Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,SFirst aid kit must be present at the area and the Hse personnel is the first response in case of emergency
Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices that
need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.
File: 10.30
2 Re bar sizing ,cutting and bending Unauthorized personnel operation machinery Machinery to be operated by authorized person
hand only,
Equipment failure/Fire Daily inspection is required for all equipment. A
fire extinguisher should be on location. During
work any defects noticed on tools or equipment
should be reported to the supervisor.
Loose clothing Hi Vest should be taken off and all loose clothing
should be secured.
Installation of steel work Protruding re bar All protruding re bar should be cap with approved
re bar caps.
Scorpions the job Gloves must be worn while tying re bar. After the
wire is cut the shape point (scorpions) should be
tapped down. If worker receives cut from wires or
re bars it should be reported to the supervisor.
Awkward positions/ back injury If work is in Workers will be oriented about the proper posture
an awkward position frequent break will be and positioning during the execution of the job.
needed.
Access and access to work area Ensure work Area with excavation/holes to be barricaded
area is kept clear from binding wires and steel.
When tying steel on ground worker should not
walk on the steel directly.