SHOP DRAWING / MATERIAL / EQUIPMENT / BROCHURE / SPECIFICATION / CALCULATION / TEST DATA / METHODOLOGY / WARRANTY
Project: Clark Green Frontier Office Towers Project Submittal Type X For Comments & Approval For Inspection Submittal No.
NPICGF-NPI-RFA-TDI-E&A-0014
X New Submittal For The Record / Information Proposed Equivalent/Alternative
Location: M.A. Roxas Highway, 9999 Clark Additional Submittal For Reconfirmation Others
Freeport Zone, Angeles City, Pampanga Resubmittal For Review & Comments Date Submitted: July, 4,2017 Response date:
To: Townsquare Development Inc. Thru From
DATEM, INC.
Attn: Engr. Rodrigo M. Ocampo - Senior Manager for Construction MW-CPM
Reference Data
SHT
Description Submittal Requirements ACTION TAKEN Remarks
NO.
Cutting List Application / Installation
A
Shop Drawing / Details Company Profile
X Brochure / Catalogue Calculations/Analysis
H1 Architecture
and Design
Technical / Product Data Procedure
SAMPLE AND BROCHURE OF HANGER AND SUPPORT B
UNISTRUT BRAND Test Results Computation
X Sample/s Photographs
C
Mock-up Sequence of Operation
Method Statement Testing Procedure
A
Certificates Site Inspection Photographs
Incorporated
Specifications Warranty
ESCA
Testing & Commissioning Comparative Analysis B
Prepared By:
C
JOSEPH J. FRECIA
NPI - P.I.C
A
Townsquare
JAMES B. VILLANUEVA
Dev't Inc.
DATEM - MEPFS Coordinator B
CARLOTA B. LOR
DATEM - QA,QC Head
RECEIVED RELEASED RECEIVED RELEASED
RESP RESP
Noted By: (Sign w/ Date & Time) DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE:
Legend (Design Consultant's Action): H1
A > Work may proceed
ESCA
B > Work may proceed subject to
correction indicated,
Engr. RODRIGO M. OCAMPO TDI
Project: Clark Green Frontier Office Towers Project Submittal Type X For Comments & Approval For Inspection Submittal No.
NPICGF-NPI-RFA-TDI-E&A-0015
X New Submittal For The Record / Information Proposed Equivalent/Alternative
Location: M.A. Roxas Highway, 9999 Clark Additional Submittal For Reconfirmation Others
Freeport Zone, Angeles City, Pampanga Resubmittal For Review & Comments Date Submitted: July, 25,2017 Response date:
To: Townsquare Development Inc. Thru From
DATEM, INC.
Attn: Engr. Rodrigo M. Ocampo - Senior Manager for Construction MW-CPM
Reference Data
SHT
Description Submittal Requirements ACTION TAKEN Remarks
NO.
Cutting List Application / Installation
A
X Shop Drawing / Details Company Profile
Brochure / Catalogue Calculations/Analysis
H1 Architecture
and Design
Technical / Product Data Procedure
B
RELOCATION OF GROUNDING ROD Test Results Computation
Sample/s Photographs
C
Mock-up Sequence of Operation
Method Statement Testing Procedure
A
Certificates Site Inspection Photographs
Incorporated
Specifications Warranty
ESCA
Testing & Commissioning Comparative Analysis B
Prepared By:
C
JOSEPH J. FRECIA
NPI - P.I.C
A
Townsquare
JAMES B. VILLANUEVA
Dev't Inc.
DATEM - MEPFS Coordinator B
CARLOTA B. LOR
DATEM - QA,QC Head
RECEIVED RELEASED RECEIVED RELEASED
RESP RESP
Noted By: (Sign w/ Date & Time) DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE:
Legend (Design Consultant's Action): H1
A > Work may proceed
ESCA
B > Work may proceed subject to
correction indicated,
Engr. RODRIGO M. OCAMPO TDI
Project: Clark Green Frontier Office Towers Project Submittal Type X For Comments & Approval For Inspection Submittal No.
NPICGF-NPI-RFA-TDI-E&A-0016
X New Submittal For The Record / Information Proposed Equivalent/Alternative
Location: M.A. Roxas Highway, 9999 Clark Additional Submittal For Reconfirmation Others
Freeport Zone, Angeles City, Pampanga Resubmittal For Review & Comments Date Submitted: August 3, 25,2017 Response date:
To: Townsquare Development Inc. Thru From
DATEM, INC.
Attn: Engr. Rodrigo M. Ocampo - Senior Manager for Construction MW-CPM
Reference Data
SHT
Description Submittal Requirements ACTION TAKEN Remarks
NO.
Cutting List Application / Installation
A
Shop Drawing / Details Company Profile
X Brochure / Catalogue Calculations/Analysis
H1 Architecture
and Design
X Technical / Product Data Procedure
B
WIRES CABLES Test Results Computation
X Sample/s Photographs
BRAND: COLUMBIA WIRE AND CABLE CORPORATION Mock-up Sequence of Operation
C
Method Statement Testing Procedure
A
Certificates Site Inspection Photographs
Incorporated
X Specifications Warranty
ESCA
Testing & Commissioning Comparative Analysis B
Prepared By:
C
JOSEPH J. FRECIA
NPI - P.I.C
A
Townsquare
JAMES B. VILLANUEVA
Dev't Inc.
DATEM - MEPFS Coordinator B
CARLOTA B. LOR
DATEM - QA,QC Head
RECEIVED RELEASED RECEIVED RELEASED
RESP RESP
Noted By: (Sign w/ Date & Time) DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE:
Legend (Design Consultant's Action): H1
A > Work may proceed
ESCA
B > Work may proceed subject to
correction indicated,
Engr. RODRIGO M. OCAMPO TDI
Project: Clark Green Frontier Office Towers Project Submittal Type X For Comments & Approval For Inspection Submittal No.
NPICGF-NPI-RFA-TDI-E&A-0014
X New Submittal For The Record / Information Proposed Equivalent/Alternative
Location: M.A. Roxas Highway, 9999 Clark Additional Submittal For Reconfirmation Others
Freeport Zone, Angeles City, Pampanga Resubmittal For Review & Comments Date Submitted: July, 4,2017 Response date:
To: Townsquare Development Inc. Thru From
DATEM, INC.
Attn: Engr. Rodrigo M. Ocampo - Senior Manager for Construction MW-CPM
Reference Data
SHT
Description Submittal Requirements ACTION TAKEN Remarks
NO.
Cutting List Application / Installation
A
Shop Drawing / Details Company Profile
X Brochure / Catalogue Calculations/Analysis
H1 Architecture
and Design
Technical / Product Data Procedure
SAMPLE AND BROCHURE OF HANGER AND SUPPORT B
UNISTRUT BRAND Test Results Computation
X Sample/s Photographs
C
Mock-up Sequence of Operation
Method Statement Testing Procedure
A
Certificates Site Inspection Photographs
Incorporated
Specifications Warranty
ESCA
Testing & Commissioning Comparative Analysis B
Prepared By:
C
JOSEPH J. FRECIA
NPI - P.I.C
A
Townsquare
JAMES B. VILLANUEVA
Dev't Inc.
DATEM - MEPFS Coordinator B
CARLOTA B. LOR
DATEM - QA,QC Head
RECEIVED RELEASED RECEIVED RELEASED
RESP RESP
Noted By: (Sign w/ Date & Time) DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE:
Legend (Design Consultant's Action): H1
A > Work may proceed
ESCA
B > Work may proceed subject to
correction indicated,
Engr. RODRIGO M. OCAMPO TDI
Project: Clark Green Frontier Office Towers Project Submittal Type X For Comments & Approval For Inspection Submittal No.
NPICGF-NPI-RFA-TDI-E&A-0016-A
New Submittal For The Record / Information Proposed Equivalent/Alternative
Location: M.A. Roxas Highway, 9999 Clark Additional Submittal For Reconfirmation Others
Freeport Zone, Angeles City, Pampanga X Resubmittal For Review & Comments Date Submitted: August 23, 25,2017 Response date:
To: Townsquare Development Inc. Thru From
DATEM, INC.
Attn: Engr. Rodrigo M. Ocampo - Senior Manager for Construction MW-CPM
Reference Data
SHT
Description Submittal Requirements ACTION TAKEN Remarks
NO.
Cutting List Application / Installation
A
Shop Drawing / Details Company Profile
X Brochure / Catalogue Calculations/Analysis
H1 Architecture
and Design
X Technical / Product Data Procedure
B
WIRES CABLES Test Results Computation
Sample/s Photographs
BRAND: COLUMBIA WIRE AND CABLE CORPORATION Mock-up Sequence of Operation
C
Method Statement Testing Procedure
A
X Certificates Site Inspection Photographs
Incorporated
X Specifications Warranty
ESCA
Testing & Commissioning Comparative Analysis B
Prepared By:
C
EMHAR LUKE P. AMANTE
NPI-Project In-Charge
A
Townsquare
RENEBERT C. CACERES
Dev't Inc.
DATEM - MEPFS Coordinator B
CARLOTA B. LOR
DATEM - QA,QC Head
RECEIVED RELEASED RECEIVED RELEASED
RESP RESP
Noted By: (Sign w/ Date & Time) DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE:
Legend (Design Consultant's Action): H1
A > Work may proceed
ESCA
B > Work may proceed subject to
correction indicated,
Engr. RODRIGO M. OCAMPO TDI
Project: Clark Green Frontier Office Towers Project Submittal Type X For Comments & Approval For Inspection Submittal No.
NPICGF-NPI-RFA-TDI-E&A-0013
X New Submittal For The Record / Information Proposed Equivalent/Alternative
Location: M.A. Roxas Highway, 9999 Clark Additional Submittal For Reconfirmation Others
Freeport Zone, Angeles City, Pampanga Resubmittal For Review & Comments Date Submitted: September 14,2017 Response date:
To: Townsquare Development Inc.
Attn: Engr. Rodrigo M. Ocampo - Senior Manager for Construction
Reference Data
SHT
Description Submittal Requirements ACTION TAKEN Remarks
NO.
Cutting List Application / Installation
A
Shop Drawing / Details Company Profile
X Brochure / Catalogue Calculations/Analysis
H1 Architecture
and Design
Technical / Product Data Procedure
SAMPLE AND BROCHURE OF CABLE LADDER/TRAY
B
AND PULLBOX (GENTEC DISTRIBUTION Test Results Computation
CORPORATION}
X Sample/s Photographs
C
Mock-up Sequence of Operation
Method Statement Testing Procedure
A
Certificates Site Inspection Photographs
Incorporated
X Specifications Warranty
ESCA
Testing & Commissioning Comparative Analysis B
Prepared By:
C
EMHAR LUKE P. AMANTE
NPI – Assistant Project In-Charge
A
Townsquare
RENEBERT C. CACERES
Dev't Inc.
DATEM - MEPFS Coordinator B
CARLOTA B. LOR
DATEM - QA,QC Head
RECEIVED RELEASED RECEIVED RELEASED
RESP RESP
Noted By: (Sign w/ Date & Time) DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE:
Legend (Design Consultant's Action): H1
A > Work may proceed
ESCA
B > Work may proceed subject to
correction indicated,
Engr. RODRIGO M. OCAMPO TDI
Project: Clark Green Frontier Office Towers Project Submittal Type X For Comments & Approval For Inspection Submittal No.
NPICGF-NPI-RFA-TDI-E&A-0017
X New Submittal For The Record / Information Proposed Equivalent/Alternative
Location: M.A. Roxas Highway, 9999 Clark Additional Submittal For Reconfirmation Others
Freeport Zone, Angeles City, Pampanga Resubmittal For Review & Comments Date Submitted: September 14, 25,2017 Response date:
To: Townsquare Development Inc.
Attn: Engr. Rodrigo M. Ocampo - Senior Manager for Construction
Reference Data
SHT
Description Submittal Requirements ACTION TAKEN Remarks
NO.
Cutting List Application / Installation
A
X Shop Drawing / Details Company Profile
Brochure / Catalogue Calculations/Analysis
H1 Architecture
and Design
Technical / Product Data Procedure
B
RELOCATION OF GROUNDING ROD Test Results Computation
Sample/s Photographs
C
Mock-up Sequence of Operation
Method Statement Testing Procedure
A
Certificates Site Inspection Photographs
Incorporated
Specifications Warranty
ESCA
Testing & Commissioning Comparative Analysis B
Prepared By:
C
EMHAR LUKE P. AMANTE
NPI-Project In-Charge
A
Townsquare
RENEBERT C. CACERES
Dev't Inc.
DATEM - MEPFS Coordinator B
CARLOTA B. LOR
DATEM - QA,QC Head
RECEIVED RELEASED RECEIVED RELEASED
RESP RESP
Noted By: (Sign w/ Date & Time) DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE:
Legend (Design Consultant's Action): H1
A > Work may proceed
ESCA
B > Work may proceed subject to
correction indicated,
Engr. RODRIGO M. OCAMPO TDI
Project: Clark Green Frontier Office Towers Project Submittal Type X For Comments & Approval For Inspection Submittal No.
NPICGF-NPI-RFA-TDI-E&A-0019
X New Submittal For The Record / Information Proposed Equivalent/Alternative
Location: M.A. Roxas Highway, 9999 Clark Additional Submittal For Reconfirmation Others
Freeport Zone, Angeles City, Pampanga Resubmittal For Review & Comments Date Submitted: September 16, 2017 Response date:
To: Townsquare Development Inc.
Attn: Engr. Rodrigo M. Ocampo - Senior Manager for Construction
Reference Data
SHT
Description Submittal Requirements ACTION TAKEN Remarks
NO.
Cutting List Application / Installation
A
X Shop Drawing / Details Company Profile
Brochure / Catalogue Calculations/Analysis
H1 Architecture
and Design
Technical / Product Data Procedure
SHOP DRAWING FOR SLEEVE CABLE TRAY, POWER
B
AND AUXILIARY SYSTEM AT FOURTH FLOOR, EE. RM. & Test Results Computation
TELCO ROOM.
Sample/s Photographs
C
Mock-up Sequence of Operation
Method Statement Testing Procedure
Fourth Floor Gridline 46-47 Certificates Site Inspection Photographs
A
Incorporated
Specifications Warranty
ESCA
Testing & Commissioning Comparative Analysis B
Prepared By:
C
EMHAR LUKE P. AMANTE
NPI-Assistant Project In-Charge
A
Townsquare
RENEBERT C. CACERES
Dev't Inc.
DATEM - MEPFS Coordinator B
CARLOTA B. LOR
DATEM - QA,QC Head
RECEIVED RELEASED RECEIVED RELEASED
RESP RESP
Noted By: (Sign w/ Date & Time) DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE:
Legend (Design Consultant's Action): H1
A > Work may proceed
ESCA
B > Work may proceed subject to
correction indicated,
Engr. RODRIGO M. OCAMPO TDI
Project: Clark Green Frontier Office Towers Project Submittal Type X For Comments & Approval For Inspection Submittal No.
NPICGF-NPI-RFA-TDI-E&A-0020
X New Submittal For The Record / Information Proposed Equivalent/Alternative
Location: M.A. Roxas Highway, 9999 Clark Additional Submittal For Reconfirmation Others
Freeport Zone, Angeles City, Pampanga Resubmittal For Review & Comments Date Submitted: September 28, 2017 Response date:
To: Townsquare Development Inc.
Attn: Engr. Rodrigo M. Ocampo - Senior Manager for Construction
Reference Data
SHT
Description Submittal Requirements ACTION TAKEN Remarks
NO.
Cutting List Application / Installation
A
X Shop Drawing / Details Company Profile
Brochure / Catalogue Calculations/Analysis
H1 Architecture
and Design
Technical / Product Data Procedure
B
GROUNDING ROD WITH COUPLER CONNECTION Test Results Computation
Sample/s Photographs
C
Mock-up Sequence of Operation
Method Statement Testing Procedure
A
Certificates Site Inspection Photographs
Incorporated
Specifications Warranty
ESCA
Testing & Commissioning Comparative Analysis B
Prepared By:
C
EMHAR LUKE P. AMANTE
NPI-Assistant Project In-Charge
A
Townsquare
RENEBERT C. CACERES
Dev't Inc.
DATEM - MEPFS Coordinator B
CARLOTA B. LOR
DATEM - QA,QC Head
RECEIVED RELEASED RECEIVED RELEASED
RESP RESP
Noted By: (Sign w/ Date & Time) DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE:
Legend (Design Consultant's Action): H1
A > Work may proceed
ESCA
B > Work may proceed subject to
correction indicated,
Engr. RODRIGO M. OCAMPO TDI
Project: Clark Green Frontier Office Towers Project Submittal Type X For Comments & Approval For Inspection Submittal No.
NPICGF-NPI-RFA-TDI-E&A-0025
X New Submittal For The Record / Information Proposed Equivalent/Alternative
Location: M.A. Roxas Highway, 9999 Clark Additional Submittal For Reconfirmation Others
Freeport Zone, Angeles City, Pampanga Resubmittal For Review & Comments Date Submitted: December 15, 2017 Response date:
To: Townsquare Development Inc.
Attn: Engr. Rodrigo M. Ocampo - Senior Manager for Construction
Reference Data
SHT
Description Submittal Requirements ACTION TAKEN Remarks
NO.
Cutting List Application / Installation
A
X Shop Drawing / Details Company Profile
Brochure / Catalogue Calculations/Analysis
H1 Architecture
and Design
Technical / Product Data Procedure
PROPOSED CONCRETE ENCASEMENT AND ROUTING B
LAYOUT Test Results Computation
Sample/s Photographs
C
Mock-up Sequence of Operation
Method Statement Testing Procedure
A
Certificates Site Inspection Photographs
Incorporated
Specifications Warranty
ESCA
Testing & Commissioning Comparative Analysis B
Prepared By:
C
EMHAR LUKE P. AMANTE
NPI-Assistant Project In-Charge
A
Townsquare
RENEBERT C. CACERES
Dev't Inc.
DATEM - MEPFS Coordinator B
CARLOTA B. LOR
DATEM - QA,QC Head
RECEIVED RELEASED RECEIVED RELEASED
RESP RESP
Noted By: (Sign w/ Date & Time) DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE:
Legend (Design Consultant's Action): H1
A > Work may proceed
ESCA
B > Work may proceed subject to
correction indicated,
Engr. RODRIGO M. OCAMPO TDI
Project: Clark Green Frontier Office Towers Project Submittal Type X For Comments & Approval For Inspection Submittal No. NPICGF-NPI-RFI-TDI-E&A-00__
X New Submittal For The Record / Information Proposed Equivalent/Alternative
Location: M.A. Roxas Highway, 9999 Clark Additional Submittal For Reconfirmation Others
Freeport Zone, Angeles City, Pampanga Resubmittal For Review & Comments Date Submitted: February 12, 2020 Response date:
To: Townsquare Development Inc.
Attn: Engr. Rodrigo M. Ocampo - Senior Manager for Construction
Reference Data
SHT
Description Submittal Requirements ACTION TAKEN Remarks
NO.
Cutting List Application / Installation
A
Shop Drawing / Details Company Profile
Brochure / Catalogue Calculations/Analysis
H1 Architecture
and Design
FOR TEMPORARY TAPPING POINT OF FIRE Technical / Product Data Procedure
B
PUMP POWER SUPPLY AT BPO-POWER Test Results Computation
CENTER A
X Sample/s Photographs
C
Mock-up Sequence of Operation
Method Statement Testing Procedure
A
Certificates Site Inspection Photographs
Incorporated
Specifications Warranty
ESCA
Testing & Commissioning Comparative Analysis B
Prepared By:
C
EMHAR LUKE P. AMANTE
NPI-Project In-Charge
A
Townsquare
ARENZ JOSHUA B. MANABAT
Dev't Inc.
DATEM - MEPFS Coordinator B
FRANCIS R. PONTILLAS
DATEM - QA,QC Head
RECEIVED RELEASED RECEIVED RELEASED
RESP RESP
Noted By: (Sign w/ Date & Time) DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE:
Legend (Design Consultant's Action): H1
A > Work may proceed
ESCA
B > Work may proceed subject to
correction indicated, Engr. HARVI S. GOPEZ TDI