DESIGN CALCULATION OF
RAW SEWAGE PUMPING STATION
OF SPS – 2 FOR
3 MLD STP BASED ON SBR
TECHNOLOGY AT JHANSI
Page 1 of 85
DESIGN CALCULATION FOR Checked Approved
Doc. No. : - CIVIL - 14 RAW SEWAGE PUMPING by by
STATION OF SPS – 2
Rev. No. 00 MKM MKM
PROJECT: 3MLD STP BASED ON SBR
TECHNOLOGY AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS PVT
BOARD JHANSI
LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2
INDEX
SR. NO. TITLE PAGE NO.
1 DESIGN BASIS 3
2 REFERENCES 5
3 DESIGN OF MONORAIL 7
3 DESIGN OF SLAB 10
4 DESIGN OF STAIRCASE 17
5 DESIGN OF WALLS 20
6 DESIGN OF BEAMS 52
7 DESIGN OF COLUMNS 69
8 DESIGN OF RAFT 73
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY
AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH
BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2
DESIGN BASIS
Page 3 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY
CLIENT: CANTONMENT AT JHANSI CONTRACTOR: M/s AQUATECH
BOARD JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2
DESIGN BASIS
DESIGN DATA:
Concrete grade : M 30 ( FOR LIQUID RETAINING STRUCTURE)
Seismic Load :
Wind Load :
Page 4 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY
AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH
BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2
REFERENCES
Page 5 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY
CLIENT: CANTONMENT AT JHANSI CONTRACTOR: M/s AQUATECH
BOARD JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2
IS 3370 - ( Part I ) : 2009 :-Code of practice for concrete structure for the storage of liquids : General Requirements
IS 3370 - ( Part II ) : 2009 :-Code of practice for concrete structure for the storage of liquids : R C Structures
IS 3370 - ( Part IV ) : 2009 :-Code of practice for concrete structure for the storage of liquids : Design Charts
Page 6 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY
AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH
BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2
DESIGN OF MONORAIL
Page 7 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
S/w of beam
0.037 T/m
1.65 T
Shear
1.7 T
( Assuming load at support )
l= 2.800 m
Maximum shear
( Assuming load at one end )
0.037 x 2.800
Vmax. = 1.65 + = 1.7 T.
2
384 EI 48 x E I
= 0.073 cm
l 280.0
∆ Permissible. =
500
=
500
= 0.56 cm
∆ cal < ∆ Permissible Hence ok
D 250 Leff. 2800
= = 20.00 = = 105.67
T 12.5 ryy 26.5
Page 8 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
Shear
1.69 T
1.2 m
0.0373 x 1.2 ²
M max. = 1.65 x 1.2 + = 2.01 Tm (BM. X)
2
M max.=
0.06 x 1.2 = 0.07 Tm (BM. Y)
(Hori.)
Maximum shear
Vmax. = 1.65 + 0.0373 x 1.2 = 1.69 T
∆ Calc. =
8 7 + 7
x 2.1 x 10 x 5131.6 3 x 2.1 x 10 x 5131.6
= 0.088 cm
l 120
∆ Permissible. =
500
=
500
= 0.24 cm
Page 9 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY
AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH
BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2
DESIGN OF SLAB
Page 10 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: JHANSI CONTRACTOR: M/s
CANTONMENT AQUATECH SOLUTIONS
BOARD JHANSI DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING PVT LTD.
STATION OF SPS-2
shear V =
(DL) 0.350 KN
(LL) 0.350 KN
0.700
Loading on slab
Dead load
1) Self weight of slab = 0.375 T/m²
2) Floor Finish = 0.125 T/m²
0.500 T/m²
Live load
3) Live load = 0.500 T/m²
0.500 x 0.7 ^2
Moment for DL = = 0.123 Tm/m
2
0.5 x 0.70 ^2
Moment for LL= = 0.123 Tm/m
2
= 0.368 Tm/m
Mu / bd^2 = 0.273
Pt % = 0.063 %
Ast reqd. =
0 .5 f ck 1 − 1 − 4.6 M 2u bd
fy f ck bd
Pt min = 0.12 %
0.12
Ast min = x 1000 x 150 = 180 mm^2/m
100
Page 11 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: JHANSI CONTRACTOR: M/s
CANTONMENT AQUATECH SOLUTIONS
BOARD JHANSI DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING PVT LTD.
STATION OF SPS-2
SUMMARY :
PROVIDE D = 150 mm
Shear check:
Pt provided = 0.289 %
τc = 0.393 N/mm^2
τc > τvu
Hence safe
Span 700
= = 3.02 < 7
Effective depth X M.F. 116 x 2
( Permissible values for slab as per IS
456, Clause no. 23.2.1 )
Hence safe
Page 12 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CLIENT: CANTONMENT BOARD CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION
OF SPS-2
Loading on slab
Dead load
0.5 T/m²
Live load
= 0.33 Tm/m
Mu / bd^2 = 0.245
Pt % = 0.057 %
Pt min 0.12 %
PROVIDE D = 150 mm
Page 13 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CLIENT: CANTONMENT BOARD CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION
OF SPS-2
Shear check:
Pt provided = 0.216 %
τc = 0.346 N/mm^2
τc > τvu
Hence safe
Page 14 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2
Depth D = 150 mm 2 D D
Breadth B = 1000 mm
d = 116 D
Four Edges Discontinous
Loading on slab
Dead load
0.500 T/m²
Live load
`
1) Live load = 0.5 T/m²
Moment due to Dead Load ( MDL) (Ref : IS 456:2000, Table 26, page no 91.)
Page 15 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2
0.272 0.408 Short span +ve moment 116 0.303 0.071 % 82 mm^2/m
0.000 0.000 Short span -ve moment 116 0.000 0.000 % 0 mm^2/m
0.224 0.336 Long span +ve moment 108 0.288 0.067 % 72 mm^2/m
0.000 0.000 Long span -ve moment 108 0.000 0.000 % 0 mm^2/m
SUMMARY :
PROVIDE D = 150 mm
Shear check:
Area of contribution for long side Area of contribution for short side
= ( 2 X 2.3 - 2 X 2^ 2 / 4 ) / 2 = 2 ^ 2 /4
= 1.3 m^2 = 1 m^2
Total factored shear force along long side Total factored shear force along short side
= 1.3 m^2 X 1.5 T/m^2 = 1 m^2 X 1.5 T/m^2
= 1.95 T = 1.5 T
Factored shear per m along long side Factored shear per m along short side
= 1.95 T / 2.3 m = 1.5 T / 2 m
= 0.85 T/m = 0.75 T/m
Pt provided = 0.216 %
τc = 0.346 N/mm^2
τc > τvu
Hence safe
Span 2000
= = 9.07 < 20
Effective depth X M.F. 116 X 1.90
( Permissible value for slab as per
IS:456-2000 Clause 23.2.1 )
Hence safe
Page 16 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY
AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH
BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2
DESIGN OF STAIRCASE
Page 17 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH
BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION
OF SPS-2
DESIGN OF STAIRCASE
INPUT DATA :
Concrete grade = M 30 Steel Grade = Fe 500
Clear cover = 30 mm Top
Clear cover = 30 mm Bottom
Thickness (D) = 150 mm
Breadth (b) = 1000 mm
Length ( L ) = 2.3 m
Riser = 170 mm
Tread = 250 mm
Partial safety factor for load = 1.5
1.292 t/m^2
Loading on Staircase :
Mu = W X L ^2 / 8
= 1.28 Tm/m
SHEAR CHECK
Vu = w X L /2 = 2.229 T/m
τvu = Vu /bd = 0.194 N/mm^2
Pt % provided = 0.342
τc = 0.423 N/mm^2
τc > τvu
Hence safe
SUMMARY :
Provided D = 150 mm
Provide 10 tor @ 200 c/c main steel
(Provided Ast. = 393 mm^2/m)
Provide 8 tor @ 200 c/c dist. Steel.
(Provided Ast. = 251 mm^2/m)
Page 18 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH
BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION
OF SPS-2
Check for deflection
Span 2300
= 11.11 < 20
Effective depth X M.F. 115 x 1.8
Hence safe
( Permissible value for simply supported slab as per IS 456,Clause no. 23.2.1 )
Page 19 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY
AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH
BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2
DESIGN OF WALLS
Page 20 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
JHANSI
CLIENT: CANTONMENT BOARD CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2
=b
236.20
Surcharge Pressure =
0.33 x 1 = 0.330 T/sqm Water Pressure for strength =
2 =2a 1.0 T/m^3* 4.2
Earth Pressure = [ ( 2 - 1 ) X 0.33 + 1 ] x 0 = 4.2
= 0.00 T/sq m
= { 2 x 0.33 x 3.7 }
= 2.442 t/sq m Water Pressure for serviceability =
1.0 T/m^3* 1.00
=1
Moment due to water Pressure for strength condition: T/sq m
a / b = 0.238
(Refer Moody's chart fig.no 04 Plate fixed along three edges,Free at top)
Page 21 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
JHANSI
CLIENT: CANTONMENT BOARD CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2
(Refer Moody's chart fig.no 04 plate fixed along three edges,free at top)
a/b = 0.270
(Refer moody's chart fig.no:1 plate fixed along three edges,free at top)
Page 22 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
JHANSI
CLIENT: CANTONMENT BOARD CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2
Ast = 0 .5 f ck 1 − 1 − 4 .6 M u2 bd
fy f ck bd
Page 23 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
JHANSI
CLIENT: CANTONMENT BOARD CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2
SUMMARY :
A) From Bottom to Top = 300 mm to 300 mm
D @ bottom = 300
Provide 10 tor @ 200 c/c vertical inside upto midheight
(Provided Ast. = 393 mm^2/m)
Provide 10 tor @ 150 c/c horizontal inside
(Provided Ast. = 524 mm^2/m)
Provide 10 tor @ 200 c/c Vertical outside upto 1.35m ht from bottom
(Provided Ast. = 393 mm^2/m)
Provide 10 tor @ 150 c/c horizontal outside
(Provided Ast. = 524 mm^2/m)
Shear check :-
Water
Shear V = 1.64 T/M
Vu = 1.64 x 1.50 = 2.460
τvu = Vu / bd
=( 2.46 X 10^4 ) / ( 1000 x 250 )
= 0.098 N/mm^2
Pt provided = 0.157 %
τc = 0.300 N/mm^2
τc > τvu
HENCE SAFE
Soil + Surcharge
Shear V = 1.08 T/M
Vu = 1.08 x 1.50 = 1.620
τvu = Vu / bd
=( 1.62 X 10^4 ) / ( 1000 x 250 )
= 0.065 N/mm^2
Pt provided = 0.157 %
τc = 0.300 N/mm^2
τc > τvu
HENCE SAFE
Page 24 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
Tension- "T"=
CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61
" r " = As/bd = 0.002 0.008
depth to neutral axis, "x" = (-a.r +((a.r)2 + 2.a.r)0.5.d = 48.12 mm 94.61
Page 25 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
Page 26 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
Tension- "T"=
CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61
" r " = As/bd = 0.002 0.008
depth to neutral axis, "x" = (-a.r +((a.r)2 + 2.a.r)0.5.d = 48.12 mm 94.61
Page 27 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
Page 28 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2
=b
237.35
Surcharge Pressure =
0.33 x 1 = 0.330 T/sqm Water Pressure for strength =
5.4 =2a 1.0 T/m^3* 3.05
Earth Pressure = [ ( 2 - 1 ) X 0.33 + 1 ] x 0 = 3.05
= 0.00 T/sq m
= { 2 x 0.33 x 2.55 }
= 1.683 t/sq m Water Pressure for serviceability =
1.0 T/m^3* 0.00
=0
(Refer Moody's chart fig.no 04 plate fixed along three edges,free at top)
Page 29 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2
a/b = 1.059
(Refer moody's chart fig.no:1 plate fixed along three edges,free at top)
Ast = 0 .5 f ck 1 − 1 − 4 .6 M u2 bd
fy f ck bd
Page 30 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2
Reinforcement required due to earth + surcharge:-
SUMMARY :
A) From Bottom to Top = 300 mm to 300 mm
D @ bottom = 300
Provide 10 tor @ 200 c/c vertical inside upto midheight
(Provided Ast. = 393 mm^2/m)
Provide 10 tor @ 150 c/c horizontal inside
(Provided Ast. = 524 mm^2/m)
Provide 10 tor @ 200 c/c Vertical outside upto 1.35m ht from bottom
(Provided Ast. = 393 mm^2/m)
Provide 10 tor @ 150 c/c horizontal outside
(Provided Ast. = 524 mm^2/m)
Shear check :-
Water
Shear V = 1.71 T/M
Vu = 1.71 x 1.50 = 2.565
τvu = Vu / bd
=( 2.565 X 10^4 ) / ( 1000 x 250 )
= 0.103 N/mm^2
Pt provided = 0.157 %
τc = 0.300 N/mm^2
τc > τvu
HENCE SAFE
Soil + Surcharge
Shear V = 1.36 T/M
Vu = 1.36 x 1.50 = 2.040
τvu = Vu / bd
=( 2.04 X 10^4 ) / ( 1000 x 250 )
= 0.082 N/mm^2
Pt provided = 0.157 %
τc = 0.300 N/mm^2
τc > τvu Page 31 of 85
HENCE SAFE
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
Tension- "T"=
CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61
" r " = As/bd = 0.002 0.008
depth to neutral axis, "x" = (-a.r +((a.r)2 + 2.a.r)0.5.d = 48.12 mm 94.61
Page 32 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
Page 33 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING SOLUTIONS PVT LTD.
STATION OF SPS-2
=b 0.60
236.55
Surcharge Pressure =
0.33 x 1 = 0.330 T/sqm Water Pressure for strength =
4 =2a 1.0 T/m^3* 3.85
Earth Pressure = [ ( 2 - 1 ) X 0.33 + 1 ] x 0 = 3.85
= 0.00 T/sq m
= { 2 x 0.33 x 3.35 }
= 2.211 t/sq m Water Pressure for serviceability =
1.0 T/m^3* 0.60
= 0.6
Moment due to water Pressure for strength condition: T/sq m
a / b = 0.519
(Refer Moody's chart fig.no 04 Plate fixed along three edges,Free at top)
Page 34 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING SOLUTIONS PVT LTD.
STATION OF SPS-2
Moment due to earth Pressure :
a / b = 0.597
(Refer Moody's chart fig.no 04 plate fixed along three edges,free at top)
a/b = 0.597
(Refer moody's chart fig.no:1 plate fixed along three edges,free at top)
Page 35 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING SOLUTIONS PVT LTD.
STATION OF SPS-2
Ast = 0 .5 f ck 1 − 1 − 4 .6 M u2 bd
fy f ck bd
Page 36 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING SOLUTIONS PVT LTD.
STATION OF SPS-2
Reinforcement required due to earth + surcharge:-
SUMMARY :
A) From Bottom to Top = 300 mm to 300 mm
D @ bottom = 300
Provide 10 tor @ 200 c/c vertical inside upto midheight
(Provided Ast. = 393 mm^2/m)
Provide 10 tor @ 150 c/c horizontal inside
(Provided Ast. = 524 mm^2/m)
Provide 10 tor @ 200 c/c Vertical outside upto 1.35m ht from bottom
(Provided Ast. = 393 mm^2/m)
Provide 10 tor @ 150 c/c horizontal outside
(Provided Ast. = 524 mm^2/m)
Page 37 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING SOLUTIONS PVT LTD.
STATION OF SPS-2
Shear check :-
Water
Shear V = 2.44 T/M
Vu = 2.44 x 1.50 = 3.660
τvu = Vu / bd
=( 3.66 X 10^4 ) / ( 1000 x 250 )
= 0.146 N/mm^2
Pt provided = 0.157 %
τc = 0.300 N/mm^2
τc > τvu
HENCE SAFE
Soil + Surcharge
Shear V = 1.62 T/M
Vu = 1.62 x 1.50 = 2.430
τvu = Vu / bd
=( 2.43 X 10^4 ) / ( 1000 x 250 )
= 0.097 N/mm^2
Pt provided = 0.157 %
τc = 0.300 N/mm^2
τc > τvu
HENCE SAFE
SUMMARY :
A) From Bottom to Top = 400 mm
D @ bottom = 400
Provide 10 tor @ 150 c/c vertical inside upto midheight
(Provided Ast. = 524 mm^2/m)
Provide 10 tor @ 150 c/c horizontal inside
(Provided Ast. = 524 mm^2/m)
Provide 10 tor @ 150 c/c Vertical outside upto 1.35m ht from bottom
(Provided Ast. = 524 mm^2/m)
Provide 10 tor @ 150 c/c horizontal outside
(Provided Ast. = 524 mm^2/m)
Page 38 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
Tension- "T"=
CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61
" r " = As/bd = 0.002 0.008
depth to neutral axis, "x" = (-a.r +((a.r)2 + 2.a.r)0.5.d = 48.12 mm 94.61
Page 39 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
Page 40 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
Tension- "T"=
CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61
" r " = As/bd = 0.002 0.008
depth to neutral axis, "x" = (-a.r +((a.r)2 + 2.a.r)0.5.d = 48.12 mm 94.61
Page 41 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
Page 42 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
JHANSI
CLIENT: CANTONMENT BOARD CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2
=b
234.80
Surcharge Pressure =
0.33 x 1 = 0.330 T/sqm Water Pressure for strength =
4 =2a 1.0 T/m^3* 5.6
Earth Pressure = [ ( 2 - 1 ) X 0.33 + 1 ] x 0 = 5.6
= 0.00 T/sq m
= { 2 x 0.33 x 5.1 }
= 3.366 t/sq m Water Pressure for serviceability =
1.0 T/m^3* 1.70
= 1.7
Moment due to water Pressure for strength condition: T/sq m
a / b = 0.357
(Refer Moody's chart fig.no 04 Plate fixed along three edges,Free at top)
Page 43 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
JHANSI
CLIENT: CANTONMENT BOARD CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2
(Refer Moody's chart fig.no 04 plate fixed along three edges,free at top)
a/b = 0.392
(Refer moody's chart fig.no:1 plate fixed along three edges,free at top)
Page 44 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
JHANSI
CLIENT: CANTONMENT BOARD CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2
Ast = 0 .5 f ck 1 − 1 − 4 .6 M u2 bd
fy f ck bd
Page 45 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
JHANSI
CLIENT: CANTONMENT BOARD CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2
SUMMARY :
A) From Bottom to Top = 300 mm to 300 mm
D @ bottom = 300
Provide 10 tor @ 150 c/c vertical inside upto midheight
(Provided Ast. = 524 mm^2/m)
Provide 10 tor @ 150 c/c horizontal inside
(Provided Ast. = 524 mm^2/m)
Provide 10 tor @ 150 c/c Vertical outside upto 1.35m ht from bottom
(Provided Ast. = 524 mm^2/m)
Provide 10 tor @ 150 c/c horizontal outside
(Provided Ast. = 524 mm^2/m)
Page 46 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
JHANSI
CLIENT: CANTONMENT BOARD CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2
Shear check :-
Water
Shear V = 3.99 T/M
Vu = 3.99 x 1.50 = 5.985
τvu = Vu / bd
=( 5.985 X 10^4 ) / ( 1000 x 250 )
= 0.239 N/mm^2
Pt provided = 0.21 %
τc = 0.341 N/mm^2
τc > τvu
HENCE SAFE
Soil + Surcharge
Shear V = 2.64 T/M
Vu = 2.64 x 1.50 = 3.960
τvu = Vu / bd
=( 3.96 X 10^4 ) / ( 1000 x 250 )
= 0.158 N/mm^2
Pt provided = 0.21 %
τc = 0.341 N/mm^2
τc > τvu
HENCE SAFE
Page 47 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
Tension- "T"=
CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61
" r " = As/bd = 0.002 0.008
depth to neutral axis, "x" = (-a.r +((a.r)2 + 2.a.r)0.5.d = 54.66 mm 94.61
Page 48 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
Page 49 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
Tension- "T"=
CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61
" r " = As/bd = 0.002 0.008
depth to neutral axis, "x" = (-a.r +((a.r)2 + 2.a.r)0.5.d = 54.66 mm 94.61
Page 50 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
Page 51 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY
AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH
BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2
DESIGN OF BEAMS
Page 52 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS PVT
BOARD JHANSI
LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
INPUT DATA
Grade of concrete = M 30 Steel Grade = Fe 500
clear cover = 40 mm TOP
clear cover = 40 mm BOTTOM
Provide depth(D) = 450 mm.
BEAM WIDTH = 300 mm.
2.000
0.838 T 0.838 T
Loading on beam:
1) S.W. of BEAM = 0.45 X 0.3 X 2.5 t/m^3 = 0.338 T/m
Max BM = ( W X L^2 /8 )
Design moment = 0.419 Tm Max moment
Ast . = 36 mm^2
Ast MIN . = 242 mm^2
SUMMARY:
PROVIDE B= 300 mm
PROVIDE D= 450 mm
SHEAR DESIGN
Vmax = 0.838 T
Vu = 1.26 T
Pt % provided = 0.35 %
τc = 0.43 N/mm^2
Page 53 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS PVT
BOARD JHANSI
LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
INPUT DATA
Grade of concrete = M 30 Steel Grade = Fe 500
clear cover = 40 mm TOP
clear cover = 40 mm BOTTOM
Provide depth(D) = 450 mm.
BEAM WIDTH = 300 mm.
2.300
2.630 T 1.77 T
Loading on beam:
1) S.W. of BEAM = 0.45 X 0.3 X 2.5 t/m^3 = 0.338 T/m
Max BM = ( W X L^2 /8 )
Design moment = 1.300 Tm Max moment (REFFER STAAD)
SHEAR DESIGN
Vmax = 2.630 T
Vu = 3.95 T
Pt % provided = 0.35 %
τc = 0.43 N/mm^2
Page 54 of 85
****************************************************
* *
* STAAD.Pro CONNECT Edition *
* Version 22.02.00.26 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= NOV 22, 2019 *
* Time= 14:16:28 *
* *
* Licensed to: *
****************************************************
1. STAAD PLANE
INPUT FILE: Z:\P5WQSH~6\DATA\I87AJT~9\SFC\SX8NNX~5\JHANSI\D3Z4KL~O\2IDNU4~Q\BEAMS\FB2\FB2.STD
2. START JOB INFORMATION
3. ENGINEER DATE 24SEP19
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. UNIT METER MTON
7. JOINT COORDINATES
8. 1 0 0 0; 2 2.3 0 0
9. MEMBER INCIDENCES
10. 1 1 2
11. DEFINE MATERIAL START
12. ISOTROPIC CONCRETE
13. E 2.21467E+06
14. POISSON 0.17
15. DENSITY 2.40262
16. ALPHA 1E05
17. DAMP 0.05
18. TYPE CONCRETE
19. STRENGTH FCU 2812.28
20. END DEFINE MATERIAL
21. MEMBER PROPERTY AMERICAN
22. 1 PRIS YD 0.45 ZD 0.3
23. CONSTANTS
24. MATERIAL CONCRETE ALL
25. SUPPORTS
26. 1 2 PINNED
27. LOAD 1 LOADTYPE DEAD TITLE LOAD CASE 1
28. SELFWEIGHT Y 1
29. MEMBER LOAD
30. 1 UNI GY 0.84 0 2.3
31. 1 UNI GY 1.5 0 1.15
32. PERFORM ANALYSIS PRINT STATICS CHECK
P R O B L E M S T A T I S T I C S
Page 55 of 85
SIZE OF STIFFNESS MATRIX = 0 DOUBLE KILOWORDS
REQRD/AVAIL. DISK SPACE = 12.0/********* MB
X = 0.924728065E+00
Y = 0.000000000E+00
Z = 0.000000000E+00
TOTAL APPLIED LOAD 1
Page 56 of 85
1 MAX 2.63 0.00 1 0.00 0.00 1
0.00 0.00 1 0.00 0.00 1 0.00 0.00 1
MIN 1.77 2.30 1 1.30 0.96 1
0.00 2.30 1 0.00 2.30 1 0.00 2.30 1
35. FINISH
************************************************************
* For technical assistance on STAAD.Pro, please visit *
* http://www.bentley.com/en/support/ *
* *
* Details about additional assistance from *
* Bentley and Partners can be found at program menu *
* Help>Technical Support *
* *
* Copyright (c) 19972017 Bentley Systems, Inc. *
* http://www.bentley.com *
************************************************************
Page 57 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS PVT
BOARD JHANSI
LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
INPUT DATA
Grade of concrete = M 30 Steel Grade = Fe 500
clear cover = 40 mm TOP
clear cover = 40 mm BOTTOM
Provide depth(D) = 450 mm.
BEAM WIDTH = 300 mm.
2.800
1.936 T 1.936 T
Loading on beam:
1) S.W. of BEAM = 0.45 X 0.3 X 2.5 t/m^3 = 0.338 T/m
Max BM = ( W X L^2 /8 )
Design moment = 1.355 Tm Max moment
SHEAR DESIGN
Vmax = 1.936 T
Vu = 2.90 T
Pt % provided = 0.35 %
τc = 0.43 N/mm^2
Page 58 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS PVT
BOARD JHANSI
LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
INPUT DATA
Grade of concrete = M 30 Steel Grade = Fe 500
clear cover = 40 mm TOP
clear cover = 40 mm BOTTOM
Provide depth(D) = 600 mm.
BEAM WIDTH = 300 mm.
1.3m
2m
4.3m
2.500 T 2.040 T
Loading on beam:
1) S.W. of BEAM = 0.6 X 0.3 X 2.5 t/m^3 = 0.450 T/m
SHEAR DESIGN
Vmax = 2.500 T
Vu = 3.75 T
Pt % provided = 0.31 %
τc = 0.41 N/mm^2
Page 59 of 85
****************************************************
* *
* STAAD.Pro CONNECT Edition *
* Version 22.02.00.26 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= NOV 23, 2019 *
* Time= 11:16: 9 *
* *
* Licensed to: *
****************************************************
1. STAAD PLANE
INPUT FILE: Z:\P5WQSH~6\DATA\I87AJT~9\SFC\SX8NNX~5\JHANSI\D3Z4KL~O\2IDNU4~Q\BEAMS\FB4\FB4.STD
2. START JOB INFORMATION
3. ENGINEER DATE 24SEP19
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. UNIT METER MTON
7. JOINT COORDINATES
8. 1 0 0 0; 2 4.30001 0 0
9. MEMBER INCIDENCES
10. 1 1 2
11. DEFINE MATERIAL START
12. ISOTROPIC CONCRETE
13. E 2.21467E+06
14. POISSON 0.17
15. DENSITY 2.40262
16. ALPHA 1E05
17. DAMP 0.05
18. TYPE CONCRETE
19. STRENGTH FCU 2812.28
20. END DEFINE MATERIAL
21. MEMBER PROPERTY AMERICAN
22. 1 PRIS YD 0.6 ZD 0.3
23. CONSTANTS
24. MATERIAL CONCRETE ALL
25. SUPPORTS
26. 1 2 PINNED
27. LOAD 1 LOADTYPE DEAD TITLE LOAD CASE 1
28. MEMBER LOAD
29. 1 UNI GY 0.45 0 4.3
30. 1 CON GY 0.84 1.3 0
31. 1 CON GY 1.77 2 0
32. PERFORM ANALYSIS PRINT STATICS CHECK
P R O B L E M S T A T I S T I C S
Page 60 of 85
STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO. 1
LOADTYPE DEAD TITLE LOAD CASE 1
X = 0.193448862E+01
Y = 0.000000000E+00
Z = 0.000000000E+00
TOTAL APPLIED LOAD 1
Page 61 of 85
34. PRINT SUPPORT REACTION ALL
SUPPORT REACTION ALL
35. FINISH
************************************************************
* For technical assistance on STAAD.Pro, please visit *
* http://www.bentley.com/en/support/ *
* *
* Details about additional assistance from *
* Bentley and Partners can be found at program menu *
* Help>Technical Support *
* *
* Copyright (c) 19972017 Bentley Systems, Inc. *
* http://www.bentley.com *
************************************************************
Page 62 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS PVT
BOARD JHANSI
LTD.
INPUT DATA
Grade of concrete = M 30 Steel Grade = Fe 500
clear cover = 40 mm TOP
clear cover = 40 mm BOTTOM
Provide depth(D) = 450 mm.
BEAM WIDTH = 300 mm.
2.300
2.941 T 2.941 T
Loading on beam:
1) S.W. of BEAM = 0.45 X 0.3 X 2.5 t/m^3 = 0.338 T/m
Max BM = ( W X L^2 /8 )
Design moment = 1.691 Tm Max moment
SHEAR DESIGN
Vmax = 2.941 T
Vu = 4.41 T
Pt % provided = 0.28 %
τc = 0.39 N/mm^2
Page 63 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS PVT
BOARD JHANSI
LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
INPUT DATA
Grade of concrete = M 25 Steel Grade = Fe 500
clear cover = 40 mm TOP
clear cover = 40 mm BOTTOM
Provide depth(D) = 300 mm.
BEAM WIDTH = 300 mm.
0.500
1.500
2.580 T 1.460 T
Loading on beam:
1) S.W. of BEAM = 0.3 X 0.3 X 2.5 t/m^3 = 0.225 T/m
Max BM = ( W X L^2 /8 )
Design moment = 1.230 Tm Max moment (REFFER STAAD OUTPUT)
SHEAR DESIGN
Vmax = 2.580 T
Vu = 3.87 T
Pt % provided = 0.45 %
τc = 0.47 N/mm^2
Page 64 of 85
****************************************************
* *
* STAAD.Pro V8i SELECTseries4 *
* Version 20.07.09.31 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= SEP 24, 2019 *
* Time= 14:42:12 *
* *
* USER ID: *
****************************************************
1. STAAD PLANE
INPUT FILE: RB1.STD
2. START JOB INFORMATION
3. ENGINEER DATE 24SEP19
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. UNIT METER MTON
7. JOINT COORDINATES
8. 1 0 0 0; 2 1.5 0 0
9. MEMBER INCIDENCES
10. 1 1 2
11. DEFINE MATERIAL START
12. ISOTROPIC CONCRETE
13. E 2.21467E+006
14. POISSON 0.17
15. DENSITY 2.40262
16. ALPHA 1E005
17. DAMP 0.05
18. TYPE CONCRETE
19. STRENGTH FCU 2812.28
20. END DEFINE MATERIAL
21. MEMBER PROPERTY AMERICAN
22. 1 PRIS YD 0.3 ZD 0.3
23. CONSTANTS
24. MATERIAL CONCRETE ALL
25. SUPPORTS
26. 1 2 PINNED
27. LOAD 1 LOADTYPE DEAD TITLE LOAD CASE 1
28. SELFWEIGHT Y 1
29. MEMBER LOAD
30. 1 UNI GY 0.23
31. 1 CON GY 3.37 0.5
32. PERFORM ANALYSIS PRINT STATICS CHECK
P R O B L E M S T A T I S T I C S
Page 65 of 85
CENTER OF FORCE BASED ON Y FORCES ONLY (METE).
(FORCES IN NONGLOBAL DIRECTIONS WILL INVALIDATE RESULTS)
X = 0.541427017E+00
Y = 0.000000000E+00
Z = 0.000000000E+00
TOTAL APPLIED LOAD 1
Page 66 of 85
SUPPORT REACTIONS UNIT MTON METE STRUCTURE TYPE = PLANE
35. FINISH
************************************************************
* For questions on STAAD.Pro, please contact *
* Bentley Systems or Partner offices *
* *
* Telephone Web / Email *
* USA +1 (714) 9742500 *
* UK +44 (0) 808 101 9246 *
* SINGAPORE +65 62256158 *
* FRANCE +33 (0) 1 55238400 *
* GERMANY +49 0931 40468 *
* INDIA +91 (033) 40062021 *
* JAPAN +81 (03)59526500 http://www.ctcg.co.jp *
* CHINA +86 21 6288 4040 *
* THAILAND +66 (0)26451018/19 partha.p@reisoftwareth.com*
* *
* Worldwide http://selectservices.bentley.com/enUS/ *
* *
************************************************************
Page 67 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS PVT
BOARD JHANSI
LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
INPUT DATA
Grade of concrete = M 25 Steel Grade = Fe 500
clear cover = 40 mm TOP
clear cover = 40 mm BOTTOM
Provide depth(D) = 300 mm.
BEAM WIDTH = 300 mm.
S.W of beam =
0.23 T/m
T T
2.800
0.315 T 0.315 T
Loading on beam:
1) S.W. of BEAM = 0.3 X 0.3 X 2.5 t/m^3 = 0.225 T/m
Max BM = ( W X L^2 /8 )
Design moment = 0.221 Tm Max moment
Ast . = 30 mm^2
Ast MIN . = 152 mm^2
SUMMARY:
PROVIDE B= 300 mm
PROVIDE D= 300 mm
SHEAR DESIGN
Vmax = 0.315 T
Vu = 0.47 T
Pt % provided = 0.45 %
τc = 0.47 N/mm^2
Page 68 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY
AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH
BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2
DESIGN OF COLUMNS
Page 69 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF PVT LTD.
SPS-2
Z = 0.1 I = 1.25 R = 3
Sa/g = 2.5
Ah = Z X I x Sa = 0.052
2R g
Page 70 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT AQUATECH
BOARD JHANSI SOLUTIONS PVT
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF
LTD.
SPS-2
from chart 63 of SP 16
Page 71 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT AQUATECH
BOARD JHANSI SOLUTIONS PVT
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF
LTD.
SPS-2
INITITAL MOMENTS:
Mux" = 0.000 Kn-m ……… 1
Muy" = 6.59 Kn-m………. 2
calculating minimum eccentricity moments,
p/fck = 0.0356
value of Mux/Mux1 = 0.95 ….this value is greater than above value , hence ok
.
Steel provided is satisfactory
Page 72 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY
AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH
BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2
DESIGN OF RAFT
Page 73 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
JHANSI
CONTRACTOR: M/s AQUATECH
CLIENT: CANTONMENT BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2
LOAD ON RAFT : ( FOR RECEIVING CHAMBER, SCREEN CHAMBER & STAIRCASE CHAMBER )
L B H NOS. Density
A TOTAL DEAD LOAD MT 90
LOAD CALCULATION
(a) Walls 60.72
Receiving Chamber
Long Wall 2.600 X 0.300 X 4.200 X 2 X 2.5 = 16.38
Short Wall 1.000 X 0.300 X 4.200 X 2 X 2.5 = 6.30
Total 60.72
Total 6.15
Page 74 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
JHANSI
CONTRACTOR: M/s AQUATECH
CLIENT: CANTONMENT BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2
LOAD ON RAFT : ( FOR RECEIVING CHAMBER, SCREEN CHAMBER & STAIRCASE CHAMBER )
L B H NOS. Density
(d) Staircase 2.38
Riser & Tread for Flight 1 & 2 0.5 0.25 X 0.175 X 1.000 X 16 X 2.5 = 0.88
Total = 2.38
Total = 4.00
Total 1.22
Page 75 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CLIENT: CANTONMENT BOARD JHANSI 0.000
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF
SPS-2
LOAD ON RAFT : ( FOR RECEIVING CHAMBER, SCREEN CHAMBER & STAIRCASE CHAMBER )
L B H NOS. Density
A TOTAL LIVE LOAD MT 9
LOAD CALCULATION
(a) Slab 6.15
Total 6.15
Page 76 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
DESIGN OF RAFT FOR RECEIVING CHAMBER, SCREEN CHAMBER & STAIRCASE CHAMBER
INPUT DATA
Grade of concrete = 30
Steel Grade : Fe 500
clear cover = 60 mm @ bottom
clear cover = 60 mm @ top
Load :
Total = 81.33 T
Say = 82.00 T
BASE SLAB AREA =
SOIL PRESSURE
Page 77 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
DESIGN OF RAFT :
2.300
lx
= 2.43 x 2.300 ^2
= 1.609 Tm/m
8
Page 78 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
Shear check:
Vu max = (w X lx / 2 )
= ( 3.650 x 2.300) 2
= 4.197 T/m
τvu = 4.197 X 10^4 / ( 1000 x 235 )
τvu = 0.179 N/mm^2
Pt provided = 0.33 %
τc = 0.4 N/mm^2
τc > τvu Hence safe
Provide D = 300 mm
Page 79 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2
HOOP
B/F
Location For Crack Width Check TOP BOTTOM -@ 2.975
INPUT
fck= 30 N/mm2 30 30
2
fy= 500 N/mm 500 500
Area of reinforcement " As " = 785 mm2 393 1340
b= 1000 mm 1000 1000
h= 300 mm 300 600
d= 235 mm 235 532
Minimum cover to tension reinforcement " CO " = 60 mm 60 60
Bar spacing " S " = 100 mm 200 150
Bar dia " DIA " = 10 mm 10 16
" acr " =(((S/2)^2+(CO+DIA/2)^2)^(1/2)-DIA/2) as default or enter other value = 77.0 mm 114.3 93.2
"acr " is distance from the point considered to the surface of the nearest
longitudinal bar
Applied moment " M "= 3.58 Tm 1.36
Page 80 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT BOARD JHANSI AQUATECH
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SOLUTIONS PVT LTD.
SPS-2
L B H NOS. Density
A TOTAL DEAD LOAD MT 84
LOAD CALCULATION
(a) Walls
Wet Well
Long Wall 4.000 X 0.300 X 4.800 X 2 X 2.5 = 28.80
Long Wall (Dip Portion) 1.200 X 0.300 X 0.800 X 2 X 2.5 = 1.44
Short Wall 3.100 X 0.300 X 4.800 X 2 X 2.5 = 22.32
Total 52.56 T
(b) Slab
(c) Beams
(d) Column
SC1 0.300 X 0.300 X 4.300 X 4 X 2.5 = 3.87
Total = 3.87 T
(e) Pedestral
PD1 0.400 X 0.200 X 0.550 X 3 X 2.5 = 0.33
Total = 0.33 T
(f) Monorail
Weight
Length
(Kg/m)
Monorail ISMB 250 4.000 X - X - X 1 X 37.3 = 149.20
Total Load in
= 0.15 T
MT
(g) Raft
Page 81 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT BOARD JHANSI AQUATECH SOLUTIONS
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF PVT LTD.
SPS-2
LOAD ON RAFT :
L B H NOS. Density
A TOTAL LIVE LOAD MT 4
LOAD CALCULATION
(a) Slab
(b) Monorail
Total 1.65 T
Page 82 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT BOARD
AQUATECH
JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
INPUT DATA
Grade of concrete = M 30
Steel Grade : Fe 500
clear cover = 60 mm @ bottom
clear cover = 60 mm @ top
Provide depth(D) = 400 mm
LOAD ON SLAB :-
Toe projection
Top = 0.30 m
Bottom = 0.30 m
Left = 0.30 m
Right = 0.30 m
DL LL
TOTAL LOAD = 61.00 + 4.00 = 65.00 T
Soil Pressure due to load (P) = 3.380 T/m^2 ( REFER LOAD CALCULATIONS )
Positive moment at mid span = coefficient* P* (lx)^2 = 0.056 X 3.380 X 2.80 x 2.80
Long span 1.48 Tm/m + 3.28 Tm/m
( WALL MOMENT )
= 4.76 Tm/m
Tension in slab due to water pressure = 4.00 T/M ( Along short direction )
Page 83 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT BOARD
AQUATECH
JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2
Ast @ top = 0 . 5 f ck 1 − 1 − 4 .6 M u
short span 2 bd
f y f ck bd
= (0.5x30/500) x [ 1 - √ ( 1-(4.6x5.68x1.5x10^7)/ ( 30x1000x334^2) ) ] x (1000x334)
= 605.0 mm^2/m
Ast @ top = 0 . 5 f ck 1 − 1 − 4 .6 M u
Long span 2 bd
f y f ck bd
= (0.5x30/500) x [ 1 - √ ( 1-(4.6x4.76x1.5x10^7)/ ( 30x1000x334^2) ) ] x (1000x334)
= 504.4 mm^2/m
Shear check:
Total factored load ( w ) = 3.380 X 1.5 = 5.07 T/m^2
Area of contribution for long side Area of contribution for short side
= ( 4.3 X 2.8 - 2 X 2.8^ 2 / 4 ) / 2 = 2.8 ^ 2 /4
= 4.06 m^2 = 1.96 m^2
Total factored shear force along long side Total factored shear force along short side
= 4.06 m^2 X 5.07 T/m^2 = 1.96 m^2 X 5.07 T/m^2
= 20.58 T = 9.94 T
Factored shear per m along long side Factored shear per m along short side
= 20.58 T / 4.3 m = 9.94 m / 2.8 m
= 4.79 T/m = 3.55 T/m
0.24 400
x 1000 x = 480 mm^2/m
100 2
For thk = 400 mm
Provide
D = 400 mm
HOOP
B/F
Location For Crack Width Check TOP BOTTOM -@ 2.975
INPUT
fck= 30 N/mm2 500 30
2
fy= 500 N/mm 500 500
Area of reinforcement " As " = 807 mm2 565 1340
b= 1000 mm 1000 1000
h= 400 mm 400 600
d= 334 mm 334 532
Minimum cover to tension reinforcement " CO " = 60 mm 60 60
Bar spacing " S " = 140 mm 200 150
Bar dia " DIA " = 12 mm 12 16
" acr " =(((S/2)^2+(CO+DIA/2)^2)^(1/2)-DIA/2) as default or enter other value = 90.2 mm 113.8 93.2
"acr " is distance from the point considered to the surface of the nearest
longitudinal bar
Applied moment " M "= 5.68 Tm 2.18
Page 85 of 85