircraft fuselage/ cabin Hazard Code: OPS-ALPHA-TECH-H1-L2-13
3. UNSAFE EVENT [UE]: Rat (s) infestation confirmed through rat sightings or evidence of aircraft wiring damage by roden activities.
4. ULTIMATE CONSEQUENCE [UC]: Multiple aircraft system(s) failure or malfunction (due to electrical wiring damage by rats).
Table B
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> Unsafe Event Mitigation (as applicable) >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> Ultimate Consequence Mitigation (as applicable) >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
Hazard / Threat
Consequence
Unsafe Event
1. Emergency
1. Emergency
1. Emergency
7. Organization
7. Organization
7. Organization
7. Organization
8. Personnel
8. Personnel
8. Personnel
8. Personnel
3. Abnormal
3. Abnormal
3. Abnormal
3. Abnormal
Control [EC]
Control [EC]
Control [EC]
Control [EC]
Factor [EF]
Factor [EF]
Factor [EF]
Factor [EF]
Risk Level
Risk Level
Risk Level
Risk Level
Procedure
Escalation
Procedure
Escalation
Procedure
Escalation
Procedure
Escalation
10. Others
Severity x
10. Others
Severity x
10. Others
Severity x
10. Others
Severity x
2. Backup
Procedure
Escalation
2. Backup
Procedure
Escalation
2. Backup
Procedure
Escalation
2. Backup
Procedure
Escalation
Likelihood
Likelihood
Likelihood
Likelihood
5. Special
5. Special
5. Special
5. Special
Approval
Approval
Approval
Approval
9. TRNG
9. TRNG
9. TRNG
9. TRNG
Approval
Approval
Approval
Approval
System
System
System
System
4. SOP
4. SOP
4. SOP
4. SOP
6. GM
6. GM
6. GM
6. GM
Inspn
Inspn
Inspn
Inspn
E-
operational A320 aircraft fuselage/
PC1 >E-PC1 PC1 PC1 N-PC1 RM1 RM1 E-RM1 RM1 RM1 N-RM1
R3 - Moderate Risk
1
L3 - Moderate Risk
damage by rats).
R4 - Low Risk
R4 - Low Risk
3D 3B 4C 3B
EF>E- EC>EF> EF>N- EC>EF> EF>E- EC>EF> EF>N- EC>EF>
PC3 E-PC3 PC3 N-PC3 RM3 E-RM3 RM3 N-RM3
Description of Existing Preventive Controls [E-PC] Description of New Preventive Controls [N-PC] Description of Existing Recovery Measures [E-RM] Description of New Recovery Measures [N-RM]
E-PC1: Flight, cabin and maintenance personnel are normally N-PC1: SOP to be put in place to require flight crew and E-RM1: Any operational aircraft reported with rat sighting is N-RM1: Special Inspection sheet (Ref SI/ A320/ 25/ 112) has been
expected to report any rat sightings within an aircraft. maintenance personnel to report rats sighting within aircraft normally subjected to a cabin inspection by maintenance raised to require any operational aircraft with reported sighting or
cabin. personnel during stayover check. evidence of rats infestation to be scheduled for de-infestation
action by approved Pest Controller upon aircraft return to main
base.
EF>E-PC1: No documented procedure/ instruction for such N-PC2: SOP to be put in place to require that all aircraft N-RM2: A routine "C" Check Maintenance Job Card has been raised
reporting expectation. fuselage doors to be closed or sealed during silent hours, to call for inspection of all opened aircraft internal fuselage
especially when undergoing hangar maintenance checks. compartments for evidence of rat droppings and necessary follow
up action. Ref: MJC-1C-53-45; SI/ A320/ 25/ 112.
7
10/01/2017
8 Recovery Measure (RM) A mitigating action, barrier or defence to block or prevent an Unsafe Event from escalating into an Ultimate Consequence or Accident.
Existing RMs refer to current/ known/ established RMs which have been in place before the current HIRM exercise. New RMs refer to
new/ additional/ modified RMs being recommended, proposed or which have been put in place as a result of the current HIRM exercise.
Consequence
Unsafe Event
1. Emergency
1. Emergency
1. Emergency
7. Organization
7. Organization
7. Organization
7. Organization
8. Personnel
8. Personnel
8. Personnel
8. Personnel
3. Abnormal
3. Abnormal
3. Abnormal
3. Abnormal
Control [EC]
Control [EC]
Control [EC]
Control [EC]
Factor [EF]
Factor [EF]
Factor [EF]
Factor [EF]
Risk Level
Risk Level
Risk Level
Risk Level
Procedure
Escalation
Procedure
Escalation
Procedure
Escalation
Procedure
Escalation
10. Others
Severity x
10. Others
Severity x
10. Others
Severity x
10. Others
Severity x
2. Backup
Procedure
Escalation
2. Backup
Procedure
Escalation
2. Backup
Procedure
Escalation
2. Backup
Procedure
Escalation
Likelihood
Likelihood
Likelihood
Likelihood
5. Special
5. Special
5. Special
5. Special
9. TRNG
9. TRNG
9. TRNG
9. TRNG
Approval
Approval
Approval
Approval
System
Approval
System
Approval
System
Approval
System
Approval
4. SOP
4. SOP
4. SOP
4. SOP
6. GM
6. GM
6. GM
6. GM
Inspn
Inspn
Inspn
Inspn
E-
operational A320 aircraft fuselage/
PC1 >E-PC1 PC1 PC1 N-PC1 RM1 RM1 E-RM1 RM1 RM1 N-RM1
1
R3 - Moderate Risk
L3 - Moderate Risk
damage by rats).
R4 - Low Risk
R4 - Low Risk
3D 3B 4C 3B
EF>E- EC>EF> EF>N- EC>EF> EF>E- EC>EF> EF>N- EC>EF>
PC3 E-PC3 PC3 N-PC3 RM3 E-RM3 RM3 N-RM3
Description of Existing Preventive Controls [E-PC] Description of New Preventive Controls [N-PC] Description of Existing Recovery Measures [E-RM] Description of New Recovery Measures [N-RM]
E-PC1: Flight, cabin and maintenance personnel are normally N-PC1: SOP to be put in place to require flight crew and E-RM1: Any operational aircraft reported with rat sighting is N-RM1: Special Inspection sheet (Ref SI/ A320/ 25/ 112) has been
expected to report any rat sightings within an aircraft. maintenance personnel to report rats sighting within aircraft normally subjected to a cabin inspection by maintenance raised to require any operational aircraft with reported sighting or
cabin. personnel during stayover check. evidence of rats infestation to be scheduled for de-infestation
action by approved Pest Controller upon aircraft return to main
base.
EF>E-PC1: No documented procedure/ instruction for such N-PC2: SOP to be put in place to require that all aircraft N-RM2: A routine "C" Check Maintenance Job Card has been raised
reporting expectation. fuselage doors to be closed or sealed during silent hours, to call for inspection of all opened aircraft internal fuselage
especially when undergoing hangar maintenance checks. compartments for evidence of rat droppings and necessary follow
up action. Ref: MJC-1C-53-45; SI/ A320/ 25/ 112.
8
10/01/2017
4. If there are any known Escalation Factors (EF), then an associated Escalation Control (EC) will be
required. If a EC is not already existing, then it should be addressed under New-Preventive Control,
later.
5-6. Based on the annotated Existing Preventive Controls (E-PCs), assess and annotate the Existing
Risk Index (Severity & Likelihood) & its Tolerability in columns 14-15.
7. If the Existing Risk Index & Tolerability is deemed unacceptable, then proceed to identify or
recommend New Preventive Controls (N-PC)or Escalation Factors (EF) in applicable columns
provided (16-25).
10-11. Upon final completion of SRM
Worksheet, proceed to fill out the
8-9. Assess the Resultant Risk Index & Tolerability (columns 28-29) based on the annotated SRM Report form and process the
Existing Preventive Controls plus the annotated New Preventive Controls, and associated ECs if any. completed SRM report (with the
If the Resultant Risk Index is still deemed unacceptable, then you may need to review and enhance completed SRM Worksheet) for
the Existing as well as New Preventive Controls in order to obtain a more tolerable Risk Index. management approval.
Operation/ Generic Hazard/ (Reported / (Reported / Corrective SRM SRM Priority Date Existing RI & Resultant RI & Next
Source of Specific Hazard/ Hazard Project Date
Equipment Threat Projected)* Projected)* Action* Action* Level* Dept / Sect Completed Tolerability Tolerability Review
Information* Threat* ID Code I/C Activated
(Original Report) [Yes/ No] [Yes / No] (H, M, L) / Rpt Ref (UE/UC) (UE/UC) Date
A320 aircraft Cabin crew reported one Inflight [H] - Rats OPS- Nil Projected - Aircraft No Yes Medium A320 ABC
operation. large rat sighted in incident infestation of ALPHA- wiring/ equipment Operations
Example
aircraft rear galley area notification A320 aircraft H1-M- damage by rats.
during cruise. report ref: 013
A320/ OPS/
012/ 2005.
1
2
3
Hazard ID Code:
Sector (1) - Organization (2) - Hazard No (3) - Priority Level (4) - Year (5)
1 Sector: AGA / ANS / OPS / DMO / AMO / MDO* (*MDO - Materials Distribution Organizations, including fuel distribution)
2 Organization: Five letters code (eg ALPHA - Alpha Airline)
3 Hazard No: Hazard number (eg H001) as assigned by the organization concerned within a given Year.
4 Priority Level: Hazard prioritization Level [High (Accident), Medium (Serious Incident), Low (Incident)].
5 Year: Year when the Hazard was registered in the organization's Hazard Register.
Hazard ID Code Illustration:
a) OPS-ALPHA-H001-M-013 [Air Operations - Alpha Airline - Hazard #1 - Moderate Priority - Year 2013]
b) AGA-GATB-H005-L-012 [Aerodrome - Timbaktu Airport - Hazard #5 - Low Priority - Year 2012]
*Explanatory Notes:
1 Source of Information: Hazard information as may be extracted from - Voluntary Hazard Rpt, Occurrence Notification/ Investigation Rpt, Internal Audit Rpt, External Audit Rpt, Hazard Survey Rpt, Operational Data Review Rpt
2 Specific Hazard/ Threat: If more than one Hazard/ Threat identified, register such additional Hazard/ Threat under new row/ item
3 Reported/ Projected (UE/ C): Annotate UE/ C description as a "Reported" occurrence or a "Projected" occurrence. If multiple H>UE>C combinations involved, register each combination under a new Row (Each single H>UE>C
combination will constitute one potential SRM Task)
4 Corrective Action: If the Hazard can be effectively eliminated through conventional corrective action (eg disposal, repair, replacement, modification), annotate YES with the action taken/ recommended. Otherwise annotate NO.
5 SRM Action: Annotate YES to indicate systematic SRM action is recommended (or has been taken already). Annotate NO if systematic SRM action is not recommended (or not necessary).
6 Priority Level: SRM or Corrective Action Priority Level based on (Annex 13) occurrence category of the projected (or reported) Unsafe Event or Consequence. Accident - High; Serious Incident - Medium; Incident - Low.
7 SRM Project Registration: This column for registration of assigned (new) SRM project, or a previously completed SRM project (with respect to the specific H>UE>C thread).
9
10/01/2017
Item
Operation/ Generic Hazard/ (Repo rted / (Repo rted / Corrective SRM SRM Priority Date Existing RI & Resultant RI & Next
Source of Specific Hazard/ Hazard Project Date
Equipment Threat Projected)* Projected)* Action* Action* Level* Dept / Sect Completed Tolerability Tolerability Review
Information* Threat* ID Code I/C Activated
/ Rpt Ref (UE/UC) (UE/UC) Date
(Original Report) [Yes/ No] [Yes / No] (H, M, L)
A320 aircraft Cabin crew reported one Inflight [H] - Rats OPS- Nil Projected - Aircraft No Yes Medium A320 ABC
operation. large rat sighted in incident infestation of ALPHA- wiring/ equipment Operations
Example
aircraft rear galley area notification A320 aircraft H1-M- damage by rats.
during cruise. report ref: 013
A320/ OPS/
012/ 2005.
1
2
3
Hazard Registration
Hazard [H] / Threat [T] Recommended Action
Area/ Unsafe-Event [UE] Consequence [C]
Item
aircraft rear galley area notification A320 aircraft H1-M- damage by rats.
during cruise. report ref: 013
A320/ OPS/
012/ 2005.
1
2
3
Hazard Registration
Hazard [H] / Threat [T] Recommended Action
Area/ Unsafe-Event [UE] Consequence [C]
Item
aircraft rear galley area notification A320 aircraft H1-M- damage by rats.
during cruise. report ref: 013
A320/ OPS/
012/ 2005.
1
2
3
10
10/01/2017
Remarks This Option takes into consideration the severity of the Hazard’s projected
Consequence only.
Operation/ Generic Hazard Consequence* Corrective Priority Date Existing Risk Resultant Next
Source of Specific Hazard Hazard SRM Action* Date
Equipment Description [tentative] Action* Level Dept Name
Activated
Completed Index & Risk Index & Review
Information* Decription ID Code [Yes / No] / Rpt Ref Level Level Date
(Original Report) [Yes/ No] (H, M, L)
A320 aircraft Cabin crew reported one Inflight incident Rat (s) infestation of OPS- a) Aircraft wiring/ No Yes Medium A320 ABC
operation. large rat sighted in aircraft notification A320 aircraft ALPHA- equipment damage by rat Operations
Example Only
Hazard ID Code:
Sector (1) - Organization (2) - Hazard No (3) - Priority Level (4) - Year (5)
1) Sector: AGA / ANS / OPS / DMO / AMO / MDO* (*MDO - Materials Distribution Organizations, including fuel distribution)
i)
ii)
Example of Hazard ID Code:
SRM Project Team/ SAG
OPS-ALPHA-H001-M-013 [Air Operations - Alpha Airline - Hazard #1 - Moderate Priority - Year 2013]
AGA-GATB-H005-L3-012 [Aerodrome - Timbaktu Airport - Hazard #5 - Low Priority - Year 2012]
Risk Mitigation Project Completion
*Explanatory Notes:
a)
Date
Source of Information: Hazard information as may be extracted from - Voluntary Hazard Rpt, Occurrence Notification/ Investigation Rpt, Internal Audit Rpt, External Audit Rpt, Hazard Survey Rpt, Operational Data Review Rpt
Next
b)
c)
Credible Unsafe Event / Consequence: Tentative projection to facilitate hazard prioritization when assigning for SRM action only (refer Priority Level column)
Date Existing Risk Resultant Risk
Corrective Action: If the Hazard can be effectively eliminated through conventional corrective action (eg disposal, repair, replacement, modification), annotate YES with the recommended corrective action. Otherwise annotate NO.
d)
e) Dept Name Completed
SRM Action: Annotate YES to indicate systematic SRM action is recommended (essentially permanent/ recurring hazards). Annotate NO if systematic SRM action is not recommended (essentially temporary/ transient hazards).
Priority Level: SRM action Priority Level based on (Annex 13) occurrence category of the projected Unsafe Event or Consequence > Accident - High; Serious Incident - Moderate; Incident - Low Review
Activated Index & Level Index & Level
/ Rpt Ref Date
A320 ABC
Operations
11
10/01/2017
Existing Existing
Unsafe Event
Consequence
Resultant Resultant
Existing Preventive Controls [E-PC] RI & T
New Preventive Controls [N-PC] RI & T
Existing Recovery Measures [E-RM] New Recovery Measures [N-RM]
Ultim ate
RI & T RI & T
7. Organization
7. Organization
7. Organization
7. Organization
8. Personnel
8. Personnel
8. Personnel
8. Personnel
3. Abnormal
3. Abnormal
3. Abnormal
3. Abnormal
Control [EC]
Control [EC]
Control [EC]
Control [EC]
Factor [EF]
Factor [EF]
Factor [EF]
Factor [EF]
Em ergency
Em ergency
Em ergency
Em ergency
10. O thers
10. O thers
10. O thers
10. O thers
Risk Level
Risk Level
Risk Level
Risk Level
Severity x
Severity x
Severity x
Severity x
Procedure
Escalation
Escalation
Procedure
Escalation
Escalation
Procedure
Procedure
Escalation
Escalation
Procedure
Escalation
Escalation
2. Backup
2. Backup
2. Backup
2. Backup
5. Special
5. Special
5. Special
5. Special
Likelihood
Likelihood
Likelihood
Likelihood
9. T RNG
9. T RNG
9. T RNG
9. T RNG
Approval
Approval
Approval
Approval
Approval
Approval
Approval
Approval
System
System
System
System
4. SO P
4. SO P
4. SO P
4. SO P
6. G M
6. G M
6. G M
6. G M
Inspn
Inspn
Inspn
Inspn
1.
1.
1.
1.
Rat (s ) infestation confirm ed through rat
EF (to EF (to
Rat (s) infestation within an operational
RM1) RM5)
R3 - Moderate Risk
L3 - M oderate Risk
EF1 EF1 (to
EF>E- EC>EF-F- N- EF>N- EC>EF> EC (to N- EC (to
damage by rats).
R4 - Low Risk
R4 - Low Risk
(to E- N-
PC2 PC2 PC2 PC6 N-PC6 EF1) RM2 EF1)
RM2) RM6)
EF>E- EC>EF>
3D EF>N- EC>EF>
3B EF2
EC (to
4C 3B
(to E-
PC3 E-PC3 PC7 N-PC7 EF2)
RM3)
EF (to
EF>E- EC>EF> EC (to
E-
PC4 E-PC4 EF)
RM4)
Table
A
Hazard Identification & Risk Mitigation (HIRM) Worksheet [Risk mitigation illustration] 27 Mar 14
1. OPERATION/ PROCESS: Pest control within A320 aircraft fuselage/ cabin.
Rat (s) infestation within an operational A320
2. HAZARD / THREAT [H/T]: Hazard Code: OPS-ALPHA-TECH-H1-L2-13
aircraft fuselage/ cabin
Rat (s) infestation confirmed through rat sightings or evidence of aircraft wiring damage by
3. UNSAFE EVENT [UE]:
roden activities.
4. ULTIMATE CONSEQUENCE
[UC]: Multiple aircraft system(s) failure or malfunction (due to electrical wiring damage by rats).
Unsafe Event
Existing Resultant
Existing Preventive Controls [E-PC] RI & T
New Preventive Controls [N-PC] RI & T
7. Organization
7. Organization
8. Personnel
8. Personnel
Control [EC]
Control [EC]
3. Abnormal
3. Abnormal
Emergency
Emergency
Factor [EF]
Factor [EF]
10. Others
10. Others
Procedure
Escalation
Escalation
Procedure
Escalation
Escalation
Severity x
Severity x
2. Backup
2. Backup
Likelihood
Likelihood
Risk Level
Risk Level
9. TRNG
9. TRNG
5. Special
5. Special
Approval
Approval
System
System
Approval
Approval
4. SOP
4. SOP
6. GM
6. GM
Inspn
Inspn
1.
1.
R3 - Moderate Risk
N-
PC2 PC2 PC2 PC6 N-PC6
3D 3B
EF>E- EC>EF> EF>N- EC>EF>
PC3 E-PC3 PC7 N-PC7
EF>E- EC>EF>
PC4 E-PC4
Description of Existing Preventive Controls [E-PC] Description of New Preventive Controls [N-PC]
E-PC1: Flight, cabin and maintenance personnel are expected to N-PC1: SOP to be put in place to require that all aircraft
report any rat sightings within an aircraft. fuselage doors to be closed or sealed during silent hours,
especially when undergoing hangar maintenance checks.
12
10/01/2017
Note: The Likelihood (Level) of a given UE/ UC is to be derived from the "Consolidated
Barrier Strength Value (CBSV)" of its line of PCs/ RMs. Refer to Sheet 6A of the Excel
HIRM Worksheet.
13
10/01/2017
Existing
Unsafe Event
Resultant
Existing Recovery Measures [E-RM] New Recovery Measures [N-RM]
Ultimate
RI & T RI & T
1. Emergency
1. Emergency
7. Organization
7. Organization
8. Personnel
8. Personnel
3. Abnormal
3. Abnormal
Control [EC]
Control [EC]
Factor [EF]
Factor [EF]
Risk Level
Risk Level
Procedure
Escalation
Procedure
Escalation
10. Others
Severity x
10. Others
Severity x
2. Backup
Procedure
Escalation
2. Backup
Procedure
Escalation
Likelihood
Likelihood
5. Special
5. Special
9. TRNG
9. TRNG
Approval
Approval
System
System
Approval
Approval
4. SOP
4. SOP
6. GM
6. GM
Inspn
Inspn
EF (to EF (to
Rat (s) infestation confirmed through
EF1 EF1
damage by rats).
EC (to N- EC (to
R4 - Low Risk
(to E- (to N-
EF1) RM2 EF1)
RM2) RM6)
EF2 4C 3B
EC (to
(to E-
EF2)
RM3)
EF (to
EC (to
E-
EF)
RM4)
Description of Existing Recovery Measures [E-RM] Description of New Recovery Measures [N-RM]
E-RM1: Any operational aircraft reported with rat sighting N-RM1: Special Inspection sheet (Ref SI/ A320/ 25/ 112) has
is subject to a cabin inspection by maintenance personnel been raised to require any operational aircraft with reported
during stayover check. sighting or evidence of rats infestation to be scheduled for de-
infestation action by approved Pest Controller upon aircraft
return to main base.
14
10/01/2017
O ptional
O ptional
O ptional
O ptional
O ptional
Major (4) Unlikely / Improbable (B) 4B R3 -
Moderate (3) Likely / Occasional (D) 3D Moderate Yes Yes Yes _ Yes Yes Yes
Moderate (3) Possible/ Remote (C) 3C Risk
Minor (2) Certain / Frequent (E) 2E
Minor (2) Likely / Occasional (D) 2D
Insignificant (1) Certain / Frequent (E) 1E
Major (4) Exceptional / Impossible (A) 4A
Moderate (3) Unlikely / Improbable (B) 3B
Optional
Optional
Optional
Optional
Optional
Optional
Optional
Moderate (3) Exceptional / Impossible (A) 3A
R4 -
Minor (2) Possible/ Remote (C) 2C _ _ _ _ _
Low Risk
Minor (2) Unlikely / Improbable (B) 2B
Insignificant (1) Likely / Occasional (D) 1D
Insignificant (1) Possible/ Remote (C) 1C
Optional
Optional
Optional
Optional
Minor (2) Exceptional / Impossible (A) 2A R5 -
Insignificant (1) Unlikely / Improbable (B) 1B Negligible _ _ _ _ _ _ _ _
Insignificant (1) Exceptional / Impossible (A) 1A Risk
Note: This Table is an illustration/ guide to the likely scope of PC/ RM categories which might be expected to be considered (where applicable) in relation to
the indicated Risk Index and levels. In principle, a wider scope of defenses can be expected for higher risk levels.
1 Schematic output of the completed SRM project (eg completed HIRM Wsht or BTXP Diagram)
Note: Upon approval, forward Copy to SMS Office for HRM Master Register update/ closure
**Refer HIRM Wsht, Tab #11 – Hazard & Risk Management Register. *Refer HIRM Wsht Tab #8 – Risk Levels
15
10/01/2017
16
10/01/2017
17
10/01/2017
a) TRUE
b) FALSE
18
10/01/2017
a) TRUE
b) FALSE
19
10/01/2017
20
10/01/2017
21
10/01/2017
Congratulations!
for completing this Section 2 on HIRM Worksheet.
You are now able to:
Understand and apply HIRM Terminology & Definitions
Customize HIRM Tool & SOP
Create Master Hazards Register
Prioritize Hazards for risk mitigation
Activate risk mitigation for selected Hazards
Project Unsafe Event/ Ultimate Consequence
Evaluate Defenses, Risk Index & Tolerability
Check Defenses to Risk Index Correlation
Raise a SRM Project Report
22