User Note:
The requirements of this document are mandatory. Non-compliance shall only be authorised by the
Document Owner or his Delegate through STEP-OUT approval.
A controlled copy of the current version of this document is on PDO's EDMS. Before making
reference to this document, it is the user's responsibility to ensure that any hard copy, or electronic
copy, is current. For assistance, contact the Document Custodian or the Document Controller.
Users are encouraged to participate in the ongoing improvement of this document by providing
constructive feedback.
Page 1 SP-1106: Specification for Coding and identification of Overhead Line Systems Printed 26/06/08
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version: 2.0
Petroleum Development Oman LLC Effective: May-08
ii Revision History
The following is a brief summary of the 4 most recent revisions to this document. Details of all
revisions prior to these are held on file by the issuing department.
Page 3 SP-1106: Specification for Coding and identification of Overhead Line Systems Printed 26/06/08
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version: 2.0
Petroleum Development Oman LLC Effective: May-08
Contents
1. Introduction ............................................................................................. 5
1.1 PURPOSE............................................................................................................ 5
1.2 APPLICABLE STANDARDS, SPECIFICATION AND CODES ..................... 5
1.3 COMPLIANCE WITH STANDARDS ............................................................... 5
1.3.1 Language and Units Of Measurement ..................................................................5
2. Scope......................................................................................................... 6
2.1 OVERHEAD LINE IDENTIFICATION PLATE ............................................... 6
2.1.1 Identification Code ...............................................................................................6
2.1.1.1 Top Row - Operation Code ....................................................................6
2.1.1.2 Middle Row - Circuit Code ....................................................................7
2.1.1.3 Bottom Row - Pole Number Code..........................................................8
2.1.2 Pole Number Plate ................................................................................................9
2.1.3 Phase Plate............................................................................................................9
2.1.4 Circuit Number Plate ............................................................................................9
2.2 SUBSTATION LOCATION CODE ................................................................... 9
2.2.1 Area Code .............................................................................................................9
2.2.2 Field Code.............................................................................................................9
2.2.3 Substation Code....................................................................................................9
2.3 MODIFIED OVERHEAD LINE......................................................................... 9
2.4 DRAWINGS AND SCHEDULES .................................................................... 10
2.4.1 Drawings.............................................................................................................10
2.4.2 Overhead Line Identification Code Schedule.....................................................10
2.4.2.1 General .................................................................................................10
2.4.2.2 Pole and Tower Types..........................................................................10
2.4.3 Reference Card ...................................................................................................10
APPENDICES
APPENDIX 1 - FIGURES...............................................................................................................11
APPENDIX A : GLOSSARY OF DEFINITIONS, TERMS AND ABBREVIATIONS ...............20
SP USER-COMMENT FORM........................................................................................................21
FIGURES
FIGURE 1. - SUBSTATION CODES ......................................................................................................11
FIGURE 2. - POLE & TOWER TYPES AND CODES ...............................................................................11
FIGURE 3. - TYPICAL OVERHEAD LINE ARRANGEMENT ...................................................................12
FIGURE 4. - TYPICAL OVERHEAD LINE ARRANGEMENT CODING KEY ..............................................13
FIGURE 5. - OVERHEAD LINE POLE NUMBERING SYSTEM ................................................................15
FIGURE 6. - OVERHEAD LINE TYPICAL IDENTIFICATION CODE PLATE..............................................16
FIGURE 7. - NUMBER PLATE .............................................................................................................17
FIGURE 8. - PHASE PLATE.................................................................................................................17
FIGURE 9. - OVERHEAD LINE TYPICAL IDENTIFICATION CODE SCHEDULE .......................................18
FIGURE 10. - OVERHEAD LINE IDENTIFICATION CODE REFERENCE CARD ........................................19
Page 4 SP-1106: Specification for Coding and identification of Overhead Line Systems Printed 26/06/08
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version: 2.0
Petroleum Development Oman LLC Effective: May-08
1. Introduction
1.1 PURPOSE
A Specification (SP) is a document that Petroleum Development Oman (PDO) issue to
specify their requirements, procedures and standards. The prefix for these documents shall
be SP.
This SP describes a consistent coding method to be adopted for identification of overhead
lines. The coding system will serve three main purposes:
• Uniquely identify each overhead line on the system.
• Identify each pole or tower structure on the particular overhead line.
• Provide information as to the operating voltage, function and sources of supply to the
particular overhead line.
Page 5 SP-1106: Specification for Coding and identification of Overhead Line Systems Printed 26/06/08
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version: 2.0
Petroleum Development Oman LLC Effective: May-08
2. Scope
a) Main Lines
Main lines interconnect two substations at the same voltage level.
The function code for main lines shall be ML*.
*1, 2, 3 etc. shall be added for parallel main lines
c) Radial Lines
Radial lines are spur feeders from substations.
The function code for radial lines shall be RL*.
* 1, 2, 3, etc. shall be added for radial lines from the same substation
Page 6 SP-1106: Specification for Coding and identification of Overhead Line Systems Printed 26/06/08
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version: 2.0
Petroleum Development Oman LLC Effective: May-08
d) Tee-Off Lines
A Tee-Off line branches off from a main line, ring main line or a radial line.
The function code for Tee-Off lines shall be TO*.
*The substation code of the substation, which the line supplies, shall be added.
Page 7 SP-1106: Specification for Coding and identification of Overhead Line Systems Printed 26/06/08
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version: 2.0
Petroleum Development Oman LLC Effective: May-08
The circuit code shall consist of the field distribution line circuit code of the line supplying
the well supply line followed by – *
*V or W for the particular field distribution line.
Page 8 SP-1106: Specification for Coding and identification of Overhead Line Systems Printed 26/06/08
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version: 2.0
Petroleum Development Oman LLC Effective: May-08
Page 9 SP-1106: Specification for Coding and identification of Overhead Line Systems Printed 26/06/08
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version: 2.0
Petroleum Development Oman LLC Effective: May-08
2.4.1 Drawings
The Identification code shall be marked on all drawings relating to specific overhead lines.
This is taken to include all single line diagrams, layouts, line date sheets, etc.
2.4.2.1 General
Final line coding shall be agreed with Operator.
A schedule of line identification codes and other relevant information shall be issued for
approval prior to the manufacture of the identification plates and shall be completed after
installation and commissioning of the line for inclusion with other As-Built drawings.
Figure 9 shows a typical pro forma of the information required.
Figure 10 shows the information to be printed on the two sides of the card.
Page 10 SP-1106: Specification for Coding and identification of Overhead Line Systems Printed 26/06/08
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version: 2.0
Petroleum Development Oman LLC Effective: May-08
APPENDIX 1 - FIGURES
TYPE CODE
A Wood Poles:
Intermediate I
Terminal T
Section S
Angle A
Switchrack Terminal WT
Switchrack Section WS
Switchrack Tee-Off WO
B Steel Tower:
Single Circuit Tower OS*
Double Circuit Tower OD*
* I - Intermediate
T - Terminal
S - Section
A - Angle
Page 11 SP-1106: Specification for Coding and identification of Overhead Line Systems Printed 26/06/08
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version: 2.0
Petroleum Development Oman LLC Effective: May-08
1 2
33 kV
4
12
5
6 13
GATHERING QAHARIR
STN. B.
7
1 10
1
8 14
9
QAHARIR EAST
Page 12 SP-1106: Specification for Coding and identification of Overhead Line Systems Printed 26/06/08
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version: 2.0
Petroleum Development Oman LLC Effective: May-08
1 132 kV ML
MAR – AML
2 132 kV. ML
AML – AMIN
3 33 kV. ML.3
MAR – MAR.Y
4 33 kV. RL.1
MAR.Y
5 33 kV. RM.1
MAR.Y
6 33 kV. TO. B
MAR.Y - RM.1
7 33 kV. FD.VW
MAR.B
8 33 kV. FD.V
MAR.B
9 33 kV. FD.R.V
MAR.B
10 33 kV. FD.W
MAR.B
11 33 kV. WS.1
MAR.B. V
12 33 kV. ML.1
MAR.Y – MAR. X
13 33 kV. ML.1
MAR.X – QAH
14 33 kV .TO QAH.E
QAH - QAT
Page 13 SP-1106: Specification for Coding and identification of Overhead Line Systems Printed 26/06/08
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version: 2.0
Petroleum Development Oman LLC Effective: May-08
NIM . E NIM . W
001 201
132 kV – RM. 1
002 200 NIM.E
COND
199
Page 14 SP-1106: Specification for Coding and identification of Overhead Line Systems Printed 26/06/08
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version: 2.0
Petroleum Development Oman LLC Effective: May-08
33 kV.WS.1
NIM.E.A – W
COND
200 201 202
102
101
33 kV.FD.W
100 NIM.E.A
025 026 027 COND
G. S.
A
001
002
003
4 Radial Lines
202
201 33 kV.RL.1
200 NIM.E
001 002 003 004 COND
Page 15 SP-1106: Specification for Coding and identification of Overhead Line Systems Printed 26/06/08
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version: 2.0
Petroleum Development Oman LLC Effective: May-08
33 kV. RL.1
A1 A2
NIM.W - NIM . P
B2 B3
B1 B1
ELM
C
Page 16 SP-1106: Specification for Coding and identification of Overhead Line Systems Printed 26/06/08
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version: 2.0
Petroleum Development Oman LLC Effective: May-08
Height = 30 mm
Thickness = 3 mm
8
2# ∅7 holes
001
50
25
100
∅ 75 plate
1# ∅ 5 hole
Page 17 SP-1106: Specification for Coding and identification of Overhead Line Systems Printed 26/06/08
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version: 2.0
Petroleum Development Oman LLC Effective: May-08
CODE PLATE
See Note: 3
Letters On Plate
Code Name
Page 18 SP-1106: Specification for Coding and identification of Overhead Line Systems Printed 26/06/08
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version: 2.0
Petroleum Development Oman LLC Effective: May-08
DESCRIPTION CODE
FUNCTION CODE
Main Line ML
Ring Main RM
Tee-Off TO
Field Distribution FD
Well Supply WS
Radial RL
SUBSTATION CODE
Gathering Station A A
Gathering Station B B
Gathering Station M M
Gathering Station O
Production Station P
Main Substation Z
Power Plant Substation Y
Minor Substation X
Minor Substation 1 1
Page 19 SP-1106: Specification for Coding and identification of Overhead Line Systems Printed 26/06/08
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version: 2.0
Petroleum Development Oman LLC Effective: May-08
The following terms and abbreviations used in this document, are defined below:
General Terminology
Company - Petroleum Development Oman LLC
Principal - The person or organisation that specifies the requirements in a contract and
pays the contractors and vendors for their services, materials and
equipment
Contractor - The person or organisation that supplies the company with services
Vendor - The person or organisation that supplies the company with materials
and/or equipment
Discipline - A specific set of technical knowledge and skills
Corporate Functional The person responsible for a discipline in the Company. The CFDH owns
Discipline Head the SPs that apply to his discipline
(CFDH) -
User - The person or organisation that reads, and uses the information, in this and
other SPs
Shall - tells you that you must obey an instruction
Should - tells you what the principal recommends
May - tells you a possible procedure
Abbreviation
CFDH Corporate Functional Discipline Head.
DCS Document Control Section
ERD Engineering Reference Document.(old revision of SP)
FME Functional Manager for Engineering.
PDO Petroleum Development Oman LLC
SIEP Shell International Exploration and Production BV.
SIOP Shell International Oil Products BV.
SP - Specification (PDO)
Page 20 SP-1106: Specification for Coding and identification of Overhead Line Systems Printed 26/06/08
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version: 2.0
Petroleum Development Oman LLC Effective: May-08
SP USER-COMMENT FORM
SP User-Comment Form
If you find something that is incorrect, ambiguous or could be better in an SP, write your comments
and suggestions on this form. Send the form to the Document Control Section (DCS). They make a
record of your comment and send the form to the correct CFDH. The form has spaces for your
personal details. This lets DCS or the CFDH ask you about your comments and tell you about the
decision.
Comments:
Suggestions:
CFDH Actions
Recd Decision: Inits: Ref. Date:
Date: Reject: Ind:
Accept, revise at next issue:
Accept, issue temporary amendment
Comments:
Page 21 SP-1106: Specification for Coding and identification of Overhead Line Systems Printed 26/06/08
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Version: 2.0
Petroleum Development Oman LLC Effective: May-08
Page 22 SP-1106: Specification for Coding and identification of Overhead Line Systems Printed 26/06/08
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.