Saic F 2022
Saic F 2022
Saic F 2022
00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Receiving Inspection of Power Piping & Auxillaries SAIC-F-2022 30-Apr-17 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A. General:
Damage was avoided during shipment, to all instruments and valves, 32-SAMSS-021,
A1
including auxiliary systems. Para. 25.1.5
All exposed finished and machined surfaces, including bolts, are 32-SAMSS-021,
A2
coated with a rust-inhibiting compound. Para. 25.1.6
Bearings and seal assemblies are fully protected against the entry of 32-SAMSS-021,
A3
moisture and dirt. Para. 25.1.7
Flanged connections and all other machined surfaces are protected 32-SAMSS-021,
A4
by a coating, such as MIL-C-16173 Grade IV. Para. 25.1.8
Flanges are fitted with a steel or wood cover, 3 mm thick and 32-SAMSS-021,
A5
neoprene gaskets. Para. 25.1.8
32-SAMSS-021,
A6 Threaded connections are protected with threaded plugs.
Para. 25.1.12
B. Improper practices or careless handling are likely to result in pipe damage of the following types:
Dents or ovalness of the pipe due to improper supports, or too widely 01-SAMSS-024,
B1
spaced supports and excessive stacking height. Para. 4.3
End damage due to use of improper end hooks for lifting or due to
improper nesting or denesting techniques, or due to longitudinal 01-SAMSS-024,
B2
shifting of the pipe and striking the end of the pipe, which would Para. 4.3
cause cutting of the bevel.
Fatigue cracks due to excessive static and cyclic loads as a result of 01-SAMSS-024,
B3
vertical vibrations during transportation. Para. 4.3
Abrasion or peening due to rubbing or striking of the pipewall against 01-SAMSS-024,
B4
other objects. Para. 4.3
REMARKS:
REFERENCE DOCUMENTS:
1. 32-SAMSS-021, Manufacture of Industrial Boilers, (28 January, 2003)
2. 01-SAMSS-024, Pipe Handling and Nesting, (29 October, 2003)
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A General:
Damage was avoided during shipment, to all instruments and valves, 32-SAMSS-021,
A1
including auxiliary systems. Para. 25.1.5
All exposed finished and machined surfaces, including bolts, are 32-SAMSS-021,
A2
coated with a rust-inhibiting compound. Para. 25.1.6
Bearings and seal assemblies are fully protected against the entry of 32-SAMSS-021,
A3
moisture and dirt. Para. 25.1.7
Flanged connections and all other machined surfaces are protected 32-SAMSS-021,
A4
by a coating, such as MIL-C-16173 Grade IV. Para. 25.1.8
Flanges are fitted with a steel or wood cover, 3 mm thick and 32-SAMSS-021,
A5
neoprene gaskets. Para. 25.1.8
32-SAMSS-021,
A6 Threaded connections are protected with threaded plugs.
Para. 25.1.12
No end damage exists due to use of improper end hooks for lifting or
due to improper nesting or denesting techniques, or due to 01-SAMSS-024,
A8
longitudinal shifting of the pipe and striking the end of the pipe, which Para. 4.3
would cause cutting of the manufacturer's bevel.
No Fatigue cracks exist due to excessive static and cyclic loads as a 01-SAMSS-024,
A9
result of vertical vibrations during transportation. Para. 4.3
B Packing:
02-SAMSS-005,
C1 All fittings must be protected from mechanical damage.
Para. 10.5
Welding ends must be protected with suitable wood, plastic, or metal 02-SAMSS-005,
C2
covers. Para. 10.5
ITEM RE-INSP
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No. DATE
REMARKS:
ATTACHMENTS:
REFERENCE DOCUMENTS:
1. 32-SAMSS-021, Manufacture of Industrial Boilers, (12 January 2013)
2. 01-SAMSS-024, Pipe Handling and Nesting, (21 June 2011)
3. 02-SAMSS-005, Butt Welding Pipe Fittings, (20 Feb 2012)