0% found this document useful (0 votes)
228 views4 pages

Solar PV System Technical Specifications Sample

The document provides technical specifications for a proposed 80 kW solar PV system including minimum requirements for system components, solar panels, inverters, monitoring, mounting, and operations and maintenance. Key requirements include a minimum projected output of 2.5 million kWh over 25 years, mono-crystalline solar panels rated at least 300W each with 10+ year warranties, tier 1 inverters with rapid shutdown capability and 10+ year warranty, 25-year warranted power optimizers, cloud-based monitoring system, aluminum mounting system meeting certification standards with 10-year warranty, and 15 years of operations and maintenance support with under 24 hour response times.

Uploaded by

Charlie Ayco
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
228 views4 pages

Solar PV System Technical Specifications Sample

The document provides technical specifications for a proposed 80 kW solar PV system including minimum requirements for system components, solar panels, inverters, monitoring, mounting, and operations and maintenance. Key requirements include a minimum projected output of 2.5 million kWh over 25 years, mono-crystalline solar panels rated at least 300W each with 10+ year warranties, tier 1 inverters with rapid shutdown capability and 10+ year warranty, 25-year warranted power optimizers, cloud-based monitoring system, aluminum mounting system meeting certification standards with 10-year warranty, and 15 years of operations and maintenance support with under 24 hour response times.

Uploaded by

Charlie Ayco
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

SOLAR PV SYSTEM TECHNICAL SPECIFICATIONS SAMPLE

COMPONENT MINIMUM SPECIFICATIONS AND OFFER BY SOLAR PV SYSTEM PROVIDER


REQUIREMENTS (please attached supporting document as appropriate)
System Type Grid-Tie System
System Size (kWp) At least 80 kWp system size using
generated from same the same area of roof space
roof space
Projected total KWH Not less than 2.5 million KWH in
produced by the solar 25 years based on PVSol
system in 25 years Simulation or equivalent industry
software of similar reputation
SOLAR PANELS
Panel Quality and Tier 1 Classification of Solar
Manufacturer’s Manufacturer in the last 4 quarters
Reliability from the current month
Type of Solar PV Must use MONOCRYSTALLINE
Panels Used solar panels.
Rating per Panel Solar PV panel rating is at least 300
(Watts) watts per panel or higher
Warranty versus At least 10 years warranty against
Manufacturing Defect manufacturing defect of solar
panel
Performance Warranty of at least 80% solar
Warranty of Panels panel efficiency 25 years from
delivery
INVERTER
Tier Classification of Tier 1 Classification for the past 4
Inverter and Brand quarters from current month
Inverter Warranty At least 10 years
Rapid Shutdown Duly certified documentary
feature of the inverter evidence that the Inverters to be
to be used used in the project meet US
National Electrical Code (NEC)
2014 requirement under Section
690.12 and as updated in 2017
(applies to PV Systems installed on
building roofs) on module level
rapid shutdown function of the
inverter of solar systems
specifically the following
capabilities:
a. to de-energize PV source
circuits from all sources to
less than 30 Volts within
10 seconds.
b. module-level rapid
shutdown of solar systems
instead of NEC 2014’s
array-level shutdown
requirement.
Capability to be Inverter to be used must be
Converted to a Hybrid convertible from grid-tie to hybrid
System system with minimal addition of
software or hardware interface.
Manufacturer certification is
needed as proof that the criterion
is met including the process of
conversion required.
Export Control or The system offered must include a
Limiter limiter or export control either as a
built-in or added function of the
inverter.

Power Optimizer The system offered must include


POWER OPTIMIZERS with at least
25-year warranty.
MONITORING AND System being offered must include
REMOTE CONTROL an internet or cloud-based
OF SYSTEM platform which can perform the
following minimum functions:

- automatic alert on system


issues
- remote troubleshooting
and access to real-time
system data and guided
root-cause fault analysis
- full visibility of system
technical performance,
building consumption and
self-consumption
- data presentation at the
module, string and system
level
- visualization of PV
production
- real time monitoring
- module level trouble
shooting and performance
analysis and pinpoint
issues to the exact location
of each module on a
virtual site map

MOUNTING SYSTEM
Mounting System Must show proof that the
mounting system to be used in the
project meet global certification
standards.

All aluminum profiles are


made of at least 6005 T5 with
surface protection
anodic oxidation 12-15 micron (μ),
hooks and bolts are made of
Stainless Steel 304.

10-year quality warranty of


mounting materials
OPERATIONS AND Operations and maintenance
MAINTENANCE including the replacement of
system components should be
shouldered by the proponent for
15 years free of any charge.

Response time for any operations


or maintenance issue should not
be more than 24 hours.