MS SAPT Transformer Testing
MS SAPT Transformer Testing
Table of Contents
1 Introduction ..................................................................................................................... 3
2 Scope .............................................................................................................................. 3
3 Testing Equipment Required ............................................... Error! Bookmark not defined.
4 Method of execution of Activity ......................................................................................... 3
4.1 Manpower Requirement ............................................................................................. 3
4.2 Detailed Work Procedure............................................. Error! Bookmark not defined.
4.3 Risk Assessment........................................................................................................ 6
5 HSE Plan ......................................................................................................................... 6
5.1 Emergency Procedure ................................................................................................ 6
5.2 Personal Protective Equipment .................................................................................... 7
5.3 Responsible Personel ................................................................................................. 7
Page: 3/7
Method Statement for Transformer Testing
1 Introduction
This method statement has been developed to comply with client’s requirements and will serve
as technical guidelines to the testing of Transformer Testing. This method statement will serve
for SAPT Phase II. This method statement is with reference to client’s specifications, quality
procedures and other related standards.
2 Scope
Transformer Testing
1. Verify nameplate ratings are in accordance with the approved drawings and specifications.
2. Inspect for physical damage/ defects and mechanical condition.
3. Verify tightness of accessible bolted electrical connections by calibrated torque-wrench
method.
4. Verify earth connections.
5. Labels/Marking Rating Plate Correctness Checks.
Winding Resistance test is to confirm that the measured resistance of HV and LV windings must
match the factory test results; this resistance is measured with a ohm meter.
- Ensure the contacts at the bushing are clean.
- Hold the sensing probes across the conduct between with the contact resistance is to be
measured (Test Current 5A DC)
- Observe the reading and record in the test format.
Page: 5/7
Method Statement for Transformer Testing
4- Ratio Measurement
- Ensure that both the Primary and Secondary windings are not connected to any cables/ Bus bar.
- Ensure that Tap Changer in the lowest tap position.
- Apply three phase supply voltage (415 V AC) across the Primary Termination of the
Transformer.
- Measure the secondary (LV) voltage at the LV Termination, Observe the reading and record the
test format.
- If the tap changer is OFF load type, switch of the power supply and rise on step and apply the
three Phase 415 V AC at primary winding, and measure the voltage at the secondary winding.
- The above step to be carried out until the highest tap.
Alternatively, test is performed with a digital ratio meter which measures the ratio value of the
transformer and simultaneously checks the vector group and the polarity.
Objective of HV test is to determine the equipment is in proper condition to put in service, after
installation for which it was designed and to give some basis for predicting whether or not that a
healthy condition will remain or if deterioration is underway which can result in abnormally short
life.
- Ensure that both the Primary and Secondary windings are not connected to any cables/Bus Bar.
- Connect the “R” phase of the Primary winding and the “R” phase of the Secondary winding
(Short R phase of primary and secondary termination).
- Apply 3 Phase supply voltage (415 V AC) across the Primary Termination of the Transformer.
Measure the voltage at the both primary and secondary termination at all the phases. Observe
the reading and record in the test format.
Page: 6/7
Method Statement for Transformer Testing
4.3 Risk Assessment
The contractor should control all and not limited to the following listed hazards during the
testing
No. Hazard Control Measure
2 Equipment hitting working people Trained people, tool box talks on regular basis
5 HSE Plan
Tick the
check box
for
specifying
the Task
Specific
PPE’S
Safety Safety Reflective Safety Ear Gloves Dust Face Safety Gas
Helmet goggle vest shoe Plugs Mask Shield Harness Mask
Specify the names of additional task specific PPE’s (If Required)
Testing Engineer
Technicians
Helpers