Method Statement For MDB & MSB
Method Statement For MDB & MSB
Method Statement For MDB & MSB
CONTENTS:
1. Scope of works
2. Method Statement
3. Approved Materials
4. Project organization for Health & Safety Control
5. Health & Safety Risks and Control
6. Access / Egress
7. Lighting
8. Plant & Equipment
9. Waste Management
10. Special Control Measures
11. Appendixes
United Engineers ( Singapore ) Pte. Ltd.
257 Jalan Ahmad Ibrahim
Singapore 629147
Tel: +6562660988
Fax: +6562686993
1. Scope of Works
Scope of Activities
This scope defines the minimum standards to be adopted when installing Electrical
Distribution Boards is installed in surfaced concrete/brick wall according to
construction co-ordination drawings. A distribution board divides the electrical mains
feed into various circuits, providing a fuse or circuit breaker for each circuit. They
usually include a main switch, and often one or more Residual-current devices
(RCD) or Residual Current Breakers with over current protection (RCBO)
Site Procedure
Site mobilization shall be done with real time monitoring the conditions & progress of
builder works. Before commencement of the work, carry out examination of the
physical condition of the area. Photographs should be taken where necessary, prior
to commencement and during works.
United Engineers ( Singapore ) Pte. Ltd.
257 Jalan Ahmad Ibrahim
Singapore 629147
Tel: +6562660988
Fax: +6562686993
Method Statement
1. Installation stage
a. Site survey of the proposed conduit routing based on approved CSD by
foreman / sub-contractor together with Engineer.
b. Installation must be carried out based on approved shop drawings & samples
by foreman / sub-contractor.
c. Mark the exact position of the distribution board using respective template.
d. Drill the anchor location and install the distribution board.
e. Fix all the metering equipment in the distribution board.
f. Name or label all sub-switch boards and distribution boards.
g. After installation of distribution board, Engineer-in-charge shall check the
complete works and complete the Inspection checklist EE-INS-13 for
Electrical distribution board installation works. ( See annex. 1 )
h. Engineer-in-charge shall arrange and request for inspection with the Owner’s
representative M&E clerks of works (COW) using approved Main con
Request for Inspection (RIN) form. ( See annex.2 )
2. Preferred Materials
Main Distribution SMB, Sun light, ABB, ATCO, Terasaki, GSM, Total Automation Pte
Board Ltd.
5. Access / Egress
Proper step ladders shall be provided for access and egress into Distribution board as
applicable.
6. Lighting
Adequate temporary/task lighting shall be provided if work to be carried at night or at dark
places.
8 Level 1lot
*The above machinery & Equipment used quantity will be varied depending on site conditions
and production rate.
8. Waste management
The Rubbish which would be created from our scope of works will be disposed to the
designated dumping ground.
United Engineers ( Singapore ) Pte. Ltd.
257 Jalan Ahmad Ibrahim
Singapore 629147
Tel: +6562660988
Fax: +6562686993
ANNEX 1:
Inspection Checklist
for EE-INS-13 for
Cable Installation
United Engineers ( Singapore ) Pte. Ltd.
257 Jalan Ahmad Ibrahim
Singapore 629147
Tel: +6562660988
Fax: +6562686993
ANNEX 2 :
ANNEX 3:
Project Organisation
for Health & Safety
Control
United Engineers ( Singapore ) Pte. Ltd.
257 Jalan Ahmad Ibrahim
Singapore 629147
Tel: +6562660988
Fax: +6562686993
ANNEX 4:
Risk Assessment