INSP-F01 WICS Form (Rev.10 - Oct2015)

1) The document is a welding inspection control sheet for welding a joint between a WNRF Flange and 2-inch schedule 80 carbon steel pipe using gas tungsten arc welding (GTAW). 2) It provides details on the welding work description, reference documents, design data, welding data including the WPS and PQR numbers, filler metal and electrode details, and welder information. 3) The sheet also lists NDT hold points that require 100% visual inspection of bevel joints and weld caps as well as 100% dye penetrant testing of re-beveled existing joints.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
329 views2 pages

INSP-F01 WICS Form (Rev.10 - Oct2015)

1) The document is a welding inspection control sheet for welding a joint between a WNRF Flange and 2-inch schedule 80 carbon steel pipe using gas tungsten arc welding (GTAW). 2) It provides details on the welding work description, reference documents, design data, welding data including the WPS and PQR numbers, filler metal and electrode details, and welder information. 3) The sheet also lists NDT hold points that require 100% visual inspection of bevel joints and weld caps as well as 100% dye penetrant testing of re-beveled existing joints.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

WELDING INSPECTION CONTROL SHEET (WICS) WICS

WICS/CS/2019/001
INSPECTION SECTION, TSD, PC FKSB 06.01.03 L3 QP-TSD-INSP-003 Appendix 3 NO.

A1 WELDING WORK DESCRIPTION / PURPOSE A6 COMPULSORY DOCUMENT (5 ITEMS):

√ WPS/PQR or WPS Summary Sheet √ Weld map √ Mill Certificate or PMI Report (for
To welding 1 joint between the WNRF Flange & pipe 2' sch 80 carbon steel using the Low-Temp CS, SS, LAS, Ni-based,
GTAW welding process. Weld summary sheet WQT / welder list etc)

A2 TYPE A3 STATUS A4 REFERENCE DOCUMENT NO.: A7 ADDITIONAL DOCUMENT

√ Planned √ Permanent SAP WO#: EMOC#: Pressure Test Certificate Isometric / GA dwg Others :

Emergent Temporary IRS#: NSR#: √ Inspection Test Plan (ITP) Insp. Report (IRS)

A5 DESIGN DATA √ Repair Procedure Piping Class Spec. Sheet

Eqpt Tag OR Piping Line ID Piping Class Fluid / Medium Design Pressure A8 JOINT SUMMARY (TYPE & QUANTITY)
Shop Field Total Joints
Tag No: 4200-P-0001 A/B/C/D/E
ASTM A106 WATER NA
√ Butt Weld (BW) : 1 + NA = 1
Dwg No: Q1617-FE-713-A Rev.01
Fillet / Socket Weld (FW) : NA + NA = NA

A9 WELDING DATA

WPS. NO. : STS/WPS(M)/001-1 WPS STS EDAC ENGINEERING SMAW GTAW+SMAW


WELDING
OWNER / : SDN BHD
PROCESS
PQR NO. : STS/PQR/001 COMPANY √ GTAW

BASE METAL 1 BASE METAL 2 FILLER METAL ELECTRODE

Part / component
WNRF Flange 1500# Pipe Manufacturer KOBE WIRE THAILAND
(e.g. pipe,tube,shell, flange)
Material Spec. / Grade &
ASTM A105 SA106 Gr.B Trade Name TGS 50
UNS No. (for High Alloy)

P. No 1 1 F - No. 6
BEFORE WELDING

√ Carbon Steel Stainless Steel √ Carbon Steel Stainless Steel AWS Class. /
Material Group
Group
ER 70S-G
Low Alloy High Alloy Low Alloy High Alloy
If Pipe (NPS & Sch.)
2"SCH 80 1500# 2"SCH 80 SFA No. 5.18
THICKNESS

If Plate (nom. thick.)


SIZE /

Nominal thickness N\A 5.54mm WELDING WORK SCHEDULE


Deposited weld metal
N/A 8.54mm Start:20/9/2019 End: 26/9/2019
thickness

A10 WELDER DATA Welder #1 Welder #2 Welder #3

Welder's Name : AHMAD AMIRUL BIN RAMLI ZAIROL HISHAM


WELDER(S)
Welder ID No. : GT02 GT01
DETAILS

Welder Expiry Date : NA NA

INSPECTION / NDT HOLDPOINTS:


(as per PFK Piping Class, ASME, PTRS & API requirement)
A11 NDT Holdpoints (Fill-up by Maintenance / PEC) B1 Review & Approved by Inspection Rep.

1 100% VI @ all bevel joints (BW & FW) and weld cap Rejected:

2 100% DPT at all re-beveling of existing joints Approved without comments

3 100% DPT / MPI @ new joints Approved with additional comments:

4 HT @ 1.3 x Design Pressure i.e.

5 PWHT @ degC; holding time hours

6 Hardness Test before & after PWHT

7
NOTE : To add % as per Piping Class requirement; Abbreviation: VI (Visual Inspection), MPI (magnetic particle inspection); DPT (dye
penetrant testing), RT (radiography testing); PWHT (post weld heat treatment); HT (hydrostatic test); HdT (Hardness Test)

A12 SUBMISSION BY Name Signature Date REVIEW / APPROVAL BY:


Name / Signature / Date
Work Supervisor (PC FKSB or Contractor)

MOHD AS SHAHIDDIN
Maintenance / PECS Engineer 20/9/2019
JAFRI
Review & Verify
A13 NDT REPORT & RESULTS (to be filled-up by Maintenance / PECS) B2 (by Insp)
Acc. Criteria
Item (e.g. NDT, Date of Result (√) Signed by
Report No. Code (√) Sign. & Date Remarks
PWHT etc) Report QC / Supervisor
B31.3 ASME VIII Acc. Rej.

1
AFTER WELDING

B3 COMPLETION / CLOSE-OUT
I hereby certify that the welding work is satisfactory and all necessary tests (NDT) has been carried out and accepted as per specifications.

INSPECTOR IN-CHARGE : SIGNATURE : DATE :

NOTE: WICS Rev.10 (Oct. 2015)


Section [A1-A12] to be filled-up by Maintenance / PECS / TACS / QA/QC only
Section [B1-B3] to be filled-up by Inspection only
WELDING INSPECTION CONTROL SHEET (WICS) WICS
WICS/SS/2019/001
INSPECTION SECTION, TSD, PC FKSB 06.01.03 L3 QP-TSD-INSP-003 Appendix 3 NO.

A1 WELDING WORK DESCRIPTION / PURPOSE A6 COMPULSORY DOCUMENT (5 ITEMS):

To welding 1 piece Orifite Plate stainless steel SS316 to Pipe 2"sch 80 ASTM A105 using √ WPS/PQR or WPS Summary Sheet √ Weld map Mill Certificate or PMI Report (for
Low-Temp CS, SS, LAS, Ni-based,
GTAW welding process Weld summary sheet WQT / welder list etc)

A2 TYPE A3 STATUS A4 REFERENCE DOCUMENT NO.: A7 ADDITIONAL DOCUMENT

√ Planned √ Permanent SAP WO#: EMOC#: Pressure Test Certificate √ Isometric / GA dwg Others :

Emergent Temporary IRS#: NSR#: √ Inspection Test Plan (ITP) Insp. Report (IRS)

A5 DESIGN DATA √ Repair Procedure Piping Class Spec. Sheet

Eqpt Tag OR Piping Line ID Piping Class Fluid / Medium Design Pressure A8 JOINT SUMMARY (TYPE & QUANTITY)
Shop Field Total Joints
Tag No: 4200-P-0001 A/B/C/D/E
N/A WATER NA
Butt Weld (BW) : NA + NA = NA
Dwg No: Q1617-FE-713-A Rev.01
√ Fillet / Socket Weld (FW) : 2 + NA = 2

A9 WELDING DATA

WPS. NO. : STS/WPS (M)/104-1 WPS SMAW GTAW+SMAW


STS EDAC ENGINEERING WELDING
OWNER / :
SDN BHD PROCESS
PQR NO. : STS/PQR/007 COMPANY √ GTAW

BASE METAL 1 BASE METAL 2 FILLER METAL ELECTRODE

Part / component
Plate Pipe Manufacturer NA NA
(e.g. pipe,tube,shell, flange)
Material Spec. / Grade &
SS 316 A106 Gr.B Trade Name TG-S309L NA
UNS No. (for High Alloy)

P. No 1 1 F - No. 6 NA
BEFORE WELDING

Carbon Steel √ Stainless Steel √ Carbon Steel Stainless Steel AWS Class. /
Material Group Group
SFA5.9 NA
Low Alloy High Alloy Low Alloy High Alloy
If Pipe (NPS & Sch.)
6mm 2"SCH 80 SFA No. 5.9 NA
THICKNESS

If Plate (nom. thick.)


SIZE /

Nominal thickness NA 5.54mm WELDING WORK SCHEDULE


Deposited weld metal
NA 8.54mm Start:20/9/2019 End: 26/9/2019
thickness

A10 WELDER DATA Welder #1 Welder #2 Welder #3

Welder's Name : AHMAD AMIRUL BIN RAMLI ZAIROL HISHAM


WELDER(S)
Welder ID No. : GT02 GT01
DETAILS

Welder Expiry Date : N/A N/A

INSPECTION / NDT HOLDPOINTS:


(as per PFK Piping Class, ASME, PTRS & API requirement)
A11 NDT Holdpoints (Fill-up by Maintenance / PEC) B1 Review & Approved by Inspection Rep.

1 100% VI @ all bevel joints (BW & FW) and weld cap Rejected:

2 100% DPT at all re-beveling of existing joints Approved without comments

3 100% DPT / MPI @ new joints Approved with additional comments:

4 HT @ 1.3 x Design Pressure i.e.

5 PWHT @ degC; holding time hours

6 Hardness Test before & after PWHT

NOTE : To add % as per Piping Class requirement; Abbreviation: VI (Visual Inspection), MPI (magnetic particle inspection); DPT (dye
penetrant testing), RT (radiography testing); PWHT (post weld heat treatment); HT (hydrostatic test); HdT (Hardness Test)

A12 SUBMISSION BY Name Signature Date REVIEW / APPROVAL BY:


Name / Signature / Date
Work Supervisor (PC FKSB or Contractor)

Maintenance / PECS Engineer MOHD AS SHAHIDDIN 20/9/2019

Review & Verify


A13 NDT REPORT & RESULTS (to be filled-up by Maintenance / PECS) B2 (by Insp)
Acc. Criteria
Item (e.g. NDT, Date of Result (√) Signed by
Report No. Code (√) Sign. & Date Remarks
PWHT etc) Report QC / Supervisor
B31.3 ASME VIII Acc. Rej.

1
AFTER WELDING

B3 COMPLETION / CLOSE-OUT
I hereby certify that the welding work is satisfactory and all necessary tests (NDT) has been carried out and accepted as per specifications.

INSPECTOR IN-CHARGE : SIGNATURE : DATE :

NOTE: WICS Rev.10 (Oct. 2015)


Section [A1-A12] to be filled-up by Maintenance / PECS / TACS / QA/QC only
Section [B1-B3] to be filled-up by Inspection only