RFIA

This document is a request for approval of shop drawings, brochures, and samples for hangers and support Unistrut brand from DATEM Inc. for the Clark Green Frontier Office Towers project. It provides details on the submittal type, location of the project, date submitted, references, description of items submitted, submittal requirements, and spaces for reviewers to note their actions and remarks. The primary purpose is to obtain comments and final approval for the hangers and supports from the project owners and managers.

Uploaded by

Mary Joy Torres
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
171 views11 pages

RFIA

This document is a request for approval of shop drawings, brochures, and samples for hangers and support Unistrut brand from DATEM Inc. for the Clark Green Frontier Office Towers project. It provides details on the submittal type, location of the project, date submitted, references, description of items submitted, submittal requirements, and spaces for reviewers to note their actions and remarks. The primary purpose is to obtain comments and final approval for the hangers and supports from the project owners and managers.

Uploaded by

Mary Joy Torres
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 11

REQUEST FOR APPROVAL

SHOP DRAWING / MATERIAL / EQUIPMENT / BROCHURE / SPECIFICATION / CALCULATION / TEST DATA / METHODOLOGY / WARRANTY

Project: Clark Green Frontier Office Towers Project Submittal Type X For Comments & Approval For Inspection Submittal No.
NPICGF-NPI-RFA-TDI-E&A-0014
X New Submittal For The Record / Information Proposed Equivalent/Alternative
Location: M.A. Roxas Highway, 9999 Clark Additional Submittal For Reconfirmation Others

Freeport Zone, Angeles City, Pampanga Resubmittal For Review & Comments Date Submitted: July, 4,2017 Response date:
To: Townsquare Development Inc. Thru From
DATEM, INC.
Attn: Engr. Rodrigo M. Ocampo - Senior Manager for Construction MW-CPM
Reference Data
SHT
Description Submittal Requirements ACTION TAKEN Remarks
NO.
Cutting List Application / Installation
A
Shop Drawing / Details Company Profile
X Brochure / Catalogue Calculations/Analysis

H1 Architecture

and Design
Technical / Product Data Procedure
SAMPLE AND BROCHURE OF HANGER AND SUPPORT B
UNISTRUT BRAND Test Results Computation

X Sample/s Photographs
C
Mock-up Sequence of Operation
Method Statement Testing Procedure
A
Certificates Site Inspection Photographs

Incorporated
Specifications Warranty

ESCA
Testing & Commissioning Comparative Analysis B
Prepared By:
C
JOSEPH J. FRECIA
NPI - P.I.C
A

Checked & Reviewed by:


B
CARLITO C. BUNTOG
NPI - Sr. Project Engineer C

Noted By: (Sign w/ Date & Time)


A

Townsquare
JAMES B. VILLANUEVA

Dev't Inc.
DATEM - MEPFS Coordinator B

CARLOTA B. LOR
DATEM - QA,QC Head
RECEIVED RELEASED RECEIVED RELEASED
RESP RESP
Noted By: (Sign w/ Date & Time) DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE:
Legend (Design Consultant's Action): H1
A > Work may proceed
ESCA
B > Work may proceed subject to
correction indicated,
Engr. RODRIGO M. OCAMPO TDI

TDI - Senior Project Manager for Construction


C > Work shall not proceed
REQUEST FOR APPROVAL
SHOP DRAWING / MATERIAL / EQUIPMENT / BROCHURE / SPECIFICATION / CALCULATION / TEST DATA / METHODOLOGY / WARRANTY

Project: Clark Green Frontier Office Towers Project Submittal Type X For Comments & Approval For Inspection Submittal No.
NPICGF-NPI-RFA-TDI-E&A-0015
X New Submittal For The Record / Information Proposed Equivalent/Alternative
Location: M.A. Roxas Highway, 9999 Clark Additional Submittal For Reconfirmation Others

Freeport Zone, Angeles City, Pampanga Resubmittal For Review & Comments Date Submitted: July, 25,2017 Response date:
To: Townsquare Development Inc. Thru From
DATEM, INC.
Attn: Engr. Rodrigo M. Ocampo - Senior Manager for Construction MW-CPM
Reference Data
SHT
Description Submittal Requirements ACTION TAKEN Remarks
NO.
Cutting List Application / Installation
A
X Shop Drawing / Details Company Profile
Brochure / Catalogue Calculations/Analysis

H1 Architecture

and Design
Technical / Product Data Procedure
B
RELOCATION OF GROUNDING ROD Test Results Computation

Sample/s Photographs
C
Mock-up Sequence of Operation
Method Statement Testing Procedure
A
Certificates Site Inspection Photographs

Incorporated
Specifications Warranty

ESCA
Testing & Commissioning Comparative Analysis B
Prepared By:
C
JOSEPH J. FRECIA
NPI - P.I.C
A

Checked & Reviewed by:


B
CARLITO C. BUNTOG
NPI - Sr. Project Engineer C

Noted By: (Sign w/ Date & Time)


A

Townsquare
JAMES B. VILLANUEVA

Dev't Inc.
DATEM - MEPFS Coordinator B

CARLOTA B. LOR
DATEM - QA,QC Head
RECEIVED RELEASED RECEIVED RELEASED
RESP RESP
Noted By: (Sign w/ Date & Time) DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE:
Legend (Design Consultant's Action): H1
A > Work may proceed
ESCA
B > Work may proceed subject to
correction indicated,
Engr. RODRIGO M. OCAMPO TDI

TDI - Senior Project Manager for Construction


C > Work shall not proceed
REQUEST FOR APPROVAL
SHOP DRAWING / MATERIAL / EQUIPMENT / BROCHURE / SPECIFICATION / CALCULATION / TEST DATA / METHODOLOGY / WARRANTY

Project: Clark Green Frontier Office Towers Project Submittal Type X For Comments & Approval For Inspection Submittal No.
NPICGF-NPI-RFA-TDI-E&A-0016
X New Submittal For The Record / Information Proposed Equivalent/Alternative
Location: M.A. Roxas Highway, 9999 Clark Additional Submittal For Reconfirmation Others

Freeport Zone, Angeles City, Pampanga Resubmittal For Review & Comments Date Submitted: August 3, 25,2017 Response date:
To: Townsquare Development Inc. Thru From
DATEM, INC.
Attn: Engr. Rodrigo M. Ocampo - Senior Manager for Construction MW-CPM
Reference Data
SHT
Description Submittal Requirements ACTION TAKEN Remarks
NO.
Cutting List Application / Installation
A
Shop Drawing / Details Company Profile
X Brochure / Catalogue Calculations/Analysis

H1 Architecture

and Design
X Technical / Product Data Procedure
B
WIRES CABLES Test Results Computation

X Sample/s Photographs
BRAND: COLUMBIA WIRE AND CABLE CORPORATION Mock-up Sequence of Operation
C
Method Statement Testing Procedure
A
Certificates Site Inspection Photographs

Incorporated
X Specifications Warranty

ESCA
Testing & Commissioning Comparative Analysis B
Prepared By:
C
JOSEPH J. FRECIA
NPI - P.I.C
A

Checked & Reviewed by:


B
CARLITO C. BUNTOG
NPI - Sr. Project Engineer C

Noted By: (Sign w/ Date & Time)


A

Townsquare
JAMES B. VILLANUEVA

Dev't Inc.
DATEM - MEPFS Coordinator B

CARLOTA B. LOR
DATEM - QA,QC Head
RECEIVED RELEASED RECEIVED RELEASED
RESP RESP
Noted By: (Sign w/ Date & Time) DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE:
Legend (Design Consultant's Action): H1
A > Work may proceed
ESCA
B > Work may proceed subject to
correction indicated,
Engr. RODRIGO M. OCAMPO TDI

TDI - Senior Project Manager for Construction


C > Work shall not proceed
REQUEST FOR APPROVAL
SHOP DRAWING / MATERIAL / EQUIPMENT / BROCHURE / SPECIFICATION / CALCULATION / TEST DATA / METHODOLOGY / WARRANTY

Project: Clark Green Frontier Office Towers Project Submittal Type X For Comments & Approval For Inspection Submittal No.
NPICGF-NPI-RFA-TDI-E&A-0014
X New Submittal For The Record / Information Proposed Equivalent/Alternative
Location: M.A. Roxas Highway, 9999 Clark Additional Submittal For Reconfirmation Others

Freeport Zone, Angeles City, Pampanga Resubmittal For Review & Comments Date Submitted: July, 4,2017 Response date:
To: Townsquare Development Inc. Thru From
DATEM, INC.
Attn: Engr. Rodrigo M. Ocampo - Senior Manager for Construction MW-CPM
Reference Data
SHT
Description Submittal Requirements ACTION TAKEN Remarks
NO.
Cutting List Application / Installation
A
Shop Drawing / Details Company Profile
X Brochure / Catalogue Calculations/Analysis

H1 Architecture

and Design
Technical / Product Data Procedure
SAMPLE AND BROCHURE OF HANGER AND SUPPORT B
UNISTRUT BRAND Test Results Computation

X Sample/s Photographs
C
Mock-up Sequence of Operation
Method Statement Testing Procedure
A
Certificates Site Inspection Photographs

Incorporated
Specifications Warranty

ESCA
Testing & Commissioning Comparative Analysis B
Prepared By:
C
JOSEPH J. FRECIA
NPI - P.I.C
A

Checked & Reviewed by:


B
CARLITO C. BUNTOG
NPI - Sr. Project Engineer C

Noted By: (Sign w/ Date & Time)


A

Townsquare
JAMES B. VILLANUEVA

Dev't Inc.
DATEM - MEPFS Coordinator B

CARLOTA B. LOR
DATEM - QA,QC Head
RECEIVED RELEASED RECEIVED RELEASED
RESP RESP
Noted By: (Sign w/ Date & Time) DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE:
Legend (Design Consultant's Action): H1
A > Work may proceed
ESCA
B > Work may proceed subject to
correction indicated,
Engr. RODRIGO M. OCAMPO TDI

TDI - Senior Project Manager for Construction


C > Work shall not proceed
REQUEST FOR APPROVAL
SHOP DRAWING / MATERIAL / EQUIPMENT / BROCHURE / SPECIFICATION / CALCULATION / TEST DATA / METHODOLOGY / WARRANTY

Project: Clark Green Frontier Office Towers Project Submittal Type X For Comments & Approval For Inspection Submittal No.
NPICGF-NPI-RFA-TDI-E&A-0016-A
New Submittal For The Record / Information Proposed Equivalent/Alternative
Location: M.A. Roxas Highway, 9999 Clark Additional Submittal For Reconfirmation Others

Freeport Zone, Angeles City, Pampanga X Resubmittal For Review & Comments Date Submitted: August 23, 25,2017 Response date:
To: Townsquare Development Inc. Thru From
DATEM, INC.
Attn: Engr. Rodrigo M. Ocampo - Senior Manager for Construction MW-CPM
Reference Data
SHT
Description Submittal Requirements ACTION TAKEN Remarks
NO.
Cutting List Application / Installation
A
Shop Drawing / Details Company Profile
X Brochure / Catalogue Calculations/Analysis

H1 Architecture

and Design
X Technical / Product Data Procedure
B
WIRES CABLES Test Results Computation

Sample/s Photographs
BRAND: COLUMBIA WIRE AND CABLE CORPORATION Mock-up Sequence of Operation
C
Method Statement Testing Procedure
A
X Certificates Site Inspection Photographs

Incorporated
X Specifications Warranty

ESCA
Testing & Commissioning Comparative Analysis B
Prepared By:
C
EMHAR LUKE P. AMANTE
NPI-Project In-Charge
A

Checked & Reviewed by:


B
CARLITO C. BUNTOG
NPI - Sr. Project Engineer C

Noted By: (Sign w/ Date & Time)


A

Townsquare
RENEBERT C. CACERES

Dev't Inc.
DATEM - MEPFS Coordinator B

CARLOTA B. LOR
DATEM - QA,QC Head
RECEIVED RELEASED RECEIVED RELEASED
RESP RESP
Noted By: (Sign w/ Date & Time) DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE:
Legend (Design Consultant's Action): H1
A > Work may proceed
ESCA
B > Work may proceed subject to
correction indicated,
Engr. RODRIGO M. OCAMPO TDI

TDI - Senior Project Manager for Construction


C > Work shall not proceed
REQUEST FOR APPROVAL
SHOP DRAWING / MATERIAL / EQUIPMENT / BROCHURE / SPECIFICATION / CALCULATION / TEST DATA / METHODOLOGY / WARRANTY

Project: Clark Green Frontier Office Towers Project Submittal Type X For Comments & Approval For Inspection Submittal No.
NPICGF-NPI-RFA-TDI-E&A-0013
X New Submittal For The Record / Information Proposed Equivalent/Alternative
Location: M.A. Roxas Highway, 9999 Clark Additional Submittal For Reconfirmation Others

Freeport Zone, Angeles City, Pampanga Resubmittal For Review & Comments Date Submitted: September 14,2017 Response date:
To: Townsquare Development Inc.
Attn: Engr. Rodrigo M. Ocampo - Senior Manager for Construction
Reference Data
SHT
Description Submittal Requirements ACTION TAKEN Remarks
NO.
Cutting List Application / Installation
A
Shop Drawing / Details Company Profile
X Brochure / Catalogue Calculations/Analysis

H1 Architecture

and Design
Technical / Product Data Procedure
SAMPLE AND BROCHURE OF CABLE LADDER/TRAY
B
AND PULLBOX (GENTEC DISTRIBUTION Test Results Computation
CORPORATION}
X Sample/s Photographs
C
Mock-up Sequence of Operation
Method Statement Testing Procedure
A
Certificates Site Inspection Photographs

Incorporated
X Specifications Warranty

ESCA
Testing & Commissioning Comparative Analysis B
Prepared By:
C
EMHAR LUKE P. AMANTE
NPI – Assistant Project In-Charge
A

Checked & Reviewed by:


B
CARLITO C. BUNTOG
NPI - Sr. Project Engineer C

Noted By: (Sign w/ Date & Time)


A

Townsquare
RENEBERT C. CACERES

Dev't Inc.
DATEM - MEPFS Coordinator B

CARLOTA B. LOR
DATEM - QA,QC Head
RECEIVED RELEASED RECEIVED RELEASED
RESP RESP
Noted By: (Sign w/ Date & Time) DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE:
Legend (Design Consultant's Action): H1
A > Work may proceed
ESCA
B > Work may proceed subject to
correction indicated,
Engr. RODRIGO M. OCAMPO TDI

TDI - Senior Project Manager for Construction


C > Work shall not proceed
REQUEST FOR APPROVAL
SHOP DRAWING / MATERIAL / EQUIPMENT / BROCHURE / SPECIFICATION / CALCULATION / TEST DATA / METHODOLOGY / WARRANTY

Project: Clark Green Frontier Office Towers Project Submittal Type X For Comments & Approval For Inspection Submittal No.
NPICGF-NPI-RFA-TDI-E&A-0017
X New Submittal For The Record / Information Proposed Equivalent/Alternative
Location: M.A. Roxas Highway, 9999 Clark Additional Submittal For Reconfirmation Others

Freeport Zone, Angeles City, Pampanga Resubmittal For Review & Comments Date Submitted: September 14, 25,2017 Response date:
To: Townsquare Development Inc.
Attn: Engr. Rodrigo M. Ocampo - Senior Manager for Construction
Reference Data
SHT
Description Submittal Requirements ACTION TAKEN Remarks
NO.
Cutting List Application / Installation
A
X Shop Drawing / Details Company Profile
Brochure / Catalogue Calculations/Analysis

H1 Architecture

and Design
Technical / Product Data Procedure
B
RELOCATION OF GROUNDING ROD Test Results Computation

Sample/s Photographs
C
Mock-up Sequence of Operation
Method Statement Testing Procedure
A
Certificates Site Inspection Photographs

Incorporated
Specifications Warranty

ESCA
Testing & Commissioning Comparative Analysis B
Prepared By:
C
EMHAR LUKE P. AMANTE
NPI-Project In-Charge
A

Checked & Reviewed by:


B
CARLITO C. BUNTOG
NPI - Sr. Project Engineer C

Noted By: (Sign w/ Date & Time)


A

Townsquare
RENEBERT C. CACERES

Dev't Inc.
DATEM - MEPFS Coordinator B

CARLOTA B. LOR
DATEM - QA,QC Head
RECEIVED RELEASED RECEIVED RELEASED
RESP RESP
Noted By: (Sign w/ Date & Time) DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE:
Legend (Design Consultant's Action): H1
A > Work may proceed
ESCA
B > Work may proceed subject to
correction indicated,
Engr. RODRIGO M. OCAMPO TDI

TDI - Senior Project Manager for Construction


C > Work shall not proceed
REQUEST FOR APPROVAL
SHOP DRAWING / MATERIAL / EQUIPMENT / BROCHURE / SPECIFICATION / CALCULATION / TEST DATA / METHODOLOGY / WARRANTY

Project: Clark Green Frontier Office Towers Project Submittal Type X For Comments & Approval For Inspection Submittal No.
NPICGF-NPI-RFA-TDI-E&A-0019
X New Submittal For The Record / Information Proposed Equivalent/Alternative
Location: M.A. Roxas Highway, 9999 Clark Additional Submittal For Reconfirmation Others

Freeport Zone, Angeles City, Pampanga Resubmittal For Review & Comments Date Submitted: September 16, 2017 Response date:
To: Townsquare Development Inc.
Attn: Engr. Rodrigo M. Ocampo - Senior Manager for Construction
Reference Data
SHT
Description Submittal Requirements ACTION TAKEN Remarks
NO.
Cutting List Application / Installation
A
X Shop Drawing / Details Company Profile
Brochure / Catalogue Calculations/Analysis

H1 Architecture

and Design
Technical / Product Data Procedure
SHOP DRAWING FOR SLEEVE CABLE TRAY, POWER
B
AND AUXILIARY SYSTEM AT FOURTH FLOOR, EE. RM. & Test Results Computation
TELCO ROOM.
Sample/s Photographs
C
Mock-up Sequence of Operation
Method Statement Testing Procedure
Fourth Floor Gridline 46-47 Certificates Site Inspection Photographs
A

Incorporated
Specifications Warranty

ESCA
Testing & Commissioning Comparative Analysis B
Prepared By:
C
EMHAR LUKE P. AMANTE
NPI-Assistant Project In-Charge
A

Checked & Reviewed by:


B
CARLITO C. BUNTOG
NPI - Sr. Project Engineer C

Noted By: (Sign w/ Date & Time)


A

Townsquare
RENEBERT C. CACERES

Dev't Inc.
DATEM - MEPFS Coordinator B

CARLOTA B. LOR
DATEM - QA,QC Head
RECEIVED RELEASED RECEIVED RELEASED
RESP RESP
Noted By: (Sign w/ Date & Time) DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE:
Legend (Design Consultant's Action): H1
A > Work may proceed
ESCA
B > Work may proceed subject to
correction indicated,
Engr. RODRIGO M. OCAMPO TDI

TDI - Senior Project Manager for Construction


C > Work shall not proceed
REQUEST FOR APPROVAL
SHOP DRAWING / MATERIAL / EQUIPMENT / BROCHURE / SPECIFICATION / CALCULATION / TEST DATA / METHODOLOGY / WARRANTY

Project: Clark Green Frontier Office Towers Project Submittal Type X For Comments & Approval For Inspection Submittal No.
NPICGF-NPI-RFA-TDI-E&A-0020
X New Submittal For The Record / Information Proposed Equivalent/Alternative
Location: M.A. Roxas Highway, 9999 Clark Additional Submittal For Reconfirmation Others

Freeport Zone, Angeles City, Pampanga Resubmittal For Review & Comments Date Submitted: September 28, 2017 Response date:
To: Townsquare Development Inc.
Attn: Engr. Rodrigo M. Ocampo - Senior Manager for Construction
Reference Data
SHT
Description Submittal Requirements ACTION TAKEN Remarks
NO.
Cutting List Application / Installation
A
X Shop Drawing / Details Company Profile
Brochure / Catalogue Calculations/Analysis

H1 Architecture

and Design
Technical / Product Data Procedure
B
GROUNDING ROD WITH COUPLER CONNECTION Test Results Computation

Sample/s Photographs
C
Mock-up Sequence of Operation
Method Statement Testing Procedure
A
Certificates Site Inspection Photographs

Incorporated
Specifications Warranty

ESCA
Testing & Commissioning Comparative Analysis B
Prepared By:
C
EMHAR LUKE P. AMANTE
NPI-Assistant Project In-Charge
A

Checked & Reviewed by:


B
CARLITO C. BUNTOG
NPI - Sr. Project Engineer C

Noted By: (Sign w/ Date & Time)


A

Townsquare
RENEBERT C. CACERES

Dev't Inc.
DATEM - MEPFS Coordinator B

CARLOTA B. LOR
DATEM - QA,QC Head
RECEIVED RELEASED RECEIVED RELEASED
RESP RESP
Noted By: (Sign w/ Date & Time) DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE:
Legend (Design Consultant's Action): H1
A > Work may proceed
ESCA
B > Work may proceed subject to
correction indicated,
Engr. RODRIGO M. OCAMPO TDI

TDI - Senior Project Manager for Construction


C > Work shall not proceed
REQUEST FOR APPROVAL
SHOP DRAWING / MATERIAL / EQUIPMENT / BROCHURE / SPECIFICATION / CALCULATION / TEST DATA / METHODOLOGY / WARRANTY

Project: Clark Green Frontier Office Towers Project Submittal Type X For Comments & Approval For Inspection Submittal No.
NPICGF-NPI-RFA-TDI-E&A-0025
X New Submittal For The Record / Information Proposed Equivalent/Alternative
Location: M.A. Roxas Highway, 9999 Clark Additional Submittal For Reconfirmation Others

Freeport Zone, Angeles City, Pampanga Resubmittal For Review & Comments Date Submitted: December 15, 2017 Response date:
To: Townsquare Development Inc.
Attn: Engr. Rodrigo M. Ocampo - Senior Manager for Construction
Reference Data
SHT
Description Submittal Requirements ACTION TAKEN Remarks
NO.
Cutting List Application / Installation
A
X Shop Drawing / Details Company Profile
Brochure / Catalogue Calculations/Analysis

H1 Architecture

and Design
Technical / Product Data Procedure
PROPOSED CONCRETE ENCASEMENT AND ROUTING B
LAYOUT Test Results Computation

Sample/s Photographs
C
Mock-up Sequence of Operation
Method Statement Testing Procedure
A
Certificates Site Inspection Photographs

Incorporated
Specifications Warranty

ESCA
Testing & Commissioning Comparative Analysis B
Prepared By:
C
EMHAR LUKE P. AMANTE
NPI-Assistant Project In-Charge
A

Checked & Reviewed by:


B
Bernardo R. Torres
NPI - Sr. Project Engineer C

Noted By: (Sign w/ Date & Time)


A

Townsquare
RENEBERT C. CACERES

Dev't Inc.
DATEM - MEPFS Coordinator B

CARLOTA B. LOR
DATEM - QA,QC Head
RECEIVED RELEASED RECEIVED RELEASED
RESP RESP
Noted By: (Sign w/ Date & Time) DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE:
Legend (Design Consultant's Action): H1
A > Work may proceed
ESCA
B > Work may proceed subject to
correction indicated,
Engr. RODRIGO M. OCAMPO TDI

TDI - Senior Project Manager for Construction


C > Work shall not proceed
REQUEST FOR INFORMATION
SHOP DRAWING / MATERIAL / EQUIPMENT / BROCHURE / SPECIFICATION / CALCULATION / TEST DATA / METHODOLOGY / WARRANTY

Project: Clark Green Frontier Office Towers Project Submittal Type X For Comments & Approval For Inspection Submittal No. NPICGF-NPI-RFI-TDI-E&A-00__
X New Submittal For The Record / Information Proposed Equivalent/Alternative
Location: M.A. Roxas Highway, 9999 Clark Additional Submittal For Reconfirmation Others

Freeport Zone, Angeles City, Pampanga Resubmittal For Review & Comments Date Submitted: February 12, 2020 Response date:
To: Townsquare Development Inc.
Attn: Engr. Rodrigo M. Ocampo - Senior Manager for Construction
Reference Data
SHT
Description Submittal Requirements ACTION TAKEN Remarks
NO.
Cutting List Application / Installation
A
Shop Drawing / Details Company Profile
Brochure / Catalogue Calculations/Analysis

H1 Architecture

and Design
FOR TEMPORARY TAPPING POINT OF FIRE Technical / Product Data Procedure
B
PUMP POWER SUPPLY AT BPO-POWER Test Results Computation
CENTER A
X Sample/s Photographs
C
Mock-up Sequence of Operation
Method Statement Testing Procedure
A
Certificates Site Inspection Photographs

Incorporated
Specifications Warranty

ESCA
Testing & Commissioning Comparative Analysis B
Prepared By:
C
EMHAR LUKE P. AMANTE
NPI-Project In-Charge
A

Checked & Reviewed by:


B
CARLITO C. BUNTOG
NPI - PROJECT MANAGER C
Noted By: (Sign w/ Date & Time)
A

Townsquare
ARENZ JOSHUA B. MANABAT

Dev't Inc.
DATEM - MEPFS Coordinator B

FRANCIS R. PONTILLAS
DATEM - QA,QC Head
RECEIVED RELEASED RECEIVED RELEASED
RESP RESP
Noted By: (Sign w/ Date & Time) DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE: DATE: SIGNATURE:
Legend (Design Consultant's Action): H1
A > Work may proceed
ESCA
B > Work may proceed subject to
correction indicated, Engr. HARVI S. GOPEZ TDI

TDI - CMT AREA HEAD


C > Work shall not proceed

You might also like