Generator Protection - Calculation
Generator Protection - Calculation
Nominal Frequency 60 Hz
𝑉𝑃
NGT ratio = 𝑛 = nNGT 53.000
𝑉𝑆
𝑉
Maximum generator primary fault current 𝐼𝐹𝐺 =
𝑅𝑁
Maximum generator primary fault current IFGPRI 5.143 A
GREENKO GROUP GENERATOR STATOR PROTECTIONS SETTING GUIDELINES
𝑅𝑁
Generator neutral secondary resistance 𝑅𝑁 = = 0.879 Ω
𝑛
𝑉𝑁
Maximum generator secondary ground fault current 𝐼𝐹𝐺 = 272.960 A
𝑅𝑁
Figure 2: Zero-Sequence Network for a Ground Fault at the GSU High-Voltage Terminals
−𝑗𝑋 ∗ 3 ∗ 𝑅𝑁
From Figure 2, Generator equivalent impedance 𝑍 =
3 ∗ 𝑅𝑁 − 𝑗𝑋
ZN 5.239 kΩ
In worst-case, zero-sequence voltage equal to one-third of the nominal phase-neutral system voltage. Hence,
𝑉 ( )
Maximum zero sequence voltage under fault conditions 𝑍 = 44.264 kV
3
𝑍 1
Secondary neutral voltage for a high voltage ground fault 𝑉𝑁 =𝑍 ∗ ∗
𝑍 − 𝐽𝑋 𝑛
Secondary neutral voltage for a high voltage ground fault VNSEC 8.190 V
𝑉𝐺 − 59𝑁 ∗𝑛
59𝑁% 𝐶𝑜𝑣𝑒𝑟𝑎𝑔𝑒 = ∗ 100%
𝑉𝐺
59N% Coverage = 95.83 %
X3T 4.220 kΩ
GREENKO GROUP GENERATOR STATOR PROTECTIONS SETTING GUIDELINES
1
Neutral Third harmonic capacitive reactance 𝑋 =
𝐶
2𝜋 ∗ 3 ∗ 𝑓 ∗ 2
X3N 5.954 kΩ
−𝑗𝑋 ∗ 3 ∗ 𝑅𝑁
Neutral third harmonic impedance 𝑍 =
3𝑅𝑁 − 𝑗𝑋
Z3N 4.641 kΩ
𝑍
Per unit voltage drop at neutral 𝑉𝑁3 =
𝑍 − 𝑗𝑋
VN3PU 0.555
−𝑗𝑋
Per unit voltage drop at terminals 𝑉𝑇3 =
𝑍 − 𝑗𝑋
VT3PU 0.505
Third harmonic survey (as carried out on generator after installation at site)
Load (pu) VN3_PRI (V) VT3_PRI (V) VN3_SEC (V) VT3_SEC (V) (d)-RAT*(e) 59D3% Cover
(a) (b) (c) (d) (e) (f) (g)
0 123 428.9 1.070 2.859 0.074 18.83
0.1 160.5 515.7 1.396 3.438 0.020 19.68
0.3 120.8 348.3 1.050 2.322 0.122 18.01
0.5 136.7 487.4 1.189 3.249 0.111 19.36
0.6 163.5 582 1.422 3.880 0.130 20.03
0.7 171.1 609.6 1.488 4.064 0.138 20.19
0.8 189.6 674.3 1.649 4.495 0.149 20.50
0.9 201.2 717.3 1.750 4.782 0.163 20.68
1 200.6 715.9 1.744 4.773 0.165 20.67
∑ 𝑉𝑁3_𝑆𝐸𝐶
The optimum ratio setting for 59D3 is 𝑅𝐴𝑇 =
∑ 𝑉𝑇3_𝑆𝐸𝐶
The Ratio Setting RAT 0.4
Optimum pickup setting of 59D3 is 𝑃𝑖𝑐𝑘𝑢𝑝 = 1.1 0.1 + 𝑀𝐴𝑋 𝑉𝑁3_𝑆𝐸𝐶 − 𝑅𝐴𝑇 𝑉𝑇3_𝑆𝐸𝐶
𝑅𝐴𝑇 𝑃𝐾𝑃
59𝐷3% 𝐶𝑜𝑣𝑒𝑟𝑎𝑔𝑒 = − ∗ 100%
𝑃𝑇𝑅 𝑃𝑇𝑅 𝑃𝑇𝑅𝑁
𝑅𝐴𝑇 + 𝑃𝑇𝑅𝑁 𝑅𝐴𝑇 + 𝑃𝑇𝑅𝑁 ∗ 𝑉𝑁 ∗ 𝑃𝑇𝑅 + 𝑉𝑇3_𝑆𝐸𝐶
𝑉𝑁3
Pickup Setting of 27N3 𝑃𝑖𝑐𝑘𝑢𝑝 =
2
Pickup 27N3 60.4 V
600
400
200
-200
-400
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%