FIRE PROOF PAINTING INSPECTION REPORT

Inspection date : / / Station : Haji Nawi


Doc No : Material Purpose : Beam
Project Name : MRT CP-103 Steel Tag :
Customer : PT. Jaya Obayashi Painting Process :
Paint Supplier : Chugoku Paints Indonesia Painting Spec. : No
Enviromental Test

Material Preparation Check Point Standard Specification Design Actual Tolerance

1. Before Blasting
- Surface Temperature > 5° C -
- Dew Point > 3° C -
- Relative Humidity < 80% -
2. After Painting
- Surface Temperature > 5° C -
- Dew Point > 3° C -
- Relative Humidity < 80% -
Contaminant & All Visible Residues Inspection
1. Material cleanliness Poor Fair Good
2. Material damage Y N
3. Material sign of corrosion - rust grade Grade A Grade B Grade C
4. Blast Cleaning >95% surface area is free of all visible residues :
Painting Check Point
Paint Specification Thickness (microns)
1. Primer Coat (Bannoh 500) 75
2. Intermediate Coat
-Charformax SH-100 0.5h 2h
475 290 3985 3580 3515
2405 4520 4117
-Charrex PFP-1000 2h 3h
16730 24380
-Bannoh 500 75
3. Finish Coat (UNY Marines) 50
TOTAL THICKNESS
Remark's/Sketch

DFT POINT CHECK


DFT = 75 (µ) DFT = (µ)
Sample
No Description Primer Primer + Intermediate
Inspection
1 2 3 4 5 1 2 3 4
1
Inspection Result : OK REPAIR
Prepared By, Checked By,
PT. Jaya Obayashi SE-OSJ QC-OSJ-JV

( ) ( ) ( )

Date :

DFT POINT CHECK


DFT = 75 (µ) DFT = (µ)
Sample
No Description Primer Primer + Intermediate
Inspection
1 2 3 4 5 1 2 3 4
Inspection Result : OK REPAIR
Prepared By, Checked By,
PT. Jaya Obayashi SE-OSJ QC-OSJ-JV

( ) ( ) ( )

Date :
NG INSPECTION REPORT

: Haji Nawi / Blok A / Blok M / Sisi

Manual Machine
h
omental Test
Acceptence
Remark
Yes No

sible Residues Inspection


Excellent

Grade D
Y N
g Check Point
s (microns) Batch No
75

2h
3030

3h

50

- Thickness check every 5 spot per 10 m2


(each spot 3 times reading)
- Thickness Inspection per Layer (Tolerance +20%)

OINT CHECK
DFT = (µ) DFT = (µ)
Primer + Intermediate Primer + Intermediate + Finish
5 1 2 3 4 5
REJECT
Confirmed By,
JMCMC

( )

Rev : 1, Tanggal 12.06.2017

OINT CHECK
DFT = (µ) DFT = (µ)
Primer + Intermediate Primer + Intermediate + Finish
5 1 2 3 4 5
REJECT
Confirmed By,
JMCMC

( )

Rev : 1, Tanggal 12.06.2017


OBAYASHI - SHIMIZU - JAYA KONSTRUKSI - JOINT VENTUR

Project : MRT CP-103 Date


Subject : Beam Location
Gridline : PBS6-1C3

General View of PBS6-1C3, after application Top Coat Top Coat 6200 Microns (PF

Top Coat 4110 Microns (PFP Spec : 3515 Microns) Top Coat 4400 Microns (PF
Top Coat 4170 Microns (PFP Spec : 3515 Microns) Top Coat 4300 Microns (PF
ONSTRUKSI - JOINT VENTURE

: August, 22th 2017


: SISINGAMANGARAJA Station

Top Coat 6200 Microns (PFP Spec : 3515 Microns)

Top Coat 4400 Microns (PFP Spec : 3515 Microns)


Top Coat 4300 Microns (PFP Spec : 3515 Microns)
PHOTO REPORT

Comment :
General View of PBS6 - 1C3
After appication Top Coat

Comment :
General View of PBS6 - 1C3
After appication Top Coat

Comment :
Top coat 4,110 Microns

Comment :
Topcoat 4,170 Microns

Comment :
Top coat 6,200 Microns

Comment :
Top coat 4,400 Microns
PHOTO REPORT

Comment :
Top coat 4,300 microns

Comment :

Comment :

Comment :
Comment :

Comment :