Client : Dy. Ex. Engr, Panchayat R&B Sub Division, Bhuj - Kutch
Consultant : -
Agency : -
10 mm Stone Dust
Weight % Cum. % % Weight % Cum. % %
Retained Retained Retained Passing Retained Retained Retained Passing
75 mm - 0.0 0.0 0.0 100.0 0.0 0.0 0.0 100.0
53 mm - 0.0 0.0 0.0 100.0 0.0 0.0 0.0 100.0
26.5 mm - 0.0 0.0 0.0 100.0 0.0 0.0 0.0 100.0
9.5 mm - 610.0 610.0 12.2 87.8 0.0 0.0 0.0 100.0
4.75 mm - 3120.0 3730.0 74.6 25.4 230.0 230.0 4.6 95.4
2.36 mm - 1165.0 4895.0 97.9 2.1 505.0 735.0 14.7 85.3
0.85 mm - 95.0 4990.0 99.8 0.2 1055.0 1790.0 35.8 64.2
0.425 mm - 105.0 5000.0 100.0 0.0 1530.0 2265.0 45.3 54.7
0.075 mm - 0.0 5000.0 100.0 0.0 2010.0 4275.0 85.5 14.5
Page 1
Mix Grading 40 mm 20 mm 10 mm Stone Dust Final Required
Page 2
Sieve Analysis 28% 24% 23% 25% 100% Lower Design Upper Sieve
75 mm - 28.0 24.0 23.0 25.0 100.0 100 100 100 100 75
53 mm - 28.0 24.0 23.0 25.0 100.0 80-100 80 100 100 53
26.5 mm - 6.6 24.0 23.0 25.0 78.6 55-90 55 78.58 90 26.5
9.5 mm - 0.5 3.7 20.2 25.0 49.4 35-65 35 49.442 65 9.5
4.75 mm - 0.0 0.6 5.8 23.9 30.3 25-55 25 30.292 55 4.75
2.36 mm - 0.0 0.3 0.5 21.3 22.1 20-40 20 22.096 40 2.36
0.85 mm - 0.0 0.0 0.0 16.1 16.1 --- 10 13.675 25 0.425
0.425 mm - 0.0 0.0 0.0 13.7 13.7 10-15 0 3.625 5 0.075
0.075 mm - 0.0 0.0 0.0 3.6 3.6 <5
110
% of Passing
100
90
80
70
60
50
40
30
20
10
0
0.001 0.01 0.1 1 10
Sieve Size( in mm)
Ref. Code : MORT&H Specification, IS : 2720, IS : 2386 & IRC Guide Lines
Sieving : Electronic Sieve Shaker
Shaking : 1440 rpm (Up-Down & Circular)
Shaking Time : 1 min. to 60 min.
Stone
Testing : 40 mm 20 mm 10 mm
Dust
Std. Req.
Shall be
Water Absorption : 0.91 1.25 1.32 1.45
<2%
Shall be
Impact Value Test : 11.8 12.6 13.4 ---
< 40 %
Shall be
Los Angeles
Abrasion Test
: 13.4 14.5 15.7 --- < 40
%
Page 3
Shall be
Crushing Value
Test
: 14.6 15.4 16.3 ---
< 30 %
Page 4
M.D.D & O.M.C : MDD OMC
C.B.R
Diameter of Mould : 15 Cm P (mm) L (kg)
1200
Height of Mould : 17.5 Cm 0.0 0
Load ( kg )
2.5mm 5mm
45.9 46.4 47.0 47.8 47.2 46.8
Soaked 46.4 47.3
51.7 52.7 51.4 52.7 52.5 53.6
Unsoaked 51.9 52.9
Page 5
Page 6
Page 7
1 Grading - I
GNR 17 2012
30 As per
2 18 2013
Specification
30 30 19 2014
30 20
21
22
12.5 100 23
10 85-100 24
4.75 0-20 25
2.36 0-5 26
27
28
29
30
31
Page 8
Grading I Grading II Grading III Grading I Coarse Grading V Grading VI
100 100 --- --- 100 100 ---
10 - 30 25-55 40 - 65 10 - 30 10 - 30 25 - 50 30 - 55
30 30 30 30 30 30
10 100
Page 9
1.73 1.87
1.87 2.01
2.123 2.263
1.91 2.05
1.74 1.88
167.00 184.00
298.00 315.00
412.00 429.00
521.00 538.00
632.00 649.00
711 728.00
842.00 859.00
895.00 912.00
51.91240876
Page 10
Sieve Lower Design upper Sieve Lower Dsign upper Lower Design upper
75 100 100.0 100
53 80 100.0 100 53 80 100.0 100 53 100 100.0 100
26.5 55 78.6 90 26.5 70 78.6 100 26.5 55 78.6 75
9.5 35 49.4 65 9.5 50 49.4 80 4.75 10 30.3 30
4.75 25 30.3 55 4.75 40 30.3 65 0.075 0 3.6 5
2.36 20 22.1 40 2.36 30 22.1 50
0.425 10 13.7 25 0.425 15 13.7 25
0.075 0 3.6 5 0.075 0 3.6 5
Page 11
Sieve Lower Design upper Sieve Lower Design upper
75 100 100.0 100
53 100 100.0 100 53 80 100.0 100
26.5 50 78.6 80 26.5 55 78.6 90
4.75 15 30.3 35 9.5 35 49.4 65
0.075 0 3.6 5 4.75 25 30.3 50
2.36 10 22.1 20
0.85 2 16.1 10
0.425 0 13.7 5
Page 12
Page 13
Sieve Lower Design upper
53 100 100.0 100
26.5 75 78.6 100
9.5 55 49.4 75
4.75 30 30.3 55
2.36 10 22.1 25
0.425 0 13.7 8
0.075 0 3.6 3
Page 14
PROJECT REPORT
DESIGN OF GRANULAR SUB BASE
CLIENT
Dy. Ex. Engr, Panchayat R&B Sub
Division, Bhuj - Kutch
Widening and Strengthning of Kokma Chakar Chandiya Road, Bhuj-Kutch.
2 Objective 2
3 General Summary 3
8 Result Summary 8
Design C.B.R : 30
Source : Khedoi-Anjar
Ref. Code : MORT&H Specification, IS : 2720, IS : 2386 & IRC Guide Lines
Sieve Analysis
% Passing
G.S.B Sieve
Size
40 mm 20 mm 10 mm Stone Dust
Combine
Sieve Size 40 mm 20 mm 10 mm Stone Dust Requirements
% Passing
40 mm 20 mm 10 mm Stone Dust
MORT & H
28% 24% 23% 25%
Clause - 401
75 mm 100.0 100.0 100.0 100.0 28.0 24.0 23.0 25.0 100.0 100
53 mm 100.0 100.0 100.0 100.0 28.0 24.0 23.0 25.0 100.0 80-100
26.5 mm 23.5 100.0 100.0 100.0 6.6 24.0 23.0 25.0 78.6 55-90
9.5 mm 1.8 15.6 87.8 100.0 0.5 3.7 20.2 25.0 49.4 35-65
4.75 mm 0.0 2.5 25.4 95.4 0.0 0.6 5.8 23.9 30.3 25-55
2.36 mm 0.0 1.2 2.1 85.3 0.0 0.3 0.5 21.3 22.1 20-40
0.85 mm 0.0 0.0 0.2 64.2 0.0 0.0 0.0 16.1 16.1 ---
0.425 mm 0.0 0.0 0.0 54.7 0.0 0.0 0.0 13.7 13.7 10-15
0.075 mm 0.0 0.0 0.0 14.5 0.0 0.0 0.0 3.6 3.6 <5
100
90
% of Passing
80
70
60
50
40
30
20
10
0
0.01 0.1 1 10 100
Sieve Size( in mm)
Height of Fall : 45 Cm
Sample Taken : 20 Kg
2.28
2.22
2.16
2.1
2.04
1.98
1.92
1.86
1.8
3 4 5 6 7 8 9 10 11 12
Optimum Moisture Content (%)
Geo Test House, Vadodara Job No. 122-291019 Page 6
CALIFORNIA BEARING RATIO TEST
Diameter of Mould : 15 Cm
Surcharge Weight : 5 Kg
1200
Load ( kg )
1000
800
600
400
200
0
0.0 1.0 2.0 3.0 ( mm )
Penetration 4.0 5.0 6.0
Geo Test House, Vadodara Job No. 122-291019 Page 7
RESULT SUMMARY
Graded Mix Design of G.S.B Material
40 mm 20 mm 10 mm Stone Dust
28% 24% 23% 25%
Soaked Condn.
% 47.3
(Avg)
C.B.R
Unsoaked Condn.
% 52.9
(Avg)
GSB shall be prepared in an approved mixing plant of suitable capacity having provision for controlled
addition of water and forced mixing arrangement. While adding water due allowance should be made for
evaporation losses. At the time of compaction, water in Mix should not vary from Optimum value by more
than agreed limits. Mix material should be uniformly wet and no segregation should be permitted.
Immediately after mixing, aggregates shall be spread uniformly & evenly upon the prepared sub grade in
required quantities. In no case should they be dumped in heaps directly on the area where these are to be
laid nor shall their hauling over a partly completed stretch be permitted. Manual mixing shall be permitted
only where width of laying is not adequate for mechanical operations.
After the mix has been laid to the required thickness, grade and cross fall, the same shall be uniformly
compacted to the full depth with suitable roller. The speed of roller shall not exceed 5 km/hour. Rolling shall
be continued till the density achieved is at least 98 % of the MDD for the material as determined by the
method outlined in IS : 2720 (P-8). After final compaction of Granular sub base course, the road shall be
allowed to dry for 24 hours.
The G.S.B shall be laid (in one or more in layers as lower and upper sub-base) over the prepared or finished
Sub-grade shall be prepared by removing all vegetation and other extraneous matter, lightly sprinkled with
water if necessary and rolled with two passes of 80-100 KN smooth wheeled roller.
G.S.B material shall be spread ion sub-grade with the help of motor grader. When G.S.B material consist of
combination of material at that time mixing shall be done mechanically by the mix-in-place method
(Equipment used of this method is Rotavator). Manual mixing permitted in such circumstances only. If
moisture content is less then add some part of water and then mix uniformly.
Immediately, thereafter rolling shall start. If thickness of compacted layer <100 mm the rolling can be done by
smooth wheel roller of 80-100 KN weight. But if single layer up to 225 mm the rolling can be done with the
help of vibratory roller of minimum 80-100 KN static weight or heavy pneumatic tyred rolled of minimum
200-300 KN weight.
The speed of roller shall not exceed 5 Km per hour. Each pass of the roller shall uniformly overlap not less
than 1/3 of the track made. During rolling grade & camber shall be checked. The passes of roller shall be done
from edge to camber. Rolling shall be continued till the density achieved is at least 98% of M.D.D for the
material.
#DIV/0! #DIV/0! 0
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
OMC
LIQUID LIMIT
1 #DIV/0! #DIV/0!
CBR VALUE
2.950
2.900
2.850
2.800
2.750
2.700
2.650
2.600
2.550
2.500
2.450
2.400
2.350
2.300
2.250
2.200
2.150
2.100
2.050
2.000
2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00