CPD Assignmnet 3 (CH-16059)
CPD Assignmnet 3 (CH-16059)
Review the benzene storage system shown in figure in which benzene enters tank T-l01 through a
4-in. line L-l01 and is subsequently pumped out through pumps P-101A and B at 35 atm into a 3-
in. line L-102. By using the relevant guide words develop HAZOP study on the benzene storage
system
HAZOP FOR LINE L-101
Guide Word Property Possible Cause Possible Action Required
Consequence
LESS Temperature Low ambient Benzene can freeze 1.Heating coil
temperature installation
2.Install feedback
line
MORE Temperature 1.More Ambient Benzene can vaporize1. Install Cooling
Temperature Jacket
2.High Benzene Install feedback line
temperature
NO Flow 1.Valve malfunctioning Process will not Level alarm
2.Empty source start installation