PROJECT: PHILIPPINE STATISTIC AUTHORITY

LOCATION: EAST AVENUE, QUEZON CITY


SUBJECT: BID SCHEDULE

UNIT COST
ITEM NO. DESCRIPTION QTY UNIT TOTAL AMOUNT
MATERIAL LABOR TOTAL

I GENERAL REQUIREMENTS / PRELIMINARIES


1.1 Mobilization month/s
1.2 Permits and Licenses month/s
1.3 Temporary Facilities month/s
a. Temporary Offices (Contractor, Project Management)
b Barracks for Staff
c. Barracks for Workers
1.4 Temporary Utilities (Water, Electricity , Internet and Communication) month/s
1.3 Site Supervision /Site Management and Office Expenses month/s
1.5 Safety and Security month/s
1.6 Bonds and Insurances month/s
1.6.1 Surety Bond month/s
1.6.2 Performance Bond month/s
1.6.3 Guarantee Bond month/s
1.6.4 Contractors All Risk Insurance (CARI) month/s
1.6.3 Contractor Employees Accident Insurance and CGL month/s
1.7 As-Built Drawings and Shop Drawings month/s
1.8 Quality Control/ Testing and Commisioning month/s
1.9 Site Clearing and Demobilization month/s
1.10 Equipment (Including Tower Crane) month/s
1.11 Others (All other items necessary for the completion and operation of the building)

TOTAL 1: GENERAL REQUIREMENTS

I .a STRUCTURAL WORKS

I.1 SITEWORKS
1.1 Site Survey (Layout and Stakeout) lot
1.2 Earthworks
a. Excavation m³
b. Trimming m²
c. Hauling and Disposal m³
d. Protection for Adjacent Structure lot
1.3 Backfilling and Compaction m³
1.4 Gravel Bedding (150mm thick) m³
1.5 Dewatering Works lot
1.6 Soil Treatment lot
1.7 Vapor Barrier m²
1.8 Perimeter Fencing lm
1.9 Others (Please specify)

SUB TOTAL A
I.2 CIVIL WORKS
1.1.1 Demolition Works
a. One Level PSA Building lot
b. Guard Quarters lot
c. Guard Outpost lot
d. Walkway with Shed lot
e. Toilet lot
f. Water Tank lot
g. Canteen lot
1.1.2 Removal of Existing Curb l.m.
1.1.3 Removal of Drainage Manholes pcs
1.1.4 Removal of Drainage Pipes lines l.m.
1.1.5 Removal of Streets Ligths with Pole pcs
1.1.6 Removal of Tress
a. Coconut Trees pcs
b. Narra Trees pcs
1.1.7 Clearing and Grubbing HA
1.1.8 Excavation (Surplus common) cu.m.
1.1.9 Embankment cu.m.
1.1.10 Pipe Culvert and Drainage Excavation cu.m.
1.1.11 Subgrade Preparation sq.m.
1.1.12 Subbase and Base courses
a. Aggregate Subbase Course cu.m.
1.1.13 Surface Courses
a. Portland Cement Concrete Pavement (Plain), 230mm thk. sq.m.
1.1.14 Drainage Structures
a. RCP 300mm l.m.
b. RCP 750mm l.m.
c. Area Drain pcs
d. Catch Basin pcs
e. Drainage Manhole pcs
1.1.15 Miscellaneous Structures
a. Curbs and Gutter (Cast in Place) l.m.
b. Cement Concrete Sidewalk sq.m.
1.1.15 Others (Please Specify)

SUB TOTAL B
I.3 CONCRETING WORKS
1.3.1 Footing m³
1.3.2 Footing Tie Beam m³
1.3.3 Retaining Wall m³
1.3.4 Shearwall m³
1.3.5 Slab on Fill/Grade m³
1.3.6 Colums m³
1.3.7 Beams m³
1.3.8 Suspended Slab m³
1.3.9 Stairs m³
1.3.10 Ramp m³
1.3.11 Miscellaneous Concreting m³
1.3.12 Others (Please Specify)

SUB TOTAL C

Page 1 of 14
UNIT COST
ITEM NO. DESCRIPTION QTY UNIT TOTAL AMOUNT
MATERIAL LABOR TOTAL

I.4 REBAR WORKS


1.4.1 Footing
a. Gr. 60 kgs
b. Gr. 40 kgs
c. Tie Wire
1.4.2 Footing Tie Beam
a. Gr. 60 kgs
b. Gr. 40 kgs
c. Tie Wire
1.4.2 Retaining Wall
a. Gr. 60 kgs
b. Tie Wire
1.4.3 Shearwall
a. Gr. 60 kgs
b. Tie Wire
1.4.4 Slab on Fill/Grade
a. Gr. 60 kgs
b. Gr. 40 kgs
c. Tie Wire
1.4.5 Colums
a. Gr. 60 kgs
b. Tie Wire
1.4.6 Beams
a. Gr. 60 kgs
b. Tie Wire
1.4.7 Suspended Slab
a. Gr. 60 kgs
b. Gr. 40 kgs
c. Tie Wire
1.4.8 Stairs
a. Gr. 60 kgs
b. Gr. 40 kgs
c. Tie Wire
1.4.9 Ramp
a. Gr. 60 kgs
b. Tie Wire
1.4.10 Miscellaneous Rebar works (Grade 60) kgs
1.4.11 Others (Please Specify)

SUB TOTAL D

I.5 FORMWORKS / SCAFFOLDING


1.5.1 Footing m²
1.5.2 Footing Tie Beam m²
1.5.3 Retaining Wall m²
1.5.4 Shearwall m²
1.5.5 Colums m²
1.5.6 Beams m²
1.5.7 Suspended Slab m²
1.5.8 Stairs m²
1.5.9 Ramp m²
1.5.10 Miscellaneous Formworks m²
1.5.11 Others (Please Specify)

SUB TOTAL E

TOTAL 1.A: CIVIL / STRUCTURAL WORKS

II ARCHITECTURAL WORKS
II.1.1 1.1 MASONRY
1.1.1 Wall panel - Precast (125mm tk) m²
1.1.1 150mm CHB Wall 2Hr Fire rated (incldg Mortar, Plastering and RSB) m²
1.1.3 150 mm CHB Wall (incldg Mortar, Plastering and RSB) m²
1.1.4 Drip Mould (20mmx20mm) lm
1.1.5 Plastering Works (Interior) m²
1.1.6 Plastering Works (Exterior) m²
1.1.7 Others (Please Specify)

SUB TOTAL A

II.1.2 1.2 WALL FINISHES


1.2.1 300mm x 600mm x 25mm Polished Homo Granite Wall Tiles (All in accordance with m²
Architects Specification)
1.2.2 600mm x 600mm x 25mm Polished Homo Granite Wall Tiles (All in accordance with m²
Architec's Specification)
1.2.3 Epoxy Lining m²
1.2.4 Liquid Applied Elastomeric Wall Coating m²
1.2.6 Traffic Striping Paint m²
1.2.7 Aluminum Composite Panel m²
1.2.8 Others (Please Specify) -

SUB TOTAL B

II.1.3 1.3 FLOOR FINISHES


1.3.1 Epoxy Paint Finished m²
1.3.2 600mmx600mmx25mm Polished Granite Floor Tiles m²
1.3.3 Wet Installed 20mm thk Polished Granite Slab m²
1.3.4 Trowel Finished, with Penetrating Sealer and Hardener m²
1.3.5 Epoxy Tank Lining m²

1.3.6 Wet Installed 20mm thk Flamed Granite Slab provide Sealer and Finished Granite Slab m²
1.3.7 Others (Please Specify) -

SUB TOTAL C

II.1.4 1'.4 CEILING FINISHES


1.4.1 Low Sheen Acrylic latex Paint on Smoothed Rubbed Finished (exposed under side of Slab / m²
Beam)

Page 2 of 14
UNIT COST
ITEM NO. DESCRIPTION QTY UNIT TOTAL AMOUNT
MATERIAL LABOR TOTAL
1.4.2 12mm thk Moisture Resistant Gypsum Board on Metal Ceiling Joist, Low Sheen Acrylic latex m²
paint finish

1.4.3 600mm x 600mm Regular Acoustic Tiles with Powder Coated Aluminum T-Runners m²

1.4.4 Powder Coated Aluminum Panel on concealed Aluminum Runners m²

1.4.5 12mm thk Gypsum Board in HPL Metal Fin and 6mm thk Graphicote Glass Panels on Powder m²
Coated Aluminum Framing with 6mm thk Acrylic Diffusers

1.4.6 12mm thk regular Gypsum Board , Low sheen Acrylic latex paint finish m²

1.4.7 Others (Please Specify) -

SUB TOTAL D

II.1.5 1.5 WATERPROOFING WORKS


1.5.1 Bentonite Water proofing lm
1.5.2 Crystalline Water Proofing (Torch-On) lm
1.5.3 Liquid-Applied Water Proofing m²
1.5.4 1.5 mm thk Root and Rot Resistant PVC waterproofing membrane m²
1.5.4 Others (Consumables) (Please Specify)

SUB TOTAL E

II.1.6 1.6 PAINTING WORKS


1.6.1 Exterior Walls m²
1.6.2 Interior Walls m²
1.6.3 Zebra Paint 1m high m²
1.6.4 Parking Grapics: Parking Slot Number in Black Paint & Yellow Backgroud nos
1.6.5 Directional Arrow Paint m²
1.6.6 Others (Please Specify)

SUB TOTAL F

II.1.7 1.7 MISCELLANEOUS METAL WORKS


1.7.1 50mm Stainless Steel Fire Exit Stair Railings lm
1.7.2 Balcony Railings
a. Stainless Steel Handrail lm
b. 12mm thk Tempered Glass on S/S Anchors and fixing m²
1.7.3 Ladders and Ladder Rung (Tanks) sets
1.7.4 Stainless Steel Gutter lm
1.7.5 Stainless Steel Nosing lm
1.7.6 Trench Grating (400mm D x 350mm W) lm
1.7.7 Wheel Stopper (Parking) sets
1.7.8 Safety Guard Rail (Parking) l.m.
1.7.9 Column Guard (Parking) sets
1.7.10 Cornice Types Ceiling Finishes
a. Plain Aluminum Angle lm
b. Shadow Line Aluminum Angle lm
1.7.11 Aluminum Composite Coping (Roof Deck) lm
1.7.12 100mm x 12mm thk Stainless Baseboard lm
1.7.13 50 mm Stainless Steel Handrail (PWD Ramp) lm
1.7.14 Others (Please Specify)

SUB TOTAL G

II.1.8 1.8 DOORS, JAMBS AND FINISH HARDWARES (Incldg Hardwares and Accessories)

1.8.1 - D-1 900mm x 2400mm Fire Rated Metal Swing Door in Primed and Automotive Spray Paint set/s
with Vision Panel All in accordance with Architect Specifications.
1.8.2 - D-2 900mm x 2400mm Fire rated Metal Swing Door All in accordance with Architect set/s
Specifications.
1.8.3 - D-3 900mm x 2400mm Hollow Metal Swing Door with louver set/s
1.8.4 - D-4 900mm x 2700mm Tempered Clear Glass Swing door All in accordance with Architect set/s
Specifications.
1.8.5 - D-5 1700mm x 2400mm Framed Glass Double Swing Door All in accordance with set/s
Architect Specifications.
1.8.6 - D-6 1700mm x 2400mm Hollow Metal Double Swing Door with louver set/s
1.8.7 -D-7 2400mmx2400mm Hollow Metal Louvered Double Swing door All in accordance with set/s
Architect Specifications.

1.8.14 Others (Please Specify)

SUB TOTAL H

II.1.9 1.9 WINDOWS AND GLAZING WORKS


1.9.1Aluminum Framed Windows

1.9.1.1 W-1 , 1075mm x 2700mm Fixed with Awning type window, 8mm thk Heat- strengthened set/s
Highly Reflective Glass, All in accordance with Architect Specifications.

1.9.1.2 W-2: 5175mm x 2700mm Fixed with Awning type window, 8mm thk Heat- strengthened set/s
Highly Reflective Glass, All in accordance with Architect Specifications.

1.9.1.3 W-3: 2245mm x 2700mm Fixed with Awning type window, 8mm thk Heat- strengthened set/s
Highly Reflective Glass, All in accordance with Architect Specifications.

1.9.1.4 W-4: 3600mm x 3000mm Fixed with Awning type window, 8mm thk Heat- strengthened set/s
Highly Reflective Glass, All in accordance with Architect Specifications.

1.9.1.5 W-5: 21700mm x 2700mm Fixed with Awning type window, 8mm thk Heat- set/s
strengthened Highly Reflective Glass, All in accordance with Architect Specifications.

1.9.1.6 W-6: 4450mm x 3000mm Fixed with Awning type window, 8mm thk Heat- strengthened set/s
Highly Reflective Glass, All in accordance with Architect Specifications.
1.9.1.7 W-7: 10550mm x 3500mm Fixed Window , 12mm thk Cleared Tempered Glass. All in set/s
accordance with Architect Specification.
1.9.1.8 W-8: 6100mm x 3500mm Fixed Window , 12mm thk Cleared Tempered Glass. All in set/s
accordance with Architect Specification.
1.9.1.9 W-9: 10000mm x 3500mm Fixed Window, 12mm thk Cleared Tempered Glass. All in set/s
accordance with Architect Specifications
1.9.1.10 W-10a: 5465mm x 3500mm Fixed Window with 12mm thk Clear Tempered Glass. All in set/s
accordance with Architect Specifications.
1.9.1.11 W-10b: 2750mm x 3500mm Fixed window with 12mm thk Clear Tempered Glass. All in set/s
accordance with Architect Specification.
1.9.1.12 W-11: 2750mm x 3500mm Fixed Window with 12mm thk Clear tempered Glass. All in set/s
accordance with Architect Specifications.
1.9.1.13 W-12: 1085mm x 3500mm Fixed Window with 12mm thk Clear Tempered Glass. All in set/s
accrodance with Architect Specifications.

Page 3 of 14
UNIT COST
ITEM NO. DESCRIPTION QTY UNIT TOTAL AMOUNT
MATERIAL LABOR TOTAL
1.9.1.14 GF-01 10100mm x 3200mm Storm Aluminum louvers in PVDF Finish (Transformer set/s
Room)
1.9.1.15 GF-02 6200mm x 3200mm Storm Aluminum louvers in PVDF Finish (Transformer set/s
Room)
1.9.1.16 GF-03 3750mm x 3200mm Storm Aluminum louvers in PVDF Finish (Transformer set/s
Room)
1.9.1.17 GF-04 10950mm x 3200mm Storm Aluminum louvers in PVDF Finish (Transformer set/s
Room)

1.9.1.18 5955mm x 2200mm Architectural Louver (Diagonal), PVDF Finish (2F-6F Parking Area) set/s

1.9.1.19 6075mm x 2200mm Architectural Louver , PVDF Finish (2F-6F Parking Area) set/s

1.9.1.20 9650mm x 2200mm Architectural Louver , PVDF Finish (2F-6F Ramp Area) set/s

1.9.1.21 10000mm x 2200mm Horizontal Storm Resistant Louver , PVDF Finish (Driveway) set/s

1.9.1.22 2525mm x 2200mm Horizontal Storm Resistant Louver ,PVDF Finish (2F Generator set/s
and Paralleling Room)

1.9.1.23 10000mm x 2200mm Horizontal Storm Resistant Louver ,PVDF Finish (2F Generator set/s
and Paralleling Room)

1.9.1.24 5955mm x 2200mm Vertical Storm Resistant Louver ,PVDF Finish (2F Generator and set/s
Paralleling Room)
1.9.1.24 22050mm x 2700mm Vertical Storm Resistant Louver ,PVDF Finish (2F Generator and set/s
Paralleling Room)
1.9.1.18 Others (Please specify)
SUB TOTAL I

II.2.0 2.0 MISCELLANEOUS ARCHITECTURAL WORKS


2.1 Facial Mirrors (Common and Admin) m²
2.2 Toilet Partition (Common and Admin) sets
2.3 Urinal Partition (600mmW x 1200mmH) sets
2.4 Granite Countertop m²
2.5 SS Grab Bars (PWD Toilet) sets
2.6 Carpet Grass / Turfing m²
2.8 Others (Please Specify)

SUB TOTAL J

TOTAL II: ARCHITECTURAL WORKS

III. ELECTRICAL WORKS


III.1 SERVICE ENTRANCE
1.0 Manholes, complete with cover , ground rod and other accs. lot
2.0 Concrete Pedestal and Encasement lot
3.0 110mmø PVC Conduit lgt
4.0 110mmø PVC long Elbow Conduit lgt
5.0 110mmø PVC End bell pcs
6.0 Pull Box lot
7.0 100mm² Bare Copper Wire lm/s
8.0 20mmØ x 3000mm Copper Clad Steel Ground Rod (Including Exothermic Weld pcs
connections to Vertical & Horizontal Bars)
9.0 Bolt - Eye pcs
10.0 Wires and Cables including connectors, tapes, etc.
12.1 XLPE CABLE (34.5 KV) lm/s
12.2 Cable Terminating Kit set
11.0 Others (Please Specify)

SUB TOTAL A

III.2 MAIN AND SUB-MAIN DISTRIBUTION

III.2.1 1.0 15mm ø RSC Pipe lgt


1.0 20mm ø RSC Pipe lgt
2.0 25mm ø RSC Pipe lgt
3.0 32mm ø RSC Pipe lgt
4.0 40mm ø RSC Pipe lgt
5.0 50mm ø RSC Pipe lgt
6.0 65mm ø RSC Pipe lgt
8.0 80mm ø RSC Pipe lgt
9.0 100mm ø RSC Pipe lgt
10.0 20mm ø PVC Pipe lgt
11.0 Others (Please Specify)

III.2.2 Boxes and Pull Boxes


1.0 Pull Box G.a. #16 lot
2.0 Others (Please Specify)

III.2.3 Wires and Cables (Including Fittings, Supports and Hangers and Consumables)
1.0 3.5mm sq. THHN lm/s
2.0 5.5mm sq. THHN lm/s
3.0 8.0mm sq. THHN lm/s
4.0 14mm sq. THHN lm/s
5.0 22mm sq. THHN lm/s
6.0 30mm sq. THHN lm/s
7.0 38mm sq. THHN lm/s
8.0 50mm sq. THHN lm/s
9.0 60mm sq. THHN lm/s
10.0 100mm sq. THHN lm/s
10.0 125mm sq. THHN lm/s
11.0 150mm sq. THHN lm/s
12.0 175mm sq. THHN lm/s
13.0 200mm sq. THHN lm/s
14.0 250mm sq. THHN lm/s
15.0 Others (Please Specify)

SUB TOTAL B

III.3 LIGHTING FIXTURES


III.3.1 Including necessary Supports , boxes and dropped flexible metal conduits
1.0 2x 36 Watts Fluorescent Light, pcs

Page 4 of 14
UNIT COST
ITEM NO. DESCRIPTION QTY UNIT TOTAL AMOUNT
MATERIAL LABOR TOTAL
2.0 1x 36 Watts Flourescent Light pcs
3.0 Emergency Light pcs
4.0 Exit Light pcs
5.0 4x 18 Watts Troffer Light pcs
6.0 Recessed Mounted Light pcs
7.0 Cove Light pcs
8.0 Wall Light pcs
9.0 Flood Light pcs
10. Metal hallide lamp pcs
11.0 Others (Please Specify)

SUB TOTAL C

III.4 PANEL BOARDS, HV/LV SWITCH GEAR

III.4.1 Panel Boards (According to plans and specifications, complete with accessories and others to
make the equipment fucntionable)
LBS W/POWER FUSE ( Private Pole included) lot
T1 (1500KVA , 34.5KV /400V, 3Ø,60HZ ) Compartmental type assy
T2 (1500KVA , 34.5KV /400V, 3Ø,60HZ )Compartmental type assy
T3 (1000KVA , 34.5KV /400V, 3Ø,60HZ )Compartmental type assy
LVSG 1 PANEL assy
LVSG 2 PANEL assy
LVSG 3 PANEL assy
ATS 1 assy
ATS 2 assy
ATS 3 assy
MCB1 assy
MCB2 assy
MCB3 assy
MDPA assy
PP1 assy
LP1 assy
DP1 assy
PP2 assy
PP3- PP6 (TYPICAL) assy
LP2- LP6 (TYPICAL) assy
DP2 assy
DP3 assy
DP4 assy
DP5 assy
DP6 assy
PP7 assy
LP7 assy
DP7 assy
PP8C assy
PP8 assy
LP8 assy
DP8 assy
PP9 assy
LP9 assy
DP9 assy
PP10 assy
LP10 assy
DP10 assy
PP11C assy
PP11 assy
LP11 assy
DP11 assy
PP12C assy
PP12 assy
LP12 assy
DP12 assy
PP14C assy
PP14 assy
LP14 assy
DP14 assy
PP15C assy
PP15 assy
LP15 assy
DP15 assy
PP16C assy
PP16 assy
LP16 assy
DP16 assy
PP17C assy
PP17 assy
LP17 assy
DP17 assy
PP18 assy
LP18 assy
DP18 assy
PP19C assy
PP19 assy
LP19 assy
DP19 assy
PP20C assy
PP20 assy
LP20 assy
DP20 assy
PP21C assy
PP21 assy
LP21 assy
DP21 assy
PP22C assy
PP22 assy
LP22 assy
DP22 assy
PP23C assy

Page 5 of 14
UNIT COST
ITEM NO. DESCRIPTION QTY UNIT TOTAL AMOUNT
MATERIAL LABOR TOTAL
PP23 assy
LP23 assy
DP23 assy
PP24 assy
LP24 assy
DP24 assy
MDPSERVA assy
DPSERVAI assy
DPSERVA2 assy
PP SERV 7A assy
PP SERV 8A assy
PP SERV 9A assy
PP SERV 10A assy
PP SERV 11A assy
PP SERV 12A assy
PP SERV 13A assy
PP SERV 14A assy
PP SERV 15A assy
PP SERV 16A assy
PP SERV 17A assy
PP SERV 18A assy
PP SERV 19A assy
PP SERV 20A assy
PP SERV 21A assy
PP SERV 22A assy
PP SERV 23A assy
PP SERV 24A assy
DPPSRTI assy
DPPSRTI 17 assy
SMC 7 assy
PP17FCU assy
PP17 ACCU assy
DPPSRTI 18 assy
PP18 FCU assy
PP18 ACCU assy
DPACCU1 assy
PP7FCU assy
PP7ACCU assy
PP8FCU assy
PP8ACCU assy
PP9FCU assy
PP9ACCU assy
PP10FCU assy
PP10ACCU assy
PP11FCU assy
PP11ACCU assy
PP12FCU assy
PP12ACCU assy
PP14FCU assy
PP14ACCU assy
PP15FCU assy
PP15ACCU assy
MDPB assy
MDPSERVB assy
DPSERVB1 assy
DPSERVB2 assy
PPSERV 7B assy
PPSERV 8B assy
PPSERV 9B assy
PPSERV 10B assy
PPSERV 11B assy
PPSERV 12B assy
PPSERV 13B assy
PPSERV 14B assy
PPSERV 15B assy
PPSERV 16B assy
PPSERV 17B assy
PPSERV 18B assy
PPSERV 19B assy
PPSERV 20B assy
PPSERV 21B assy
PPSERV 22B assy
PPSERV 23B assy
PPSERV 24B assy
DPM assy
PPEF assy
PPSF assy
PPTP assy
LPELEV assy
PPELEV assy
PPPF assy
PPBP assy
DPACCU2 assy
LPU 1 - LPU13 (TYPICAL) assy
PP16FCU assy
PP16ACCU assy
PP19FCU assy
PP19ACCU assy
PP20FCU assy
PP20ACCU assy
PP21FCU assy
PP21ACCU assy
PP22FCU assy
PP22ACCU assy
PP23FCU assy
PP23ACCU assy
PP24FCU assy
PP24ACCU assy

Page 6 of 14
UNIT COST
ITEM NO. DESCRIPTION QTY UNIT TOTAL AMOUNT
MATERIAL LABOR TOTAL
UPS 200KVA assy
Geneartor 1 ,2812KVA,400V,3Ø,60Hz set
Geneartor 2 ,2812KVA,400V,3Ø,60Hz set
Geneartor 3 ,1587 KVA,400V,3Ø,60Hz set
Generator MCB1 assy
Generator MCB2 assy
Generator MCB3 assy
III.4.2 Others (Please Specify)

SUB TOTAL D

III.5 LIGHTING AND POWER SYSTEM


III.5.1 Roughing-ins( including fittings and accessories, in place)
1.0 15mm ø RSC Pipe Conduit lgt
2.0 Others (Please Specify)

III.5.2 Boxes and Pull Boxes ( including fittings and accessories)


1.0 Junction Box pcs
2.0 Utility Box pcs
3.0 Square Box pcs
4.0 Others (Please Specify)

III.5.3 Wires and Cables


1.0 3.5mm2 THHN lm/s
2.0 Others (Please Specify)

III.5.4 Others (Please Specify)

SUB TOTAL E

III.6 WIRING DEVICES


1.0 1-gang Switch Outlet pcs
2.0 2-Gang Switch Outlet pcs
3.0 3-Gang Switch Outlet pcs
4.0 Three Way Switch pcs
5.0 Four Way Switch pcs
6.0 Duplex Convenience Outlet pcs
7.0 Single Convenience Outlet pcs
8.0 Floor Mounted Outlet pcs
9.0 GFCI Duplex Convenience Outlet pcs
10.0 ACU outlet pcs
11.0 Ref. Outlet pcs
12.0 Others (pls. specify)

SUB TOTAL F

III.7 LIGHTING PROTECTION SYSTEM


1.0 100 mm2 Bare Copper Wire lm
2.0 20mmØ x 3000mm Copper Clad Steel Ground Rod (Including Exothermic Weld pcs
connections to Vertical & Horizontal Bars)
3.0 Ground Pit assembly pcs
4.0 Lightning Arrester ( Including accesories and others to make the safety equipment/ set
system functionable)
5.0 Ground Bus Bar (complete with terminal lugs and accessories) lot
6.0 25mm ø PVC Conduit lgt
7.0 Others (please specify)

SUB TOTAL G

III.8 AUXILLARY WORKS


III.8.1 Roughing-ins( including fittings and accessories, in place)
1.0 20mm ø PVC Conduit lgt
2.0 63mm ø PVC Conduit lgt
3.0 Others (Please Specify)

III.8.2 Boxes and Pull Boxes


1.0 Utility Box pcs
2.0 Junction box pcs
3.0 Pull box lot
4.0 Others (Please Specify)

III.8.3 Cabinets with Slide Gutters, Backboards, Briddle Rings, and Terminal Block, etc.
1.0 Main Data Swicth assy
2.0 Patch Panel with Cable Rack Cabinet complete accessories assy
3.0 Others (Please Specify)

III.8.4 Wires and Cables (Including Consumables, Supports and Hangers)


1.0 Cat5e, UTP 4pairs lm
2.0 Data Outlet "PANASONIC" sets
3.0 Others (please specify)

SUB TOTAL H

III.9 FIRE ALARM AND DETECTION SYSTEM


III.9.1 Roughing-ins( including fittings and accessories, in place)
1.0 15mm ø RSC Pipe Conduit lgt
2.0 32mm ø RSC Pipe Conduit lgt
3.0 15mm ø Flexible Metal Conduit lgt
4.0 Others (Please Specify)

III.9.2 Boxes and Pull Boxes


1.0 Utility Box pcs
2.0 Junction Box pcs
3.0 Square Box pcs
4.0 Others (Please Specify)

III.9.3 Wires and Cables


1.0 1.25 mm TF Wire lm
2.0 Others (Please Specify)

III.9.4 Devices and Equipments (Including Consumables)


1.0 Smoke Detector (Addressable) set/s
2.0 Heat Detector (Addressable) set/s
3.0 Manual Pull Station (Addressable ) set/s
4.0 Fire Alarm Annunciator (Addressable ) set/s
5.0 Fire Alarm Control Panel (Addressable ) assy
6.0 Speaker Horn set/s
7.0 Monitoring Module set/s
8.0 Firemans Tel Jack set/s
9.0 IDC ( Initiating Device Circuit ) set/s
10.0 Others (please specify)

Page 7 of 14
UNIT COST
ITEM NO. DESCRIPTION QTY UNIT TOTAL AMOUNT
MATERIAL LABOR TOTAL
SUB TOTAL I

III.10 CATV SYSTEM


III.10.1 Roughing-ins( including fittings and accessories, in place)
1.0 15mm ø PVC Conduit lgt
2.0 50mm ø PVC Conduit lgt
3.0 110mm ø PVC Conduit lgt
4.0 Others (Please Specify)

III.10.2 Boxes and Pull Boxes


1.0 Utility Box pcs
2.0 Junction Box pcs
3.0 Pull Box assy
4.0 Others (Please Specify)

III.10.3 Cabinets with Slide Gutters, Backboards, Briddle Rings, and Terminal Block, etc.
1.0 MCTC assy
2.0 CTC assy
3.0 Others (Please Specify)

III.10.4 Wires and Cables (Including Consumbales and supports)


1.0 RG-59 Coaxial Cable "BELDEN" lm/s
2.0 8.0. mm² TW lm/s
3.0 20mmØ x 3000mm Copper Clad Steel Ground Rod pcs
4.0 CATV Outlet sets
5.0 Others (please specify)

SUB TOTAL J

III.11 CCTV SYSTEM


III.11.1 Roughing-ins( including fittings and accessories, in place)
1.0 15mm ø Flexible Metal Conduit lm
2.0 20mm ø RSC Pipe Conduit lgt
3.0 50mm ø RSC Pipe Conduit lgt
4.0 Others (Please Specify)_

III.11.2 Boxes and Pull Boxes


1.0 Utility Box pcs
2.0 Junction Box pcs
3.0 PABGM Pull Box assy
4.0 Others (Please Speicfy)

III.11.3 Wires and Cables (Including Consumbales and supports)


1.0 1.25 mm² TF Wires lm
2.0 Others (Please Specify)

III.11.4 Devices and Equipments


1.0 Ceiling Mounted Speakers pcs
2.0 Wall Mounted Speakers pcs
3.0 Power Amplifier assy
4.0 Digital Matrix Center assy
5.0 Automatic Announcement assy
6.0 AM/FM Tuner assy
7.0 CD/MP3 Player assy
8.0 Test Panel assy
9.0 PABGM RACK assy
10.0 Others (please specify)

SUB TOTAL K

TOTAL III: ELECTRICAL WORKS

IV PLUMBING WORKS
IV.I PVC PIPES AND FITTINGS
IV.1.1 PVC Series 1000 including Fittings
1.0 250mm Ø l.m.
2.0 200 mm Ø l.m.
3.0 150mm Ø l.m.
4.0100mm Ø l.m.
5.0 50mm Ø l.m.
6.0 75mm Ø l.m.
7.0 Others (Please specify)

IV.I.2 HDPE Pipes and Fittings


1.0 250mm Ø l.m.
2.0 Others (Please specify)

IV.I.3 PVC CO
1.0 150mm Ø pc/s
2.0 100mm Ø pc/s
3.0 Others (Please specify)

IV.I.4 Others (Please specify)


SUB TOTAL A
IV.2 DRAINS AND CLEAN OUT
IV.2.1 Parking Drain
1.0 100mm Ø pc/s
2.0 Others (Please specify)

IV.2.2 Deck Drain


1.0 75mm Ø pc/s
2.0 Others (Please specify)

IV.2.3 Ledge Drain / Balcony Drain


1.0 50mm Ø pc/s
2.0 Others (Please specify)

IV.2.4 Floor Drain


1.0 50mm Ø pc/s
2.0 Others (Please specify)

IV.2.5 Area Drain


1.0 600mm x600mm pc/s
2.0 Others (Please specify)

IV.2.6 Manhole
1.0 600mm x600mm pc/s
2.0 Others (Please specify)

IV.2.7 PVC P-Trap pc/s


IV.2.8 Others (Please specify)

Page 8 of 14
UNIT COST
ITEM NO. DESCRIPTION QTY UNIT TOTAL AMOUNT
MATERIAL LABOR TOTAL
SUB TOTAL B

IV.3 WATER LINE WORKS


IV.3.1 PPR PIPES AND FITTINGS
1.0 75mm Ø pc/s
2.0 50mm Ø pc/s
3.0 32mm Ø pc/s
4.0 Others (Please specify)

IV.3.2 Gate Valve


1.0 75mm Ø pc/s
2.0 50mm Ø pc/s
3.0 32mm Ø pc/s
4.0 Others (Please specify)

IV.3.3 Water Meter


1.0 75mm Ø pc/s
2.0 Others (Please specify)

IV.3.4 Check Valve


1.0 75mm Ø pc/s
2.0 50mm Ø pc/s
3.0 Others (Please specify)

IV.3.5 Float Valve


1.0 75mm Ø pc/s
2.0 Others (Please specify)

IV.3.6 Pressure Relief Valve


1.0 75mm Ø pc/s
2.0 Others (Please specify)

IV.3.7 Hose Bib pc/s


IV.3.8 Others (Please Specify)

SUB TOTAL B

IV.4 PUMPS AND EQUIPMENTS


IV.4.1 Submersible Sump Pump Non-Clog set
IV.4.2 Submersible Type transfer Pump set
350GPM vs. 370Ft TDH 375KWH
IV.4.3 Submersible Type Transfer Pump (Non Portable water) set
1000GPM vs. 300Ft TDH 15.0HP
IV.4.4 Duplex Type Non-Clog Sewage Ejector Pump set
50GPM vs. 50Ft TDH 2KWH
IV.4.5 Elevator sump pump set
42 GPM Vs. 20Ft TDH 5KWH
IV.4.6 Booster Pump (Duplex) set
100GPM Vs. 90Ft TDH 2KWH
IV.4.7 Others (Please Specify)
SUB TOTAL C

IV.5 PLUMBING FIXTURES


IV.5.1 Water Closet set
IV.5.2 Wall Hung Lavatory set
IV.5.3 Kitchen Sink (Stainless ) set
IV.5.4 Hot and Cold
a. Shower Valves PP Single with rain shower head set
b. Lavatory Faucet set
c. Sink Faucet set
IV.5.5 Urinal set
IV.5.6 Others (Please Specify)

SUB TOTAL D

TOTAL IV: PLUMBING / SANITARY WORKS

V MECHANICAL WORKS
V.1 EQUIPMENTS
V.1.1 TOILET EXHAUST FAN
1.0 TEF-1 50W, Exhaust Fan Ceiling Cassete, Direct Type 80CFM, 33, PA, 2.7KW, set/s
230V/1P/60Hz, Complete with Accessories as per specs)
2.0 Others (Please Specify)

V.1.2 EXHAUST VENTILATION FAN (Including Standrad accessories conforming with the plan and
specification)
1.0 EF01 - Pump Room Basement (In Line type, 8800CFM, 25PA, Belt Drive, 0.30KW, set/s
380V/3P/60Hz , Complete with Accessories as per specs)
2.0 JF01 - 2nd,4th,5th,6th Floor (Jet Fan Type, 4300CFM, 13PA, Direct Drive, 0.056KW, set/s
380V/3P/60Hz, Complete with Accessories as per Specs)
3.0 EF02- 2nd ,3rd,4th, 5th, 6th Floor (In line type, 47200CFM, 25PA, Belt Drive, 1.23KW, set/s
380V/3P/60Hz, Complete with Accessories as per specs)
4.0 SF01 -2nd,3rd,4th, 5th, 6th Floor (In line type, 42,862CFM, 25PA, Belt Drive, 1.12KW, set/s
380V/3P/60Hz, Complete with Accessories as per specs)
5.0 SF02- 2nd Floor Parking (In line Type, 3500CFM, 10PA, Belt Drive, 0.018KW, set/s
380V/3P/60Hz, Complete with Accessories as per specs)
6.0 EF03- 2nd Floor Parking (In line Type, 3500CFM, 10PA, Belt Drive, 0.018KW, set/s
380V/3P/60Hz, Complete with Accessories as per specs)
7.0 PF- Roof deck (SWSI Centrifugal type, 16000CFM, 250PA, Belt Drive, set/s
4.17KW,380/3P/60Hz, Complete with Accessories as per specs)
8.0 Others (Please Specify)

V.1.3 VARIABLE REFRIGERANT FLOW AIR CONDITIONING SYSTEM


1.0 ACCU-1 (9.5TR)
FCU-6 (4TR), FCU-7 (4TR), FCU-25 (1.5TR) set/s
2.0 ACCU-2 (6TR)
FCU-8 (4TR), FCU-9 (4TR) set/s
3.0 ACCU-3 (20.5TR)

FCU-10 (4TR), FCU-11 (4TR), FCU-12 (4TR), FCU-13 (4TR), FCU-23 (3TR), FCU-26 (1.5TR) set/s

4.0 ACCU-4 (17TR)


FCU-14 (4TR), FCU-15 (4TR), FCU-16 (4TR), FCU-17 (4TR), FCU-21 (4TR) set/s
5.0 ACCU-5 (7TR)
FCU-18 (4TR), FCU-19 (4TR) set/s
5.0 ACCU-6 (28TR)
FCU-1 (4TR), FCU-2 (4TR), FCU-3 (4TR), FCU-4 (4TR), FCU-5 (4TR), FCU-22 (3TR), FCU-24 set/s
(3TR)
6.0 ACCU-1 (12.5TR)

Page 9 of 14
UNIT COST
ITEM NO. DESCRIPTION QTY UNIT TOTAL AMOUNT
MATERIAL LABOR TOTAL
FCU-6 (4TR), FCU-7 (4TR), FCU-8 (4TR), FCU-25 (1.5TR) set/s
7.0 ACCU-2 (9.5R)
FCU-8 (4TR), FCU-9 (4TR), FCU-10 (1.5TR), FCU-29 (1.5TR) set/s
8.0 ACCU-3 (28.5R)

FCU-9 (4TR), FCU-10 (4TR), FCU-11 (4TR), FCU-12 (4TR), FCU-13 (4TR), FCU-14 (4TR), set/s
FCU-15 (4TR), FCU-23 (3TR), FCU-26 (1.5TR)

9.0 ACCU-4 (18.5TR)


FCU-11 (1.5TR), FCU-12 (1.5TR), FCU-13 (1.5TR), FCU-14 (1.5TR), FCU-15 (1.5TR), FCU- set/s
16 (1.5TR), FCU-17 (1.5TR), FCU-27 (3TR), FCU-30 (1.5TR)
10.0 ACCU-5 (15TR)
FCU-16 (4TR), FCU-17 (4TR), FCU-18 (4TR), FCU-21 (4TR) set/s
11.0 ACCU-6 (13TR)
FCU-18 (1.5TR), FCU-19 (1.5TR), FCU-20 (1.5TR), FCU-21 (1.5TR), FCU-22 (1.5TR), FCU-
23 (4TR), FCU-24 (4TR) set/s

12.0 ACCU-7 (6TR)


FCU-1 (4TR), FCU-2 (4TR) set/s
13.0 ACCU-8 (22TR)
FCU-3 (4TR), FCU-4 (4TR), FCU-5 (4TR), FCU-6 (4TR), FCU-7 (4TR), FCU-24 (1.5TR), FCU- set/s
26 (4TR), FCU-28 (3TR)
14.0 ACCU-9 (31TR)
FCU-1 (4TR), FCU-2 (4TR), FCU-3 (4TR), FCU-4 (4TR), FCU-5 (4TR), FCU-19 (4TR), FCU-20 set/s
(3TR), FCU-22 (3TR), FCU-24 (3TR)
15.0 ACCU-1 (12.5TR)

FCU-6 (4TR), FCU-7 (4TR), FCU-8 (4TR), FCU-24 (1.5TR) set/s

16.0 ACCU-2 (10.5TR)


FCU-10 (4TR), FCU-8 (4TR), FCU-9 (4TR), FCU-28 (1.5TR) set/s
17.0 ACCU-3 (6TR)
FCU-10 (4TR), FCU-11 (4TR) set/s
18.0 ACCU-4 (22.5TR)

FCU-12 (4TR), FCU-13 (4TR), FCU-14 (4TR), FCU-15 (4TR), FCU-16 (4TR), FCU-17 (4TR), set/s
FCU-25 (3TR), FCU-29 (1.5TR)

19.0 ACCU-5 (20.5TR)

FCU-9 (4TR), FCU-10 (4TR), FCU-11 (4TR), FCU-13 (4TR), FCU-14 (4TR), FCU-25 (1.5TR) set/s

20.0 ACCU-6 (17TR)


FCU-14 (4TR), FCU-15 (4TR), FCU-16 (4TR), FCU-17 (4TR), FCU-22 (3TR) set/s
21.0 ACCU-7 (14TR)
FCU-18 (4TR), FCU-19 (4TR), FCU-20 (4TR), FCU-21 (1.5TR), FCU-23 (4TR) set/s
22.0 ACCU-8 (6TR)
FCU-18 (4TR), FCU-19 (4TR), FCU-20 (4TR) set/s
23.0 ACCU-9 (6TR)
FCU-1 (4TR), FCU-2 (4TR) set/s
24.0 ACCU-10 (23TR)
FCU-3 (4TR), FCU-4 (4TR), FCU-5 (4TR), FCU-6 (4TR), FCU-22 (4TR), FCU-24 (4TR), FCU- set/s
26 (3TR), FCU-27 (3TR)
25.0 ACCU-11 (17TR)

FCU-3 (4TR), FCU-4 (4TR), FCU-5 (4TR), FCU-21 (4TR), FCU-23 (3TR) set/s

26.0 ACCU-12 (8TR)


FCU-1 (4TR), FCU-2 (4TR) set/s
27.0 ACCU-1 (13.5TR)
FCU-7 (4TR), FCU-8 (4TR), FCU-9 (4TR), FCU-10 (4TR), FCU-26 (1.5TR) set/s
28.0 ACCU-2 (6TR)
FCU-8 (4TR), FCU-9 (4TR) set/s
29.0 ACCU-3 (9TR)
FCU-6 (4TR) set/s
30.0 ACCU-3 (9.5TR)
FCU-7 (4TR), FCU-24 (1.5TR) set/s
31.0 ACCU-4 (17.5TR)

FCU-9 (4TR), FCU-10 (4TR), FCU-11 (4TR), FCU-12 (4TR), FCU-13 (4TR), FCU-25 (1.5TR) set/s

32.0 ACCU-5 (19.5TR)

FCU-10 (4TR), FCU-11 (4TR), FCU-12 (4TR), FCU-13 (4TR), FCU-14 (4TR), FCU-15 (4TR), set/s
FCU-27 (1.5TR)

33.0 ACCU-6 (16TR)

FCU-16 (4TR), FCU-17 (4TR), FCU-18 (4TR), FCU-19 (4TR), FCU-20 (4TR), FCU-24 (4TR) set/s

34.0 ACCU-7 (23TR)

FCU-14 (4TR), FCU-15 (4TR), FCU-16 (4TR), FCU-17 (4TR), FCU-18 (4TR), FCU-19 (4TR), set/s
FCU-20 (4TR), FCU-22 (4TR)

35.0 ACCU-8 (4TR)

FCU-21 (4TR), FCU-22 (4TR) set/s

36.0 ACCU-9 (8TR)


FCU-1 (4TR), FCU-2 (4TR) set/s
37.0 ACCU-10 (17TR)

FCU-3 (4TR), FCU-4 (4TR), FCU-5 (4TR), FCU-21 (4TR), FCU-23 (3TR) set/s

38.0 ACCU-11 (23TR)


FCU-1 (4TR), FCU-2 (4TR), FCU-3 (4TR), FCU-4 (4TR), FCU-5 (4TR), FCU-6 (4TR), FCU-23 set/s
(4TR), FCU-25 (3TR)
39.0 ACCU-1 (20.5TR)

FCU-6 (4TR), FCU-7 (4TR), FCU-8 (4TR), FCU- 9 (4TR), FCU-10 (4TR), FCU-11 (4TR), FCU- set/s
30 (1.5TR)

Page 10 of 14
UNIT COST
ITEM NO. DESCRIPTION QTY UNIT TOTAL AMOUNT
MATERIAL LABOR TOTAL
40.0 ACCU-2 (6TR)

FCU-8 (4TR), FCU-9 (4TR) set/s

41.0 ACCU-3 (19.5TR)

FCU-4 (4TR), FCU-5 (4TR), FCU-6 (4TR), FCU-7 (4TR), FCU-27 (3TR), FCU-28 (1.5TR) set/s

42.0 ACCU-4 (6TR)


FCU-12 (4TR), FCU-13 (4TR), set/s
43.0 ACCU-5 (23.5TR)

FCU-10 (4TR), FCU-11 (4TR), FCU-12 (4TR), FCU-13 (4TR), FCU-14 (4TR), FCU-15 (4TR), set/s
FCU-16 (4TR), FCU-17 (4TR), FCU-29 (1.5TR)

44.0 ACCU-6 (20.5TR)

FCU-14(4TR), FCU-15 (1.5TR), FCU-16 (4TR), FCU-17 (4TR), FCU-18 (4TR), FCU-19 (4TR), set/s
FCU-31 (1.5TR)

45.0 ACCU-7 (17TR)

FCU-20 (4TR), FCU-21 (4TR), FCU-22 (4TR), FCU-23 (4TR), FCU-28 (4TR) set/s

46.0 ACCU-8 (17TR)


FCU-18 (4TR), FCU-19 (4TR), FCU-20 (4TR), FCU-21 (4TR), FCU-26 (4TR) set/s
47.0 ACCU-9 (6TR)

FCU-22 (4TR), FCU-23 (4TR), FCU-24 (4TR) set/s

48.0 ACCU-10 (6TR)


FCU-24 (4TR), FCU-25 (4TR), FCU-26 (4TR) set/s
49.0 ACCU-11 (15TR)
FCU-1 (4TR), FCU-2 (4TR), FCU-3 (4TR), FCU-25 (4TR) set/s
50.0 ACCU-12 (15TR)
FCU-3 (4TR), FCU-4 (4TR), FCU-5 (4TR), FCU-27 (4TR) set/s
51.0 ACCU-13 (6TR)
FCU-1 (4TR), FCU-2 (4TR) set/s
52.0 ACCU-1 (8.5TR)
FCU-7 (4TR), FCU-8 (4TR), FCU-9 (4TR), FCU-25 (1.5) set/s
53.0 ACCU-2 (11.5TR)
FCU-9 (4TR), FCU-10 (4TR), FCU-11 (4TR), FCU-12 (4TR), FCU-35 (1.5TR) set/s
54.0 ACCU-3 (6TR)
FCU-13 (4TR), FCU-14 (4TR) set/s
55.0 ACCU-4 (6TR)
FCU-10 (4TR), FCU-11 (4TR) set/s
56.0 ACCU-5 (22.5TR)
FCU-15 (4TR), FCU-16 (4TR), FCU-17 (4TR), FCU-18 (4TR), FCU-19 (4TR), FCU-20 (4TR), set/s
FCU-33 (3TR), FCU-36 (1.5TR)
57.0 ACCU-6 (22.5TR)
FCU-12 (4TR), FCU-13 (4TR), FCU-14 (4TR), FCU-15 (4TR), FCU-16 (4TR), FCU-23 (3TR),
FCU-26 (1.5TR) set/s

58.0 ACCU-7 (15TR)

FCU-17 (4TR), FCU-18 (4TR), FCU-19 (4TR), FCU-20 (4TR) set/s

59.0 ACCU-8 (19TR)


FCU-21 (4TR), FCU-22 (4TR), FCU-23 (4TR), FCU-24 (4TR), FCU-25 (4TR), FCU-26 (4TR), set/s
FCU-31 (4TR)
60.0 ACCU-1 (15.5TR)

FCU-6 (4TR), FCU-7 (1.5TR), FCU-8 (4TR), FCU-9 (4TR), FCU-10 (4TR), FCU-27 (1.5TR) set/s

61.0 ACCU-2 (23.5TR)

FCU-5 (4TR), FCU-6 (4TR), FCU-7 (4TR), FCU-8 (4TR), FCU-9 (4TR), FCU-10 (4TR), FCU-11 set/s
(4TR), FCU-28 (3TR), FCU-19 (1.5TR)

62.0 ACCU-3 (6TR)


FCU-11 (4TR), FCU-12 (4TR) set/s
63.0 ACCU-4 (6TR)
FCU-11 (4TR), FCU-12 (4TR) set/s
64.0 ACCU-5 (24.5TR)

FCU-13 (4TR), FCU-14 (4TR), FCU-15 (4TR), FCU-16 (4TR), FCU-17 (4TR), FCU-18(4TR), set/s
FCU-19 (4TR), FCU-30 (1.5TR)

65.0 ACCU-6 (17.5TR)

FCU-13 (4TR), FCU-14 (4TR), FCU-15 (4TR), FCU-16 (4TR) set/s

66.0 ACCU-7 (17TR)


FCU-17 (4TR), FCU-18 (4TR), FCU-19 (4TR), FCU-20 (4TR), FCU-24 (4TR) set/s
67.0 ACCU-8 (13TR)
FCU-20 (4TR), FCU-21 (4TR), FCU-22 (4TR), FCU-26 (4TR) set/s
68.0 ACCU-9 (6TR)
FCU-21 (4TR), FCU-22 (4TR), FCU-23 (4TR) set/s
69.0 ACCU-10 (6TR)
FCU-23 (4TR), FCU-24 (4TR), FCU-25 (4TR) set/s
70.0 ACCU-11 (15TR)

FCU-1 (4TR), FCU-2 (4TR), FCU-3 (4TR), FCU-4 (4TR), FCU-27 (4TR) set/s

71.0 ACCU-12 (25TR)


FCU-1 (4TR), FCU-2 (4TR), FCU-3 (4TR), FCU-4 (4TR), FCU-5 (4TR), FCU-25 (4TR), FCU-26
set/s
(3TR)
72.0 ACCU-1 (12.5TR)

FCU-6 (4TR), FCU-7 (4TR), FCU-8 (4TR), FCU-24 (1.5TR) set/s

73.0 ACCU-2 (12.5TR)


FCU-6 (4TR), FCU-7 (4TR), FCU-8 (4TR), FCU-25 (1.5TR) set/s

Page 11 of 14
UNIT COST
ITEM NO. DESCRIPTION QTY UNIT TOTAL AMOUNT
MATERIAL LABOR TOTAL
74.0 ACCU-3 (20.5TR)

FCU-9 (4TR), FCU-10 (4TR), FCU-11 (4TR), FCU-12 (4TR), FCU-13 (4TR), FCU-26 (1.5TR) set/s

75.0 ACCU-4 (20.5TR)

FCU-9 (4TR), FCU-10 (1.5TR), FCU-11 (4TR), FCU-12 (4TR), FCU-13 (4TR), FCU-25 (1.5TR) set/s

76.0 ACCU-5 (17TR)

FCU-14 (4TR), FCU-15 (4TR), FCU-16 (4TR), FCU-17 (4TR), FCU-22 (4TR) set/s

77.0 ACCU-6 (19TR)

FCU-14 (4TR), FCU-15 (4TR), FCU-16 (4TR), FCU-17 (4TR), FCU-18 (4TR), FCU-23 (4TR) set/s

78.0 ACCU-7 (6TR)

FCU-19 (4TR), FCU-20 (4TR), FCU-21 (4TR) set/s

79.0 ACCU-8 (6TR)


FCU-18 (4TR), FCU-19 (4TR), FCU-20(4TR) set/s
80.0 ACCU-9 (17TR)
FCU-3 (4TR), FCU-4 (4TR), FCU-5 (4TR), FCU-21 (4TR), FCU-23 (3TR) set/s
81.0 ACCU-10 (25TR)
FCU-1 (4TR),FCU-2 (4TR),FCU-3 (4TR),FCU-4 (4TR),FCU-5 (4TR),FCU-23 (4TR), FCU-24 set/s
(3TR)
82.0 ACCU-11 (8TR)
FCU-1 (4TR), FCU-2 (4TR) set/s
83.0 ACCU-1 (14TR)
FCU-14 (4TR), FCU-15 (4TR), FCU-16 (4TR), FCU-17 (4TR), FCU-18 (4TR), FCU-19 (4TR),
FCU-20 (4TR), FCU-23 (4TR) set/s

84.0 ACCU-2 (20TR)

FCU-21 (4TR), FCU-22 (4TR), FCU-24 (4TR), FCU-26 (4TR),FCU-27 (4TR), FCU-36 (4TR), set/s
FCU-38 (1.5TR), FCU-39 (1.5TR)

85.0 ACCU-3 (21TR)

FCU-20 (4TR), FCU-29 (4TR), FCU-30 (4TR), FCU-31 (4TR), FCU-32 (4TR), FCU-33 (4TR) set/s

86.0 ACCU-4 (22.5TR)


FCU-1 (4TR), FCU-2 (4TR), FCU-3 (4TR), FCU-4 (4TR), FCU-5 (4TR), FCU-6 (4TR), FCU- set/s
34(4TR), FCU-35 (4TR)
87.0 ACCU-5 (8.5TR)

FCU-7 (4TR), FCU-8 (4TR), FCU-9 (4TR), FCU-10 (4TR) set/s

88.0 ACCU-5 (10TR)


FCU-11 (4TR), FCU-12 (1.5TR), FCU-13 (4TR), FCU-15 (4TR), FCU-37 (3TR) set/s
89.0 ACCU-1 (6TR)
FCU-9 (4TR), FCU-10 (4TR) set/s
90.0 ACCU-2 (15TR)

FCU-11 (4TR), FCU-12 (4TR), FCU-13 (4TR), FCU-14 (4TR), FCU-15 (4TR), FCU-25 (1.5TR), set/s
FCU-26 (1.5TR)

91.0 ACCU-3 (16TR)


FCU-12 (4TR), FCU-13 (4TR), FCU-14 (4TR), FCU-15 (4TR), FCU-16 (4TR), FCU-17 (4TR), set/s
FCU-21 (1.5TR)
92.0 ACCU-4 (18TR)

FCU-1 (4TR), FCU-2 (4TR), FCU-3 (4TR), FCU-18 (4TR), FCU-19 (4TR), set/s

93.0 ACCU-5 (20.5TR)

FCU-4 (4TR), FCU-5 (4TR), FCU-6 (4TR), FCU-7 (4TR), FCU-20 (3TR), FCU-22 (3TR) set/s

94.0 OTHERS (PLEASE SPECIFY)

V.1.3 OTHERS (PLEASE SPECIFY)

SUB TOTAL D

V.2 PIPES AND FITTINGS, GRILLES, DUCTS AND LOUVERS (Including Consumables, Hangers
and supports)
V.2.1. PVC PIPES (Including Fittings)

1.0 100mm ø l.m.


2.0 50mm ø l.m.

3.0 25mm ø l.m.


4.0 Others (Please Specify)

V.2.2 VENT CAP

1.0 100mm ø no.s


2.0 Others (Please Specify)

V.2.3 Fresh Air Duct


1.0 Gauge 26 sq.m.
2.0 Gauge 20 sq.m.
3.0 Others (Please Specify)

V.2.4 Fresh Air Louver


1.0 950mm x 500mm set/s
2.0 Others (Please Specify)

V.2.5 Exhaust Air Grille


1.0 900mm x 500mm set/s
2.0 150mm x 150mm set/s
3.0 Others (Please Specify)

V.2.6 Dampers
1.0 Relief Damper, 1500mmx950mm with motorized Actuator set/s

Page 12 of 14
UNIT COST
ITEM NO. DESCRIPTION QTY UNIT TOTAL AMOUNT
MATERIAL LABOR TOTAL
2.0 Volume Damper 200mmx150mm set/s
3.0 Volume Damper 400mmx350mm set/s
4.0 Others (Please Specify)

V.2.7 REFRIGERANT PIPE TYPE L


1.0 15.88mm lgt
2.0 9.53mm lgt
3.0 6.35mm lgt
4.0 Others (Please Specify)

V.2.8 Rubber Insulation 1" thick


1.0 15.88mm (I.D.) lgt
2.0 9.53mm (I.D.) lgt
3.0 6.35mm (I.D.) lgt
4.0 Others (Please Specify)

V.2.9 Others (Please Specify)


SUB TOTAL D
TOTAL V: MECHANICAL WORKS

VI FIRE PROTECTION WORKS


1.1 BLACK IRON PIPES AND FITTINGS
1.1.1 BI Staright Pipes Schedule 40 (Including fittings,
Supports (full thread hangers) and Paintings)
1.0 250mm ø lm
2.0 200mm ø lm
3.0 150mm ø lm
4.0 100mm ø lm
5.0 75mm ø lm
6.0 50mm ø lm
7.0 40mm ø lm
8.0 32mm ø lm
9.0 25mm ø lm
10.0 Others (Please Specify)

SUB TOTAL A

1.2 VALVES AND ACCESSORIES


1.2.1 Gate Valve (UL/FM)
1.0 150mm ø (OS & Y) pc/s
2.0 100mm ø pc/s
3.0 25mm ø pc/s
3.0 Others (Please Specify)
1.2.2 Butterfly Valve(UL/FM)
1.0 150mm ø pc/s
2.0 Others (Please Specify)
1.2.3 Check Valve(UL/FM)
1.0 250mm ø pc/s
2.0 150mm ø pc/s
3.0 Others (Please Specify)
1.2.4 Alarm Check Valve Assembly(UL/FM)
1.0 150mm ø pc/s
2.0 Others (Please Specify)
1.2.1 Globe Valve
1.0 25mm ø pc/s
2.0 Others (Please Specify)
1.2.6 Flexible Coupling
1.0 150mm ø pc/s
2.0 Others (Please Specify)
1.2.7 Pressure Gauge pc/s
1.2.8 Supervisory Switch
1.0 75mm ø pc/s
2.0 Others (Please Specify)
1.2.9 Roof Manfold
1.0 200mm ø x 2 - 65mm ø pc/s
1.2.10 Floor Control Valve
1.0 100mm ø pc/s
2.0 Others (Please Specify)
1.2.11 Fire Hose Valve
1.0 65mm ø pc/s
2.0 Others (Please Specify)
1.2.12 Sprinkler Orifice with Sight Glass
1.0 25mm ø pc/s
2.0 Others (Please Specify)
1.2.13 Water Flow Switch pc/s
1.2.14 2-Way Testing Hose Header Outlet
1.0 65mm x 65mm x 65mm x 150mm ø pc/s
2.0 Others (Please Specify)
1.2.15 2-Way Fire Department Connection Inlet
1.0 65mm x 65mm x 150mm ø pc/s
1.2.16 Auxillary Drain
1.0 50 mm ø pc/s
2.0 Others (Please Specify)
1.2.17 Airvent PVC Pipe
1.0 50mm ø pc/s
1.2.18 Manhole Cover with SS Lader Rung
1.0 600 x600 pc/s
2.0 Others (Please Specify)
1.2.19 Alarm Motor Gong pc/s
1.2.20Suction Strainer
1.0 150mm ø pc/s
2.0 50mm ø pc/s
1.2.21 Pressure Relief Valve
1.0 150mm ø pc/s
1.2.22 Automatic Drain-Off Valve
1.0 25mm ø pc/s
1.2.23 Angle Valve
1.0 40mm ø pc/s
1.2.24 Sight Glass
1.0 100mm ø pc/s
1.2.25 Monitor Switch pc/s
1.2.26 Inspector Test Valve pc/s
1.2.27 Siamese Twin Outlet pc/s
2.0 Others (Please Specify)

SUB TOTAL B

1.3 SPRINKLER HEADS


1.3.1 Pendent pc/s
1.3.2 Sidewall (Standard) pc/s

Page 13 of 14
UNIT COST
ITEM NO. DESCRIPTION QTY UNIT TOTAL AMOUNT
MATERIAL LABOR TOTAL
1.3.3 Sidewall (Extended) pc/s
1.3.4 Upright pc/s
1.3.5 Others (Please Specify)

SUB TOTAL C

1.4 FIRE HOSE CABINETS


1.4.1 Fire Hose Cabinets (complete with valves, Hose and accessories) set/s

SUB TOTAL D

1.5 PUMPS
1.5.1 Fire Pump
Horizontal Split Case, 750 GPM, 220 psi set/s
150 HP, 380V/3P/60Hz
1.5.2 Jockey Pump
Submersible Type, 50 GPM, 220 psi set/s
10 HP, 380V/3P/60Hz
1.5.3 Others (Please Specify)

SUB TOTAL E

TOTAL VI: FIRE PROTECTION WORKS

TOTAL CONTRACT COST -