This document provides a test format for functional testing of AC distribution boards (ACDB) panels. It outlines 8 sections to test: 1) general data, 2) mechanical inspection, 3) general panel functions, 4) electrical operations, 5) interlocks, 6) DC schemes, 7) auxiliary circuits, and 8) annunciation. Each section lists specific items to check and spaces to record checkmarks and remarks. The format is intended to standardize testing according to Commissioning Standard TCS–P-105 Rev – 01.
Download as DOCX, PDF, TXT or read online on Scribd
0%(1)0% found this document useful (1 vote)
837 views
Acdb - Function Test
This document provides a test format for functional testing of AC distribution boards (ACDB) panels. It outlines 8 sections to test: 1) general data, 2) mechanical inspection, 3) general panel functions, 4) electrical operations, 5) interlocks, 6) DC schemes, 7) auxiliary circuits, and 8) annunciation. Each section lists specific items to check and spaces to record checkmarks and remarks. The format is intended to standardize testing according to Commissioning Standard TCS–P-105 Rev – 01.
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4
Commissioning Service Department
Commissioning Standard Test Formats
Description: FUNCTIONAL TEST – ACDB PANELS Record No.: Bay no.: Drawing ref.: Sheet: 1 of 4 Contractor: Contract no.: Substation No :
As per the schematic drawings the contents in this test format can be modified
1. GENERAL DATA AND INFORMATION
Panel designation Circuit ref
Serial no Type Manufacture Range Dwg & sch no Class Panel no
2. MECHANICAL CHECK AND VISUAL INSPECTION as per TCS–P-105 Rev – 01,
Item no 4.1
Item Description Checked
1 Check tightness of all connections Yes N/A 2 Inspect for physical damage / defects Yes N/A 3 Panel condition, cleanliness, organization, labeling, readiness for Yes N/A service, panel doors, handles...etc 4 Ct shorting checked Yes N/A 5 Indications checked Yes N/A 6 Contact resistance of tripping and alarm checked Yes N/A 7 Check the ferrules as per specification Yes N/A 8 Confirm that each panel has been properly secured to the floor in its Yes N/A final service location. 9 Panel earthing checked Yes N/A 10 Confirm that panels are constructed and wired as per sec relevant Yes N/A specification. 11 Check case cover and gasket for proper seal against dust. Yes N/A 12 Check all installed equipment nameplate information for compliance Yes N/A to approved drawings and equipment /material lists. 13 For all internal and external panel wiring, confirm that all screw Yes N/A terminations are tight and that crimp connectors are firmly secured to the wire and to the termination point. Ensure that no part of the wire is bent at the termination point. Check ferrules. 14 Check that panel equipment is mounted securely and protected against Yes N/A mal operation due to vibration, shock, etc 15 Use of ring type terminals for wire termination for current circuit Yes N/A wires. Tested by: ENG. Witnessed by: ENG.
Signature & Date: Signature & Date:
Commissioning Service Department Commissioning Standard Test Formats Description: FUNCTIONAL TEST – ACDB PANELS Record No.: Bay no.: Drawing ref.: Sheet: 2 of 4 Contractor: Contract no.: Substation No :
3. GENERAL PANEL FUNCTIONAL CHECKS : As Per Tcs–P-105 Rev – 01, Item no
5.1
Item Description Remarks
1 Check output of ac outlet Yes N/A 2 Check illumination lamp Yes N/A 3 Check door switch Yes N/A 4 Check heater / thermostat Yes N/A 5 Identification label for each component is fixed properly Yes N/A 6 Manual spring charging operation Yes N/A 7 Circuit breaker manual closing by push button Yes N/A 8 Circuit breaker manual opening by push button Yes N/A . 4. ELECTRICAL OPERATION TEST
Item Description Status
1 Electrical spring charging motor operation 2 Circuit breaker closing by local & remote electrical operation 3 Circuit breaker opening by local & remote electrical operation 4 Circuit breaker emergency trip checked 5 Circuit breaker close interlock verified as per drawing 6 Circuit breaker “on “ indication checked 7 Circuit breaker “off “ indication checked 8 circuit breaker “trip “ indication checked 9 Cubicle illumination lamp circuit checked 10 Cubicle heater circuit checked 11 All contactor & relay operation is checked
5. INTERLOCK TEST
Item Condition Q – Ax bus - 1 Q – Cx bus coupler Q – Bx bus - 2
1 Normal Closed Opened Closed 2 >v at bus - 1 Opened Closed Closed 3 > v at bus - 2 Closed Closed Opened 4 > v at bus -1 & bus - 2 Opened Opened Opened
Tested by: ENG. Witnessed by: ENG.
Signature & Date: Signature & Date:
Commissioning Service Department Commissioning Standard Test Formats Description: FUNCTIONAL TEST – ACDB PANELS Record No.: Bay no.: Drawing ref.: Sheet: 3 of 4 Contractor: Contract no.: Substation No :
6. DC SCHEME CHECK:
Item Description Remarks
1 Dc MCB function 2 All protection relays and auxiliary relays function checked 3 Q10x,q10y&q10z close/open function checked 4 All breaker close/open status indication checked 5 All breakers motor spring charging operations verified 6 Auxiliary supply change over checked 7 Auto/manual selector switch function checked 8 Breaker control switch function checked 9 Over current, under voltage & over voltage trip checked
7. ACDB AUXILIARY CIRCUIT CHECK
Item Circuit details Cable size Breaker size From To Remarks
circuits circuits
Tested by: ENG. Witnessed by: ENG.
Signature & Date: Signature & Date:
Commissioning Service Department Commissioning Standard Test Formats Description: FUNCTIONAL TEST – ACDB PANELS Record No.: Bay no.: Drawing ref.: Sheet: 4 of 4 Contractor: Contract no.: Substation No :
8. ANNUNCIATION:
Panel Ref: Unit name:
Alarm Time Colour of
O/p Descriptio Fmk the led Item I/P Con n Indication Audible Set Mea TB no. Red / Oper yellow 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15