110kV Substation
110kV Substation
ISSUE : P0
SECTION - 1
AND
1
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
TABLE OF CONTENTS
PAGE
Sl.No DESCRIPTION
NO.
1.0 Introduction 3
2
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
1.0 INTRODUCTION:
• SRI ANDAL PAPER MILLS PVT LTD (SAPM) has a large paper manufacturing
Plant at Pasuvapalayam, Erode District, Tamilnadu. SAPM proposes to
produce a capacity to 700 Tonne/day with introduction of a modern Open
Corrugated Container process and a Paper Machine.
• This project involves construction of a new electrical distribution system to
support the increase in plant production.
3
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
4
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
SYSTEM
110kV 11kV 0.415kV
VOLTAGE
Initial symmetrical
short circuit 31.5KA, 3Sec 25KA, 3Sec 50KA, 1Sec
current
Auxiliary power
• AC control voltage 240 VAC
• DC control voltage 110 VDC
5
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
▪ IS 778 (Gun metal gate, globe and check-valves for general purpose)
6
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
▪ IS 9434 (Guide for sampling and analysis of dissolved gas in oil filled
equipments)
▪ IS: 731 1971 Porcelain insulators for overhead, power lines with a
national voltage, greater than 1000V.
▪ IS:2309 1989 Code of Practice for the protection of buildings and allied
structures against lightning
7
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
a. complete survey of the land along the TL route as shown in above drawing
SriAndal hereby indicate that entire Route of TL and Towers are within their Own
land and way leave for TL route shall be limited to obtaining their approval only.
8
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
CONSTRUCTION
• The circuit breakers shall be single pole operated, out-door type, Trip free SF6
gas insulated and shall comply with the requirements of IEC 56 and IS 2516.
• The circuit breaker shall be live tank type.
• All the three poles of circuit breakers shall be operated by local electrical and
remote/electrical from the mechanism in the housing.
• The circuit breaker shall have SF6 gas for electrical interrupting medium.
• The SF6 gas shall comply with the requirement of IEC 376 and be suitable for
use in the circuit breaker when it is operated under the service and system
conditions.
• Sufficient gas shall be provided for filling the circuit breaker at installation with
additional 20% for any losses. SF6 Gas filling equipment with Gas leak
Detector and all accessories, and necessary volume of SF6 Gas with Cylinder .
• Insulation creepage distance shall not be less than 25 mm per kV of rated
voltage between phases.
OPERATING MECHANISM
• The operating mechanism shall be suitable for mounting at the circuit breaker
supporting structure, and below the circuit breaker in a weather -proof, dust-
proof, vermin-proof and well-ventilated housing.
• Operating duty shall be standard and operating mechanism shall be trip free
during the entire closing sequence.
• A set of at least ten normally closed and ten normally open spare potential
free contacts shall be provided for remote electrical indication as well as
electrical interlocking and shall be wired to a terminal block in the housing.
9
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
• Potential free contacts shall be provided for alarming spring charge failure or
control oil pressure low. Potential free contacts shall be provided for alarms
for SF6 gas low and SF6 Trip Block.
• The circuit breaker shall be provided with Local/Remote selector switch. The
selection of local operation shall inhibit the operation of the circuit breaker
from any remote source and selection of remote inhibits operation from local
operation.
• Mechanically operated indication to show the status of the circuit breaker operations
(open/close and springs charged/discharged) shall be provided.
➢ SCOPE
This specification is for current transformers for use with electrical instruments
and electrical protective devices on systems with maximum operating voltage of
123kV.
➢ CONSTRUCTION
The current transformer shall be outdoor, oil-filled, hermetically sealed and shall
comply with the requirement of IEC 185. The current transformer shall be
suitable for vertical installation on steel structure.
➢ SCOPE
10
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ CONSTRUCTION
• The porcelain portion of the voltage transformer shall be made of high -grade
brown glazed porcelain. All other external parts shall be either inherently
resistant to atmospheric corrosion or hot dip galvanized.
• The voltage transformer shall have primary, secondary and earth terminals.
• The primary terminal shall be tin-plated, suitable for both copper and
aluminium connectors. The secondary terminal shall be brought out to a
separate terminal box, complete with protection MCB. The MCB should have
auxiliary contacts for indication, alarm and distance relay input.
➢ SCOPE
• This specification is for 110kV, 1250 Amps Isolator OFF LOAD type for use
online disconnection, isolation of substation apparatus.
• This specification covers both the 110 kV isolators with and without earth
switch.
➢ CONSTRUCTION
• The isolator shall be center rotating type, double break, horizontal upright
mounting isolator for use on a 110kV, 50 Hz, 3 - phase system.
• The isolator shall be complete with supporting base, phase coupling details,
operating rod, unions and guides.
11
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
• The operating mechanism shall be provided with a universal joint to allow for
a reasonable degree of out-of alignment of the operating rod.
• The isolator shall be Motorized and also fitted with manual operation facility.
There should be a remote selection to allow for operation of the isolator from
the control room. The remote selection should block any local electrical or
manual operation.
• The supporting under-base shall be hot dip galvanized steel as per the
requirement of BS 729. The under-base shall be suitable for mounting on a
steel structure.
• All the three switches shall be arranged so that the phase units are moun ted
independently and then finally interconnected with coupling tubes so as to
ensure simultaneous operation of all switches by drive rods and operating
handle for both manual and motor operation.
• Auxiliary dry contacts, five normally open and five normally closed shall be
provided for electrical interlocks such that the isolator and a ssociated 110 kV
circuit breaker can be interlocked with each other. The contacts shall be
rated to continuously carry at least 10Amps at voltages up to 500V dc/ac
• Each phase shall be mounted on a spiral type solid core post insulator
conforming to IEC 60273, and shall be fitted with clamp connector for the
suitable conductor/connector.
• The isolator shall be designed such that in fully open position, it shall provide
adequate electrical isolation between the contacts on all the three switches.
• All current carrying parts shall be made of electrolytic hard drawn copper
with switch contacts silver plated.
• The earth switch shall consist of a hinged type earthing switch fixed at the
base frame. The earth switch shall have the same rating as the isolator.
12
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
• Ten normally open and ten normally closed auxiliary contacts shall be
provided on the switch for future use.
• Five normally open and five normally closed auxiliary contacts shall be
provided on the earth switch for future use.
• The isolator and earth switch shall be provided with a padlocking facility such
that the mechanism can be locked in OPEN or CLOSED position.
➢ SCOPE
• The specification also covers inspection and test of the transformer as well
as schedule of Guaranteed Technical Particulars to be filled, signed by the
manufacturer and submitted for tender evaluation.
➢ SYSTEM CHARACTERISTICS
➢ The primary HV system is 110,000 volts, 3 phase, 3 wire, 50Hz, with neutral
point solidly earthed.
➢ The secondary MV system is 11,000 volts, 3 phase, 3 wire, 50Hz, with neutral
point Resistance earthed.
➢ GENERAL REQUIREMENTS
➢ The transformer shall be a two winding type three -phase integral unit.
13
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ The transformer shall be of the free breathing type. A dehydrating cobalt free
breather of approved design shall be provided.
➢ The design shall incorporate every reasonable precaution and provision for
the safety of all those concerned in the operation and maintenance of the
equipment keeping in view the regulatory requirements.
➢ All material used shall be of the best quality and of the class most suitable
for working under the conditions specified and shall withstand the variatio ns
of temperatures and atmospheric conditions arising under working conditions
without undue distortion or deterioration or the setting up of undue stresses
in any part, and also without affecting the strength and suitability of the
various parts for the work which they have to perform.
➢ All connections and contacts shall be of ample section and surface for
carrying continuously the specified currents without undue heating and fixed
connections shall be secured by bolts or set screws of ample size,
adequately locked. Lock nuts shall be used on stud connections carrying
current. All leads from the winding to the terminals and bushings shall be
adequately supported to prevent injury from vibration including a systematical
pull under short circuit conditions.
➢ In tank on-load-tap changers shall be located such that the space above the
diverter switch chamber will be free of inter-connecting pipes etc. for lifting
the diverter switch unit for inspection and maintenance purposes.
14
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ Galvanizing shall be applied by the hot-dipped process to ISO 1461 and for
all parts other than steel wires shall consist of a thickness of zinc coating
equivalent to not less than 610g of zinc per square meter of su rface. The zinc
coating shall be smooth, clean and of uniform thickness and free from
defects. The preparation of galvanizing and the galvanizing itself shall not
adversely affect the mechanical properties of the coated material. The quality
will be established by tests as per ISO 1461.
➢ All bolts, nuts, and washers exposed to atmosphere and in contact with non -
ferrous parts which carry current shall be of phosphor bronze. If bolts and
nuts are placed so that they are inaccessible by means of ordinary spanners,
suitable special spanners shall be provided by the supplier. Except for
hardware, which may have to be removed at site, all external surfaces shall
receive at least four coats of paint. The total dry film thickness shall be
between 100 and 130 microns.
➢ Descriptive labels for mounting indoors or inside cubicles and kiosks shall be
of material that will ensure permanence of the lettering. A matt or satin finish
shall be provided to avoid dazzle from reflected light. Labels mounted on
dark surface shall have white lettering on a black background. Danger
notices shall have red lettering on a white background.
➢ All interior surfaces of chambers or kiosks that are in contact with air shall
receive at least three coats of paint, of which the topcoat shall be of a light
shade.
➢ The design and all materials and processes used in the manufacture of the
transformer, shall be such as to reduce to a minimum the risk of the
development of acidity in the oil.
➢ Every care shall be taken to ensure that the design and manufac ture of the
transformers and auxiliary plant shall be such to have minimum noise and
vibration levels following good modern manufacturing practices. The
maximum noise levels shall be stated in the bid.
RATINGS
➢ The rating specified in this clause shall be the continuous rating at the
maximum ambient temperature.
15
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ The transformer shall be wound Dyn11 to be checked with respect to the 110
kV and 11 kV windings as per IEC 60076.
➢ The windings and connections as well as the insulating material shall not
soften, ooze, shrink or collapse during service. The materials shall be non -
catalytic and chemically inactive in transformer oil during service.
➢ No strip conductor wound on edge shall have a width exceeding six times its
thickness. The conductors shall be transposed at sufficient intervals to
minimize eddy currents and equalize the current and temperature distribution
along the windings.
➢ All windings after being wound and all fibrous hygroscopic materials used in
the construction of the transformer shall be dried under vacuum and
impregnated with hot oil.
16
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ The coil clamping rings wherever used shall preferably be of flat insulated
steel laminations.
➢ During inspection they will check the built-up winding for its quality, weight of
copper, insulation and overall weight of coil assembly. The size of conductor
used for different windings shall also be checked during stage inspection to
check the current density.
TAPPING
➢ TAPPING RANGE
➢ The transformer shall be provided with tapping on the 110-kV winding for a
variation of no-load primary voltage for parallel operation, with Tap No. 1
having the highest voltage assignment, as follows:
17
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
a) CORE
➢ The core shall be constructed from the laminations of high-grade cold rolled
non-aging, grain-oriented silicon steel known as M4 High B Grade or superior
grade CRGO steels of maximum 0.27mm or less lamination thickness
especially suitable for transformer core. The grade of CRGO shall be stated
in the bid.
➢ Every care shall be exercised in the selection, treatment and hand ling of
core steel to ensure that as far as practicable, the laminations are flat and
the finally assembled core is free from distortion.
➢ Adequate oil ducts shall be provided in the core for cooling. Tinned copper
strip bridging pieces shall be used for maintaining electrical continuity
wherever the magnetic circuit is provided into pockets by such ducts or
insulating material thicker than 0.25mm.
➢ There shall be no movement of the core assembly relative to the tank during
transport, installation as well as in service due to sudden jerks caused by
short circuits and fluctuating loads.
➢ All steel sections used for supporting the core shall be thoroughly sand
blasted or shot blasted after cutting, drilling and welding. Any non -magnetic
or high resistance alloy shall be of established quality.
➢ The insulation structure for the core to bolts and core to clamp plate shall be
such as to withstand a voltage of 2kV AC for one minute.
b) FLUX DENSITY
➢ The primary voltage variation, which may affect the flux density at every tap,
shall be kept in view while designing the transformer.
18
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ The transformer shall be so designed that the working flux density shall not
exceed 1.6 Tesla at normal voltage, frequency & ratio. Tenders with higher
flux density than specified shall not be considered.
➢ Tender shall indicate the continuous allowable maximum flux for one minute
and five seconds.
➢ The limit of flux density at which core material used saturates shall also be
stated in the tender. The name and grade of core material shall be stated in
the tender.
NOTE:
The above flux density has been specified to meet with the over fluxing of the
core due to temporary over voltage of the orders of 25% for one minute and
40% for five seconds that may appear in abnormal conditions such as the
one obtained following sudden loss of large loads.
➢ The 11kV and 110kV windings shall be brought out separately through open
bushings of outdoor, weatherproof design in accordance with the latest IEC
standard.
19
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ Bushing terminals shall be clamp type suitable for both copper and
aluminium Bus bars of sizes up to 76mm diameter.
➢ Each bushing of the 11kV windings shall be mounted on a turret. Each turret
shall be suitable for accommodating at least three sets of current
transformers.
11KV NEUTRAL
CORE 1
➢ Neutral side -;15 VA 600-/1A, cl. 5P20- for Standby Earth fault Protection.
CORE 2
➢ Neutral Side - ;15VA 600/1A, cl.PS -for Restricted Earth fault Protection
20
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
AIR CLEARANCE
➢ Care shall be taken to ensure that all fittings are suitably positioned so as
not to interfere with the external connection to the bushing terminals.
INSULATION LEVELS
The complete transformer arranged for service, shall be capable of withstandi ng the
following voltages and shall comply fully with the requirements of IEC 60076 Part 3,
including the latest amendments.
11 12 28 75
21
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ Contactors and associated equipment for the control circuit for local/remote
and manual operations of the tap changer mechanism shall be housed in the
mechanism box.
➢ The Motor Drive Unit shall have the following in addition to what has been
stated above:
(a) Isolating switch in the transformer marshalling box for the supply to the
tap changer Motor Drive Unit,
(b) Raise/lower contactors for tap changer motor operation, and associated
single phase protection/overload relay,
(e) Provisions shall be made available for hand operation in the mechanism
box.
22
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
The remote tap changer control panel shall contain the following devices:
➢ Raise, Lower, ‘out of step’ and tap change in progress indication lamps
➢ Dial type Tap position indicator (technical details to be submitted with the
tender).
The relay shall be of Numerical type proven design and shall incorporate the
following features;
➢ Initial time delay range 5-100 seconds, and ability to select Integrated
23
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
range 150%-250%
2. Oil temperature indicator with a maximum pointer drag hand type with a
resetting knob and two separately adjustable mercury contacts for alarm and
trip.
24
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
3. Mechanical isolating switch for the incoming 3 phase , 4 wire, 415V 50Hz
supply to the marshalling kiosk. 415 volts and 240 volts socket outlets
(square pins) shall also be provided in the kiosk.
4. A mechanical isolating switch for the outgoing 3 phase 4 -wire 415V 50Hz
supply to the OLTC Motor drive unit.
5. An internal standard screw type illumination lamp and heater for the kiosk
with respective switches. The lamp shall be door switch operated.
6. Wiring, fuses, links, terminal boards and cable glands for bottom entry of
multicore cables.
11. Phase sequence relay for detection of wrong phase rotation for the supply to
the fans and the OLTC Motor Drive Unit. Detailed technical details, drawings,
and schematics shall be submitted with the tender
AUXILIARY SUPPLIES
➢ The tank shall be constructed of mild steel plates of sufficient thickness and
strength and shall be complete with all accessories. It shall be designed so
as to allow the complete transformer when filled with oil to be lifted by crane
or jacks, transported by road, rail or on water without overstraining any joints
and without causing subsequent leakage of oil.
25
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ All joints, other than those that may have to be broken shall be welded.
Caulking of unsatisfactorily welded joints is forbidden.
➢ The main tank body shall be pressure tested and a certificate issued by the
national standards and testing laboratory ascertaining the soundness of all
welded joints. A certified copy of the certificate shall be submitted with the
tender for evaluation.
➢ Tank shall be provided with lifting lugs suitable for lifting the complete
transformer with oil. Furthermore, a minimum of four accessible jacking
positions shall be provided to enable the complete transformer to be raise d
or lowered using jacks.
➢ The transformer tank and all attachments normally under oil shall be capable
of withstanding full vacuum. The oil conservator shall withstand at least 35%
full Vacuum.
➢ Tank cover and inspection covers shall be provided with suitable lifting
arrangements. Inspection covers shall not weigh more than 25 kg apiece.
➢ The tank cover shall be fitted with isolated pockets for oil and winding
temperature instrument bulbs. Protection shall be provided where necessary
for each capillary tube. The pocket shall be fitted with a captive screwed cap
to prevent the ingress of water. Detailed drawings shall be provided.
➢ Gaskets for weather and oil-tight joint faces shall be of synthetic rubber-and-
cork composition and shall have a minimum thickness of 5mm, except that
where jointing faces are precision-machined thinner gaskets may be used.
26
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
PAINT WORK
➢ A test report issued by the national standards and testing laboratory shall be
produced at the time of acceptance testing of the transformer.
➢ External and internal surfaces of all transformer tanks and chambers and
other fabricated steel items shall be cleaned of scale, rust and surface dirt by
blast cleaning or other suitable approved method. After cleaning, these
surfaces should be immediately covered with paint.
➢ The interior of all transformer tanks and other oil-filled chambers shall be
cleaned of all scale and rust by shot blasting or other approved method. Hot
oil resistant varnish on white synthetic enamel/proxy paint is to be used for
painting the inside of all oil filled chambers, including transformer tanks. The
final coat shall be of a light-colored anti-condensation finish.
RADIATORS
FITTINGS
CONSERVATOR
27
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
located at the lowest point in the conservator in its final installed position and
welded such that it can drain all the sludge in the conservator.
➢ Transformers shall be provided with a gas and oil actuated relay (Buchholz
relay) of double float type with tripping contacts to detect accumulation of
gas and sudden changes of oil pressure. Shut off valves and flange
couplings shall be provided to facilitate easy removal of the relay without
lowering oil level in the main tank. A bleed valve for gas venting, a test valve
and a terminal box suitably wired to the marshalling kiosk shall also be
provided. The gas venting pipe shall be brought down to a height reachable
from ground level and shall be fitted with a gas sampling device at the end.
➢ Provision should be made on the relay for simulation of gas and oil surge for
testing purposes.
➢ Tap changer compartment shall be provided with a gas and oil actuated relay
(Buchholz relay) of double float type with tripping contacts to detect
accumulation of gas and sudden changes of oil pressure. Shut off valves and
flange couplings shall be provided to facilitate easy removal of the relay
without lowering oil level in the tap changer compartment. A bleed valve for
gas venting, a test valve and a terminal box suitably wired to the marshalling
kiosk shall also be provided. The gas venting pipe shall be brought down to a
height reachable from ground level and shall be fitted with a gas sampling
device at the end. Provision should be made on the relay for simulation of
gas and oil surge for testing purposes.
➢ A pressure relief device shall be provided for the main tank, complete with
trip contacts suitably wired to the marshalling kiosk. The devi ce shall be
resettable after an operation. Details of the device shall be submitted with
the offer.
28
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
(c) Isolating and test links shall be provided in a control cubicle to allow for
measuring the oil temperature and testing the heater coil.
(f) If the value on the winding temperature indicator varies by more than 3°C
from the values derived from the tests specified in clau se 5, then
adjustments shall be made to the equipment to achieve these limits.
ACCESSORIES
➢ The valve located at the bottom of the tank shall also be suitabl e
for draining oil from the transformer tank.
➢ All valves shall close with a clockwise rotation. The main inlet and
outlet valves shall be provided with “open” and “closed” position
indicators, visible from ground level.
➢ All valves shall have provision for padlocking in the open and
closed position for operation purposes. The hole for the padlock
shall have a clearance of not less than 8mm and not more than
10mm. Locking pin shall be of anti-rattle design to limit noise
emissions. The locking padlocks shall be provided.
➢ Closed/Open positions of all valves must be clearly marked
29
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
7. Testing Plan.
8. Impact recorder for the whole duration of transit and a report
provided afterwards.
9. Sets of keys for padlocking devices. (all control boxes as well as
valves to be padlocked)
TRANSFORMER OIL
The transformer and all associated oil immersed equipment shall be supplied oil filled. The
oil shall comply with all the requirements of IEC 296 (class 1: un-inhibited oil). Tenderer shall
provide the chemical composition and properties of the oil and the replacement cycle over
the expected life of the transformer.
CAPITALIZATION
Transformer losses shall be capitalized at the following rates to facilitate evaluation and
comparison of tenders.
Loss Capitalization will be calculated and loaded on Vendor’s offer. Loss capitalization
figures will be arrived based on Tamilnadu Regulatory Commissions Codes & Regulations.
NB: - Where tenders are being compared, losses will be capitalized at the above rate and
added to the bid evaluated price of the transformer.
➢ The supplier shall include a quality assurance programme (QAP) that will be
used to ensure that the transformer design, material, workmanship, tests,
service capability, maintenance and documentation, will fulfill the
requirements stated in the contract documents, standards, specifications and
30
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
regulations. The QAP shall be based on and include relevant parts to fulfill
the requirements of ISO 9001:2000.
➢ Certified true copies of previous Type Test Certificates and Type Test
Reports issued by the relevant International or National Testing/ Standards
Authority or ISO/IEC 17025/ILAC accredited laboratory shall be submitted
with the offer for evaluation (all in English Language). A copy of the
accreditation certificate for the laboratory shall also be submitted. Any
translations of certificates and test reports into English language shall be
signed and stamped by the Testing Authority.
Copies of type test certificates and reports for the transformer to be submitted shall
include:
1. Dielectric tests to IEC 60076 (Lightning Impulse and Power Frequency
withstand Tests).
2. Short circuit withstand test to IEC 60076.
3. Temperature rise test to IEC 60076.
31
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ Type Tests to IS2026/ IEC 60076 (to be done during acceptance testing at
factory)
- Temperature rise test – To be performed on the two units
during acceptance testing.
• Additional tests (to be done during acceptance testing at factory)
- Insulation dissipation factor
- Condenser bushing capacitance and tan delta
- DGA (dissolved gas analysis) of the insulating oil. - To be
performed before and after temperature rise test
- Acoustic and sound level
- Sweep Frequency Response Analysis
- Insulation tests on the auxiliary wiring in the marshalling boxes
- Measurement of zero sequence impedance
- Measurement of harmonics no-load current
- CT ratio and polarity
- Measurement of zero phase sequence impedance
- Paint thickness
- Tank pressure test
-
➢ Testing Facility
The manufacture shall provide current e-mail address, fax and telephone
numbers and contact person at the International or National Standards and
Testing Facility of the country where the transformer is manufactured and
tested.
➢ Test reports for each transformer (including its individual components) shall
be submitted to SAPM for approval before shipment.
➢ On receipt of the transformer SAPM will inspect it and may perform or have
performed any of the relevant tests in order to verify compliance with the
specification. The manufacturer shall replace/rectify without charge to SAPM,
equipment which upon examination, test or use fail to meet any or all of the
requirements in the specification.
32
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ Each assembly and package of items associated with the transformer shall
be suitably marked.
➢ In addition, the name plate shall include load and no-load losses for the
highest, lowest and principle tap positions, temperature class of insulation,
connection diagram and the inscription 'PROPERTY OF SAPM.
SCOPE
➢ This specification is for 96kV Zinc-oxide type surge arresters without spark
gaps for AC system.
CONSTRUCTION
➢ The surge arrester shall be metal-oxide type without spark gaps and
constructor as per the requirement of IEC 99-4. 3.6.2.2. The metal-oxide
used shall be of quality to ensure thermal stability under service duty of the
surge arrester.
➢ The surge arrester shall be sealed (end caps) with a controlled permanent
seal to ensure no moisture absorption or deterioration of the metal -oxide
element for the surge arrester.
33
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ The surge arrester shall be supplied with fixing accessories and fitted with
pad type clamp connectors suitable for both copper and aluminium tubes of
up to 76.2mm diameter. The steel plates or straps shall be galvanized as per
the requirement of BS 729. The mounting brackets shall be suitable for both
horizontal and vertical mounting on a steel channel.
SCOPE
➢ This subsection covers the design, detailing, manufacture testing before
shipments, packing, transport to site, erection and tests at the site of the
following equipment:
➢ The equipment for the control system shall be highly reliable, durable and
suitable for continuous operation.
➢ The equipment shall be designed to be fail – safe for the possible failure of
any major circuit during the operation and shall provide a safe guard against
possible surges, fail – safe against disrupted surges against disrupted
signals due to outside interference that would normally be associated with
the cable communication lines and any other provisions necessary for the
efficient operation of the equipment.
➢ All instrument scales, coils, relay contacts and other features shall be
suitable for the apparatus controlled or the purpose intended.
➢ The control and relay panels provided under this subsection shall be located
in the control rooms of the substation.
34
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ GENERAL
➢ GENERAL
➢ The electrical Measuring protective relays for the 110-kV line shall be of
Numeric Design type suitable for operation with the current transformer
secondary of 1A and the voltage transformer secondary of 110V, as shown
on the single line diagrams.
➢ The protective relays and their auxiliary relays shall operate successfully for
any value of the DC supply voltage between 85% and 120% of the rated
voltage of 110V without exceeding the temperature rise limits for the
operating coils.
35
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ PROTECTION RELAYS:
This must satisfy the requirements for distance, Three Phase Overcurrent and
Earth Fault Relay, Sensitive Earth Fault Relay and Auto reclose Relay
facilities.
Grid Isolation Relay during Parallel operation with TG
There should be suitable Protection for both the TGs to Isolate the Grid during
any External Fault at Grid Section.
➢ The offer should include the associated stabilizing resistor and voltage
dependent resistor (metrosil)
➢ Current setting range for earth fault relay (0.01 to 0.8 In)
➢ Thermal Protection
36
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
37
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ High set Element for both overcurrent and earth fault Protection, with a
setting range of 1-30In.
➢ Thermal Protection.
➢ This relay shall be independent and not as part of Numerical Main Protection
relay
38
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ This relay shall be independent and not as part of Numerical Main Protection
relay
➢ NB: The relay LEDs should be visible from the front of the panel without
opening the panel door(s).
G. ANNUNCIATOR UNIT
➢ Integrated event register to provide analysis of the latest five (5) events
➢ Preferably with Red L.E.D for ON indication and Green L.E.D for OFF
Indication.
39
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ Separate input for overcurrent high set element and I.D.M.T element
➢ Synchro-check facility and single pole auto reclose and delayed auto reclose
facility.
➢ Incoming Line bay and Transformer bay shall be provided with Numerical
type Protection relays and with all features for SCADA system
➢ Storage of Fault records and Event records; the Fault flags should be
accessible on the relay LCD screen without opening the relay cover.
➢ Separate function that performs overfluxing protection with alarm and trip
functions.
40
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ The scope of supply shall include preparation and submission of all design
details, drawings, technical information, operating and maintenance
instructions, test certificates, recommended quantities of consumables and
spares.
➢ The scope of supply for the Supplier shall include, but not be limited to, the
following switchboards along with provision of protective relays and
associated current transformers, metering and indicating instruments and
associated current transformers, and tripping/control supply battery unit.
41
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
❖ Voltage 11 kV
❖ Phase 3
❖ Frequency 50 Hz
❖ Interrupting current 40 kA
42
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ Equipment shall be designed for indoor operation having front and back
access and shall have an enclosed construction for damp and dust protection
and to prevent entry of vermin that may create electrical short -circuits or
malfunction. The switchboard circuits shall have a degree protection
conforming to IPH4x.
13.5.1 SWITCHBOARD
➢ The Breaker shall be drawn from service position to Isolation position without
opening of Front Door
➢ Where access doors are provided at the front of the panel, these shall be of
hinged construction and fitted with lockable securing handles.
➢ Each panel shall have separate enclosed chambers for bus bars, circuit
breaker, power cable terminations, control cable terminations, controls,
instruments and protection relays.
43
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ Each panel shall have provision for earthing the frames and metal work of
the switchgear to a common earth system.
➢ All controls, indicators, relays and meters shall be located on the front of the
panel. Control switches shall be close/neutral/trip with spring return to the
neutral position, and local/remote, where required. An approved means of
locking the switch in the neutral position shall be provided.
➢ Pad locking facilities shall be provided for all shutters and for locki ng the
circuit breaker in the open and closed position.
➢ Provision shall be made, where necessary, for the expansion and contraction
of busbars and connections caused by rating and ambient conditions.
➢ Circuit breakers shall be single pole, single throw VCB circuit breakers and
all the three poles linked suitably for simultaneous closing, operating
mechanism, control device, auxiliary contacts, wiring, interlock devices, all
mounted on a composite unit with free moving wheels.
➢ The circuit breakers shall be rated for the circuit applications as specified
and ambient conditions.
➢ The circuit breakers shall be capable of making and breaking the specified
fault current without affecting the reliability in operation of the circuit breaker
and supporting structure.
44
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ The design of the VCB circuit breaker offered shall not cause any induced
over voltage in the circuit being controlled. Supplier shall employ suitable
means of arresting the current chopping induced voltage, if necessary, by
surge suppressors, which shall be part of scope of supply.
➢ All current carrying parts of the circuit breaker shall be adequately sized for
the duty as indicated in the present system design.
➢ The operating mechanism shall be either of the stored energy quick release
type or solenoid closing and shall be non-pumping and trip free. The energy
storing mechanism shall be hand and motor operated. Motor operation shall
be from 240 V AC supply and solenoid closing through 110 V DC.
Requirement of power for closing through solenoid to be given.
➢ The closing and shunt trip releases shall be suitable for operation on 110 V
DC supply. Operation shall be achieved at all times for a variation between
75 and 110 percent of the DC supply voltage.
➢ Suitable means of access shall be provided for either the busbar side of
selected circuits or the circuit side of feeders.
➢ Each circuit breaker shall have a tripping supply circuit test button and
indicating lamp, which shall indicate a healthy trip supply condition.
➢ MCBs shall protect all control circuits on the circuit breaker. Links shall be
provided only on an earthed pole of the circuit.
45
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ All circuit breakers shall have a separate mechanically operated trip button,
which shall release the tripping latch to open the circuit breakers
independently of the tripping supply.
➢ Each circuit breaker shall have minimum auxiliary switches for control,
indication and interlocking circuits with provision for mounting additional
switches. In addition to the breaker operation requirement, two separate
potential free contacts operated through breaker are to be provided duly
wired upto terminal block.
13.5.5 ISOLATION
➢ Means of bus selection on the double bus switchgear, through fixed offload
isolators shall be provided showing relevant features of operation and safety.
The isolators shall be mechanically and electrically interlocked to the circuit
breaker.
➢ In case the selection of busbars cannot be offered with isolators Supplier can
come out with alternatives by means of two sections of buses with breaker
plugged in either of the busbar with suitable in terlocks.
➢ For protective relaying, current transformers shall maintain the ratio and
accuracy up to 20 times the rated current.
46
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ Voltage transformers shall be supplied for metering and protection for the
specific circuits having a volt-ampere rating for the load requirements.
➢ Each transformer shall have primary fuses on the high voltage winding
mounted within the transformer tank and secondary fuses i n shrouded
carriers mounted on the exterior of the tank. The fuses shall be cartridge
type.
➢ Earth continuity between the transformer unit and the switchgear unit shall
be maintained by suitable means when in the service position. The
transformer connections shall be automatically earthed when isolated.
➢ The secondary voltage shall be 110 V between phases and wired out to
terminals enclosed in a terminating chamber.
➢ All meters and indicating equipment shall comply with the latest editions of
IEC and shall be rated for the secondary current rating of the metering
current transformers and the secondary voltage of the voltage transformers.
➢ Accuracy of the meters shall be such that over the effective range of the
meter the error, expressed as a percentage of the full-scale figure, shall not
exceed 0.5% at unity power factor.
47
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ The relays shall be mounted on the fixed portion of the switchgear and shall
be of the flush mounting withdrawable type, enclosed in dust tight cases.
➢ The relays shall securely lock into position and shall not be susceptible to
damage or mal operation due to mechanical shock or vibration.
➢ On withdrawal, the relay trip circuits shall be isolated and current transformer
circuits effectively short-circuited.
➢ A circuit diagram shall be permanently fixed to each relay case with terminal
connections clearly identified.
➢ A relay test block shall be provided for testing the relays from the front of the
switchgear panel, mounted on the relay cubicle.
48
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ Auxiliary relays and timers may be of fixed pattern mounted within the relay
cubicle.
➢ The relaying scheme and the type of relays offered is provisional at this time
and shall be confirmed to the Supplier at the time of finalisation of Contract.
➢ Control wiring shall be flexible stranded copper wire of minimum 2.5 mm2
cross section, PVC insulated. Wiring for current transformer circuits shall be
of minimum 2.5 mm2 cross section.
➢ Each terminal block shall have an identification label and shall be provided
with 10% spare terminals.
➢ Appropriate size of cable sockets shall be supplied for the power cables,
complete with fixing bolts and washers. The cable sockets shall be suitably
pre tinned or plated for the type of cable conductor and busbar material to
prevent electrolysis between dissimilar materials.
49
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ Suitable blanking plates shall be fitted to predrilled gland plates and bolted
covers fitted to flange terminations to prevent dirt and moisture ent ering the
terminating chamber during transportation and storage.
• The 110V DC supply for 110KV Switch Yard shall be derived from switchyard
DC source.
➢ One No. 250 KVA, 11kv/433V Auxiliary Transformer will feed all LT AC loads
inside 110KV Substation.
➢ Supplier shall specify the ampere rating of the 415/ 240 V required for each
switch board
➢ All tools, accessories and equipment for normal operation and maintenance
of the equipment shall be included in the scope of supply.
➢ Supplier shall also specify test equipment required for routine maintenance
and testing.
➢ Supplier shall specify the type, make and quantities of all consumables
required for installation and commissioning, and the annual requirement for
normal operation.
50
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
13.8 SPARES
➢ Any spares required for start-up and commissioning of the Equipment shall
be included by Supplier.
➢ Supplier shall also submit separately prices for the supply of spares for the
Equipment offered.
➢ The cable terminations and cable box on each incoming feeder circuit
breaker including gland plates and cable gland.
➢ The cable termination and cable box on each ou tgoing feeder circuit breaker
including gland plates and cable glands
• Type test and routine tests shall be performed in accordance with IS 3424.
Routine tests shall include, but not limited to:
➢ The scope of tender shall include for stage inspection and testing, which may
be witnessed by SAPM or his representative at Supplier's works. Supplier
shall not restrict access for such inspections/ tests at any time and shall
provide all facilities for such inspections/tests.
51
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ Test Certificates shall be provided for all tests performed, whether or not
witnessed by SAPM or its authorized representative. Six copies of the
certificates shall be supplied to SAPM on satisfactory completion of the tests.
Technical schedules and other relevant data shall be furnished within one
(1) month from the date of signing of the Contract.
************************************************************************************************
➢ All Switch yard structures shall be connected to foundation using base plate
and foundation bolts.
- All fastening bolts and nuts shall be of mild steel conforming to IS:
6639/1363/1367.
- All foundation bolts shall conform to IS: 5624
- All plain washers shall conform to IS: 2016
- All spring washers shall conform to IS: 3063
52
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
- Step bolts shall be of 16mm diameter 175mm long and shall conform to IS:
10238
- The base plates a stiffener shall be welded to the main leg. The welds shall
be minimum 6mm thick continuous fillet type weld.
➢ Galvanization
- All exposed switch yard steel structures shall be hot dip galvanized in
accordance with IS: 4759. The minimum coating thickness shall be
610g/sq.m.
- All foundation bolts and nuts, washers shall be hot dip galvanized with a
minimum coating thickness of 300g/sq. m. as per IS:1367.
➢ Wind Pressure
The wind pressure is considered as per IS: 875
➢ Design of Steel Structures
The design of Lattice structures shall conform to IS: 802,
Part-1, Section-2.
- The vertical loads of half the span of Conductors and Earth wire on either
side of the Girder shall be considered for design. Weight of man with tool
shall be considered as 150Kg. at the mid-phase of the girder, at peak of
tower and at top of equipment for design of structure
- Foundation bolts shall be designed by working stress method as per IS: 800.
➢ Analysis of Structures
53
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
15.2.1 BATTERY
➢ GENERAL
➢ The battery shall be led SMF VRLA type lead acid
➢ The plates shall be designed for maximum durability during all service
conditions including high rate of discharge and rapid fluctuation of load.
➢ CONSTRUCTION
➢ Each cell shall be assembled in heat resistant, shock absorbing, robust,
clear glass or hard rubber container with float type level indicator.
➢ The cells shall be supported on porcelain insulator fixed on to the rack with
adequate clearance between adjacent cells.
➢ The cell terminals posts shall be provided with connector bolts and nuts,
effectively coated with lead to prevent corrosion.
➢ Sufficient sediment space shall be provided so that the cells will not have to
be cleaned out during normal life.
54
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ Positive and Negative terminal posts shall be clearly and indelibly marked for
easy identification.
➢ Lead-coated bent copper plate, tubular copper lugs, teakwood clamp, bo lts,
nuts, washers, etc. shall be furnished for connection of outgoing Aluminum
conductor cables.
➢ Racks
- The racks for supporting battery cells shall be constructed of best quality
teakwood. Painted with at least three (3) coats of anti-acid paint of
approved shade
55
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ The charger shall be self-protecting against all A-C and D-C transients
and steady state abnormal currents and voltages.
➢ Voltage setters shall be provided for setting the output of float boost
charge. Setting shall be independent of each other so that setting of
one voltage shall not require resetting other.
➢ CONSTRUCTION
➢ All equipment within the panels shall be arranged in modular units and
laid out with sufficient space for easy maintenance.
➢ Switches, meters, relays etc. shall be flush mounted on the front of the
panels. Nameplates of approved size and type shall be provided for all
circuits and devices.
CHARGER EQUIPMENT
➢ All power diodes and control rectifiers shall be silicon type. Rectifier
Transformer shall be dry type, double wound, with copper conductor
and class B insulation.
56
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ Fuses shall be HRC type and arranged for easy replacement. Semi -
conducting device fuses shall be fast-acting.
➢ Indicating lights shall be low-watt filament type with series resistor. Both
lamp and lens shall be replaceable from front.
ALARMS
➢ One (1) ten-points alarm facia shall be provided on charger panel,
complete with proper actuating devices, circuitry and legends.
➢ Each time a window lights up, a master relay will get energised to
provide group alarm signals for Owner’s remote panel.
➢ Outgoing Feeders
57
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
WIRING / CABLING
➢ The panels shall be completely wired-up. All wiring shall be routed
through wiring troughs. Wires shall be ferruled at both ends for
identification.
➢ Panels shall have removable gland plates at the bottom for cable entry.
All incoming / outgoing cables shall be terminated in suitable terminal
blocks.
GROUNDING
➢ The charger panels shall be fully rated ground bus with two ground
terminals, one at each end.
➢ Each terminal shall comprise two-bolt drilling with M10 G.I. bolts and
nuts to receive Owner’s ground connection of 50 x 6 mm G.I. flat.
TROPICAL PROTECTION
➢ All equipment accessories and wiring shall have fungus protection,
involving special treatment of insulation and metal against fungus,
insects and corrosion.
PAINTING
➢ All surfaces shall be sand blasted, pickled and grounded as required to
produce a smooth, clean surface free of scale, grease and rust.
➢ The charger panel shall be finished in Siemens Grey (Shade RAL 7032)
with two coats of Epoxy base synthetic enamel paint.
58
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
TESTS
➢ All equipment and components there of shall be subject to shop tests as
per relevant IS standards. The tests shall include but not limited to: -
- Dielectric tests.
TEST WITNESS
a) Battery
Type : SMF VRLA
Nos. of Cells per Battery : 55
Battery nominal voltage : 110 V
Ten hour rating to : (Approx)
1.85 Volt/Cell at 27 deg. C.
Proposed Method of working
- Float charging (normal) : 2.15 Volt per cell.
- Boost charging (after : 2.75 Volt per cell.
Complete discharge)
Intermediate tapping : 44th Cell.
Mounting : Wooden racks
b) Battery Charger
Charger rating : Float & Float cum Boost.
Type : Rating shall be as required
59
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
60
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
- The entire earthing system shall fully comply with Indian electricity act and
rules, The Tenderer shall carryout any changes desired by the electrical
inspector & state electricity board authorities in order to make the
installation conforming to I.E. rules at no extra cost.
- When the earthing strips are joined together minimum overlap of 100 mm
shall be provided. To have better joint, the overlapped portion shall be
properly welded and covered with tar tape.
- Conduits in which cables have been installed shall b e earthed bonded and
earthed. Cable amour shall be earthed at both ends by providing GI/
copper clamp and PVC wire of suitable size near each cable gland.
- All paint, scale and enamel shall be removed before earthing connection
are made.
- Anchor bolts or fixing bolts shall not be used for earthing connections.
- Entire earthing system and lighting protection system shall be tested for
continuity by earth testing equipment after completion of the installation.
- The record of earth resistance and test results shall be maintained for
future reference.
61
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
- The main earth grid shall be laid at a depth of 600 mm below Ground level.
In case of built in trenches, earth strip shall be laid along the trench and
shall be firmly cleated to the wall or cable supports. It shall be protected
against mechanical damage. Joints and tapping in the main earth grid
shall be made in such a way that reliable and good electrical connections
are permanently ensured. All joints below grade level shall be welded and
suitably protected by giving two coats of bitumen and covering with tar
tape.
➢ The grease shall protect the conductors from corrosion in service, not
corrode the steel or aluminium, be compatible with any wire drawing lubric ant
that might be applied on the conductor, not flow nor exude from the
conductor during storage, transport, erection or service at temperatures of up
to 100 degrees C. In addition, the grease should have adequate resistance to
oxidation and conform to relevant current health and safety requirements.
62
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
Tolerance of diameter
Aluminium : + 1.0%
Steel : + 2.0%
Minimum tensile strength after stranding
Aluminium :
Steel :
Calculated section:
Aluminium : mm2
Steel : mm2
Total : mm2
16.2.3 DRUMS
63
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ Electrical conductivity and current carrying capacity of the tension joints for
the power conductors shall not be less than those of equivalent length of the
conductors.
➢ The cut ends of steel wires and steel component inside the joint shall be
protected from the weather in an effective and permanent manner.
➢ All tension joints shall be supplied with aluminium fool -proof gauges or anti-
displacement pins for correct positioning, adequate quantity of filling
compound in injectors and aluminium collars for gap filling.
➢ Full details of the joints including an illustration of practices for filling the air
gap between sleeves, method of correct positioning of steel sleeves, gauges
for ascertaining the compressed size, etc. shall be submitted with the tender.
➢ Repair sleeves for the power conductors shall be of the compression type
and the conditions stated above for the tension joints shall apply to the repair
sleeves where applicable.
In order to prevent fatigue of power conductors and earth wir es due to repeated
vibrations caused by breeze, the following countermeasures shall be applied.
64
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ Vibration dampers shall be of Stockbridge type for both conductors and earth
wire. The dampers shall be applied in all conductors and earth wires in every
span except slack spans into the substations. The dampers shall be
designed to be attached to the conductors and earth wire in a manner, which
will prevent damage thereto and free drop of the weight in servi ce.
➢ Clamping bolts shall be provided with domed self -locking nuts designed to
prevent corrosion to the thread.
➢ First and second dampers will be positioned at 1.1m and 2.2m for power
conductors and 0.6m and 1.2 m for earthwires respectively from the centre of
suspension clamps or from the mouth of tension clamps.
➢ Preformed armour rods shall be applied to all suspension points of the power
conductors except jumper suspension points.
➢ The design of all line conductor fittings, vibration dampers, etc., shall avoid
sharp corners or projections which would produce high electrical stress in
normal working. The design of adjacent metal parts and matching surfaces
should be such as to maintain good electrical contact under service
conditions. Particular care shall be taken during manufacture of conductors
and fittings and during subsequent handling to ensure smooth surfaces free
from abrasion.
➢ The transmission line for the project is aligned on an elevation level of 245m
above sea level. The area has high humidity levels, tropical sunshine and
prone to medium pollution by agricultural activities.
65
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ The design of insulator units shall be with end over mould or such as to
avoid local corona formation and no significant radio interferences shall be
exhibited. The long rod Insulator units shall comply with the requirements of
IEC 61109.
16.3.2 FITTINGS
➢ All fittings to make each composite insulator set complete for beneficiary use
shall be supplied and included in the rate for each insulator unit. Such bolts,
nuts, washers, cotter pins and retaining pins with necessary spares as may
be necessary for the use for erection shall be deemed to be included in the
appropriate it ems.
➢ Sockets shall have “R” type security clips in accordance with the
requirements of IEC 60372.
➢ All ferrous fittings shall be made of steel, ductile iron or malleable iron hot
dip galvanized, and shall have sufficient strength for abrasion and weariness
produced by repeated vibration.
66
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ The arcing ring shall be provided for the top and bottom of each insulator
string and shall be of such design and shape that it reduces the voltage
across the part of the insulator adjacent to the conductor for each insulator
string, to a value which prevents visual corona formation on the metal caps
and pins of the insulators and shall minimize the Radio / Video interference
voltage from complete insulator and hardware assemblies when operated at
the voltage up to 420 KV.
➢ The arcing rings shall be of such design that when added to suspension and
tension assemblies, the resulting flash-over values of the complete insulator
string shall not be reduced below the percentage indicated hereunder, of
corresponding flash over values with the rings omitted.
➢ The rings shall be of hot dip galvanized steel or Aluminium tube having
outside diameter as required for corona control and minimum thickness of
2.5mm. Both inner and outer surfaces shall be galvanized to the required
specifications (BS 729). The details of the rings, brackets and methods of
mounting shall be of such design that the rings may be readily replaced
under ‘hotline’ maintenance.
➢ All the accessories and the fitting offered against this specification shall be
subjected to corona test. The corona shall not take place and shall
extinguish at the voltages specified i.e. when a voltage of the specified value
applied (Phase to Neutral i.e. RMS) the corona shall appear and shall
disappear again at the specified value of voltage.
16.3.3 POLLUTION
The design of insulator units should take into account the principles
contained in the IEC 60815 for medium pollution environment. For this
project the minimum creepage value of 25 mm/kV shall be applied (Creepage
distance of 3988 mm).
67
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
The insulator unit cap and pin shall be fitted with zinc -collared pins to prevent
cracking due to pin corrosion caused by the effects of pollution and high
humidity in the project area.
The design of insulator fittings including corona shields shall comply with the
following requirements:
a) Shall effectively protect the insulator unit and fittings from damage caused by
power arcs.
b) Shall effectively improve the voltage distribution along the insulator unit;
c) Shall effectively improve the corona performance of the insulator unit.
d) Shall be designed in such a way as not to subject to breakage fatigue due to
wind induced vibration;
e) Shall withstand the specified mechanical load
f) Shall be suitable for live line maintenance
16.3.6 MATERIALS
➢ The silicon rubber composite insulator shall comply with requirements of IEC
61109. The tension bearing material shall be E-CR Fiber Glass and the
housing and sheds made of HTV silicone rubber.
➢ Insulator caps and pin bases of malleable cast iron shall be manufactured
from a suitable grade of MCI complying with the requirement of BS EN 1563
for spheroidal graphite or BSEN 1562 for white heart and peralitic.
➢ Zinc collars shall have a total impurity not greater than 0.05 percent and
shall comply with the requirement of BS EN 1179.
➢ All insulator caps, bases and pins shall either be inherently resistant to
atmospheric corrosion or a suitably protected against corrosion, such as may
occur in transit, storage and in service.
68
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ All ferrous parts which will be exposed to the atmosphere in service, except
those made in the appropriate grade of stainless steel, shall be protected by
hot-dipped galvanising to comply with the requirements of BS 729.
16.3.7 TESTS
Type, sample and routine tests shall be undertaken on the insulator units in
accordance with the IEC 61109.
*********************************************************************************************
➢ Outdoor type LED lighting fixtures for AC 240V and shall be of high-power
factor suitable for stable operation in tropical climate and weatherproof type.
➢ Emergency Lighting system shall feed the Selected LED lighting fixtures
used in the substation outdoor and indoor areas; Emergency AC source shall
be with suitably sized inverters.
➢ For Indoor and Outdoor Lighting system, lighting fixtures shall be selected to
suit the functional requirements. Like:
➢ Lighting supports shall be steel poles painted with suitable colour, which will
be instructed by the Employer. Ballast, cut out, and terminals shall be
equipped in the pole and other attachments necessary for wiring and fixing of
the lighting fixtures shall also be provided with the pole. The ground level
shall be marked on the support for easy installation.
69
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ 600-volt PVC insulated wires of 3.5 square millimetres in size shall be laid in
the lighting pole for connection from the terminal box to the lighting fixtures.
➢ (c) Cabling and wiring shall be of approved type as well as all required
installation materials.
➢ (d) Lighting panel for outdoor lighting system shall be installed and shall be
with IP 55 when installed outdoor.
- Two Pole moulded case circuit breakers shall be used for incomer where rating
exceeds 25 A 600V, 100 A
- Internal wirings
- Neutral links
- Terminal boards
For Substation Emergency Lighting for Indoor and Outdoor areas, one Number
2 KVA Inverter (suitable for lighting system Application) shall be provided
inside Control Building and 10% of Light fixtures (In Indoor and Outdoor area
shall be connected to inverter to provide emergency Lighting for 4 Hours in
case of Main AC supply failure.
➢ The following spares parts shall be supplied for the station - 3 sets of each
type of complete lighting fixtures with all accessories.
➢ Lighting for outdoor switchyard and access roads constructed under this
contract shall also be provided by the Contractor.
➢ The Contractor shall prepare and submit to the Employer for approval the
calculation sheets, the facilities drawings, the installation drawings and
wiring diagram.
➢ The power shall be supplied from the low-tension AC distribution panel in the
control building.
70
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
16.5.1 TYPE:
16.5.2 APPLICATION:
➢ 1.1 KV control cables for all the requirements of the equipment covered
in the new switchyard and its interface with the control and relay panels
placed inside the control building.
16.5.3 DESIGN:
➢ The type of insulation shall be cross linked polyethylene as per IS: 7098
(Part-1) -1988 Colour of Insulation of each core shall be as specified in
IS
➢ The type of sheath shall be PVC compound ST-2 type as per IS:5831-
1984
71
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
17.1 GENERAL:
➢ TNEB has the following communication systems both wired and wireless
communication systems for communication needs
➢ Power Line Carrier Communication (PLCC) Used for Voice, Data and Inter
tripping.
➢ PLCC equipment is required for both ends of the Transmission line i.e at
SAPM end and at TANGEDCO’s Sathyamangalam 110Kv Substation The
technical compatibility shall be verified with TANGEDCO Electricity
authorities. The bidder shall include the cost of supply and delivery of all
materials required for the PLCC System., together with complete erection,
testing and commissioning of the equipment at both ends covered in the
contract. It is the bidder’s responsibility to collect Data from TANGEDCO to
match the PLCC equipment to be used from TANGEDCO authorities. SAPM
will extend logistic assistance to collect data from TANGEDCO based on the
questionnaire by the bidder after award of Contract.
➢ It is intended that the contractor should erect, commission and test the PLCC
equipment at both ends and simultaneously coordinate with TANGEDCO for
Suitable operation at both end and perform the commissioning tests details
accordingly.
72
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
17.2 STANDARD
➢ All the PLCC equipment covered under the package shall conform to the
requirements of the latest edition of the relevant IEC/IS specifications or
equivalent national standards, except to the extent modified by this
specification.
➢ The PLCC equipment as specified shall be installed at the SAPM end &
TANGEDCO Substation end.
➢ The equipment for signals shall have high degree of reliability and speech. It
shall be guaranteed to function reliably in the presence of noise impulse
caused by isolator or breaker operation. It shall also be possible to effect
direct tripping of breaker at one end when the other end breaker opens out
either manually or by relays such as bus fault relays such as Bus fault relay
etc.
73
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ The time intervals between receipt of a trip command on the transmit side, its
transmission over the carrier link, reception at the far end and giving
command to the trip relays at the distant end shall not exceed 20 m.sec.
For permissive inter tripping and 30 m.sec for direct inter tripping even for
the longest line section. The above timings are inclusive of operating time for
auxiliary relays and interposing if any, included in the PLCC
equipment. However, this shall be checked with TANGEDCO officials before
Commissioning.
➢ For reasons of security and reliability, phase to Phase coupling for S/C lines
shall be employed. However, this shall be checked with TANGEDCO officials
before preparing the offer.
17.6 The proposed communication system under this specification shall be fibre
optic based and shall consist of overhead fibre optic communication links .
OPGW shall be used for Power Line communication as per latest guidelines
by TANGEDCO:
Bidder shall furnish, along with his bid copies of all type and routine test
conducted earlier on similar coupling device is accorda nce with relevant
standards.
➢ OFC shall connect the coupling device installed in the switc hyard to the
PLCC Device terminal installed indoor. The OFC cable to be offered by
the bidder shall be suitable for being laid directly in trenches or in
ducts.
74
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ Type tests
The OFC cable shall conform to type tests and be subjected to routine
tests as per TANGEDCO guidelines.
The offered Power Line Carrier terminal shall be matched with PLCC device
at other TANGEDCO end.
75
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
GENERAL
Neutral Grounding Resistor shall be of outdoor type, weather and vermin proof,
structure mounted type with control cable terminal box. This includes supply and
erection of suitable GI mounting structures and foundation.
➢ The top of the enclosure shall have suitable sloped canopy such that the rainwater
shall not accumulate on the top and also it shall not drip inside the NGR.
➢ Porcelain bushing shall be provided for High end connection with suitable box for
terminating neutral cable.
➢ Porcelain wall through bushing shall be provided for Low end connection.
➢ Two earthing studs with necessary nuts and washers shall be provided.
➢ Space heater with thermostat controlled by one MCB, industrial type 10A plug &
socket controlled by one MCB and CFL lamp with enclosure controlled by one MCB
shall be provided.
TECHNICAL PARTICULARS
76
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
19.1 GENERAL
The contractor is to design all civil work required for the installation of the all High
Voltage equipment in the switchyard.
The contractor is to design the civil work including:
Design include Design Calculations and all installation drawings .
➢ Design of Chain linked fencing for the Switchyard and the incoming
TANGEDCO Metering area inside switchyard.
➢ Design of any other Civil work not mentioned above, but required to
complete 110KV Substation Installation All required civil work.
77
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
19.3 FOUNDATIONS
Contractor shall design all foundations for 110kV equipments:
➢ Lightning Arresters
➢ Disconnectors
➢ Circuit breakers
➢ Current transformers
➢ Power transformer
19.4 TRENCHES
Cables trenches of suitable sizes shall be designed with Brick Masonry work
with RCC coverslab of suitable Thickness
78
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
➢ PLCC room
➢ 1 office room
➢ 1 Stotre room
➢ 2 Nos toilets
79
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
1. The Technical Schedules shall be filled in and completed by the Bidder and
submitted with the Bid.
80
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
-1-phase kV/ms
81
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
Creepage distance mm
82
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
1 Manufacturer
2 Applicable Standard
3 Rated voltage kV
4 Maximum service voltage kV
5 Rated frequency Hz
6 One-minute power frequency withstand
voltage of
83
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
1
Type
2 Manufacturer
3 Applicable Standard
5 No. of secondary’s
9 Ratio
10 Creepage distance mm
84
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
85
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
Auxiliary Supplies
- DC V
- AC V
Type of break
Any special assembly tool
86
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
87
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
88
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
89
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
Guaranteed
Item Particulars Unit
Figure
1 Make
2 Standard
3 Diameter of overall conductor mm
4 Weight of complete conductor Kg/m
5 Characteristics of Protective grease
6 Ultimate tensile strength Kg
7 Modulus of elasticity Kg/cm2
8 Co-efficient of linear expansion deg C
20.8 - INSULATOR
Guaranteed
Items Particulars Unit
Figure
1 Make
2 Standards followed
3 Number of discs used per String insulator
assembly
4 Total creepage distance of
90
EPC PACKAGE SRI ANDAL PAPER
MILLS PVT LIMITED
20.9 OPGW
91
MECHTECH PROJECTS SRI ANDAL PAPER MILLS PVT LTD.
Potential Transformer ,
g 3
1 Ph.(110000V/√3)/(110V/√3)/(110V/√3)/(110V/√3) (TANGEDCO)
Potential Transformer ,
h 3
1 Ph.(110000V/√3)/(110V/√3)/(110V/√3)/(110V/√3) (SAPM)
2 BUSBAR Materials
b Main ACDB 1
c 110V DC DB 1
d Main Lighting DB 1
h Communication Panel 1
9 Cables
10 Illumination
Switchyard and Control Room earthing material (Main earth mat, Equipment
11 Lot
Risers etc.,)
12 Civil Works
a Transformer Foundation 1