6 5 4 3 2 1

FROM
PRODUCTION
WELLS (GROUP 1)

D PID-1301 D
HP FLARE

FROM
PRODUCTION 1305MV02 PID-4304
WELLS (GROUP 2)
FB/LO
PID-1302

13FO
2006
13BDV2005
FROM
PRODUCTION 13TI 13PI H = 43 barg

ESD
2.0 TSO/FO
WELLS (GROUP 3) 2011 2012
2"
PID-1303
4.1
PSD
13TT 13PT
2011 2012
FROM
PRODUCTION TO
WELLS (GROUP 4) TEST SEPARATOR
FC
10"
PID-1304 PID-2001
C 13XV2007 C
13XV2008

2" FC
Note 1

PSD
4.1

FROM
PRODUCTION
WELLS (GROUP 1)

PID-1301

HP FLARE

1305MV01
FROM
PRODUCTION PID-4304
FB/LO
WELLS (GROUP 2)

PID-1302

13FO
2002
13BDV2001
FROM
B 13TI 13PI H = 43 barg
B

ESD
PRODUCTION 2.0 TSO/FO
WELLS (GROUP 3) 2009 2010
2" 2.0 4.1
PID-1303
ESD PSD

13TT 13PT
2009 2010 R
FROM
PRODUCTION TO
WELLS (GROUP 4) HP SEPARATOR
FC
18"
PID-1304 PID-2002
13EV2003
13EV2004

2" FC
Note 1

ESD
2.0

PSD
4.1

NOTES: PROJECT NAME


1. Pressurising valves 13XV2008 and 13EV2004 must be opened for 120 seconds before respective main valve is
GENERIC OIL & GAS PRODUCTION PROCESS
A opened. GENERIC OIL & GAS PRODUCTION PROCESS A
DRAWING TITLE PROCESS P & I DIAGRAM

PRODUCTION & TEST MANIFOLDS

DRAWN BY SIZE PROJECTION DRAWING NO. REV

0 AS BUILT 19/09/03 AGH GL AKL A G HARRIES A3 OGP-PID-1305 0


DATE
REV. DESCRIPTION DATE BY CHK. APPR. 16.04.2013 SCALE 1:1 UNITS SHEET 1 OF 1