From: TR To: SMDB - 5m long busway carrying 320kW load at 0.38kV and 4% impedance - Maximum design current of 608A - Selected busway size of 800A copper busway From: SMDB To: LP - 15m long cable carrying 10kW load at 0.38kV and 0.8 power factor - Maximum design current of 18A - Selected cable size of 1 x 16mm2 copper cable with derated ampacity of 72A Both the busway and cable designs meet criteria for current rating, protection, and voltage drop.

Uploaded by

Ahmed Magdy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
295 views10 pages

Cable Sizing

From: TR To: SMDB - 5m long busway carrying 320kW load at 0.38kV and 4% impedance - Maximum design current of 608A - Selected busway size of 800A copper busway From: SMDB To: LP - 15m long cable carrying 10kW load at 0.38kV and 0.8 power factor - Maximum design current of 18A - Selected cable size of 1 x 16mm2 copper cable with derated ampacity of 72A Both the busway and cable designs meet criteria for current rating, protection, and voltage drop.

Uploaded by

Ahmed Magdy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

F-SMDB

BUSWAY NO.:
destination load Transformer

From : TR 0.380 kV 400 kVA .


To : SMDB 50 Hz 320 kW 4 % Imped.
L OF BUS WAY
5 : m 0.80 p.f. 15.19 kA

Design Current , Ib = Max. Dem. KW = 608 A Trfo Design Current Ib = 607.7371 A


3 x kV x p.f. TO IEC STANDARD.
Nearest Nominal , In= 630 A . 800 AF frame .
Max.Thermal Current, I2=1.00 x 608 A = 608 AT trip BREAKER SIZING

Select Busway Size:

use CU 800
S.C.C. Sending End S.E.Imped.(in milli Ohms) = 14.44
+ Busway Bus.Imped.(in milli Ohms) = 3.78E-07
------>> Receiving End R.E.Imped.(in milli Ohms) = 14.44
R.E.Symm.Fault (in kA) = 15.19
(=kV*1000/sqrt(3)*R.E.Imped.milli Ohms)

CHECK VOLTAGE DROP CRITERIA : R (OHM/m) = 7.10E-05 cos Ø = 0.8


1- Individual V.D FOR BUS WAY. : X (OHM/m) = 2.59E-05 sin Ø = 0.6
V.D.1 = √3*BUSWAY AMPER RATING* (R cos Ø + x sin Ø)
= 1052.632 x ( 5.68E-05 + 1.55E-05 ) V/m
= 0.381 V
= 0.100 %

2- Accumulated V.D. :
Acc V.D.= V.D.1 + V.D. on upstream cable
= 0.100 + 0 % ----> THIS IS A MAIN CABLE

= 0.100 % (Should be <= 1 %)


DESIGN
SUCCEED . VERIFICATION
CABLE NO.: F-LP Multi-core conductor,Low Voltage,Power cable
destination route/type load
From : SMDB AIR 0.380 kV
To : LP XLPE 10 kW
Length : 15 m CU 0.8 p.f. CABLE / LOAD DATA

Design Current , Ib = Max. Dem. KW = 18 A


3 x kV x p.f. TO IEC STANDARD.
Nearest Nominal , In= 40 A AT 400 AF frame .
Max.Thermal Current, I2= 1.25 x 18 A = 23 trip BREAKER SIZING
C.F.
AIR Temp. 40
Correction Factor,C.F.= Ca x C g x Cf x Ci (Ca= 1 for local manufacturer) Installation burial depth 1.25
= 1 x Cg x 1 x 1 (Cg= 0.820 For grouped cables) condition soil thermal 150
= 0.82 (Cf=1, for cables protected by C.B.) LAID no. of cables 1
(Ci=1, for uninsulated installation) IN spacing : touching
target Ampacity, It = Ib = 18 = 22 A GROND formation flat
C.F. 0.82 LAID no. of cables 3
Select Cable Size: ccc >= It IN no. of trays 1
2
ccc = 88 A for S = 16 mm AIR installation H tray touching
use 22 = 1 // cables x 16 LAID IN DUCT

88 88 A ( catalog ccc ) no. of cables installation


1 touching
S.C.C. Sending End S.E.Imped.(in milli Ohms) = 14.44
Derated Ampacity , Iz= CCC x C.F + Cable Cab.Imped.(in milli Ohms) = 17.16
= 72 A ------>> Receiving End R.E.Imped.(in milli Ohms) = 31.60
R.E.Symm.Fault (in kA) = 6.94
CHECK PROTECTION CRITERIA : (=kV*1000/sqrt(3)*R.E.Imped.milli Ohms)
1- That Iz >= In , or ,
72 >= 40 SUCCEED .

2- That I2 <= 1.45 Iz , or ,


23 <= 105 SUCCEED .

CHECK VOLTAGE DROP CRITERIA :


1- Individual V.D. :
V.D.1 = mV/A/m / # cables x Ib x L
1.982= x 18.23 x 15
1
= 0.542 V
= 0.143 %
2- Accumulated V.D. :
Acc V.D.= V.D.1 + V.D. on upstream cable
= 0.143 + 0 %
= 0.143 % (Should be <= 3.5 %)
DESIGN
SUCCEED . VERIFICATION
CABLE NO.: F-PP-1 Multi-core conductor,Low Voltage,Power cable
destination route/type load
From : SMDB AIR 0.380 kV
To : PP-1 XLPE 19 kW
Length : 15 m CU 0.8 p.f. CABLE / LOAD DATA

Design Current , Ib = Max. Dem. KW = 35 A


3 x kV x p.f. TO IEC STANDARD.
Nearest Nominal , I n= 63 A AT 400 AF frame .
Max.Thermal Current, I2= 1.25 x 35 A = 44 trip BREAKER SIZING
C.F.
AIR Temp. 40
Correction Factor,C.F.= Ca x Cg x Cf x Ci (Ca= 1 for local manufacturer) Installation burial depth 1.25
= 1 x Cg x 1 x 1 (Cg= 0.820 For grouped cables) condition soil thermal 150
= 0.82 (Cf=1, for cables protected by C.B.) LAID no. of cables 1
(Ci=1, for uninsulated installation) IN spacing : touching
target Ampacity, It = Ib = 35 = 43 A GROND formation flat
C.F. 0.82 LAID no. of cables 3
Select Cable Size: ccc >= It IN no. of trays 1
2
ccc = 120 A for S = 25 mm AIR installation H tray touching
use 43 = 1 // cables x 25 LAID IN DUCT
120 120 A ( catalog ccc ) no. of cables installation
1 touching
S.C.C. Sending End S.E.Imped.(in milli Ohms) = 14.44
Derated Ampacity , Iz= CCC x C.F + Cable Cab.Imped.(in milli Ohms) = 11.05
= 98 A ------>> Receiving End R.E.Imped.(in milli Ohms) = 25.49
R.E.Symm.Fault (in kA) = 8.61
CHECK PROTECTION CRITERIA : (=kV*1000/sqrt(3)*R.E.Imped.milli Ohms)
1- That Iz >= In , or ,
98 >= 63 SUCCEED .
2- That I2 <= 1.45 Iz , or ,
44 <= 143 SUCCEED .
CHECK VOLTAGE DROP CRITERIA :
1- Individual V.D. :
V.D.1 = mV/A/m / # cables x Ib x L
1.276= x 35.13 x 15
1
= 0.672 V
= 0.177 %
2- Accumulated V.D. :
Acc V.D.= V.D.1 + V.D. on upstream cable
= 0.177 + 0 %
= 0.177 % (Should be <= 3.5 %)
DESIGN
SUCCEED . VERIFICATION
CABLE NO.: F-PP-2 Multi-core conductor,Low Voltage,Power cable
destination route/type load
From : SMDB AIR 0.380 kV
To : PP-2 XLPE 72 kW
Length : 15 m CU 0.8 p.f. CABLE / LOAD DATA

Design Current , Ib = Max. Dem. KW = 137 A


3 x kV x p.f. TO IEC STANDARD.
Nearest Nominal , I n= 200 A AT 250 AF frame .
Max.Thermal Current, I2= 1.25 x 137 A = 171 trip BREAKER SIZING
C.F.
AIR Temp. 40
Correction Factor,C.F.= Ca x Cg x Cf x Ci (Ca= 1 for local manufacturer) Installation burial depth 1.25
= 1 x Cg x 1 x 1 (Cg= 0.820 For grouped cables) condition soil thermal 150
= 0.82 (Cf=1, for cables protected by C.B.) LAID no. of cables 1
(Ci=1, for uninsulated installation) IN spacing : touching
target Ampacity, It = Ib = 137 = 167 A GROND formation flat
C.F. 0.82 LAID no. of cables 3
Select Cable Size: ccc >= It IN no. of trays 1
2
ccc = 268 A for S = 95 mm AIR installation H tray touching
use 167 = 1 // cables x 95 LAID IN DUCT
268 268 A ( catalog ccc ) no. of cables installation
1 touching
S.C.C. Sending End S.E.Imped.(in milli Ohms) = 14.44
Derated Ampacity , Iz= CCC x C.F + Cable Cab.Imped.(in milli Ohms) = 3.41
= 220 A ------>> Receiving End R.E.Imped.(in milli Ohms) = 17.85
R.E.Symm.Fault (in kA) = 12.29
CHECK PROTECTION CRITERIA : (=kV*1000/sqrt(3)*R.E.Imped.milli Ohms)
1- That Iz >= In , or ,
220 >= 200 SUCCEED .
2- That I2 <= 1.45 Iz , or ,
171 <= 319 SUCCEED .
CHECK VOLTAGE DROP CRITERIA :
1- Individual V.D. :
V.D.1 = mV/A/m / # cables x Ib x L
0.394= x 136.7 x 15
1
= 0.808 V
= 0.213 %
2- Accumulated V.D. :
Acc V.D.= V.D.1 + V.D. on upstream cable
= 0.213 + 0 %
= 0.213 % (Should be <= 3.5 %)
DESIGN
SUCCEED . VERIFICATION
CABLE NO.: F-ATS Multi-core conductor,Low Voltage,Power cable
destination route/type load
From : SMDB AIR 0.380 kV
To : ATS XLPE 40 kW
Length : 20 m CU 0.8 p.f. CABLE / LOAD DATA

Design Current , Ib = Max. Dem. KW = 76 A


3 x kV x p.f. TO IEC STANDARD.
Nearest Nominal , I n= 100 A AT 160 AF frame .
Max.Thermal Current, I2= 1.25 x 76 A = 95 trip BREAKER SIZING
C.F.
AIR Temp. 40
Correction Factor,C.F.= Ca x Cg x Cf x Ci (Ca= 1 for local manufacturer) Installation burial depth 1.25
= 1 x Cg x 1 x 1 (Cg= 0.730 For grouped cables) condition soil thermal 150
= 0.73 (Cf=1, for cables protected by C.B.) LAID no. of cables 1
(Ci=1, for uninsulated installation) IN spacing : touching
target Ampacity, It = Ib = 76 = 104 A GROND formation flat
C.F. 0.73 LAID no. of cables 9
Select Cable Size: ccc >= It IN no. of trays 1
2
ccc = 143 A for S = 35 mm AIR installation H tray touching
use 104 = 1 // cables x 35 LAID IN DUCT
143 . A ( catalog ccc ) no. of cables installation
1 touching
S.C.C. Sending End S.E.Imped.(in milli Ohms) = 14.44
Derated Ampacity , Iz= CCC x C.F + Cable Cab.Imped.(in milli Ohms) = 11.03
= 104 A ------>> Receiving End R.E.Imped.(in milli Ohms) = 25.47
R.E.Symm.Fault (in kA) = 8.61
CHECK PROTECTION CRITERIA : (=kV*1000/sqrt(3)*R.E.Imped.milli Ohms)
1- That Iz >= In , or ,
104 >= 100 SUCCEED .
2- That I2 <= 1.45 Iz , or ,
95 <= 151 SUCCEED .
CHECK VOLTAGE DROP CRITERIA :
1- Individual V.D. :
V.D.1 = mV/A/m / # cables x Ib x L
0.955= x 75.97 x 20
1
= 1.451 V
= 0.382 %
2- Accumulated V.D. :
Acc V.D.= V.D.1 + V.D. on upstream cable
= 0.382 + 0 %
= 0.382 % (Should be <= 3.5 %)
DESIGN
SUCCEED . VERIFICATION
CABLE NO.: F-GEN Multi-core conductor,Low Voltage,Power cable
destination route/type load
From : GEN AIR 0.380 kV
To : ATS XLPE 40 kW
Length : 15 m CU 0.8 p.f. CABLE / LOAD DATA

Design Current , Ib = Max. Dem. KW = 76 A


3 x kV x p.f. TO IEC STANDARD.
Nearest Nominal , I n= 100 A AT 1600 AF frame .
Max.Thermal Current, I2= 1.25 x 76 A = 95 trip BREAKER SIZING
C.F.
AIR Temp. 40
Correction Factor,C.F.= Ca x Cg x Cf x Ci (Ca= 1 for local manufacturer) Installation burial depth 1.25
= 1 x Cg x 1 x 1 (Cg= 0.730 For grouped cables) condition soil thermal 150
= 0.73 (Cf=1, for cables protected by C.B.) LAID no. of cables 1
(Ci=1, for uninsulated installation) IN spacing : touching
target Ampacity, It = Ib = 76 = 104 A GROND formation flat
C.F. 0.73 LAID no. of cables 9
Select Cable Size: ccc >= It IN no. of trays 1
2
ccc = 143 A for S = 35 mm AIR installation H tray touching
use 104 = 1 // cables x 35 LAID IN DUCT
143 . A ( catalog ccc ) no. of cables installation
1 touching
S.C.C. Sending End S.E.Imped.(in milli Ohms) = 0.00
Derated Ampacity , Iz= CCC x C.F + Cable Cab.Imped.(in milli Ohms) = 8.27
= 104 A ------>> Receiving End R.E.Imped.(in milli Ohms) = 8.27
R.E.Symm.Fault (in kA) = 26.53
CHECK PROTECTION CRITERIA : (=kV*1000/sqrt(3)*R.E.Imped.milli Ohms)
1- That Iz >= In , or ,
104 >= 100 SUCCEED .
2- That I2 <= 1.45 Iz , or ,
95 <= 151 SUCCEED .
CHECK VOLTAGE DROP CRITERIA :
1- Individual V.D. :
V.D.1 = mV/A/m / # cables x Ib x L
0.955= x 75.97 x 15
1
= 1.088 V
= 0.286 %
2- Accumulated V.D. :
Acc V.D.= V.D.1 + V.D. on upstream cable
= 0.286 + 0 %
= 0.286 % (Should be <= 3.5 %)
DESIGN
SUCCEED . VERIFICATION
CABLE NO.: F-ESMDB Multi-core conductor,Low Voltage,Power cable
destination route/type load
From : ATS AIR 0.380 kV
To : ESMDB XLPE 20 kW
Length : 20 m CU 0.8 p.f. CABLE / LOAD DATA

Design Current , Ib = Max. Dem. KW = 38 A


3 x kV x p.f. TO IEC STANDARD.
Nearest Nominal , I n= 63 A AT 100 AF frame .
Max.Thermal Current, I2= 1.25 x 38 A = 47 trip BREAKER SIZING
C.F.
AIR Temp. 40
Correction Factor,C.F.= Ca x Cg x Cf x Ci (Ca= 1 for local manufacturer) Installation burial depth 1.25
= 1 x Cg x 1 x 1 (Cg= 0.730 For grouped cables) condition soil thermal 150
= 0.73 (Cf=1, for cables protected by C.B.) LAID no. of cables 1
(Ci=1, for uninsulated installation) IN spacing : touching
target Ampacity, It = Ib = 38 = 52 A GROND formation flat
C.F. 0.73 LAID no. of cables 9
Select Cable Size: ccc >= It IN no. of trays 1
2
ccc = 88 A for S = 16 mm AIR installation H tray touching
use 52 = 1 // cables x 16 LAID IN DUCT
88 88 A ( catalog ccc ) no. of cables installation
1 touching
S.C.C. Sending End S.E.Imped.(in milli Ohms) = 25.47
Derated Ampacity , Iz= CCC x C.F + Cable Cab.Imped.(in milli Ohms) = 22.89
= 64 A ------>> Receiving End R.E.Imped.(in milli Ohms) = 48.35
R.E.Symm.Fault (in kA) = 4.54
CHECK PROTECTION CRITERIA : (=kV*1000/sqrt(3)*R.E.Imped.milli Ohms)
1- That Iz >= In , or ,
64 >= 63 SUCCEED .
2- That I2 <= 1.45 Iz , or ,
47 <= 93 SUCCEED .
CHECK VOLTAGE DROP CRITERIA :
1- Individual V.D. :
V.D.1 = mV/A/m / # cables x Ib x L
1.982= x 37.98 x 20
1
= 1.506 V
= 0.396 %
2- Accumulated V.D. :
Acc V.D.= V.D.1 + V.D. on upstream cable
= 0.396 + 0 %
= 0.396 % (Should be <= 3.5 %)
DESIGN
SUCCEED . VERIFICATION
CABLE NO.: F-ELP Multi-core conductor,Low Voltage,Power cable
destination route/type load
From : ESMDB AIR 0.380 kV
To : ELP XLPE 5 kW
Length : 15 m CU 0.8 p.f. CABLE / LOAD DATA

Design Current , Ib = Max. Dem. KW = 9 A


3 x kV x p.f. TO IEC STANDARD.
Nearest Nominal , I n= 40 A AT 100 AF frame .
Max.Thermal Current, I2= 1.25 x 9 A = 11 trip BREAKER SIZING
C.F.
AIR Temp. 40
Correction Factor,C.F.= Ca x Cg x Cf x Ci (Ca= 1 for local manufacturer) Installation burial depth 1.25
= 1 x Cg x 1 x 1 (Cg= 0.730 For grouped cables) condition soil thermal 150
= 0.73 (Cf=1, for cables protected by C.B.) LAID no. of cables 1
(Ci=1, for uninsulated installation) IN spacing : touching
target Ampacity, It = Ib = 9 = 12 A GROND formation flat
C.F. 0.73 LAID no. of cables 9
Select Cable Size: ccc >= It IN no. of trays 1
2
ccc = 88 A for S = 16 mm AIR installation H tray touching
use 12 = 1 // cables x 16 LAID IN DUCT
88 88 A ( catalog ccc ) no. of cables installation
1 touching
S.C.C. Sending End S.E.Imped.(in milli Ohms) = 0.00
Derated Ampacity , Iz= CCC x C.F + Cable Cab.Imped.(in milli Ohms) = 17.16
= 64 A ------>> Receiving End R.E.Imped.(in milli Ohms) = 17.16
R.E.Symm.Fault (in kA) = 12.78
CHECK PROTECTION CRITERIA : (=kV*1000/sqrt(3)*R.E.Imped.milli Ohms)
1- That Iz >= In , or ,
64 >= 40 SUCCEED .
2- That I2 <= 1.45 Iz , or ,
11 <= 93 SUCCEED .
CHECK VOLTAGE DROP CRITERIA :
1- Individual V.D. :
V.D.1 = mV/A/m / # cables x Ib x L
1.982= x 9.116 x 15
1
= 0.271 V
= 0.071 %
2- Accumulated V.D. :
Acc V.D.= V.D.1 + V.D. on upstream cable
= 0.071 + 0 %
= 0.071 % (Should be <= 3.5 %)
DESIGN
SUCCEED . VERIFICATION
CABLE NO.: F-UPS-1 Multi-core conductor,Low Voltage,Power cable
destination route/type load
From : ESMDB AIR 0.380 kV
To : UPS-1 XLPE 24 kW
Length : 20 m CU 0.8 p.f. CABLE / LOAD DATA

Design Current , Ib = Max. Dem. KW = 46 A


3 x kV x p.f. TO IEC STANDARD.
Nearest Nominal , I n= 63 A AT 630 AF frame .
Max.Thermal Current, I2= 1.25 x 46 A = 57 trip BREAKER SIZING
C.F.
AIR Temp. 40
Correction Factor,C.F.= Ca x Cg x Cf x Ci (Ca= 1 for local manufacturer) Installation burial depth 1.25
= 1 x Cg x 1 x 1 (Cg= 0.730 For grouped cables) condition soil thermal 150
= 0.73 (Cf=1, for cables protected by C.B.) LAID no. of cables 1
(Ci=1, for uninsulated installation) IN spacing : touching
target Ampacity, It = Ib = 46 = 62 A GROND formation flat
C.F. 0.73 LAID no. of cables 9
Select Cable Size: ccc >= It IN no. of trays 1
2
ccc = 88 A for S = 16 mm AIR installation H tray touching
use 62 = 1 // cables x 16 LAID IN DUCT
88 88 A ( catalog ccc ) no. of cables installation
1 touching
S.C.C. Sending End S.E.Imped.(in milli Ohms) = 48.35
Derated Ampacity , Iz= CCC x C.F + Cable Cab.Imped.(in milli Ohms) = 22.89
= 64 A ------>> Receiving End R.E.Imped.(in milli Ohms) = 71.24
R.E.Symm.Fault (in kA) = 3.08
CHECK PROTECTION CRITERIA : (=kV*1000/sqrt(3)*R.E.Imped.milli Ohms)
1- That Iz >= In , or ,
64 >= 63 SUCCEED .
2- That I2 <= 1.45 Iz , or ,
57 <= 93 SUCCEED .
CHECK VOLTAGE DROP CRITERIA :
1- Individual V.D. :
V.D.1 = mV/A/m / # cables x Ib x L
1.982= x 45.58 x 20
1
= 1.807 V
= 0.475 %
2- Accumulated V.D. :
Acc V.D.= V.D.1 + V.D. on upstream cable
= 0.475 + 0 %
= 0.475 % (Should be <= 3.5 %)
DESIGN
SUCCEED . VERIFICATION
CABLE NO.: F-UPP Multi-core conductor,Low Voltage,Power cable
destination route/type load
From : UPS-1 AIR 0.380 kV
To : UPP XLPE 16 kW
Length : 10 m CU 0.8 p.f. CABLE / LOAD DATA

Design Current , Ib = Max. Dem. KW = 30 A


3 x kV x p.f. TO IEC STANDARD.
Nearest Nominal , I n= 40 A AT 100 AF frame .
Max.Thermal Current, I2= 1.25 x 30 A = 38 trip BREAKER SIZING
C.F.
AIR Temp. 40
Correction Factor,C.F.= Ca x Cg x Cf x Ci (Ca= 1 for local manufacturer) Installation burial depth 1.25
= 1 x Cg x 1 x 1 (Cg= 0.730 For grouped cables) condition soil thermal 150
= 0.73 (Cf=1, for cables protected by C.B.) LAID no. of cables 1
(Ci=1, for uninsulated installation) IN spacing : touching
target Ampacity, It = Ib = 30 = 42 A GROND formation flat
C.F. 0.73 LAID no. of cables 9
Select Cable Size: ccc >= It IN no. of trays 1
2
ccc = 88 A for S = 16 mm AIR installation H tray touching
use 42 = 1 // cables x 16 LAID IN DUCT
88 88 A ( catalog ccc ) no. of cables installation
1 touching
S.C.C. Sending End S.E.Imped.(in milli Ohms) = 71.24
Derated Ampacity , Iz= CCC x C.F + Cable Cab.Imped.(in milli Ohms) = 11.44
= 64 A ------>> Receiving End R.E.Imped.(in milli Ohms) = 82.68
R.E.Symm.Fault (in kA) = 2.65
CHECK PROTECTION CRITERIA : (=kV*1000/sqrt(3)*R.E.Imped.milli Ohms)
1- That Iz >= In , or ,
64 >= 40 SUCCEED .
2- That I2 <= 1.45 Iz , or ,
38 <= 93 SUCCEED .
CHECK VOLTAGE DROP CRITERIA :
1- Individual V.D. :
V.D.1 = mV/A/m / # cables x Ib x L
1.982= x 30.39 x 10
1
= 0.602 V
= 0.158 %
2- Accumulated V.D. :
Acc V.D.= V.D.1 + V.D. on upstream cable
= 0.158 + 0 %
= 0.158 % (Should be <= 3.5 %)
DESIGN