CV - Mudasir Ali PDF
CV - Mudasir Ali PDF
CV - Mudasir Ali PDF
Email: [email protected]
Objective
As an ambitious young person, I want to serve and grow in a professional organization. Work in a
competitive environment and excel in every sphere of life. Apply the power of knowledge and work in the
Work Experience
2. Ericsson India (P) Ltd. (Off Rolls) (17 NOV 2011 – 10th
sept 2015)
(AS TECHNICIAN)
● Airtel
● Aircel
● Idea
● Rcom
3. vodafone Pvt. Ltd. (Off Rolls) (10th sept 2015 Till date)
(TECHNICIAN)
Responsibilities: -
● Complete Installation, Integration, Commissioning, Maintenance and Fault Rectification
Of 2G & 3G Ericsson BTS (2202, 2206, 2204, 2204V2, 2964, 2954, 6602 2954V2 &
2964V2 Micro BTS 2111, 6101, 6201).
● Installation maintenance of Traffic nodes(2p,6p, 20P
● NEC PASOLINK-SDH/PDH commissioning/installation
● Configuration and commissioning of Ceragon Transmission using IDU-R1 & R2.,FIU
0F NOKIA SEMEMS
● configuration and commissioning of NOKIA BTS OF FLEXI ,ULTRA & MR
● UP gradation of BTS sites for better network performance.
● Quality audit of sites, looking after all the RSI faults and TRX fault of all sites.
● Dropping E1’s at various sites.
● Communication of faults and a solution to the customer.
● HOP Up gradation from 1+0 to 1+1 in live sites.
● Recommend timely actions and solutions to customer service requests.
● Maintenance and repair of BTS, Microwave (transmission).
● Completely responsible for Integration, Installation and Testing of BTS & Microwave
sites.
● Knowledge of using procedure of site Master like (Bird& Anritsu)
● Coordinating with the field technicians and Engineers to resolve any network
degrading faults generated at BTS sites and Installation teams.
● Coordinating with Vendors and other Operators regarding site issues.
● Alarm testing & integration.
● Supervise sites, find punch point and rectify them.
O&M Responsibilities
● Responsible more than 300 BTS sites for end to end network availability
● Attending CF alarms and DTRU blockage
● Transmission activities.
● Telecom preventive maintenance
● Network CR as per D&P requirements
● Follow up work of shelter/ac and update progress
● Supervision of ASP for telecom work in progress up to integration ready.
● Final clearance of declaring site on air
Telecom Software: -
● OMT (33_6, 34 and 37A ,45M Local)
● CERA VIEW
● CERAGON (74, 97-1,40-1, 53-1)
Qualification
Personal Details
Place: Kashmir