Case-Aggregate Planning at Green Mills

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6
At a glance
Powered by AI
The document discusses and compares Chase plan and Level plan for production capacity planning.

The two plans discussed are Chase plan and Level plan.

For each plan, the factors considered in calculating the costs include regular time costs, overtime costs, hiring and training costs, layoff costs, holding costs and shipping costs.

CHASE P

Month Demand No. of Output per Worker Available Capacity-Demand


(In 1000 Workers per Month (In Capacity (In Gap (In 1000
Board Feet) 1000 Board Feet) 1000 Board Board Feet)
Feet)
D N O C = NxO G=C-D
Jan 1000 20 50 1000 0
Feb 1100 20 50 1000 -100
Mar 1300 20 50 1000 -300
Apr 1500 21 50 1050 -450
May 1800 25 50 1250 -550
Jun 2200 30 50 1500 -700
Jul 2500 37 50 1850 -650
Aug 2400 41 50 2050 -350
Sep 2000 41 50 2050 50
Oct 1600 40 50 2000 400
Nov 1200 32 50 1600 400
Dec 800 24 50 1200 400
19400
CHASE PLAN
Overtime Addl Overtime Regular Overtime Hiring & Layoff Holding
Permissible (In Workers Required (In Time Cost ($) Training Costs ($) Cost ($)
1000 Board Required 1000 Board Cost ($) Cost ($)
Feet) Feet)
OP = 0.25 x C AW OT RTC OTC HTC LOC HC
250 0 0 150000 0 0 0
250 0 100 150000 20000 0 0
250 1 250 157500 50000 1000 0
262.5 4 250 187500 50000 4000 0
312.5 5 250 225000 50000 5000 0
375 7 250 277500 50000 7000 0
462.5 4 250 307500 50000 4000 0
512.5 0 350 307500 70000 0 0
512.5 -1 -50 300000 0 0 500
500 -8 -400 240000 0 0 4000
400 -8 -400 180000 0 0 4000
300 -8 -400 120000 0 0 4000
Shipping TOTAL COSTS
Cost ($) ($)

SC TC
50000 200000
55000 225000
65000 273500
75000 316500
90000 370000
110000 444500
125000 486500
120000 497500
100000 400500
80000 324000
60000 244000
40000 164000
3946000
LEVEL PLAN
Month Demand No. of Output per Worker Available Capacity-Demand
(In 1000 Workers per Month (In Capacity (In Gap (In 1000
Board Feet) 1000 Board Feet) 1000 Board Board Feet)
Feet)
D N O C = NxO G=C-D
Jan 1000
Feb 1100
Mar 1300
Apr 1500
May 1800
Jun 2200
Jul 2500
Aug 2400
Sep 2000
Oct 1600
Nov 1200
Dec 800
LEVEL PLAN
Opening Closing Regular Overtime Hiring & Layoff Holding Shipping
Inventory (In Inventory (In Time Cost ($) Training Costs ($) Cost ($) Cost ($)
1000 Board 1000 Board Cost ($) Cost ($)
Feet) Feet)
OI CI RTC OTC HTC LOC HC SC
TOTAL COSTS
($)

TC