GENERAL NOTES: 4.

00
7.00

3.00
7.00
POURED CONCRETE
3.20 3.80
1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE EXECUTED ACCORDING TO THE PHILIPPINE PLUMBING CODE, THE NATIONAL COVER
BUILDING CODE, AND THE RULES AND REGULATIONS OF LOCAL GOVERNMENT AUTHORITIES CONCERNED. 0.50

2. ALL WORKS SHALL BE DONE UNDER DIRECT SUPERVISION OF A LICENSED AND REGISTERED MASTER PLUMBER OR A PLUMBING FCO
0.05 0.40 0.05
BAR
FCO CONCRETE
ENGINEER. 0.50
COVER WITH
3. ALL PIPE SIZES ARE IN MILLIMETER AND ALL DIMENSIONS ARE IN METERS UNLESS SPECIFIED. SINK
HANDLE BAR

3.00

3.50
4. ALL WORKS SHALL CONFORM TO THE BUILDING OWNER'S REQUIREMENTS OR GUIDELINES AND SITE CONDITIONS AND INCLUDE ALL 0.10M THK CHB
COST EXPENSES NECESSARY TO COMPLETE THE SYSTEMS. WALL

5.50

5.50
5. COORDINATE THE DRAWING WITH OTHER RELATED DRAWINGS AND SPECIFICATIONS, THE DESIGN ENGINEER SHALL BE NOTIFIED
IMMEDIATELY OF ANY DISCREPANCY FOUND HEREIN. FCO

1.50
6. ALL PIPES SHALL BE INSTALLED AS INDICATED ON PLANS, ANY RELOCATION REQUIRED FOR THE PROPER EXECUTION OF OTHER PVC PPE

VERIFY
1.00
FD LAV
TRADES SHALL BE WITH PRIOR APPROVAL OF THE ARCHITECT OR DESIGNER. 2%SLOPE

0.50
9.00

9.00
WC
7. PROPER PLUMBING / SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION, DEPTH AND INVERT ELEVATION OF ALL

1.00

1.00
EXISTING PIPES AND STRUCTURES AS VERIFIED BY THE CONTRACTOR.

11.50

11.50
8. ALL SLOPE FOR HORIZONTAL DRAINAGE SHALL MAINTAIN A 2% UNLESS OTHERWISE SPECIFIED. ALL SLOPES FOR HORIZONTAL SEWER LAV
SHALL MAINTAIN 1% UNLESS SPECIFIED.
WC

0.10
9. SIZES OF SEWER AND WATER SUPPLY PIPE TO FIXTURES SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS.

3.50

3.50
10. THE CONTRACTOR SHALL VERIFY ALL THE EXISTING UTILITIES AT THE SITE AND COORDINATES THE WORK WITH THE SEWER LINE FCO FD

EFFLUENT DISPOSAL POINT AND WATER LINE SERVICE CONNECTING POINT.


0.10M THK POURED CONCRETE
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ON SITE COORDINATION, PREPARE CONSTRUCTION SHOP DRAWINGS, FIXTURES AND
PLAN

6.00

6.00
CHB WALL BOTTOM
EQUIPMENT DIMENSIONS. INFORM OR ADVICE THE OWNER / ARCHITECT / ENGINEER OF ANY TECHNICAL / MAINTENANCE PROBLEM
FOUND HEREIN OR ON THE SITE.
12. THE CONTRACTOR SHALL INCLUDE ALL THE COST OR EXPENSES NECESSARY TO COMPLETE THE SYSTEM AND TESTING
4.00 4.00
SECTION

2.50

2.50
REQUIREMENT BY THE BUILDING OWNER.
2.50
6

SEPTIC
13. CLEAN OUT SHALL BE INSTALLED NOT TO EXCEED 15 METERS ON STRAIGHT RUN AND FOR EACH AGGREGATE CHANGE IN DIRECTION

TANK
EXCEEDING 135'. P-1 SCALE: 1:10M.
14. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR, DE-CLOGGING, RESEALING OF EXISTING SEWER, VENT AND WATER LINES UP TO
3.00 1.00 3.00
BUILDING MAIN LINE. ALL EXPENSES IN ACCOUNT OF CONTRACTOR'S. VARIES
8.00 7.00
15. ALL PLUMBING PIPES AND EQUIPMENTS SHALL BE INSTALLED IN ACCORDANCE WITH THE PLUMBING CODE AND HAVE SUFFICIENT
0.10 L 0.90
WORKING CLEARANCE OR SPACE FOR MAINTENANCE OR REPAIR.

16. ALL SEWER, WASTELINES, FCU DRAINS SHALL BE PROVIDED WITH 12mm (21") THICK CLOSE CELL ELASTOMERIC THERMAL INSULATION EQUAL 0.10 EQUAL 0.10 0.10
TAP TO NEAREST
(AEROFLEX) FOR FCU DRAIN PIPE INSTALLED ABOVE CEILING AND PROVIDE P-TRAP ON DRAIN LINE FOR FCU ON APPROVED LOCATION. 0.60 0.60 0.60
STREET SEWERLINE TAP TO NEAREST TAP TO NEAREST MANHOLE MANHOLE MANHOLE
STREET SEWERLINE STREET SEWERLINE

0.10
NO DOUBLE TRAP SHALL BE USED.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CHIPPING WORKS, EXCAVATION, AND INSTALLATION OF PLUMBING PIPES AND
NOTE: PROVIDE BEVEL CUT MARKER
FIXTURES, UNLESS OTHERWISE SPECIFIED IN THE CONTRACT ADDITIONAL REBARS IS A MUST FOR EACH COVER
IF LOCATED AT DRIVEWAY

18. THE BUILDING OWNER / CONTRACTOR SHALL MAINTAIN THE PLUMBING AND DRAINAGE SYSTEM OF HIS PREMISES IN ACCORDANCE 1 2
P-1 P-1

MANHOLE
VARIES
WITH SANITARY AND SAFE OPERATING CONDITION. SCALE: 1:100M. SCALE: 1:100M.

3.00
W
19. WATER PIPE / LINE SHALL BE 300mm ABOVE THE TOPE OF THE SEWER OR DRAINAGE PIPE / LINE. DISTANCE OF 300mm BETWEEN
WATER PIPE AND SEWER OR DRAINAGE PIPE, IF PLACE IN THE SAME TRENCH.
20. PLUMBING CONTRACTOR SHALL VERIFY AND INVESTIGATE THE ACTUAL EXISTING PIPE, SLOPES AND DIRECTION OF WATER / SEWER TO SEWER LINE
7.00 7.00
LIQUID FLOW PRIOR TO START OF THE PIPE INSTALLATION. 4.00 3.00
AT 600MM ON CENTER
AT 600MM ON CENTER
3.20 3.80

0.10
FINISH FLOOR LINE
NON-SKID COVER
PLAN
PLUG G.I. FERRULE
3.00

3MM C.I. BEND

3.50
NOTE:
0.60 PROVIDE BEVEL CUT MARKER 0.06

5.50

5.50
C.I. LENGTH AS REQUIRED
GV
FOR EACH COVER

0.06
0.15
1.50

F/SHO WC LAV

1.00
9.00

9.00
1.00

1.00
PIPE CHANNEL AT 300MM ON CENTER
RISER RISER
LIFTING EYE

11.50

11.50
GV
LAV
0.6 0.6 0.6

0.15
WC

0.30
F/SHO AIR SPACE AIR SPACE AIR SPACE
3.50

3.50
SCUM SCUM SCUM

6.00

6.00

1.50
DIGESTION CHAMBER # 1 DIGESTION CHAMBER # 2 LEACHING CHAMBER
LAV PIPE

1.05
EQUAL EQUAL

"D"
TO SEWER LINE
4.00 4.00
2.50

2.50

0.15
10% SLOPE 10% SLOPE 10% SLOPE
FINISH FLOOR LINE REMOVABLE 2.50
BRASS
COVER
RUBBER GV
COMPRESSION CV
3.00 1.00 3.00
GASKET JOINT
PVC LENGTH AS M AT 300MM ON CENTER
REQUIRED 8.00 7.00
WATER-PROOF
TAP TO MAIN INTERIOR SURFACE
DISTRIBUTION

PVC P-TRAP
WATERLINE
SECTION
6 7
P-1 SCALE: 1:100M. 3 4 P-1 SCALE: 1:25M.
P-1 SCALE: 1:100M. P-1 SCALE: 1:100M.

ENGINEER: REG. NO.: PROJECT TITLE/ LOCATION: OPWNER: DESIGNED BY: SHEET CONTENTS
SHEET NO.:
TIN NO.: GROUND FLOOR SANITARY & STORM DRAINAGE LAYOUT
DRAWN BY: SECOND FLOOR SANITARY & STORM DRAINAGE LAYOUT
GROUND FLOOR COLD WATERLINE
P.T.R.: SECOND FLOOR COLD WATERLINE
CHECKED BY:
TWO-STOREY GENERAL NOTES
PIPE SIZES
ISOMETRIC
P-1
ENGINEER RESIDENTIAL MR. NOEL F. ANG SEPTIC TANK DETAIL
ISSUED ON:

PUROK 3, SAN ROQUE, SAN RAFAEL, BULACAN


APPROVED BY: CATCH BASIN DETAIL
LEGEND
PIPE FIXTURE DETAIL
1
ISSUED AT: DATE PRINTED: WATER METER CONNECTION DETAIL