Dwitama-Bando Brosur-1
Dwitama-Bando Brosur-1
Dwitama-Bando Brosur-1
Introduction
DWITAMA BANDO is building material specialist.
Unfolding before us, will be the digital era of limitless competition across
the borders of the new millennium knowledge, information and ideas
that will influence the competitiveness of enterprises.
We, all DWITAMA BANDO members and employees welcome the new
millennium by pulling the construction market to maximize customer
satisfaction, give best prices and service to be acknowledged to be a
leading construction industry.
While expecting for your new vision and prosperity, this meeting today
is earnestly hope for new strength for the national economy and the
construction industry.
Thank you.
Index
System Support 4
Single Pipe Scaffolding 10
Pipe Support 12
Frame Scaffolding 14
Square Pipe 16
Safety System 17
Jack Support 20
Euro Form 22
Hory Beam 24
Brace Frame 26
Lease and Trust Management 28
Certificate of Registration 30
Application Method 31
System Support
Established parts of System support gives problems solving
on the structural and technical problems to ignite an excellent
adaptability in any field ranging from architecture, civil
engineering, and construction events.
Stable structure of system support prevents construction
accident as well as the work efficiency, reduce the term of
works.
1. Post
2. Handle
3. Bracing
4. U-head Jockey
5. Jockey Base
6. Yoke
7. U-head socket
Post
Type Length (mm) Weight (kg)
65
P-25 2,588 12.0
P-17 1,725 8.0
P-12 1,291 6.2
P-8 863 4.4
863
65
863
863
429
1725
65
1291
T:9.0
863
797
798
65
797
797
65
432
216
367
151
P-25 P-17 P-12 P-8 P-4 P-2
1725
H-18
1463
H-15
1158
H-12
853
H-9
549
Handle
Type Length (mm) Interval Weight (kg)
H-6 H-18 1,725 1,829 5.0
H-15 1,463 1,524 4.3
244 H-12 1,158 1,219 3.5
H-9 853 914 2.8
H-3 H-6 549 610 2.1
H-3 244 305 1.3
5
1 System Support
Bracing
Type L (mm) A (mm) B (mm) Weight
B-1718 2,332 1,725 1,829 5.8
B-1715 2,139 1,725 1,524 5.3
B-1712 1,974 1,725 1,219 5.0
L
432
100
Ø45
It is used in combination
50 with the vertical post during
U-Head installation.
Jack Base
Bracing
Handle
7
1 System Support
9
2 Single Pipe Scaffolding
Single Pipe
Easy to assemble for narrow space with various height of
the building.
70±0.5 70±0.5
Ø48.6
48.6 2.3 2.63 3.345 8.99 3.7 1.64 5.26 7.89 10.52 15.78
Feature
The width and height can be adjusted freely depending on the location and
shape to be installed.
Galvanized steel for superior strength so it is easily stored and carried for long
periods use.
Base plate is available.
Over 95 Over 95
140
Ø48.6 x 48.6 (0.68kg) Ø48.6 x 48.6 (0.68kg) Ø60.5 x 48.6 (0.77kg) Ø48.6 (1.11kg) Ø48.6 x 48.6 (0.64kg) 0.6kg 1.15kg
11
3 Pipe Support
Pipe Support
Used for various building, tower, civil and steel structure to
support reinforced concrete structures model.
Over 80
External
Over 140
Over 280
Female Screw
GC 200...GCD45
Pipe Material
Maximum Length Use
STK-400
Female Screw Length
Over 30
Parts Name :
External, internal, internal thread,
external thread, pin connector, top
plate, base plate, fixing plate
Lower Tube SPS400
Over Ø60.5±0.3 x t2.3±0.30
13
4 Frame Scaffolding
Frame Scaffolding
Frame scaffolding is generally used as an
external and internal scaffold and also
possible for castor movement. Compared
to single line scaffolding, frame scaffolding
considered safer.
Loading
Point
Loading in Accordance
with the Load Position
Max. Loading 10 ton 9.1 ton 7.5 ton 5 ton 3 ton
Min. Loading 5 ton 3.5 ton 3 ton 2 ton 1.2 ton
Rail Stand Safety Rail Stand
(1219mm) (1829mm)
1.0 Kg 1.2 Kg
Caster
(400mm x 1700mm)
11.0 Kg
5.4 Kg
(1829mm x 1729mm)
11.0 Kg 20.0 Kg
15
5 Square Pipe
Square Pipe
High recovery rate, exclusive degree is excellence and fixing
is unnecessary, so installation time is reduced.
Safety System
1. Safety Rail Stand
2. Elevator Opening Rail Stand
3. Safety Ladder
4. Ladder Board
5. Safety Working Board
6. Bracket
17
6 Safety System
BD-A
(Angle Adjustment)
Slab Bracket
External slab scaffolding
installation and for ensuring
the safety of workers
19
7 Jack Support
Jack Support
The shore of underground building framework after formwork removal
to avoidstructure cracked caused by external construction vehicle.
Feature
Anti Vibration Rubber
Holder
Standard
Lenght(mm) Admissible Maximum Weight Pipe
Minimum Maximum Load(ton) Load(ton) (Kg) (mm)
2400 2700 30 52 64.5 (Ø139.8 x 4.5t)
2700 3000 30 50 68 (Ø139.8 x 4.5t)
2900 3200 30 48 71 (Ø139.8 x 4.5t)
3100 3400 30 46 74.5 (Ø139.8 x 4.5t)
3300 3600 30 44 78 (Ø139.8 x 4.5t)
How to Install
3 4
Established the jack If the specification of the
support so that it is upright jack support shorter with
to the installation location, all the adjustment screw,
and then turn handle block under the case base
clockwise to be fixed down to control the secondary
to 200mm. Secondary height. (only do if the floor
fix so that the handle height is not right)
loosened by hitting the
handle with a hammer.
21
8 Euro Form
Euro Form
Knock down formwork system which is easy to
install in any type of concrete structure.
Outcorner
Used to connect inner outer euro form and euro
form connection as well as outer gang form and t
gang form connection
Column Band
A square pillar concrete mold used for fixing
when it’s poured at a construction site.
800~1800
Also Conclude
State Band
23
9 Hory Beam
Hory Beam
• The workability of side beam combination with the side beam
bracketing is very good and easy to manage inventory, so a separate
bracket is required
• Wood panel is securing product section which the timber is nailed on the
upper beam
Type
AX
14-18 12.5kg 7.4kg
Type
AX
18-25
19.0kg 9.2kg
Type
AX
25-32
23.0kg 13.2kg
Type
AX 4.7kg
32-39 0.2kg
28.0kg 18.2kg
Type
AX
39-46
35.0kg 25.2kg
Type
AX
46-53
39.0kg 29.2kg
Dimension
Specification Body Product Size
Crane L1 ~ L2 D
Type A x 14-18 1450~1800mm 163mm
Type A x 18-25 1800~2500mm 272mm
Type A x 25-32 2500~3200mm 323mm
Type A x 32-39 3200~3900mm 324mm
Type A x 39-46 3900~4600mm 325mm
Type A x 46-53 4600~5300mm 325mm
25
10 Brace Frame
Brace Frame
After manufacturing Euro Form and Plywood, there is no back process after the following
reinforcement
27
11 Lease and Trust Management (Lease)
Shipment Instructions
hec • When returning the
Material Billing
Material Billing
lit yC
ua material please
Q
tity
& write the materials
an specifications, that
Qu
must be returned,
separated by
Material Shipment product name,
quantity, company
Charter
Returning Material
Logistic Center (project name),
Inspection Result Notification
name, etc.
• Please notify
Advantages Disadvantages ordered material
1-2 days before
• Improvement cash flow in small • Trust is important to secure
installments leasing company
• Unload unnecessary materials for • Mechanically chain order
storage placement requires technology
• Companies perform its core • Communication is important in
competencies through outsourcing the field and headquarters
• Reduce the incidental costs of
materials management
Trust Management (Logistic center)
- Efficient allocation system
Transport - Arrival on customer’s desired time
- Shortest delivery time
- Improved material utilization
Storage
- Land efficient use
Logistics
- Loading & unloading is fast
Operation Cargo
- Waiting time is short
System
- Improved bending and working
Packing efficiency
- Land efficient use
Distribution, - Material repair
Logistic Processing - Material organized
System
29
12 Certificate of Registration
Certificate of
Registration
31
DWITAMA
Total Steel & Scaffolding
by : PT. Dwitama Prima Sakti