Manhole Reference Guide
Manhole Reference Guide
Manhole Reference Guide
First Edition
Performance Pipe
a division of Chevron Phillips Chemical Company LP
5085 W. Park Blvd., Ste 500 (75093)
PO Box 269006
Plano, TX 75026-8006
800-527-0662
www.performancepipe.com
1. Introduction
Performance Pipe offers more than forty years of polyethylene pipe manufacturing
experience, twelve manufacturing facilities certified to ISO 9001 in nine states, and two
manufacturing facilities in Mexico.
SPIROLITE® manholes are available in a variety of diameters from 36” to 120” for
standard manhole heights up to 40 feet. Manholes for greater depths are available.
Please contact Performance Pipe. Varieties of configurations are available for manhole
bases (floors), tops, and appurtenances. Bases are available with flat, gussetted, sloped,
and benched bottoms. Cone tops, flat tops, and open tops are available. Details of bases,
tops, and appurtenances are discussed in later chapters of this manual. Figure 1-2
illustrates a SPIROLITE® sewer manhole and identifies typical terminology and
configuration.
Material
ID-controlled SPIROLITE® manhole risers (shafts) are manufactured to ASTM F894
“Standard Specification for Polyethylene (PE) Large Diameter Profile Wall Sewer and
Drain Pipe”. ASTM F894 requires stress-rated resins, which have established long-term
strengths and high resistance to stress cracking. (Other materials may be used for
manhole components that are subject to little or no stress.) The manhole barrel (riser),
the base, and anti-flotation anchor connection rings are made from stress-rated HDPE
compounds having a cell classification of 335444C or E in accordance with ASTM D
3350, “Specification for Polyethylene Plastics Pipe and Fittings Materials”.
Pressure Rating
SPIROLITE® manholes are normally intended for gravity flow service with or without
external groundwater. For applications requiring internal pressurization, or vacuum, or
for high groundwater applications, please contact Performance Pipe.
As with all thermoplastics piping products, service pressure ratings and mechanical
design properties are reduced at elevated temperatures. For operating conditions above
73°F, contact Performance Pipe.
Chemical Resistance
Few materials offer better over-all resistance to corrosive acids, bases, and salts. In
addition, polyethylene is unaffected by bacteria, fungi or aggressive soils.
SPIROLITE® manholes do not rust, rot, corrode, or tuberculate like traditional metal or
concrete piping and manholes. Polyethylene is not subject to galvanic or hydrogen
sulfide corrosion.
Fabrication
SPIROLITE® manholes and structures are fabricated using extrusion welding techniques.
All manholes are tested for leakage hydraulically or ultrasonically prior to shipment from
Performance Pipe’s plants.
Handling
SPIROLITE® manholes and structures weigh far less than comparable structures made
from reinforced concrete. In many cases, this permits off-loading and handling with
lighter equipment. Although comparatively lighter than concrete, manholes and
structures are large and heavy. Careful planning, proper precautions and adequate
handling equipment are necessary for safe handling. Handling and unloading instructions
are provided with every shipment. Obtain these instructions from the delivery driver.
See Chapter 8, for general handling information.
Installation
SPIROLITE® manholes are intended for underground installation with compacted,
granular soil embedment. When manholes are to be installed in landfills, in areas of high
settlement or unstable soil, or in bodies of water, consult Performance Pipe. See Chapter
8, for information about manhole installation.
UV Protection
Black SPIROLITE® manholes may be stored outdoors and unprotected for periods of 20
years or more in direct sunlight. Black polyethylene material used to make SPIROLITE®
manholes contains a minimum of 2% carbon black for resistance to degradation from
ultraviolet light. Non-black SPIROLITE® manholes contain sacrificial additives that
provide temporary resistance to UV degradation for up to 12 months of unprotected
outdoor storage. For longer periods, covering or other protection against direct exposure
to sunlight is required.
Additional Information
For additional information on use, design, and installation of SPIROLITE® and other
Performance Pipe products, see The Performance Pipe Engineering Manual.
Guide Specification
To assist the designer in preparing a specification, Appendix A provides a Guide
Specification for HDPE manholes.
NOTES:
Riser Description
SPIROLITE® risers (shafts) are made in nominal diameters from 36” to 120”. To minimize vertical
soil loads, a uniform diameter is used from the base of the manhole to the top. SPIROLITE®
manhole risers are made from pipe manufactured in accordance with ASTM F 894. The optimum
wall construction for a manhole riser for underground applications is a cylinder with a smooth outer
surface and a solid wall without core or profile hollows. The smooth outer surface minimizes the
transfer of downdrag soil load to the riser and the solid cross section provides stable resistance to
longitudinal (axial) loads. Profile or corrugated wall pipes containing external ribs or hollow cores
tend to have limited use for underground manhole risers. Although ribbed or corrugated (open)
profiles can reduce weight, they greatly increase the downdrag soil loading on the riser. Hollow-
core profile walls are not efficient in transferring longitudinal loads and can buckle locally ‘between
the cores’.
Chapter 2: Riser Design Guidelines Page 7 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
Riser Material
Performance Pipe’s SPIROLITE® manhole risers are made from a high density, extra high molecular
weight polyethylene compound with a cell classification of 335444C or E for non-black product or
higher per ASTM D 3350. ASTM D 3350 identifies polyethylene pipe and fittings material by a cell
classification numbering system. The ASTM cell classification system identifies the PE resin, using
cell classification numbers for material properties. See Table 2-1 for the cell classification values
for the PE compound used for SPIROLITE® manholes.
Table 2-1 Cell Classification for Performance Pipe 335444C Material Per ASTM D 3350
Cell Classification for Cell Classification
SPIROLITE® HDPE PROPERTY Limits
Chapter 2: Riser Design Guidelines Page 8 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
When materials such as polyethylene are subjected to a constant deformation (strain), the load
(stress) that maintains the constant deformation decreases over time. This phenomenon is called
stress relaxation and the ratio of stress to applied strain at a given time and temperature is called the
Stress Relaxation Modulus. The Stress Relaxation Modulus and the Apparent Modulus of Elasticity
are nearly equal, and therefore, can be used interchangeably for most engineering design. In
Performance Pipe literature, the Apparent Modulus of Elasticity and the Stress Relaxation Modulus
are often referred to as the Modulus of Elasticity and this convention will be followed throughout
this Guide. Values for the Modulus of Elasticity for various times and temperatures are given Table
2-2.
Allowable Strain
In the Appendix of ASTM F 1759, the allowable compressive strain value is 3.5% at 73OF and the
typical allowable bending strain value is 5% for polyethylene materials with a cell class equal to or
exceeding 334433C.
Poisson’s Ratio
The Poisson’s ratio values typically used for HDPE are 0.45 for long-term and 0.35 for short-term.
Wall Construction
SPIROLITE® manufactures manhole risers using a spiral winding process or by conventional
extrusion. In spiral winding, a flat polyethylene extrudate is wound over a rotating mandrel.
Additional layers are used to increase the riser’s wall thickness. Spiral winding is an ID-controlled
process. The inside diameter remains fixed regardless of the wall thickness, whereas in
conventionally extruded pipe the OD is controlled and increasing the wall thickness reduces the
inside diameter. Spiral winding is used for ID sizes from 36” through 120”. Conventional extrusion
is used for OD sizes up to 54". When designing a manhole, it is important to recognize that spirally
wound manhole risers are ID sized, where conventionally extruded risers are OD sized. For example,
a 42” spiral wound SPIROLITE® riser and a conventionally extruded 48” OD riser have about the
Chapter 2: Riser Design Guidelines Page 9 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical
Company LP
www.performancepipe.com
same inside diameter.
Manhole Classification
SPIROLITE® manholes are classified according to their resistance to downdrag. When soil is
backfilled and compacted around the manhole, it settles and tries to pull or drag the manhole riser
down with it. The downward drag occurs because there is considerable frictional resistance at the
interface between the riser and the surrounding soil. The resulting frictional force is referred to as
downdrag. Downdrag causes a very slight shortening of the manhole accompanied by a transfer of
longitudinal compressive force into the riser. Excessive downdrag may cause longitudinal crushing
or buckling of the riser wall.
Resistance to downdrag depends on riser wall thickness and diameter. Therefore, SPIROLITE®
manholes are classified on the basis of their inside diameter to minimum wall thickness ratio, known
as the IDR (Inside-Diameter Dimension Ratio). Both IDR’s and SIDR’s (Standard Inside-Diameter
Dimension Ratio) are used for classification. Dimensions and properties for standard SPIROLITE®
manhole riser wall sections are given in Tables 2-3 through 2-8. Contact Performance Pipe for other
IDR’s and SIDR’s.
Conventionally extruded pipe is typically classified by DR, which is the OD divided by the
minimum wall thickness. DR or SDR is converted to IDR or SIDR by subtracting 2 from the DR or
SDR value, that is, IDR = DR –2, or SIDR = SDR –2. Thus, SIDR 49 SPIROLITE® and SDR 51
conventionally extruded manhole risers have the same downdrag resistance.
The Ring Stiffness Constant (RSC) classification used for SPIROLITE® and ASTM F894 pipe is not
an effective system for classification of manhole risers, because pipes of equivalent RSC may have
very different resistances to downdrag. A hollow core or closed profile pipe resists downdrag with
only the thin inner and outer walls of the profile. While it may have a high RSC and a high
resistance to circumferential forces such as ring deflection, its resistance to downdrag is proportional
to the sum of two thin wall sections. Therefore, buckling can occur within the thin inner profile
section at loads substantially lower than the loads required to cause buckling of a solid wall section.
A solid wall riser resists downdrag forces with its entire wall thickness. Therefore, a solid wall riser
having the same RSC as a profile riser will have a significantly higher resistance to downdrag.
Manhole Color
The standard manhole color is black. Other color manholes are available. Please note that for colors
other than black, the outdoor storage life (i.e. exposed to sunlight) may be a year or so because non-
black materials use a different type of UV protection system. The storage life of SPIROLITE® white
manholes is 3 years.
Chapter 2: Riser Design Guidelines Page 10 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
Chapter 2: Riser Design Guidelines Page 11 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical
Company LP
www.performancepipe.com
Chapter 2: Riser Design Guidelines Page 12 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
Application Limits
SPIROLITE® High Density Polyethylene (HDPE) manholes are used in industrial, municipal,
landfill and rehabilitation applications including wetwells, lift stations, sumps, valve chambers, and
dual containment vessels. Three common design applications of SPIROLITE® HDPE Manholes are
(a) underground burial with soil backfill, (b) placement in ponds or basins as standpipe, and (c)
lining existing manholes.
Chapter 2: Riser Design Guidelines Page 13 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical
Company LP
www.performancepipe.com
In preparing a design, the Engineer should give thorough consideration to the unique characteristics
of each application. For example, manholes buried underground gain a substantial amount of
support from the embedment, which adds resistance to hydrostatic pressures. But manholes installed
in a pond or in ungrouted lining applications must resist hydrostatic pressures on the basis of their
own stiffness. Each manhole should be correctly analyzed for its particular service environment
whether that may be in soil, water or grout. Installation and application information is provided in
this Guide. Where applications are beyond the information provided in this guide, the Purchaser or
Engineer should contact Performance Pipe.
The working temperature range for SPIROLITE® HDPE manholes is generally from -50°F to 140°F
(-45°C to 60°C), but this may vary depending on specific circumstances. Polyethylene is a
thermoplastic material; as the operating temperature increases, the allowable compressive stress and
the modulus of elasticity decrease, but the ductility of the material improves. A reverse effect occurs
as the temperature decreases.
SPIROLITE® HDPE manholes have excellent resistance to many harsh and corrosive chemicals.
Whenever evaluating the use of a HDPE manhole for handling chemical solutions, the Engineer
should begin by consulting The Performance Pipe Engineering Manual, Book 1, for a detailed
discussion on chemical resistance.
SPIROLITE® manholes are normally intended for gravity flow applications. However, if the
application requires slight internal pressure or vacuum, the manhole must be designed for these
conditions. The Purchaser or Engineer must take into account any pressure or vacuum in manhole.
Please consult with Performance Pipe if the manhole under consideration will be subjected to
pressure, negative pressure, or vacuum.
ASTM F 1759
ASTM F 1759 establishes a standard design procedure for polyethylene manhole risers. The
following sections cover general considerations for selecting the correct IDR/SIDR for risers, but it
is the Purchaser’s or his Engineer’s responsibility to ensure that the design meets the requirements of
ASTM F 1759. Upon request, Performance Pipe will provide riser calculations in accordance with
ASTM F1759 for the Engineer’s use. Calculations will only be performed if a completed and signed
“F1759 Calculation Input” sheet is submitted and all inputs are provided. (See Appendix B.) The
Engineer will still be responsible to evaluate the calculations and determine the suitability of the
riser for the particular application.
ASTM F 1759 recognizes the use of alternate design methods, which may include empirical
equations, finite element analysis (FEA), field measurements, and other suitable means. The method
presented below may not be suitable for every case and is by no means the only appropriate design
method.
The methodology in this section applies to manholes that are buried up to 40 feet deep in stable
insitu soil formations or in compacted earthen landfills. Manholes that are installed in
sanitary landfill cells, or installed deeper than 40 feet, or are used as liners (grouted or not), or
as standpipes in ponds may require special design. Please consult Performance Pipe.
Chapter 2: Riser Design Guidelines Page 14 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
PR
The radially-directed earth pressure is given in Equation 2-1from ASTM F 1759. Active earth
pressure will most likely vary around the circumference of the riser from uneven placement of the
backfill, and is accounted for by the 1.21 coefficient in Equation 2-1.
PR = 1.21K A γH (2 − 1)
Where:
PR = radial pressure, psf
γ = soil unit weight, pcf
H = height of fill, ft
KA = Active Earth Pressure coefficient,
φ
K = tan 2 ( 45 − ) ( 2 − 2)
A 2
Where:
φ = soil angle of internal friction, deg
Chapter 2: Riser Design Guidelines Page 15 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical
Company LP
www.performancepipe.com
(2) Downdrag load
Soil settlement around the manhole develops a shearing stress between the soil and the manhole
which acts to “drag the manhole downward” (shortening the manhole). This process is referred to as
downdrag and it creates a longitudinal (axial) compressive force in the riser wall. Downdrag is
illustrated in Figure 2-3. The load in the riser wall will increase until the frictional resistance
between the manhole and soil is overcome. At that point, the maximum load is reached and
additional settlement will cause the soil to slip while the load in the manhole remains constant.
A smooth outer surface minimizes the amount of "downdrag". Frictional resistance is greatly
increased if external ribs or corrugations are present on the outside of the riser, which in turn, create
a much greater compressive load in the riser wall. (External ribs may be used beneficially to stiffen
manhole risers that are used as liners in rehabilitation. In liner applications, the entire annular space
between an HDPE manhole liner and its host manhole is grouted. The ribs provide extra surfaces for
the grout to grip thus providing additional support to the manhole.)
Maximum downdrag load occurs at the bottom of the riser and equals the product of the downdrag
shear stress acting on the surface of the riser and the surface area of the riser. The shear stress varies
in intensity from the top of the riser to the bottom as a function of the radially-directed earth
pressure. For simplicity, F 1759 assumes that the radially-directed pressure varies linearly with
depth. Thus, the downdrag load is equal to the product of the average shear stress and the surface
area. Equation 2-3 gives the average shear stress:
PR1 + PR 2
TA = µ( ) (2 − 3)
2
Where:
TA = average shear stress, psf
PR1 = radial pressure at top of riser, psf
PR2 = radial pressure at base of riser, psf
µ = friction coefficient between riser and soil
(Martin et al. (Ref. 2-2) and Swan et al. (Ref. 2-3) suggest a coefficient of friction between a
granular or granular-cohesive soil and HDPE of 0.4.)
Chapter 2: Riser Design Guidelines Page 16 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
The downdrag load acting on the manhole that causes a compressive stress in the manhole riser wall
can be calculated from Equation 2-4. The weight of caps and equipment on the top of the manhole
may add longitudinal load in the riser.
DO
PD = TA π( )H ( 2 − 4)
12
Where:
PD = downdrag load, lbs
DO = outside diameter of riser, in
TA = average shear stress, psf
H = height of manhole fill, ft
Since soil weight is reduced by groundwater, downdrag load is reduced. However, when calculating
downdrag force, the effects of groundwater in reducing soil weight and in creating hydrostatic
pressure are normally ignored, because downdrag forces occur during construction and during
fluctuations in the groundwater level. See ASTM F 1759 for a calculation procedure in partially
saturated soils. Where manholes extend below the groundwater level or where run-off water
may collect in backfill surrounding the manhole, the manhole may “float” off-grade or out of
the ground. See Chapter 7.
Soil Support
Adequate soil support is vital for proper manhole performance. SPIROLITE® HDPE manholes
depend on the surrounding embedment for additional resistance to radial-directed earth pressure and
downdrag forces. Selecting a heavy wall manhole alone will not ensure good performance if
adequate soil support is not developed during installation. Backfill and compaction requirements are
discussed throughout this manual and are addressed in detail in Chapter 8.
For conventional backfill in stable, insitu soils, the minimum backfill required for a manhole is Class
IA, IB or II material per ASTM D 2321 compacted to a minimum of 90% Standard Proctor Density
as defined by ASTM D 698. Embedment material should be placed around the manhole in a zone
extending for 3.5 ft or to undisturbed ground whichever is the greater distance.
Riser deflection under load is greatly influenced by the stiffness of the embedment material. The
"Modulus of Soil Reaction" (E') characterizes the supporting capability of the embedment soil. E' is
a measure of the soil stiffness and it depends on the soil type, compaction level and degree of
saturation. E’ values are empirically derived from back-calculated values from installed flexible
pipe. Another measure of soil stiffness is Young’s Modulus, ES, which can be determined in a
laboratory. Both values are used in ASTM F 1759.
Chapter 2: Riser Design Guidelines Page 17 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical
Company LP
www.performancepipe.com
Chapter 2: Riser Design Guidelines Page 18 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
Ring Bending
Ring deflection normally occurs during installation. Equation 2-8 provides the ring bending moment
in the riser wall from an assumed 2% deflection.
M E = 0.25 C O D M N T (2 − 8)
Where:
ME = ring bending moment, (in-lb)/in
CO = 0.02 (correction for 2% deflection)
DM = mean riser diameter, in
NT = ring compressive thrust, lb/in
The ring bending strain, Equation 2-9, is obtained from the ring bending moment.
6ME
εB = (2 − 9)
E t2
Where:
εB = bending strain, in/in
ME = bending moment, (in-lb)/in
E = modulus of elasticity, psi
t = minimum riser wall thickness, in
The ring bending strain and the ring compressive strain can be added together to obtain the
maximum (combined) ring strain. The combined strain is limited to 5% as presented earlier.
Ring Buckling
If the ring compressive thrust exceeds a critical buckling value, the riser may lose the ability to
handle flexural deformation and buckle. Two equations for ring buckling are given in F 1759. If the
manhole riser is above the groundwater level, the critical ring compressive thrust at buckling may be
found using Equation 2-10.
N CR = 0.3 R H t E 1 / 3 E S2 / 3 (2 − 10)
Where:
NCR = critical ring compressive thrust (no groundwater), lb/in
RH = geometry factor
t = minimum riser wall thickness, in
E = modulus of elasticity, psi
ES = Young’s Modulus of the soil, psi
Chapter 2: Riser Design Guidelines Page 19 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical
Company LP
www.performancepipe.com
Where the manhole riser or a portion of the manhole riser is below the groundwater table, the critical
ring compressive thrust may be found using Equation 2-11.
R B' E' E t 3
N CRW = 0.82 (2 − 11)
DM
Where:
NCRW = critical ring compressive thrust, lb/in
DM = mean diameter, in
R = 1-0.33(H’/H) for buoyancy reduction
H’ = height of groundwater from invert, ft
H = height of fill, ft
E’ = modulus of soil reaction, psi
E = modulus of elasticity, psi
t = minimum riser wall thickness, in
and:
1
B' = ( −0.065 H )
1 + 4e
Per ASTM F 1759, the ring compressive thrust, NT, given by Equation 2-6 should not exceed one-
half of the critical ring compressive thrust, NCR or NCRW, as calculated using Equation 2-10 or
Equation 2-11). A higher safety factor may be used if desired by the Engineer.
The manhole top and bottom enhance the ring buckling resistance of the manhole riser. They act to
stiffen the manhole against ring deformation. However, the increase in resistance is normally not
considered in design as the enhancement diminishes with distance from the top or bottom.
PD + PL + PW
εA = (2 − 12)
E π DM t
Where:
εA = longitudinal (axial) compressive strain, in/in
PD = downdrag force from Equation2-4, lb
PL = live load including equipment, lb
PW= dead load including riser weight, lb
E = modulus of elasticity, psi
DM= riser mean diameter, in
t = minimum riser wall thickness, in
Chapter 2: Riser Design Guidelines Page 20 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
For solid wall riser pipes, the minimum riser wall thickness is simply the wall thickness of the riser.
For closed profile or hollow core riser pipes, the minimum riser wall thickness is not the “overall
wall thickness” or “equivalent solid wall thickness”, but the sum of the inner and outer skin
thickness, which may be found by subtracting the height of the hollow core or profile from the
“overall wall thickness”.
Local wall buckling of the structure may occur if the longitudinal (axial) compressive strain exceeds
the critical axial compressive strain. Equation 2-13 gives the critical longitudinal (axial)
compressive strain for an unsupported (non-buried) riser.
2t
ε CR = (2 − 13)
D M 3(1 − µ 2 )
Where:
εCR = critical longitudinal (axial) compressive strain (buckling strain), in/in
DM = riser mean diameter, in
µ = Poisson’s ratio for HDPE
t = minimum wall thickness, in
For profile wall riser pipe, local wall buckling may occur between ribs or stiffened sections
depending on the profile shape. For hollow-core profiles with circular cores, ASTM F 1759 permits
the substitution of the equivalent solid wall thickness for the minimum wall thickness. The
equivalent solid wall thickness is the wall thickness (t) that has a moment of inertia equal to the
moment of inertia of the profile wall. This same substitution is not permitted for hollow-core profiles
with square cores, as square cores are inherently unstable. See Section 7.1.2.6 of ASTM F 1759. In
the case of square core profiles, the minimum wall thickness must be used in Equation 2-13.
ASTM F 1759 allows Equation 2-13 to be applied without the use of a safety factor where granular
soil or compacted granular-cohesive soil surrounds the manhole. Embedment soil increases the
riser’s resistance to local wall buckling, which normally enhances the safety factor. Thus for design,
εA must be less than or equal to εCR and as stated above εA must also be less than 3.5%. If εA fails to
meet either condition, a lower IDR (SIDR) manhole riser should be selected and the trial
calculations repeated until an IDR (SIDR) is found where εA meets both conditions.
Pond Applications
Where manholes (such as standpipes) are placed in ponds or other standing bodies of water or in
muds including muck or saturated sludge that have little or no soil support, the surrounding liquid
exerts a hydrostatic pressure on the riser. In these conditions, there is little or no downdrag because
the surrounding soil is essentially a liquid. The IDR (SIDR) of the riser must be sufficient to
withstand the long-term external hydrostatic pressure created by the surrounding material without
any soil support. Equation 2-14 gives the critical hydrostatic collapse pressure for the manhole riser.
For pond standpipe applications, manhole risers may be made from pipes with a ribbed profile outer
surface.
Chapter 2: Riser Design Guidelines Page 21 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical
Company LP
www.performancepipe.com
3
2E 1
PCR = C (2 − 14)
( )
1 − µ 2 IDR + 1
Where:
PCR = critical collapse pressure, psi
E = modulus of elasticity, psi (typically long-term and at an appropriate temperature)
IDR = Inside-Diameter Dimension Ratio
µ = Poisson’s ratio (0.45 for long-term)
C = ovality correction factor as follows:
It is normal to anticipate some ovality in the manhole. Ovality can occur from handling, storage, and
shipment.
The critical collapse pressure should be reduced by a safety factor. Typical safety factors for
hydrostatic collapse are 2.5 or higher depending on the application. The reduced value should be
equal to or greater than the net external pressure at the bottom of the riser from Equation 2-15. (The
manhole base tends to provide an extra safety margin against collapse for the lower portion of the
manhole.)
PCR γ W ( H EXT − H INT )
≥ ( 2 − 15)
SF 144
Where:
SF = safety factor
HEXT = liquid height external to manhole (ft)
HINT = liquid height inside the manhole (ft)
γW = unit weight of liquid (pcf)
Equation 2-15 shows that the liquid head inside the manhole will offset some of the external
pressure acting on the manhole. However, if the liquid level inside the manhole fluctuates, the
lowest liquid level should be used.
When a manhole is submerged in a pond or body of water, the water it displaces buoys it and the
resulting buoyancy force is proportional to volume of water displaced. Provisions must be made to
anchor the manhole or standpipe to the pond floor to prevent floatation. See Chapter 7.
Chapter 2: Riser Design Guidelines Page 22 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
Summary
Manhole risers are subject to considerable load from soil downdrag and from radial soil and
groundwater pressure. Although guidance and design recommendations are provided in this chapter,
the Purchaser and the Engineer must apply their own engineering judgment and determine the
appropriateness of the design recommendations for the particular application. Proper design requires
knowledge of the embedment soils and familiarity with the insitu soil and groundwater formation.
The Engineer should avoid the use of open profile pipes (externally ribbed pipes) in stand-alone
underground manholes. Although closed profile wall constructions with hollow cores can increase
ring stiffness, longitudinal loads can exceed the local buckling strength of the net wall, which may
lead to premature failures. Solid wall construction is preferred as the optimum wall construction for
underground manhole risers because it has the highest resistance to downdrag loads. Profile wall
manhole riser constructions are limited to applications such as manhole liners and pond standpipes
where there are no downdrag loads.
Chapter 2: Riser Design Guidelines Page 23 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical
Company LP
www.performancepipe.com
NOTES:
Chapter 2: Riser Design Guidelines Page 24 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
3. Manhole Bases
Introduction
The manhole base serves as a bottom to the manhole and is usually the floor as well. Various base
styles and constructions are available for different application needs, including bases with an invert
to minimize flow disruption. While equipment may be placed on the manhole base, the primary
loading on the base is from its underside. When the base is below groundwater level, water pushes
up on the bottom of the base and exerts a uniform hydrostatic pressure across its surface. Generally,
there is no earth load on the base. Standard manhole base options are available for groundwater
pressures up to 40 ft. of head.
Flat Bases
Where there is little or no groundwater above the base, a flat base is usually economical and
efficient. Flat bases range from 1” to 2” thick with 4” thick bases available on special order. When
the base thickness exceeds 2”, a gusseted base can be less expensive. Flat bases can be supplied in
circular or square shapes that circumscribe the manhole riser. See Figures 3-1 and 3-2. Bases may be
extended to a larger size than the outer diameter of the manhole riser to provide a shelf or bench for
a concrete antiflotation anchor. See Chapter 7.
Figure 3-1. Flat Base (Circular Base) Figure 3-2. Flat Base (Square Base)
Benched Bases
Benched bases provide a platform for personnel to perform maintenance work without standing in
the flow stream. Benched bases incorporate a pipe invert that minimizes flow disturbance through
the manhole. “High Benching”, which provides benching at the pipe crown elevation is also
available. Benched bases are generally used in sanitary sewer and storm drain applications and are
normally rated for up to 25 ft of groundwater head. See Figure 3-3.
Chapter 3: Manhole Base Options Page 25 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
Manhole Riser
Manhole
Figure 3-3. Manhole Bench. Clockwise from upper right illustration: Graphic of Manhole Bench,
Photo of Inside Manhole with Benching, and Photo of Outside of Benched Base.
Chapter 3: Manhole Base Options Page 26 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
Manhole
Warning
When wet or moist, manhole surfaces can be slippery. Use personal fall protection
safety equipment when entering or working in a manhole.
Base design requires selecting the desired floor type (invert, flat, gusseted), and then determining the
proper thickness and structural gusseting required to resist groundwater pressure applied to the
bottom of the manhole. In addition to applying load to the base, the groundwater pressure acts to
Chapter 3: Manhole Base Options Page 27 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
“uplift” the manhole, that is, groundwater pressure applied to the bottom side of the manhole base is
directed upward and may push an unrestrained manhole out of the ground. Uplift is resisted by
frictional forces along the manhole riser skin, the weight of the manhole and cover, and by the
weight of soil above concrete anchors. Often, the manhole base is designed to extend radially
beyond the perimeter of the riser so that it becomes a shelf on which a concrete anchor may be
placed. See Chapter 7.
Installing the manhole in a poured (wet) concrete slab will not reduce groundwater uplift pressure
against the manhole base. Because concrete does not seal to polyethylene, groundwater will seep
between the polyethylene and the concrete and apply uplift pressure to the manhole base.
HDPE Material for Manhole Bases
Because they have a structural function, manhole bases are fabricated from stress rated polyethylene
materials that meet the same requirements applied to risers. See Chapter 1 for material requirements.
Flat Base Design Per ASTM F 1759
ASTM F 1759 provides design information for determining the thickness required for a flat base to
resist groundwater pressure. But because a flat base is structurally inefficient, gussets are frequently
used to stiffen the base. Benching and inverts can also stiffen the manhole base, and sometimes
gussets are combined with benching and inverts. ASTM F 1759 does not cover the design of
gusseted or otherwise stiffened bases. For these types of bases, Performance Pipe has performed
testing and analysis to establish the maximum recommended height of groundwater above the
manhole base. When gusseted bases are required, please consult Performance Pipe.
In ASTM F 1759, the performance criteria for bases are: (1) The stress level in the base due to
groundwater pressure must be kept below the allowable stress for the base material, and (2) the
deflection of the base is generally limited to two percent of the base diameter for 60” and smaller
manholes and to one percent of the base diameter for larger diameters. Larger deflections may be
tolerated but the floor will not be level.
Equation 3-1 below from F 1759 is for calculating the stress in a flat manhole base subjected to a
uniform pressure (groundwater). It assumes that the maximum stress of concern is at the center of
the base:
3 r2
σ= p 2 (3 − 1)
4 t
Where:
σ = stress at center of base, psi
r = radius of manhole base, in
t = manhole base thickness, in
p = hydrostatic head pressure from Equation 3-2, psi
γ HW
p= (3 − 2)
144
Where:
γ = unit weight of water, pcf
HW = height of groundwater above base, ft
Chapter 3: Manhole Base Options Page 28 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
The maximum stress in the base is limited to the allowable tensile stress of the base material. For
SPIROLITE® manholes, the allowable material tensile stress is 800 psi. at 73°F.
From ASTM F 1759, the maximum deflection of the base may be determined from Equation 3-3.
4
3 2 pr
δ = (1 − µ ) 3 (3 − 3)
16 Et
Where:
δ = deflection at center of base, in
µ = Poisson’s ratio (Long-term 0.45)
p = groundwater pressure, psi
r = manhole base radius, in
t = manhole base thickness, in
E = stress relaxation modulus, psi
The stress relaxation modulus value depends on how long groundwater is present and temp.
The actual stress and deflection observed in the base may be greater than the value from ASTM F
1759 and Equations 3-1 and 3-3. External groundwater pressure acting on the base may cause local
deformation at the edge of the base and reduce restraint. When restraint is reduced, the base can
deflect more. The resulting structural behavior of the base will be somewhere between that of a
plate with fixed edges and a plate with free edges. The stress could be 30 percent or so higher than
that predicted using Equation 3-1 and the deflection could be double that predicted by Equation 3-3.
Where the manhole is subjected to an internal negative pressure (vacuum), the negative internal
pressure increases the external pressure acting on the manhole and should be added to the
groundwater pressure in the above equations. When the application requires slight internal pressure
or vacuum, the design Engineer must take any positive or negative internal pressure in the manhole
into account. Please consult Performance Pipe.
Chapter 3: Manhole Base Options Page 29 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
NOTES:
Chapter 3: Manhole Base Options Page 30 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
4.0 Manhole Tops
Introduction
Safety considerations generally require that manholes have tops, not only to protect from a fall
hazard but also to prevent escape of noxious gases. SPIROLITE® manholes may be supplied with a
variety of different style tops. Most of these tops may be custom fabricated to provide vent pipes
and special manway locations, dimensions and lids. SPIROLITE® tops are normally intended for
gravity service manholes. When the manhole application requires internal pressurization or vacuum,
the manhole normally requires a special top. Please consult Performance Pipe.
Unless otherwise noted, the manhole top styles in this guide are suitable for personnel and hand-
carried equipment loads up to 500 pounds. When tops will be subjected to vehicular loading, ASTM
F 1759 and Performance Pipe recommend a reinforced concrete cap or reinforced concrete casting
around the manhole top. See Chapter 8 for concrete cap installation recommendations.
The gasketed system allows for easy field installation and a weather tight seal for up to 3 feet of
external hydrostatic head. To avoid interference, the riser must extend at least 12” above the crown
of the highest lateral pipe connected to the riser. See Appendix C for cone top dimensions and
installation procedure.
Cone Rim
Flat Tops
Flat HDPE tops with concentric or eccentric manways are available for all riser sizes. See Figure 4-
3. Standard manway sizes include 24" IPS, 30" IPS, 36" IPS, 30”IPS and 36” IPS. Other sizes are
available upon request. Gusseted flat tops for live loads such as equipment and personnel up to 500
pounds Special flat tops for loads up to 1000 pounds are available upon request. When used in
conjunction with concrete slab tops, polyethylene flat tops can protect the concrete slab top against
corrosion.
Manholes with flat tops are manufactured to the height specified by the Purchaser or Engineer to
meet the final field grade requirements of the application. Manhole height is not easily adjusted in
the field. If grade adjustment is required, a cone top should be considered. Before ordering the
manhole, the Purchaser or Engineer should verify the correct manhole height.
Open Tops
Open tops are available for 36"-120" diameters for use with concrete caps or other tops where
corrosion protection and slight over-spilling is not a concern. Tar-based mastics are typically used
to reduce leakage between the concrete cap and riser.
WARNING
All manholes must be covered or guarded against unauthorized or accidental
entry.
Figure 4-4. Flanged Manway Figure 4-5. Manway with Steel Back-up Ring
Top Loads
The design load for SPIROLITE® manhole tops is 500 pounds applied over a one-foot radius
circular area at the center of the manhole. The Purchaser or Purchaser’s Engineer may specify other
top loads. If so, consult Performance Pipe.
ASTM F 1759 does not provide a design methodology for manhole tops saying only that the design
should be proven sufficient by testing or calculations. Manhole tops are flat plates (with or without
gussets). The design equations for loaded flat plates are similar to those used for manhole bases. (1)
The stress level in the top from personnel and light equipment must be kept below the allowable
stress for the top material. (2) Calculated deflection is normally limited to one-half percent of the top
diameter or 1/4”, whichever is smaller, per 100 pounds of load. Deflections larger than 2 percent of
the manhole top diameter may be safe but uncomfortable for working personnel.
Equations 4-1 and 4-2 may be used to determine maximum design stress and deflection for a
concentrated load acting over a one-foot radius area at the center of a fixed end plate. Equations 4-1
and 4-2 are from the sixth edition of Roark’s Formulas for Stress & Strain, edited by Warren C.
Young (McGraw Hill (1989)).
P r
M MAX = (1 + µ ) ln( ) (4 − 1a )
4π ro
M MAX
σ =6 (4 − 1b)
t2
Where:
MMAX = maximum bending moment in top, lb-in/in
P = load, lbs
π = Pi (approximately 3.14)
µ = Poisson’s ratio values of 0.45 for long-term and 0.35 for short-term
r = radius of manhole top, in
ro = radius of loaded area, in
σ = stress at edge of loaded area, psi
t = top thickness, in or equivalent thickness if gusseted
3(1 − µ 2 ) Pr 2
δ MAX = (4 − 2)
4π E t 3
Where:
E = modulus of elasticity, psi
Actual stress and deflection may be slightly higher than calculated, if local deformation occurs at the
outer edge of the top. Error may also be introduced if deflection according to Equation 4-2 exceeds
one-half the top thickness. For short-term top loading (such as workers entering and leaving the
manhole), these errors do not create an unsafe condition.
The design load must be increased to accommodate the weight of closure materials such as a steel
blind flange, back-up ring, bolts and nuts. For example, a 24” flange is 32” in diameter. 150-pound
AWWA C207Class D flanges are 1-7/8” thick. At 490 lbs./cu ft, a 1” thick steel back-up ring and 1”
thick blind flange weigh 328 lbs. Add bolts and nuts, and the weight is about 350 lbs. From the 500
pound design load, this leaves 150 pounds. for personnel and equipment. If a full 1-7/8” thickness is
used, back-up ring, blind flange and bolts weigh about 640 pounds.
The maximum stress in the top is limited to the allowable tensile stress of the HDPE material for
SPIROLITE® manholes adjusted for the temperature when loaded. Long-term values for
SPIROLITE® HDPE are 800 psi at 73°F and 400 psi at 140oF.
Temperature and duration of load affect the modulus of elasticity value. For example, if workers are
on a top exposed to the sun in summer, the temperature of the top’s outer surface may approach
140oF. While fluid inside is generally cooler, the average temperature of the top (through its
thickness) may be 120oF. In this case, a 36,900 psi modulus of elasticity value for design of 36,900
psi would be appropriate when workers are present for one hour. See Chapter 2, Table 2-2 for
modulus of elasticity values for HDPE. The maximum deflection of the top should be limited to a
reasonable amount that will not disturb workers or create an unsafe condition. A typical deflection
limit is 2 percent of the diameter or 1-1/2 inches whichever is smaller.
Where the manhole is subjected to an internal negative pressure (vacuum), external air pressure
creates a uniform pressure load on the top equal to the internal negative pressure. In designing the
top to resist this load, the uniform pressure load equations for base design are used. See Chapter 3.
Elevated temperature values for the modulus and strength may be required if the top is outdoors and
exposed to sunlight. The design Engineer must account for any positive or negative internal
pressure in the manhole.
Normally the manhole top is at or above ground level without soil cover. Where soil cover is
desired, consult Performance Pipe. Soil cover increases the load on the top of the manhole and on
the riser and must be accounted for in the design. Often, when the top is below the surface grade
elevation, a concrete cap is required to reduce the earth load to an acceptable level.
Stub-out pipes may be placed at almost any orientation on the riser. Because backfill settlement
and consolidation apply shear and bending loads where the stub-out penetrates the manhole riser,
it is preferable to place stub-out penetrations close to the manhole's base or invert, especially
with deep manholes. Stub-out pipes penetrate the riser wall to form an open channel invert or to
connect to equipment, such as pumps or valves. Other options include, terminating the
connection at the riser wall, or providing a drop within the manhole. See Chapter 6.0 The design
Engineer should specify the orientation including the slope for gravity-flow stub-outs. The slope
should be at least one-percent.
Extrusion welding is used to connect the stub-out pipe to the riser wall and to seal the
penetration. When extrusion welding stub-outs onto solid wall SPIROLITE® risers, the weld
fully penetrates the depth of the riser wall providing a superior connection, unlike the superficial
weld resulting from the use of hollow core or profile risers. Because of the lack of penetration,
superficial (surface fillet) welds do not develop the shear or bending strength of a full penetration
weld. Likewise, field modifications to solid wall manholes (i.e. the addition of an extra stub-out)
can be made with full penetration welds. With some sizes, there is a limitation to the maximum
DR (minimum wall thickness) for the stub-out pipe. A wall that is too thin may result in stub-out
distortion after welding to the riser. Consult Performance Pipe for maximum stub-out DR’s.
For electrofusion and mechanical joining techniques, see the Performance Pipe Engineering
Manual. Electrofusion and mechanical coupling connections must be made in accordance with
the connection manufacturer’s instructions. When connecting to non-polyethylene piping
materials, the inside diameter of the polyethylene stub-out pipe and the inside diameter of the
non-polyethylene pipe should be closely matched to avoid a lip that can upset flow.
Polyisoprene gaskets meeting ASTM F-477 are standard. Neoprene, EPDM rubber, nitrile
rubber, or other elastomeric gasket materials are available upon request. See Performance Pipe
Technical Note PP 837 TN for assembly procedures.
Figure 5-4. Manhole with SPIROLITE Bell and Spigot Joint Stub-Outs
Table 5-1 SPIROLITE Thru-Pipe Sizes and Angles for Common Riser Sizes+
Riser Maximum Miter Maximum Standard
Diameter Straight Type* SPIROLITE Angles/Bends*
SPIROLITE Pipe Miter
Thru-Pipe Size Sizes
36" 30" Single 27" 0° - 60°
Double 27" 61° - 90°
42" 33" Single 30" 0° - 60°
Double 30" 61° - 90°
48" 36" Single 33" 0° - 60°
Double 33" 61° - 90°
Single 33" 0° - 60°
54" 42" Double 33" 0° - 45°
Double 33" 46° - 90°
Single 42" 0° - 60°
60" 48" Double 42" 0° - 45°
Double 36" 46° - 90°
Single 48" 0° - 60°
66" 54" Double 48" 0° - 45°
Double 42" 46° - 90°
Single 54" 0° - 60°
72" 60" Double 54" 0° - 45°
Double 48" 46° - 90°
Single 60" 0° - 60°
84" 66" Double 60" 0° - 45°
Double 54" 46° - 90°
Single 72" 0° - 60°
96" 72" Double 72" 0° - 45°
Double 66" 46° - 90°
120" 96" Single 96" 0° - 45°
* Other angles and number of miters available upon request.ο Typical stub length from the manhole wall range from
approximately 2” to 18” depending on stubout and manhole size with lengths for full fusion available. Consult Performance Pipe for
laying length dimensions.+ Thru-sizes and angles for other riser sizes may be obtained by contacting Performance Pipe.
Manhole Tee
For 48” diameter and larger pipelines, using Manhole Tee can reduce manhole riser size and
cost. See Figure 5-8. Manhole Tees are manufactured for through-pipe diameters from 42"
through 120" where the riser diameter is smaller than the through-pipe. The ends of the through-
pipe may be plain, flanged, SPIROLITE bells or spigots or SPIROLITE Closure bells, and
Manhole Tees may be supplied on bends as shown in Figure 5-8. Manhole Tees can be provided
with ladders, working platforms, and flat tops or cones. See Chapter 6.0.
6.0 Appurtenances
Introduction
To increase versatility, SPIROLITE® manholes can be supplied with various appurtenances and
accessories. Manholes are available with ladders, platforms (grates), drop pipes, pump mounting
pads, internal platforms, lifting lugs, and other appurtenances. Figure 6-1 illustrates some of the
available appurtenances and accessories. When practical, fabricated HDPE brackets and mounts that
can be extrusion welded to the manhole riser wall, floor or bench are used for mechanical
appurtenance mountings. Manholes can be supplied with factory-installed brackets ready for field
mounting of user specified accessories.
Many of the mounting details shown in the figures are for illustration only. Mounting brackets
supplied on SPIROLITE® manholes may vary from those illustrated in the figures and photographs.
The style of bracketing depends on the field application and the appurtenance or accessory.
Figure 6-1. Manhole with Appurtenances and Accessories - Drop Pipe, Ladder, and Pump
Mount
Internal HDPE piping may be factory or field installed. For field installation, HDPE brackets can be
welded to the manhole so that pipe hangers, (supplied by others), can be attached to the mounting
brackets without penetrating the manhole wall. See Figure 6-2.
For HDPE interior piping, pipe hangers should encompass the entire circumference of the pipe, and
a 1/8" thick elastomer or rubber sheet should be is placed around the pipe under the pipe hanger to
prevent abrasion damage. Spacing recommendations from the Performance Pipe Engineering
Manual are used for horizontal and vertical pipe bracket spacing.
Figure 6-3. Drop Connection, Grate, & Ladder Figure 6-4. Steel/PP Unitized “Steps”
Factory-installed HDPE piping inside a manhole can be anchored at connection points to pumps,
valves or inlet/outlet pipes. Extended pipe lengths can be restrained with guides between anchor
points or tack welding to the manhole wall.
Chapter 6: Appurtenances Page 48 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
Warning Lid
A removable warning lid for the top of the manway opening is available. Warning text on the lid
advises that the manhole is a confined space and that a safety harness attached to a fall protection
apparatus is required for entry. Warning lids are not a substitute for properly secured manhole top
closure devices (manway lids) that prevent unauthorized entry and provide structural support.
will control all manhole entries using a safety harness connected to a fall protection system.
Available
Reinforced Poly-
16.5 27 30 Telescoping Available
propylene Ladder*
Into ladder shaft
Reinforced Poly- Not Available
propylene Unitized 11.5 24 30 Not Available (Rungs are too
Vertical Steps* narrow)
NOTES:
*Ladders and unitized steps (narrow width ladders) are reinforced with aluminum and steel.
**Manway diameter to meet headroom clearance specified in OSHA 1910.27.
***Multiple ladders may be placed in manhole to reach depth of 40 ft.
When the ladder is located within a manway, the minimum clearance between the back of the ladder
and the manway wall is 4”. This meets ASTM C 478 requirements, but does not meet OSHA 29
CFR 1910.27 requirements for a 7” minimum clearance. Performance Pipe maintains the OSHA
clearance distance in the manhole riser. It is the responsibility of the Owner to determine how these
clearance requirements are to be applied, and to specify clearance requirements appropriate to their
application to Performance Pipe when purchasing a SPIROLITE® manhole with a ladder.
Deflector Shield
At the Owner’s request, Performance Pipe can provide a head deflector shield at the lower entrance
of the manway to prevent an entrant from striking their head on the manhole top where required by
OSHA 29 CFR 1910.27.
Chapter 6: Appurtenances Page 52 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
Because the “first step” distance could be excessive, Performance Pipe recommends using a safety
harness connected to a fall protection device. However, Performance Pipe cannot interpret for the
Owner whether or not this is acceptable to OSHA in meeting “first step” distance requirements.
HANDRAIL IN
EXTENDED POSITION
HANDRAIL IN
RETRACTED POSITION
material, and should obtain the grate load capacity from the grate manufacturer. See Figure 6-11.
Figure 6-11 Manhole Grate Assembly
Two pump mounting pad configurations are reinforced concrete mounting pads and sandwiched
steel plate mounting pads.
Lifting Lugs
For reliable handling, lifting lugs can be extrusion welded at the top of Performance Pipe manholes.
Figure 6-14 illustrates one style of lifting lugs available from Performance Pipe. See Section 8.0.
and illustrated in a later section of this chapter and are suitable for use with SPIROLITE pipe or
18” and larger conventionally extruded (DR) pipe. Appendix E provides formulas for evaluating
flotation resistance for manholes with anchor collars and anti-flotation slabs. Because site
conditions can vary significantly from project to project, it is the Purchaser or the
Engineer’s responsibility to verify the adequacy of a concrete collar or anti-flotation slabs
in resisting manhole flotation and to specify collar and slab dimensions and steel
reinforcement for any specific project.
Rebar Connections
The number of (rebar pins required to prevent the rebar pins from pulling through the base of the
manhole is shown in Tables 7-2 and 7-3. The Engineer must determine that the rebar selected is
adequate to carry the upward load and must ensure that the concrete collar will not fail or crack
from earth loads or stresses from thermal contraction and expansion. Tables 7-2 and 7-3 are
based on using #8 or #14 rebar. Performance Pipe will typically pre-drill the required number of
1-1/4” (for #8 bars) or 1-7/8” (for #14 bars) diameter holes around the riser base. It may be
necessary to place the rebar pins through the holes in the manhole riser before "setting" the
manhole.
The minimum number and size of rebars shown in Tables 7-2 and 7-3 are required to prevent
the rebar from pulling thorough the HDPE riser without consideration for the amount of
reinforcement required in the concrete anti-flotation collar. Collar reinforcement and design is
the Engineer’s responsibility.
Table 7-3 Number of Rebar Holes in Riser Circumference Using #14 Rebar
Riser Height of Groundwater Above Manhole Bottom (feet)
Diam.
5 10 15 20 25 30 35 40
48 * 8 8 9 9 9 10 11
54 * 8 8 9 10 11 12 13
60 8 8 9 11 11 13 13 15
66 8 8 11 12 13 15 15 17
72 8 8 12 13 14 17 17 +
84 8 10 12 16 17 20 20 +
96 8 11 15 16 20 24 24 +
120 8 15 16 22 26 27 + +
* Option A cannot be used for these conditions, as manhole bases are flat without gussets.
+ #14 rebar is not adequate for these conditions.
For precast anchor collars, the collar should be dimensioned so that the clearance between the
outside diameter of the manhole riser and the inner diameter of the anchor collar is one inch or
less. As illustrated in Figure 7-3, any gussets required to reinforce the manhole base are installed
inside the manhole. When installing the manhole, compacted foundation material should be
placed level with the top of the extended base plate, so that the downward soil load on the anchor
collar is uniformly distributed over the extended base plate and the foundation soil. To allow
clearance for the anchor collar and placement of soil bedding under the stub-out pipes, stub-out
pipes should be located in the riser to provide at least 4” clearance between the top of the anchor
collar and the stub-out invert. This provides room for a “false” bottom or floor in manholes with
internal gussets. (A “false bottom” or floor is not shown in Fig. 7-3.)
Together, the weight of the slab and the weight of the soil above the slab resist manhole
flotation. The frictional resistance within the soil is normally ignored. See Appendix E for
flotation resistance design information for concrete anti-flotation anchor slabs.
See Figure 7-5 for anti-flotation slab length, width and thickness dimensions Slab width can vary
but typically equals 48” or one pipe diameter whichever is larger. The length depends on the
diameter of the pipe and the required hold down force. As illustrated in Figure 7-6, the slab is
placed over the pipeline so that its long dimension or “length” is oriented perpendicular to the
direction of flow.
Handling
Safe handling instructions are provided with each shipment of pipe and manholes. Failure to follow
these instructions may result in severe injury, death, or property damage. Prior to off-loading
and handling any PERFORMANCE PIPE structures, it is imperative that all personnel involved in
their handling be acquainted with the Handling Instructions.
Fig. 8-1. Placing Manhole Fig. 8-2. Manhole Trench in Landfill
Chapter 8 Manhole Installation Guidelines Page 69 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
The delivery vehicle and lifting equipment must be parked on level ground with stabilizers fully
extended and set. Parking brakes must be set and wheels chocked where applicable. The unloading
equipment should be inspected for condition and lifting capacity before use. The structure should be
lifted with a crane or backhoe using slings of sufficient capacity to safely handle the load.
Structures shall be moved using the lifting lugs connected to the manhole wall. All lugs are equally
spaced around the circumference. A web style strap, such as nylon, shall be connected to each lug
on one end and held together with a hook on the other end (as illustrated in Fig. 1), taking care to
distribute the load equally between all lugs. When standing the structure upright, do not lift by lifting
lugs. Wrap straps around the structure and use the lugs as strap stops. Lift with the straps. Once the
structure is vertically "righted", then the lugs may be used for lifting. The following should be met:
• Use only web style slings when lifting the structures. Do not use wire rope or other devices
that may cut into the lifting lugs or provide insufficient force distribution.
• Do not sling by fewer lugs than those provided on the structure.
• Do not lift structure when containing fluid or any other materials.
• Do not stand on, under, or around structure while it is being lifted.
Manhole Installation
Warning
Consult the appropriate authorities on trench construction requirements. Take all safety
precautions when working in or near a trench.
PERFORMANCE PIPE’s recommendations for the installation of manholes satisfy the design
assumptions given in Section 4.2 of ASTM F 1759. PERFORMANCE PIPE recommends that the
manholes be placed on a stable base and embedded with a compacted coarse-grained embedment
material that extends radially at least 3.5 ft from the perimeter of the manhole or to undisturbed in
3.5’ min.
Chapter 8 Manhole Installation Guidelines Page 70 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
situ soil (whichever is greater) and for the full height of the manhole. Direct installation in new or
active sanitary landfills or other fills subject to large settlements require special considerations
outside the scope of these recommendations. Figure 8-3 shows PERFORMANCE PIPE’S
recommendations.
Dewatering
The manhole trench must be dry during installation. Dewater by installing deep wells, sumps, well
points, or other methods appropriate for the particular site. Maintain dewatering until completion of
backfilling to prevent flotation during construction.
Foundation
The manhole should be installed on a stable foundation. All large rocks and clumps should be
removed from the trench bottom. The foundation should consist of a minimum of 8" of Class I
material (as defined by ASTM D 2321) compacted to a minimum of 95% Standard Proctor (as
defined by ASTM D 698). Placement on a concrete slab foundation is also acceptable. In unstable
insitu soils, a sub-foundation may be required to obtain a stable trench bottom. The sub-foundation
can be constructed by removing weak organic or otherwise unstable soils and replacing them with
stable, compacted materials.
Fig. 8-4. Place Manhole on Stable Foundation Fig. 8-5. Measuring Embedment Density
When lateral pipe connections enter the manhole, the embedment requirements for the pipe located
Chapter 8 Manhole Installation Guidelines Page 71 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
within the backfill zone of the manhole must meet or exceed both the minimum requirements for the
manhole, as well as, the minimum requirements for the pipe.
Chapter 8 Manhole Installation Guidelines Page 72 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
Flowable Fills
When placed correctly, flowable backfill material, including materials such as concrete,
cementatious grout or controlled density fill (CDF), can provide reliable manhole support.
Precautions must be taken to avoid buckling and/or floating the manhole during placement of
flowable fill. These precautions may include filling the manhole with water, placing flowable fill in
lifts, and strutting the inside of the manhole. The Owner or Owner’s Engineer should review and
approve the installation procedure for each flowable backfill application. PERFORMANCE
PIPE disclaims any and all liability for manholes that are damaged during the placement of
flowable backfill.
Manholes with flat tops are manufactured to the appropriate height specified by the Owner or
Owner’s Engineer to accommodate the final field grade required. The height of such
manholes can not be easily field adjusted. Before ordering the manhole, the Owner should
verify the correct height.
! WARNING !
®
When SPIROLITE manholes are installed in streets, under pavement, or where there is
vehicular traffic, a concrete cap must be placed over the manhole to provide independent
support for the vehicular load. Failure to do so may result in property damage, injury or
death.
HDPE manholes will normally not be adequate to resist vehicular loads without use of a rigid cap or
slab. The cap or slab is typically made from reinforced concrete and transmits the majority of the
vehicular load into the soil instead of the manhole riser. Ultimately the responsibility for the design
of the rigid cap rests with the Owner’s Engineer. For convenience, typical concrete cap designs are
shown in Figures 8-8, 8-9, and 8-10 for manholes with cone tops and for flat top manholes. If the
Owner’s Engineer chooses to incorporate these details into contract specifications, he/she must
review and approve them for structural competence.
Chapter 8 Manhole Installation Guidelines Page 73 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
The concrete used to form caps typically has a minimum of 3000 psi compressive stress and may be
pre-cast or poured-in-place. When pouring caps in place over a flat manhole top, the Engineer
should determine, based on the stiffness of the top, whether or not a form is required to carry the
static head of the wet concrete to prevent excessive top deflection of the manhole. Figure 8-8 shows
a typical concrete cap for a manhole with a cone top.
Fig. 8-8. Poured in Place Concrete Caps for 48" and 60" PE Cone Tops
Figure 8-9 shows concentric and eccentric manhole caps for 48”, 60” and 72” diameter manholes. A
side view of this cap along with installation details is shown in Figure 8-10
Fig. 8-9. Concentric and Eccentric Manhole Caps for HDPE Flat Top Riser (Plan View)
Chapter 8 Manhole Installation Guidelines Page 74 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
Fig. 8-10 Typical Installation Detail of a Concrete Cap for 48", 60" or 72" Flat Top Riser
This chapter is intended for use as a guide to support the Owner and Owner’s Engineer in the
preparation of project specific installation specifications. It is not intended for use as
installation instructions, and should not be used in place of a professional design engineer. In
preparing installation specifications, the Engineer must evaluate each site’s unique soil and
groundwater conditions, the intended manhole function and the expected quality of
construction and inspection. All of the considerations are beyond the scope of these guidelines.
Chapter 8 Manhole Installation Guidelines Page 75 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
NOTES:
Chapter 8 Manhole Installation Guidelines Page 76 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
9. Dual Containment Manholes
Where leakage poses a risk of environmental concern or manhole contents need
protection against inflow from a contaminated site, DriscoPlex™ 2400 DCS dual-
containment manholes can provide an extra level of protection. A dual-containment
manhole consists of inner and outer vessels separated by an annular space that provides
for leak detection systems and monitoring. DriscoPlex™ 2400 DCS Dual-containment
manholes can be constructed with dual-contained inlet and outlet pipes that may be fused
to DriscoPlex™ 2400 DCS dual-containment system piping .
DriscoPlex™ 2400 DCS Manholes come in two styles, “DCS-DW” and “DCS-GW”.
Both offer vessel within a vessel protection. If the manhole wall is damaged, both
provide a reservoir in the base to contain fluid until it can be pumped out. The capacity
of the lower base reservoir depends on the size and style of the DCS manhole.
Chapter 9 Dual Containment Manholes Page 77 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
Chapter 9 Dual Containment Manholes Page 78 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
Accessories
Fabrication can include leak detection and/or reservoir evacuation piping. Leak detection
wiring (by others) can be installed through the leak detection-monitoring pipe.
Most accessories and appurtenances, such as ladders and anchor connection rings, that
are available on standard manholes are available for DriscoPlex™ 2400 DCS manholes.
Although the outer vessel is supported by the embedment soil, the inner vessel may or
may not be supported. The inner vessel derives its support from contact with the outer
vessel either directly or through gussets in the annular space.
Resistance to internal and external pressure is affected by elevated temperature and the
expected duration of internal or external pressure. Design specifications for maximum
fluid temperature, internal head-pressure, and duration and annular space head pressure
are required when ordering a DriscoPlex™ 2400 DCS manhole.
Testing
All DriscoPlex™ 2400 DCS manholes are tested for leakage into the annular space
before shipment. Testing may be by low pressure air or vacuum.
Chapter 9 Dual Containment Manholes Page 80 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
NOTES:
Chapter 9 Dual Containment Manholes Page 81 Performance Pipe Manhole Reference Guide
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
APPENDIX A: Guide Specification for HDPE Manholes
SECTION 1 - GENERAL
SECTION 1.2 DEFINITIONS: 2.1.5 Lubricant: The lubricant used for assembly of gasket joints
shall have no detrimental effect on the gasket or on the pipe.
Under this standard, the following definitions apply:
SECTION 2.2 MANUFACTURER'S QUALITY CONTROL
1.2.1 Purchaser: The person, firm, corporation or government
agency engaging in a contract or agreement to purchase pipe 2.2.1 The pipe and fitting manufacturer shall have an established
according to this standard. quality control program responsible for inspecting incoming and
outgoing materials. At a minimum, incoming polyethylene
1.2.2 Inspector: The authorized representative of the purchaser materials shall be inspected for density per ASTM D-1505, melt
entrusted with the duty of inspecting pipe produced and witnessing flow rate per ASTM D-1238, and contamination. The resin supplier
tests performed under these standards. shall certify all incoming polyethylene materials. The Manufacturer
shall verify certification and approve incoming materials before
1.2.3 Inspection: Inspection of the pipe and the tests by the processing into finished goods.
inspector.
SECTION 3 - REQUIREMENTS
SECTION 2 - MATERIALS
SECTION 3.1 MANHOLE FABRICATION
SECTION 2.1 BASIC MATERIALS
3.1.1 The manhole shall be fabricated to meet the design
requirements of ASTM F-1759, “Standard Practice for Design of
2.1.1 Base Materials: The riser shaft, top, base and stubout pipes
High-Density Polyethylene (HDPE) Manholes for Subsurface
shall be made of PE plastic compound meeting the requirements of
Applications” based on soil and installation information supplied by
cell classification 335444C or higher as defined in ASTM D-3350
the Purchaser or the Engineer.
Standard Specification for Polyethylene Plastics Pipe and Fittings
Materials. The Manufacturer shall certify that the materials used to
3.1.2 Riser Shaft: The riser shaft shall be manufactured in
manufacture manholes meet these requirements. White or other
accordance with ASTM F-894, shall be of solid wall construction
colored pigments may be added to the base resin provided such
only, and shall be specified by the Standard Inside-Diameter
formulations are agreed to by Purchaser and Manufacturer.
Dimension Ratio (SIDR) or the Inside-Dimension Ratio (IDR). The
riser SIDR or IDR shall be of a sufficient wall thickness that the
Exception:
manhole meets the requirements of Section 3.1.1.
1. Rotamolded cones shall be made of medium density
polyethylene.
3.1.3 Joints: Where required, the manhole riser shall be
manufactured with an integrally wound bell and spigot joint, an
2.1.2 Other Materials: Materials other than those specified under
extrusion welded joint, or a fused joint. Joining shall be
base materials may be used as part of the profile construction, for
accomplished in accordance with the manufacturer’s
example, as a core tube to support the shape of the profile during
recommendations.
processing, provided these materials are compatible with the base
PE material. Examples of suitable materials include polyethylene
SECTION 3.2 SHOP DRAWINGS
and polypropylene.
3.2.1 Upon request complete shop drawings of the manholes shall be
2.1.3 Rework materials: Clean rework material of the type
submitted to the Engineer for approval.
described in Section 2.1.1 or Section 2.1.2 and generated from the
manufacturer's own production, may be used provided the material
SECTION 3.3 WORKMANSHIP
is of the same cell classification as the base PE material and allows
the manufacturing of manhole risers that meets all the requirements
3.3.1 The riser and stubout pipes shall be homogeneous throughout
of this specification.
and free from visible cracks, holes, foreign inclusions or other
Performance Pipe Manhole Reference Guide Page 1 Appendix A: Guide Specifications for HDPE Manhole
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
injurious defects.
SECTION 3.4 PIPE MANUFACTURER 5.1.2 Installation: Achieve stable and permanent support under and
around the manhole. Install the manhole in a dry trench. Place
3.4.1 PE Pipe and manholes shall be produced by the same sufficient crushed stone or other Class I material to provide a stable
manufacturer. foundation. The thickness of the foundation layer shall be a
minimum of 8 inches. Compact the foundation material to 95%
3.4.2 Acceptable manhole manufacturers are: Standard Proctor density. Alternatively, the manhole can be set on a
a. Performance Pipe properly designed reinforced concrete slab on a stable foundation.
b. Engineered approved equal.
5.1.2.1 Backfilling: The embedment surrounding the manhole shall
SECTION 4 - INSPECTION AND TESTING extend to at least 3.5 feet or to the trench wall, whichever is the
greater distance, for manholes placed in stable insitu soils. In
SECTION 4.1 INSPECTION REQUIREMENTS: unstable soil, the embedment shall extend to a distance equal to at
least one manhole diameter (but not less than 3.5 feet) or to the
4.1.1 Access: The inspector shall have free access to the inspection trench wall, whichever is the greater distance. Embedment shall be
area of the manufacturer's plant. placed from the invert to the top of the manhole. The embedment
shall consist of Class I or II material compacted to at least 90%
4.1.2 Testing: All manholes shall be hydrostatically tested unless Standard Proctor density in 12" lifts. Place backfill evenly around
otherwise agreed to by the Manufacturer and Purchaser. the manhole to prevent moving the manhole out of alignment.
4.1.3 Certification: As the basis of the acceptance of the material, 5.1.3 Concrete Anchors: Where required to prevent flotation,
the manufacturer will furnish a certificate of conformance to these concrete anchors shall be constructed as shown in the Engineer's
specifications upon request. When prior agreement is being made in design drawings.
writing between the purchaser and the manufacturer, the
manufacturer will furnish other conformance certification in the 5.1.4 Concrete Tops: When vehicular loads are present, a concrete
form of affidavit of conformances, test results or copies of test top shall be constructed as shown in the Engineer's design drawings.
reports.
5.1.5 Manhole Entry: Manholes present confined space and fall
hazards. All entrants shall follow applicable OSHA confined space
SECTION 5 - INSTALLATION entry procedures and use a fall protection device for all entries.
5.1.1 Unloading: Manholes can be unloaded from the truck by 6.1.1. Manholes and fittings shall, unless otherwise specified, be
using a boom and sling arrangement. Manholes shall be handled per prepared for standard commercial shipment.
the Manufacturer's written recommendations. The Manufacturer
will provide lifting lugs to assist with handling unless otherwise
agreed to by the Manufacturer and Purchaser.
Performance Pipe Manhole Reference Guide Page 2 Appendix A: Guide Specifications for HDPE Manhole
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
APPENDIX B. F 1759 Calculation Input
Customer Name _____________________________________________
1. Manhole Application: (Give brief description)
______________________________________________________________________________________________________
____________________________________________________________________________________________________________
Is Manhole located in a landfill cell or in wastefill material? Yes No Is Manhole located in a pond or body of water? Yes No
2. Manhole Dimensions:
Height, H = _________ ft
Inside Diameter, I.D. = __________ in Or Outside Diameter, O.D. = __________in
Dual Containment Manhole Only:
Dual containment: Inner Vessel I.D. = _______ in Outer Vessel I.D. = _______ in
Maximum Fluid Height in Inner Vessel, Hdc =____ ft (Worse case, assume damage to manhole.)
3. Buried Applications:
Maximum height of fill above manhole base, Hf = __________ ft
Maximum height of groundwater above manhole base, Hw = ___________ ft
Saturated soil unit weight, γs = _________ pcf
Dry soil unit weight, γd = _________ pcf
Embedment Material: (Extends a minimum of 3.5 ft from wall of riser to undisturbed trench wall.)
Crushed rock or Class I per ASTM D-2321 Other____________________________
Coarse grain soils with little or no fines, GW, GP, SW, SP
containing less than 12% fines. Class II per D-2321
Compaction level ____________% Std. Proctor
Modulus of Soil Reaction, E' = _________ psi.
4. Pond Applications:
Maximum height of water outside manhole from manhole base, Hw = _________ ft Is Manhole perforated?____________
5. List all chemicals and concentrations in fluid flow stream or otherwise in contact with manhole:
________________________________________________________________________________________________________________
_______________________________________________________________________________________________________
6. Manhole Temperature:
Normal operating temperature of fluid stream, To = _______oF
Maximum temperature of fluid stream, Tmax = ________oF
Maximum temperature of soil/fill, Te = ________oF
7. Maximum Internal Positive Pressure, P = _______ psig
8. Maximum Vacuum, ie. Negative Pressure, V = _________ psig
_________________________________________
(Customer Signature)
___________________
(Date)
Performance Pipe Manhole Reference Guide Page 1 Appendix B:F 1759 Calculation Input
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
APPENDIX C: DriscoPlex™ 2000 SPIROLITE™ Manhole Cone Installation
The DriscoPlex™ 2000 SPIROLITE® manhole is finished to grade with a cone, a ring and a
cover. See Figure E-1. The cone must be encased in reinforced concrete when there is
traffic loading.
Figure E-1. DriscoPlex™ 2000 SPIROLITE® Manhole Cone – 48” and 60”
Grade elevation adjustments are made by trimming the length of the manhole riser when
shortening is required, or by placing a course of bricks and mortar or a concrete grade ring on the
cone shoulder when lengthening is required. The manhole riser should be trimmed before
placing the manhole in the trench.
1. Before cone installation, determine the desired grade elevation for the cone shoulder,
including allowance for the height of the manhole ring and the cover that are placed on
the shoulder of the manhole cone.
2. Determine the required riser length by subtracting the manhole invert elevation from the
cone shoulder grade elevation and deducting the height of the cone . Cone heights are 23
in. for a 48 in. manhole cone and 18 in. for a 60 in. manhole cone as measured from the
cone shoulder to the top of the manhole riser . See Figure E-1.
4. If the manhole was purchased with a built-in ladder, contact Performance Pipe before
cutting the ladder or its mounting brackets.
5. Double-check all measurements and dimensions before cutting the manhole riser.
“Measure twice; cut once”. Mark a cut line around the top of the manhole riser using a
"wrap-around" tape. Cut the top edge of the manhole riser squarely.
1. Clean the top edge of the manhole riser before installing the shoulder gasket. Remove
any shavings and wipe with a clean cloth.
2. Fit the shoulder gasket over the end of the manhole riser. The gasket must be square to
the manhole wall and the fins point downward as illustrated in Figure E-3.
3. Clean the inside surface of the cone bell. Apply lubricant to the entire interior surface of
the cone bell, to the gasket "fins", and to the leading edge of the gasket. Do not apply
lubricant to the underside of the gasket or to the manhole riser.
4. Place the cone over the manhole riser so that it is centered and rests uniformly on the
shoulder gasket.
Performance Pipe Manhole Reference Guide Page 4 Appendix C: Cone Installation
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
5. Push the cone down onto the manhole riser by applying steady force with a backhoe
bucket. Place one 4x4 or two 2x8 pieces of lumber that have been nailed together across
the manway opening of the cone. Apply a steady downward force using the backhoe
bucket. Push steadily until the cone slides over the gasket and bottoms out against the
end of the cone bell. See Figure E-4.
Figure E-4. Installing the Cone with a Backhoe Bucket
6. Inspect the joint from the inside. The edge of the gasket must be visible completely all
around the inside top edge of the manhole riser. If not, the gasket may have rolled down
and the cone must be removed, the riser, gasket and cone bell cleaned, and reassembled.
See Figure E-5.
Figure 1 shows a manhole located in a pipeline at a distance that is less than a full pipe length (13 ft or
20 ft) from the last installed piece of profile wall SPIROLITE pipe. Closure pipe, which can be field
cut to any length, will be used to accommodate this gap. The closure pipe will be cut to a length that
equals the distance between the inside end of the bell of the profile wall pipe and the inside end of the
closure bell of the manhole (Fig. D-1). Because the closure pipe has a standard SPIROLITE bell at
one end and a standard SPIROLITE spigot at the other end, when it is cut the spigot end can be used to
join to the bell of the installed profile pipe (Fig. D-2). A shoulder gasket (also called a closure gasket)) is
placed on the other end and inserted into the closure bell of the manhole (Fig. D-3).
Fig. D-2. Spigot end of Cut Closure Pipe Joined to Profile Pipe Bell
Fig. D-3. Plain End of Cut Closure Pipe Joined to Closure Bell on Manhole
Performance Pipe Manhole Reference Guide Page 2 Appendix D: Spirolite® Closure Joints
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
The other half of the closure pipe containing the bell is fitted with another shoulder gasket in a similar
manner as before and installed into the other closure bell of the manhole (Fig. D-4). The bell end of the
closure pipe then receives the spigot end of the next length of profile wall SPIROLITE pipe and pipe
laying continues as before.
Fig. D-4. Join Plain End of Cut Closure Pipe to Other Closure Bell on Manhole
Performance Pipe Manhole Reference Guide Page 3 Appendix D: Spirolite® Closure Joints
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
NOTES:
Performance Pipe Manhole Reference Guide Page 4 Appendix D: Spirolite® Closure Joints
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
APPENDIX E. Anti-Flotation Example Calculations
The information in this Appendix is offered only as a guide. If flotation conditions could exist,
measures to counteract flotation such as concrete anchor collars or slabs are recommended.
Because each installation is site specific and construction dependent, the Owner or Engineer
must determine if concrete anchors are required to prevent flotation, evaluate flotation
resistance and establish appropriate safety factors.
Flotation Equation
Flotation is prevented when the downward forces, FDOWN, acting on the manhole exceeds the
upward thrust due to buoyant forces, FUP. A safety factor, SF, is usually applied as shown in
Equation E-1.
FDOWN
≥FUP (E - 1)
SF
When Equation E-1 is not satisfied, flotation prevention such as concrete anchor collars or slabs
is required.
Downward Forces
The downward forces resisting flotation in Equation E-2 include the weight of the manhole and
its contents, WMH, the weight of concrete caps or other equipment on top of the manhole, WCC,
the weight of soil above the manhole stubouts, WSO, and frictional resistance force between the
soil and manhole, FR. See Figure E-1. These forces may be referred to as hold down forces.
WCC Groundwater
FR
HC
HWS
HMH WSO WSO
HW
WMH
FUP FUP
FUP
Performance Pipe Manhole Reference Guide Page 1 Appendix E: Anti-Flotation Example Calculations
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
In addition to the weight of the manhole, the weight of internal concrete pads for mounting
pumps and other heavy equipment permanently in the manhole are considered part of WMH.
When calculating the acting soil weight above the stubout, arching is usually ignored and only
the weight of the column of soil directly above the stubout is considered. The column of soil
above the stubout is assumed to extend laterally for a length of one stubout pipe diameter. Thus
for a 24” diameter stubout having 10 ft of cover, the soil column would be 2 ft wide by 2 ft long
by 10 ft high. See Equation E-3. When below groundwater level, soil weight is lessened due to
buoyancy.
DS2
WSO = ( γ B H WS + γ (H C − H WS )) (E − 3)
144
Where:
DS = Stubout Diameter (in)
γ = Unit weight of Soil (pcf)
γB = Buoyant unit weight of Soil (pcf)
HWS = Height of groundwater above stubout (ft)
HC = Height of cover above stubout (ft)
There are slight inaccuracies in Equations E-3, E-7, E-10a, and E-11, because the projection of
the stubout is curved where the stubout joins the manhole, but these calculations treat the
projection as a rectangle. This creates a slight discrepancy between calculated and actual
projected area (or volume). If in doubt, the Engineer can perform a more detailed calculation.
Performance Pipe Manhole Reference Guide Page 2 Appendix E: Anti-Flotation Example Calculations
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
FU1
τ= (E - 4)
πD M t
Downdrag and uplift resistance forces are determined in the same manner, but are calculated
using different values for the coefficient of friction, µ. The design worst case for downdrag
occurs when the coefficient of friction is high, which causes high compressive load in the
manhole riser, but the design worst case for uplift resistance occurs when the coefficient of
friction is low and where there is less soil contact against the manhole. For riser design, typical
coefficient of friction values are between 0.4 and 0.5, but for flotation resistance, typical values
are 0.1 to 0.2. The frictional force that resists flotation is a minimum frictional resistance force.
Friction between the manhole and the soil is usually reduced when the soil is saturated or is
below the groundwater level. For a partially submerged manhole, as illustrated in Figure E-2,
the soil friction angle and coefficient of friction used for the portion of the manhole above the
groundwater level will be different from the values used for the portion below the groundwater
level. Therefore the portions above and below the groundwater level are calculated separately .
The resulting values are summed to determine total frictional resistance to flotation.
Performance Pipe Manhole Reference Guide Page 3 Appendix E: Anti-Flotation Example Calculations
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
The following equations are for general information and are based on assumptions that may or
may not be applicable for any specific project. Capillary action may extend saturated soil above
the groundwater level. The Engineer must determine applicability for a specific project or
installation.
The first significant assumption is that the radial earth pressure acting on the sides of the
manhole equals the active earth pressure, and can be determined using Equations E-5a and E-5b.
Equation E-5a applies to that part of the manhole that is above the groundwater level and E-5b
applies to that part below the groundwater. See Figure E-2.
Groundwater
PR
P'R
Figure E-2. Assumed Pressure Distribution for Manhole Partially Below Groundwater
The second significant assumption is that the coefficient of friction, µ, between soil and HDPE is
0.2 for dry soil and 0.1 for wet (including saturated) soil.
PR = K A ( γ (H MH − H W )) (E − 5a )
Where:
PR = Radial earth pressure above groundwater level (psf)
KA = Active earth pressure coefficient for soil above groundwater (See Equation 2-2)
φ
K A = tan 2 (45 − ) (2 − 2)
2
Performance Pipe Manhole Reference Guide Page 4 Appendix E: Anti-Flotation Example Calculations
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
HW = Height of groundwater above manhole base (ft)
The average frictional resistance (shear) stress, TA, in psf along the manhole riser wall can be
determined by multiplying the average radial earth pressure by the friction coefficient. See
Equation 2-3. Since there are two pressure distributions being considered, one above the
groundwater level and the other below, each distribution must be calculated separately.
PR1 + PR 2
TA = µ( ) (2 − 3)
2
Where:
PR1 = Radial pressure at top of pressure distribution, psf
PR2 = Radial pressure at bottom of pressure distribution, psf
The pressure distribution is triangular for that portion of the manhole above the water level and
thus PR1 (the pressure at the top of the manhole) equals zero and PR2 equals the pressure at the
top of the groundwater level from Equation E-5a. For the portion of the manhole below the
water level, PR1 equals the pressure at the top of the groundwater level from Equation B-5a and
PR2 equals the pressure at the bottom of the manhole or at the top of the stubouts from Equation
E-5b.
The minimum frictional resistance force, FR, for the above and below groundwater portions can
be determined using a form of Equation 2-4 (downdrag load), where DO is the outside diameter
of the manhole.
DO
FR = T Aπ (
) H MH ( 2 − 4)
12
The above and below groundwater frictional resistance forces are summed to obtain the total
minimum frictional resistance force. When solving Equation 2-4, the full outside diameter of the
manhole cannot be used if stubouts and the weight of the soil above the stubouts are added into
πD O − D S1 − DS2
FR = TA ( )H MH ( E − 6)
12
Equation E-2. Equation 2-4 must be modified as shown in Equation E-6 to remove stubout
diameters otherwise the soil weight above the stubouts would be counted for resistance twice.
DS1 and DS2 are the outside diameters of the stubouts.
For smaller diameter stubouts where the soil weight above the stubout is not used, frictional
resistance is determined using the entire surface of the riser wall from the level of the stubouts to
the ground surface. When stubouts are present, a decision whether to include the frictional
resistance of the portion of the riser below the top of the stubouts (stubout crown) must be made.
Flotation resistance for manhole tees is normally determined using only the weight of soil above
the through pipe. Therefore, the minimum frictional resistance term in Equation E-2 is zero for
manhole tees.
Performance Pipe Manhole Reference Guide Page 5 Appendix E: Anti-Flotation Example Calculations
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
In some cases where manholes are submerged, a slight upward movement that mobilizes passive
soil resistance may occur. For correctly designed manholes this movement does not usually
cause hydraulic problems.
Upward Forces
Upward forces that try to lift the manhole off-grade include the buoyant force acting on the
manhole and buoyant forces acting on the lengths of stubout pipes that contribute to uplift
resistance. The upward force equals the displaced volume of groundwater and is equivalent to
the submerged volume of the manhole and the stubouts. Where the weight of the manhole and
stubouts are ignored in the downward force equation, E-2, the outer diameter of the manhole
may be used for DO in Equation E-7.
DO 2 DS31 DS3 2
FU = π γ W H W + πγ W + πγ W + ......... ( E − 7)
576 6912 6912
Where γW is the unit weight of water (pcf) and other terms are as previously defined. DO is the
manhole diameter, DS1 is the diameter of the first stubout, DS2 is the diameter of the second, etc.
(See the discussion “Upward Force with Concrete Collar” below.)
Safety Factor
The Engineer is responsible for determining an appropriate safety factor against flotation based
on site-specific conditions and the nature of the application. Performance Pipe recommends
safety factor of at least two for frictional resistance calculations. For dead load weight
calculations such as the weight of soil above the stubouts, a lower safety factor may be
acceptable. Different safety factors should be applied individually in Equation E-2 rather than
to their sum as shown in Equation E-1.
When the safety factor against flotation is not sufficient, an anchor collar, anti-flotation slabs or
other hold down methods are required.
The equations below are for circular collars. The equations may be modified for
rectangular collars.
Performance Pipe Manhole Reference Guide Page 6 Appendix E: Anti-Flotation Example Calculations
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
Where:
WCL = weight of concrete collar (lbs)
WSCL =weight of soil above the concrete collar (lbs)
WCC = weight of concrete cap (lbs)
WMH = weight of manhole (lbs)
Whether placed above or below the stubouts, when a concrete collar is used to prevent flotation,
the weight of the soil above stubouts, WSO, and the frictional resistance between the soil and the
manhole riser, FR, are not included in the calculation (Equation E-8). These effects are within the
vertical projection of the concrete collar, and if included in the downward force calculation, the
effects would be counted twice.
W CL =
π
6912
[ ]
(D O + 2w CL ) 2 − D O 2 ( t CL) ( γC - γ W ) (E − 9)
Where:
WCL = weight of concrete collar (lbs)
wCL = width of concrete collar (in) (See Fig. 7-1, 7-2, or 7-3.)
tCL = thickness of concrete collar (in) (See Fig. 7-1, 7-2, or 7-3.)
γC = unit weight of concrete (pcf)
γW = unit weight of water (pcf)
Buoyancy reduces the unit weight of soil when the soil is below the groundwater level .
Therefore, the weight of soil above the collar, WSCL, is divided into the weight above
groundwater level and the weight below and the resulting weights are added together.
Performance Pipe Manhole Reference Guide Page 7 Appendix E: Anti-Flotation Example Calculations
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
For the portion of the soil below the groundwater level, Equation E-10a may be used to
determine soil weight, WSCLGW, above the collar. HWCL is the water height above the top of the
collar and all other terms are as previously defined. When the collar is below the stubouts, the
weight of the soil displaced by the stubout is removed from WSCLGW by the subtraction terms in
Equation E-10a. If the collar is located above the stubouts, the subtraction terms may be
omitted.
WSCLGW =
π
576
( D[O + 2 w CL ) 2
− D O
2
H γ
WCL B ]
−
πw CL D S21
6912
γ B −
πw CL D S22
6912
γ B −⋅ ⋅ ⋅ ⋅ ⋅ (E − 10a )
Equation E-10b may be used to determine the soil weight on the collar from soil located above
the groundwater table HCL is the height of soil above the concrete collar, and other terms are as
previously defined. If the collar is located below the stubouts, the weight of soil displaced by the
stubouts must not be included in the calculation. The weight of soil displaced by the stubouts is
included in Equation E-10a or in Equation E-10b depending on whether the stubouts are above
or below the groundwater level. Equation E-10a is shown with the subtraction terms included.
Equation E-10b is shown without them.
WSCLB =
π
576
[ ]
(D O + 2w CL ) 2 − D O 2 (H CL − H WCL ) γ D (E − 10b)
The total weight acting downward on the concrete collar, WSCL, is the sum of WSCLGW and
WSCLB. When concrete collars are placed on anchor connection rings, the subtraction terms for
the stubouts in Equation E-10a are zero.
DO 2 D S21 D S22
FU = π γ W H W + πγ W w CL + πγ W w CL + ......... (E − 11)
576 6912 6912
NOTE – There are slight inaccuracies in Equations E-7, E-10a, E-11 and E-15, because the
projection of the stubout is actually curved where it joins the manhole, and this will cause a
slight discrepancy between calculated and actual volume. If in doubt, the Engineer can perform
a more detailed calculation.
The Engineer may choose other methods to calculate the hold down resistance of concrete
collars, such as traditional anchor pullout calculations. Other calculation methods are beyond
the scope of this manual.
Performance Pipe Manhole Reference Guide Page 8 Appendix E: Anti-Flotation Example Calculations
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
In cases where manholes are submerged, some slight upward movement may occur as soil
resistance mobilizes above the concrete anchor collars. For properly designed manholes this
slight movement is usually not sufficient to cause hydraulic problems.
When anti-flotation slabs are used, manhole flotation is restrained by the stubouts. That is,
flotation force is transmitted to the anti-flotation slabs through shear across the stubouts.
Therefore, stubout shear stress should be calculated.
Anti-flotation slabs are most effective when they are symmetrically placed on opposite sides of
the manhole. They may be applied to slight bends, but large angle bends typically require further
analysis that is beyond the scope of this manual. For stubout pipes less than 18” in diameter or
less than 25% of the manhole diameter, anti-flotation slabs are not recommended.
Calculations for the anti-flotation slabs are similar to calculations for concrete anchor collars.
Downward forces including the buoyant weight of the slabs and the soil above the slab are
calculated and a safety factor is applied. This value must exceed the upward force that includes
the buoyant force on the manhole and on the portion of the stubout located below the slab. As
with the concrete collars, the downward force from Equation E-2 and the upward force from
Equation E-7 must be modified.
Performance Pipe Manhole Reference Guide Page 9 Appendix E: Anti-Flotation Example Calculations
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
Where:
WAF = (buoyant) weight of concrete anti-flotation slab (lbs)
WAFS =weight of soil above the anti-flotation slab (lbs)
Soil friction resistance force acting on the manhole, including the portion of the manhole below
the anti-flotation slabs and acting on the pipe, is usually not considered.
t AF
W AF = LW (γ - γ ) (E − 13)
12 C W
Where:
L = length of anti-flotation slab (ft) See Fig. E-3 for dimensions.
W = width of anti-flotation slab (ft)
tAF = thickness of anti-flotation slab (in)
γC = unit weight of concrete (pcf)
γW = unit weight of water (pcf)
Because anti-flotation slabs are located above the stubouts, the contributions of soil weights
above and below groundwater level can be combined in the same equation without becoming too
complicated. Equation E-14 gives the soil weight, WAFS.
Where:
HAF = Height of soil above the anti-flotation slab (ft)
HWAF =Height of groundwater level above the anti-flotation slab (ft)
Performance Pipe Manhole Reference Guide Page 10 Appendix E: Anti-Flotation Example Calculations
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
The soil unit weight , γ, in Equation E-14 is typically the dry soil unit weight , and the buoyant
weight, γB, is the saturated soil unit weight less the unit weight of water. For a conservative
result, , the dry unit weight can be used in the buoyant weight calculation .
When anti-flotation slabs are placed over stubouts on opposite sides of the manhole, the total
downward weight from both slabs is determined by doubling the Equation E-14 value.
DO 2 D2 D2
FU = π γ W H W + πγ W W S1 + πγ W W S2 (E − 15)
576 576 576
Given: A 72" diameter manhole buried 10 feet deep with 7.5 feet of groundwater above the
base. The manhole has two 30” diameter stubouts. An Engineer determined that the friction
values given below will develop and that the other soil properties are as defined:
Dimensional Parameters:
Manhole riser approximate inside diameter ID = 72 in
Manhole riser approximate outside diameter OD = 75.7 in
Performance Pipe Manhole Reference Guide Page 11 Appendix E: Anti-Flotation Example Calculations
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
Stubout outside diameter DSO = 32.8 in
Height of riser H = 10 ft
Depth of groundwater above manhole base Hw = 7.5 ft
Depth of groundwater above stubouts HSO = 4.5 ft
Weight of polyethylene manhole is neglected
Find: (1) Is a concrete anchor collar required? (2) If so, find diameter of concrete collar.
This example is provided as an illustration only. The results obtained and the formulas
used should not be applied to specific applications without the judgment and approval of
the Engineer.
32.8 2
WSO = (47.6 pcf (4.5 ft ) + 110 pcf (7 ft − 4.5 ft )) = 3655 lbs
144
The frictional resistance stress, TA, from the manhole top to the groundwater level is :
0 + 92 psf
TA = 0.2( ) = 9.2 psf
2
92 psf + 211 psf
TA' = 0.1( ) = 15.2 psf
2
TA from the top of the groundwater level to the base of the manhole is :
The frictional resistance force, fR, for the above groundwater portion of the manhole can be
determined using Equation E-6.
Performance Pipe Manhole Reference Guide Page 12 Appendix E: Anti-Flotation Example Calculations
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
π75.5 in − 2(32.8 in )
f R = 9.2 psf ( )(10 ft − 7.5 ft ) = 328 lbs
12
The frictional resistance force, fR’, for the below groundwater portion of the manhole is:
π75.5 in − 2(32.8 in )
f R' = 15.2 psf ( )7.5 ft = 1629 lbs
12
Upward Forces
Upward forces include the buoyancy force on the manhole and on one-diameter stubout lengths .
3
(72 in ) 2 (30 in )
FU = π 62.4 pcf (7.5 ft ) + (2)π(62.4 pcf ) = 14,756 lbs
576 6912
The unit weight of water is γW (pcf).. DS1 is the diameter of the first stubout; DS2 is the diameter
of the second and etc. . (See note after Equation E-11.)
14 ,756 lbs
τ= = 53.5 psi < 400 psi
2π ( 31.4 in ) 1.4 in
Performance Pipe Manhole Reference Guide Page 13 Appendix E: Anti-Flotation Example Calculations
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
Step (2) Determine Width of Concrete Anchor Collar (assume thickness is 8”)
Figure E-4 illustrates a concrete anchor collar placed on an anchor connection ring placed 36”
above the manhole invert and above the 30” stubout pipes.
The width of the concrete collar is determined by assuming a trial width. The downward and
upward forces are calculated for the trial width and compared to determine if the safety factor is
adequate. If not, another trial width is selected. This process continues until a width that
produces an adequate safety factor is determined.
(Generally, the soil located above the collar, not the weight of the collar, provides the primary
restraint. Therefore, it is usually more efficient to increase collar width than thickness.)
Assume a trial width of 18”. The maximum collar ID is the manhole OD (assume 76”) plus 2”
or 78”. The collar OD is 114”. For simplicity, assume the top of the anchor ring is 3-1/2 ft
above the manhole base.
The next step is to find the downward forces acting on the collar.
W CL =
π
6912
[ ]
((78 in + 2(18 in )) 2 − (78 in ) 2 (8 in ) (150 pcf - 62.4 pcf) = 2200 lbs
Performance Pipe Manhole Reference Guide Page 14 Appendix E: Anti-Flotation Example Calculations
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
π
W SCLGW =
576
[(114 in) 2
]
− (78 in) 2 4 ft (47.6 pcf ) = 7174 lbs
Although the stubout terms are included in Equation E-10a, they are not included in this example
because the anchor connection ring and the concrete collar are located above the stubouts. The
stubout terms are included when the concrete collar is placed at the base of the manhole below
the stubouts
The soil weight acting down on the collar from soil located above the groundwater table is:
W SCLB =
π
576
[ ]
(114 in ) 2 − (78 in ) 2 (10 ft − 7.5 ft )110 pcf = 10,362 lbs
The total soil weight acting downward on the concrete collar, WSCL, is the sum of WSCLGW and
WSCLB or 17,536 lbs. With safety factors applied, the downward force is:
With the desired safety factor, the 18” wide collar satisfies Equation E-1 :
Given: Determine the size for a set of concrete anti-flotation slabs that are placed over the 30”
diameter 1.42” thick (DRISCOPLEXTM 2000 SPIROLITE RSC 160) stubouts for the 72"
diameter manhole given in Example 1.
Performance Pipe Manhole Reference Guide Page 15 Appendix E: Anti-Flotation Example Calculations
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
The same trial-and-error method used for Example 1 is used for the anti-flotation slabs. Assume
the following trial dimensions:
tAF = 12 in
W = 4 ft
L = 6 ft
12 in
W AF = 2 ⋅ (6 ft ) (4 ft ) ( 150 pcf − 62.4 pcf ) = 4204 lbs
12
W AFS = 2 ⋅ (6 ft )(4 ft )(110 pcf (10 ft − 7.5 ft ) + (110 pcf − 62.4 pcf )(7.5 ft − 4.0 ft )= 21,197 lbs
The downward force exceeds the upward force in proportion to the applied safety factor.
Performance Pipe Manhole Reference Guide Page 16 Appendix E: Anti-Flotation Example Calculations
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP
www.performancepipe.com
15,675 lbs
τ= = 57 psi < 400 psi
( 2) π (314
. in)14
. in
Performance Pipe Manhole Reference Guide Page 17 Appendix E: Anti-Flotation Example Calculations
January 2004 Supercedes all previous publications © 2004 Chevron Phillips Chemical Company LP