Bridge Joints
Bridge Joints
EMEA2MM
On
03/02/2018
BRIDGE
JOINTS The fifth in a series of Current Practice Sheets prepared by the Concrete Bridge
Development Group
Joint installation
The installation process should be a team effort between the engineer, main
contractor and installer. They should have access to information and design
Licensed copy from CIS: EMEA2MM, Mott Macdonald EMEA2, 03/02/2018, Uncontrolled Copy.