0% found this document useful (0 votes)
866 views25 pages

Dexpan User Guide

This document provides instructions for using Dexpan demolition grout, including: 1. Instructions for planning drill patterns, mixing Dexpan, and filling holes to cause controlled cracking. 2. Keys for success like using the correct Dexpan type for the material temperature and ensuring expansion space. 3. Answers to frequently asked questions about hole diameter, depth, spacing, timing, and alternatives when expansion space is limited.

Uploaded by

novio333
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
866 views25 pages

Dexpan User Guide

This document provides instructions for using Dexpan demolition grout, including: 1. Instructions for planning drill patterns, mixing Dexpan, and filling holes to cause controlled cracking. 2. Keys for success like using the correct Dexpan type for the material temperature and ensuring expansion space. 3. Answers to frequently asked questions about hole diameter, depth, spacing, timing, and alternatives when expansion space is limited.

Uploaded by

novio333
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 25

User Guide

Instructions
Keys to Success
FAQ’s
Safety & First Aid
Drilling Patterns
Instructions
PLAN YOUR DRILL PATTERN

Determine your Drill Pattern & hole spacing based on:


› project objectives (full demo, pre-crack, dimension, etc) › equipment available
› desired size, shape of cracked material › material type, hardness
› if expansion space or an open face is available
› any need to direct cracking or protect an adjoining structure

1. DRILL HOLES

2. MIX DEXPAN

Organize personnel & equipment to ensure mixture is poured into holes within 5 - 10 minutes of mixing.
In a flat bottom bucket:
› add 1.5 litres of cool/cold water
› slowly add one bag of Dexpan
› mix well, using hand drill and mixing paddle
› rinse the bucket between batches

3. FILL HOLES

Gradually pour Dexpan mixture into the holes to avoid air bubbles.
Leave ½ to 1 inch of space from the top (not necessary to fill to the very top).
Fill the row of holes nearest your open face (where there is room to expand) first.
Pour first row, left to right. Return to the start of the next row, pour left to right.

Timing
Small cracks can begin to appear as early as 18 hours, but waiting for 24 to 48 hours will result in more
extensive and wider cracks. When the temperature drops after filling the holes or in cooler weather,
allow 2 to 4 days for full expansion and cracking.

Dexpan Demolition Grout


Non-explosive Controlled Demolition Agent www.dexpan- canada.com
Keys to Success
CORRECT PRODUCT
Select the correct Dexpan product based on the core temperature of the concrete/rock (NOT air temperature).
Dexpan 1: 25° to 40 °C Dexpan 2: 10° to 25 °C Dexpan 3: -5° to 10 °C
WARNING: Using the wrong product may result in:
› blowouts (product reacts too fast and is ejected out of the hole resulting in safety risk and wasted product)
› cracking to fail or take significantly longer

EXPANSION SPACE
To be effective, the material to be cracked requires space to expand and break apart.
Breaking a flat rock bed, a boulder submersed in earth or concrete enclosed on all sides does not allow for room for
the material to expand, break.
Possible strategies to create expansion room or an open face:
› trenching drill to remove material around the case
› drill a series of holes into the rock or concrete that you do not fill, but leave empty to provide expansion space
› drill some holes at a 45 degree angle

DRILL HOLE PATTERN & SPACING


A well-designed hole Drill Pattern will:
› achieve breaking objectives
› minimize labour & reduce consumption of Dexpan
› direct and control breaking
› shorten time for breaking to occur
IMPORTANT
› protect areas from cracking or expansive pressure When mixing & filling holes always
Some projects may require unfilled relief holes to: use personal protective equipment
› compensate for a lack of expansion space (safety goggles, dust mask, gloves)
› direct fractures
› protect an adjoining area or structure
› reduce time required for cracks to form
› reduce consumption of Dexpan

MIXING
Organize personnel & equipment to ensure mixture is poured into holes within 5 - 10 minutes of mixing.
Add water to bucket first, then Dexpan. Mix one bag of Dexpan at a time
Mix well, preferably with an electric hand drill with a mixing paddle to achieve a lump-free slurry
Use only open pails or containers for mixing
Rinse the bucket between batches. Don’t incorporate any unused mixture into the next batch

FILLING HOLES
Clear any water and excessive dust from holes
Pouring early in the morning is ideal. Material is coolest and can gradual warm with heat of the day
Always start pouring row of holes closest to open face / where there is room for expansion first
Gradually pour mixture to minimize air bubbles
Pour first row, left to right. Return to the start of next row, pour left to right
Do NOT fill holes in a snake pattern (first row left to right, second row right to left)
You do NOT need to fill holes to the top. Fill to within ½ to 1” of the top of the hole
Use protective plastic sleeves if rock has extensive fractures, is porous or if there is noticeable ground water
Protect filled holes from rain and snow with a tarp

Dexpan Demolition Grout


Non-explosive Controlled Demolition Agent www.dexpan-canada.com
FAQ’s
Which type of Dexpan should I use? Hole Diameter, Depth & Spacing
Select the type of Dexpan (Type 1, 2 or 3) based on the For best results, we highly recommend 1.5" diameter holes.
core temperature of the material to be cracked (not the air Do not exceed 2” or go less than 1” in diameter.
temperature).
Reinforced Hard Soft
Dexpan 1 25° to 40 °C 77° to 104 °F Concrete Rock Rock Concrete Boulders
Dexpan 2 10° to 25 °C 50° to 77 °F Diameter 1.5” 1.5” 1.5” 1.5” 1.5”
Dexpan 3 -5° to 10 °C 23° to 50 °F Spacing 10-12” 10-12” 12” 12” 10”
Depth 90% 105% 105% 75% 75%
How much Dexpan do I need?
Calculate total linear feet of Dexpan you will consume: Depending upon the material, project objectives and hole
# of holes x depth of holes in feet = total linear feet diameter, it is sometimes possible to space holes 18 to 24"
apart.
Based on 1.5" diameter holes
More holes spaced closer together results in:
11 pound Bag will fill up to 9 linear feet of holes
› faster break times
44 pound Box will fill up to 36 linear feet of holes
› smaller more manageable pieces
› adds labour cost (drilling & filling more holes)
What are the common mistakes people make? › may increase quantity of Dexpan used
1. Not reading the User Guide, instructions, FAQ’s fully.
2. Using wrong Dexpan type given material temperature.
3. Not taking into account Dexpan requires expansion Why is planning your drill pattern so important?
room for the concrete or rock to crack, break apart. A well-designed hole-drilling pattern will:
4. Wrong diameter holes or too far apart. › get the job done right, the first time
5. Material too shallow › improve effectiveness of Dexpan
6. Impatience. Give Dexpan full 24-48 hours to achieve › direct and control breaking
fuller expansion and wider cracking. › reduce quantity of Dexpan required
› reduce time spent drilling/filling holes
Will Dexpan work for all shallow applications? › pre-crack difficult materials making demolition and
removal easier
No. For Dexpan to be effective, we strongly recommend
› protect any sensitive surrounding structures
materials be a MINIMUM of 7" in depth.
Why is it important to ensure sufficient empty space
How long does it take to work? around the rock or concrete to be cracked?
Factors affecting the timing for cracks to appear include: For Dexpan to be effective, the material needs an open face
› material temperature and hardness or room to expand and break apart.
› reinforcing present Breaking rock or concrete enclosed on all sides does not
› number/spacing/depth/diameter of drilled holes allow room for expansive pressure created by Dexpan to
› temperature fluctuations after filling holes crack and break the material.
Small cracks can begin to appear as early as 18 hours, but
waiting for 24 to 48 hours will result in more extensive and Our project doesn’t have an open face and is
wider cracks. enclosed on all sides, what can we do?
There are a number of alternatives to create the necessary
When the temperature drops after filling the holes or in
cool conditions, allow 2 to 4 days for full expansion and expansion space:
cracking. Expansion / cracking can occur for up to 5 days. › dig around or remove soil enclosing rock or boulders to
be cracked
› drill a series of empty relief holes
What are the considerations for drilling holes? › in a concrete slab, employ holes drilled at 45° angle (to
Spacing and depth should be adjusted based on: direct expansion upwards) in the centre of the slab
› project objectives (demo, dimension, pre-crack) › create expansion space or an open face by pre-cracking
› material type, density, presence of reinforcing the first row or two by employing alternating filled &
› desired size of broken material empty relief holes
› desired cracking time

Dexpan Demolition Grout


Non-explosive Controlled Demolition Agent www.dexpan-canada.com
FAQ’s
What is the purpose of drilling relief holes? What can cause expansive demolition grouts to
Drilling holes, but not filling with Dexpan can: blowout?
› create expansion room for material to break apart 1. Using wrong version of Dexpan.
when the case is enclosed or confined 2. Pouring grout mixture into warm or hot holes.
› direct and control cracking 3. Hole diameter is too large.
› reduce amount of Dexpan required 4. Hole depth is too shallow. Drill holes to a minimum
› shorten time for breaking to occur depth of 5 times the hole diameter.
› control breaking to protect part of a structure 5. Distance between holes is too large.
› create corners (examples: wall openings, quarrying 6. No open face or expansion room for material to expand,
stone) crack and break apart.
7. Mixing more than 1 bag of expansive grout at a time
How will drilling a different diameter hole affect resulting in #9 below.
8. Mixing expansive grout by hand vs. using electric hand
spacing? drill with mixing paddle attachment resulting in #9 below.
Depending on the density of the material and/or 9. Too much time passing between beginning to mix and
reinforcing present: pouring into holes. Pour Dexpan mixture into holes within
2” Diameter Holes 5-10 minutes.
You may be able to space holes 16” to 24” apart 10. Adding expansive grout and water to leftover mixture
1 – 1 ¼ " Diameter Holes (smaller than we remaining from previously mixed batch
recommend) 11. Too much dust in holes.
To be effective, holes need to be drilled closer together 12. Not measuring water. Using too little water.
(6 - 10" apart). 13. Using warm water. In warm conditions crucial to use
cold or ice water.
When is the best time to pour Dexpan? 14. Grout sitting in sunlight or warm conditions before
The best time to pour Dexpan is when the material being mixed with water.
temperature is coolest and material can gradually warm as 15. Filled holes exposed to hot direct sunshine.
the day progresses. 16. Filling holes incorrectly. Always fill row of holes closest
to your open face first, pouring left to right; next row,
An effective strategy is to drill holes the day before so you back to the start, pour left to right.
can pour first thing early the next morning.
Pouring the Dexpan in the morning, when material is Any tips for freezing cold conditions?
coolest, is HIGHLY recommended, especially in summer or 1. Ensure correct type of Dexpan is used (Type 3) and
when working in extremely hot temperatures. stored at 10 degrees Celsius until ready to use.
2. Drill 1.5" diameter holes at 1 foot spacing (filled with
Dexpan). To speed up and assist cracking, drill 1/2 to 3/4"
Any advice when using Dexpan in the summer? diameter relief/expansion holes in between the filled
Expansive demolition grouts are sensitive to temperature. holes (leave them empty).
Using Dexpan in hot weather requires additional 3. Ensure water temperature is luke warm (approx 10
precautions to avoid blow outs. degrees Celsius), Caution: Cooler water will delay the
› Always select the correct type of Dexpan for your cracking and DO NOT overheat the water as this could
material temperature and expected weather lead to BLOW OUTS.
conditions (Type 1 for material at/above 25 °C) 4. Fill holes in morning so any natural temperature rise
› Ensure all personal protective equipment in use during the day supports the reaction vs pouring in
› Store Dexpan in cool shaded conditions prior to use afternoon when the temperature might drop overnight
› Use cold or ice water to mix slurry and work against the reaction.
› Start with an empty bucket (do not add 2nd bag to any
left-over mixture) 5. After you fill the holes, cover with a tarp to help seal in
› Do not pour mixture into hot holes the heat. In extreme cold weather, time sensitive projects
› Do not look or stand over filled holes some customers have erected hoarding and used heaters
› Cover filled holes with a cloth tarp to shield from sun to keep the temperature within the recommended range.
6. PATIENCE. It might take 36 or up to 72+ hours for full
cracking in extreme cold conditions. If the Dexpan is still
clay-like and firm to the touch, it is still working.
Dexpan Demolition Grout
Non-explosive Controlled Demolition Agent www.dexpan-canada.com
Safety & First Aid
WARNING SUMMER PRECAUTIONS
Due to the highly alkaline nature of the product: All brands of expansive demolition grouts are sensitive to
› risk of serious eye damage hot weather. If the chemical reaction goes too quickly a
› may cause skin irritation if left on skin steam driven blowout may occur where the expansive
› inhalation of dust may irritate respiratory system or grout, under pressure within the confined holes, is ejected
lungs with sudden force.

Avoiding blowouts is of utmost priority to ensure safety of


IMPORTANT personnel, projects are completed successfully
When mixing and pouring Dexpan ALWAYS: (uneventfully, on-time & on-budget) and legal liability for
› use personal protective equipment: any injuries or property damage is avoided.
safety goggles rubber gloves
dust-proof mask proper clothing Using Dexpan in hot weather increases the chances of
› Select correct Dexpan product type given material blow outs.
core temperature › Select the correct type of Dexpan for your material
› Ensure adequate ventilation in confined spaces temperature and expected weather conditions
› Mix promptly ensuring mixture is poured into holes › Ensure all personal protective equipment in use
within 5 - 10 minutes of combining powder & water › Store Dexpan in cool shaded conditions prior to use
› Start with an empty bucket (do not add 2nd bag to any › Use cold or ice water to mix slurry
left-over mixture) › Start with an empty bucket (do not add 2nd bag to any
› Cover filled holes with a tarp left-over mixture)
› Do not pour mixture into hot holes
› Do not look or stand over filled holes
NEVER › Cover filled holes with a cloth tarp to shield from sun
› look or stand over filled holes
› pour mixture into hot holes FIRST AID
› use warm water for mixing
› leave excess product sitting in bucket If accidental contact occurs on skin, wash off powder
› use glass or enclosed containers to mix/pour Dexpan immediately. If accidental contact with eyes occurs:
(could lead to a blow-out with glass or metal › promptly wash eyes with plenty of water while lifting
fragments) eye lids
› continue to rinse for at least 15 minutes
› seek medical attention if redness or irritation develops

PERSONAL PROTECTIVE EQUIPMENT

Dust-Proof Protective Rubber Protective


Mask Glasses Gloves Clothing

Dexpan Demolition Grout


Non-explosive Controlled Demolition Agent www.dexpan-canada.com
Drilling Patterns
REINFORCED CONCRETE DEMOLITION
Full Demolition Offset, staggered holes
Grid pattern to avoid rebar

CONTROLLED DEMOLITON DIMENSION


Keep on area intact Achieve desired shape, size
Use Relief Holes (unfilled) to create boundary Reduces consumption of Dexpan

1’ WIDE CONCRETE RETAINING WALL


Pattern: Holes offset from the midline

Dexpan Demolition Grout


Non-explosive Controlled Demolition Agent www.dexpan-canada.com
Drilling Patterns
CREATE AN OPENING IN A VERTICAL WALL
Use Relief Holes (unfilled) to create expansion room
Holes drilled at downward angle to ease filling

CONCRETE STEPS DEMOLITION


In application below, need to protect the building foundation where the stair platform meets the house
Unfilled Perimeter Holes stop cracking and protect structure
Relief Holes aid the demolition

Dexpan filled holes Relief Holes (empty, unfilled)

Dexpan Demolition Grout


Non-explosive Controlled Demolition Agent www.dexpan-canada.com
Drilling Patterns
PIER OR CONCRETE COLUMN TUNNELING
Reinforced concrete structure Need to create expansion space
Use of unfilled relief holes Use of unfilled relief holes
Deliberate filling of holes in sequence Holes filled in sequence

TRENCHING QUARRYING ROCK


In rock or concrete To create blocks in pre-determined shapes, sizes
Use of unfilled relief holes Avoids blasting, damage to material
Deliberate filling of holes in sequence Use of unfilled relief holes to achieve corners

Dexpan filled holes Relief Holes (empty, unfilled)

Dexpan Demolition Grout


Non-explosive Controlled Demolition Agent www.dexpan-canada.com
Drilling Patterns
EXCAVATING ROCK
Pre-cracking an area to create expansion space Using un-filled holes to reduce Dexpan Usage

Using a pre-cracked cut line to create an outer boundary,


outline the area to be removed and create expansion space.

Dexpan filled holes Relief Holes (empty, unfilled)

Dexpan Demolition Grout


Non-explosive Controlled Demolition Agent www.dexpan-canada.com
Drilling Patterns
SMALL BOULDERS LARGER BOULDERS

ROCK HUMP

Dexpan Demolition Grout


Non-explosive Controlled Demolition Agent www.dexpan-canada.com
Help & Advice

Support and Advice


We want you to be comfortable and confident using Dexpan.

Contact us by phone or email, if you have questions or need advice with your project.
Answers to Your Questions
Project Support & Advice
Drilling Patterns
Quotes & Estimates
Retail & Distributor Inquiries

Please note, we can help you most effectively if you can email or text us:
› pictures
› dimensions
› temperature of material
› project objectives, considerations and/or challenges
› tools & equipment on hand

Contact Us
We are here to help.
Monday to Friday, 8:00 to 5:00 pm (Pacific)

1-888-219-5247
(604) 340 – 7106
[email protected]

Dexpan Demolition Grout


Non-explosive Controlled Demolition Agent www.dexpan-canada.com
Mode d’Emploi

Instructions
Clés du succès
FAQ
Sécurité & Premiers Secours
Modèles de Forage
Instructions
INSTRUCTIONS
1. FORAGE DES TROUS
Déterminez votre modèle de forage et l'espacement
en fonction de:
› Objectifs du projet, équipement disponible FORAGE DES TROUS
› Dureté du matériau Diametre Espacement Profondeur
› Espace d'expansion ou aire du côté ouverte Béton Renforcé 1.5” 10-12” 90%
disponible Roche Dure 1.5” 12-18” 105%
› Taille désirée du matériel cassé Roche Mou 1.5” 12” 105%
› Échéancier du projet (rapprocher les trous = Béton 1.5” 12” 75%
rupture plus rapide) Rocher 1.5” 10” 75%
› Si des trous de décharge/d'expansion non remplis
serait recommandés

2. MÉLANGE DEXPAN
IMPORTANT
› Utiliser des lunettes de protection, un masque anti-poussière et des gants lors du mélange.
› Organiser le personnel et l'équipement pour s'assurer que le mélange est versé dans les trous dans les 5 à 10 minutes
suivant le mélange.
Rassembler:
Équipement de protection individuelle
Agent de démolition Dexpan 44 lb Box
Eau fraîche propre et méthode pour mesurer 1,5 litre Contains four 11 lb bags
Seau de mélange à fond plat 11 lb Bucket
Perceuse électrique avec palette de mélange (recommandé)Contains one 11 lb bag
Entonnoir (optionnel) 44 lb Bucket
Contains four 11 lb bags
Dans seau de mélange à fond plat:
› ajouté 1.5 L d’eau fraîche
› ajouté lentement un sac de Dexpan PRODUCT TYPES
› mélanger bien avec perceuse électrique avec palette de mélange
Select the correct type based on concrete/rock temperature
› rinser seau entre lots Dexpan I 25°C - 40°C
Dexpan II 10°C - 25°C
Dexpan III -5°C - 10°C
3. REMPLIR LES TROUS
Remplissez lentement les trous avec le mélange.
Laissez ½ à 1 pouce d'espace du haut (pas nécessaire de remplir tout en haut).
Remplissez les trous les plus proches de votre face ouverte (où il y a de la place pour expansion) en premier.
Verser la première rangée, de gauche à droite. Rangée suivante, de gauche à droite.
Optionnel: Un mince bâton ou tige (par exemple, un cintre) peut être utilisé pour agiter le mélange dans le trou pour
libérer l'air emprisonné.

IMPORTANT
Protégez les trous remplis du soleil, de la pluie et de la neige avec une bâche.

Coulis de Démolition Dexpan


Agent de Démolition Contrôlée Non-Explosif www.dexpan-canada.com
Clés du Succès
PRODUIT CORRESPONDANT
Sélectionnez le bon produit Dexpan en fonction de la température du matériau et des conditions météorologiques
prévues.
Dexpan I: 25 - 40 °C Dexpan II: 10 - 25 °C Dexpan III: -5 - 10 °C

ESPACE D’EXPANSION
Pour être efficace, le matériau à craquer nécessite de l'espace pour se dilater et se briser.
Briser un lit de roche plat ou un rocher enterré ou le béton est entouré de tous les côtés ne laisse pas de place pour que
le matériau se dilate, se brise.
Stratégies possibles pour créer une pièce d'extension ou une face ouverte:
› trancheuse pour enlever le matériau autour
› percer une série de trous de décharge vides
› percer des trous à un angle de 45 degrés

MODÈLE DE FORAGE
Un modèle de forage bien conçu va:
› atteindre les objectifs
› minimiser le travail
› réduire l'utilisation de Dexpan
› briser directement et en contrôle
› raccourcir le temps de rupture
› briser au loin des structures sensibles

MÉLANGER
Mélanger un sac de Dexpan à la fois. Eau en premier suivi de Dexpan.
Bien mélanger, de préférence avec une perceuse à main électrique avec une palette de mélange pour obtenir une boue
sans grumeaux. Utilisez uniquement des seaux ou des contenants ouverts pour mélanger.
Rincez le seau entre lots.

VERSER
Enlever l'eau et la poussière excessive des trous. Remplissez lentement les trous pour minimiser les bulles d'air.
Verser dans les trous dans les 5 à 10 minutes suivant le mélange.
Commencez toujours à verser la rangée de trous la plus proche de la face ouverte; où il y a de la place pour l'expansion,
en premier.
Verser la première rangée, de gauche à droite. Revenez au début de la rangée suivante, versez de gauche à droite. Vous
ne voulez PAS aller dans un modèle de serpent (première rangée de gauche à droite, deuxième rangée de droite à
gauche). Remplissez lentement les trous pour minimiser les bulles d'air.
Vous n'avez pas besoin de remplir les trous complètement.
Remplissez à ½ à 1 "du haut du trou.
Utilisez des manchons en plastique si la roche contient des eaux visibles.

Coulis de Démolition Dexpan


Agent de Démolition Contrôlée Non-Explosif www.dexpan-canada.com
FAQ
Quel type de Dexpan devrais-je utiliser? Pourquoi la planification de votre modèle de
Sélectionnez le type de Dexpan (I, II ou III) en fonction forage est-elle si importante?
de la température du matériau à craquer et des Un modèle de forage bien conçu:
conditions météorologiques prévues. › fait le travail correctement, la première fois
Dexpan I 25 - 40 °C (77 - 104 °F) › améliorer l'efficacité de Dexpan
Dexpan II 10 - 25 °C (50 - 77 °F) › économise de l'argent en quantité de Dexpan
Dexpan III -5 - 10 °C (23 - 50 °F) consommé
› réduit le travail en réduisant le temps pour percer et
Quel est le rendement du produit? remplir les trous
Basé sur des trous de 1.5" de diamètre: › Réduit les coûts de main-d'œuvre en craquant les
Sac, 11 livres jusqu'à 9 pieds linéaires matériaux difficiles, facilitant la démolition et
Boîte, 44 livres jusqu'à 36 pieds linéaires l'enlèvement des matériaux
› permet une rupture plus ciblée et contrôlée
Quelles sont les erreurs communes commises? › protège les structures environnantes sensibles
Ne pas lire complètement les instructions.
Ne pas prendre en compte que Dexpan nécessite de la
Pourquoi est-il important d’assurer un espace
place pour se dilater et casser le béton ou la roche.
libre suffisant autour de la roche ou du béton à
Impatience. Donner le Dexpan un 24 à 48 heures au
complet pour obtenir une dilatation complète et une craquer?
fissuration plus large. Pour que Dexpan soit efficace, le matériau a besoin
d'une face ouverte ou d'une espace pour se dilater et se
briser.
Combien de temps faut-il pour marcher?
Briser la roche ou le béton entouré de tous les côtés ne
Les facteurs qui impactent le temps d'apparition des
permet pas à Dexpan de casser le matériau.
fissures sont les suivants:
› température du matériau, dureté
Notre projet n'a pas de face ouverte et est fermé
› renfort
de tous les côtés, que pouvons-nous faire?
› montant/espacement/profondeur/diamètre des
Il existe plusieurs alternatives pour créer l'espace
trous
d'expansion nécessaire:
› fluctuations de température
› creuser ou enlever la terre qui enferme la roche ou
De petites fissures peuvent apparaître dès 12 heures, les rochers à craquer
mais l'attente de 24 à 48 heures entraînera des fissures › percer une série de trous de décharge ou un
plus étendues et plus larges. périmètre vide
L'expansion / la fissuration peut durer jusqu'à 3 jours. › dans une dalle de béton, utiliser des trous percés à
un angle de 45° (pour diriger l'expansion vers le
Lorsque la température baisse ou en temps froid, haut) au centre de la dalle
prévoyez 2 à 4 jours pour une expansion et une
fissuration complètes.

Coulis de Démolition Dexpan


Agent de Démolition Contrôlée Non-Explosif www.dexpan-canada.com
FAQ
Comment devrais-je percer les trous? Béton Roche Roche
L'espacement et la profondeur doivent être ajustés en Renforcé Dur Mou Béton Rocher
fonction de: Diamètere 1.5” 1.5” 1.5” 1.5” 1.5”
› objectifs du projet (démo, dimension, pré-fissure) Espacement 10-12” 10-12” 12” 12” 10”
› densité de matériau Profondeur 90% 105% 105% 75% 75%
› présence de renfort Selon le matériau, les objectifs du projet et le diamètre
› taille désirée du matériel cassé du trou, il est parfois possible d'espacer les trous de 12
› temps de craquage désiré à 24 pouces .

Quel est le but du forage des trous de décharge ? Dexpan fonctionnera-t-il pour toutes les
Percer des trous, mais ne pas remplir avec Dexpan peut: applications peu profondes?
› créer une espace d'expansion pour que le matériau se Non. Pour que Dexpan soit efficace, nous recommandons
brise lorsqu’il est enfermé ou confiné fortement que les matériaux soient d'un MINIMUM de 7"
› diriger et contrôler la fissuration de profondeur.
› réduire la quantité de Dexpan requise
› raccourcir le temps de rupture Quel est le meilleur moment pour verser Dexpan?
Le meilleur moment pour verser Dexpan est lorsque la
› contrôler les rupture pour protéger une partie d'une
température du matériau est froide et que le matériau
structure
peut progressivement se réchauffer au cours de la
› créer des coins lors de l'extraction de la pierre
journée.

Quel est l'impact du forage de plus de trous, plus Une stratégie efficace consiste à percer des trous la veille
rapprochés? pour pouvoir verser tôt le lendemain.
Plus les trous sont rapprochés l'un de l'autre:
Verser le Dexpan le matin, lorsque le matériau est le plus
› temps de fissurations plus rapides
frais, est fortement recommandé lorsque la température
› petites pièces plus faciles à gérer est extrêmement élevée.
› augmente le coût de la main-d'œuvre (perçage et
remplissage de plus de trous)
› peut augmenter la quantité de Dexpan utilisé

De quel taille devrais-je percer mes trous?


Pour de meilleurs résultats, nous recommandons
fortement des trous de 1,5" de diamètre. Ne dépassez pas
2" ou moins de 1" de diamètre.

Comment le diamètre affecte-t-il l'espacement?


En fonction de la densité du matériau et/ou du renfort
présent:
Trous de 2” de Diamètre
Vous pourrez espacer les trous de 16" à 24"
Trous de 1 – 1 ¼" de diamètre (plus petit que ce que
nous recommandons)
Vous devriez peut-être percer les trous de 5” à 8”.

Coulis de Démolition Dexpan


Agent de Démolition Contrôlée Non-Explosif www.dexpan-canada.com
FAQ
Qu'est-ce qui peut faire exploser les coulis de
démolition expansifs? Quelles sont les considérations de sécurité lors de
1. Utiliser le mauvais produit pour la température du l'utilisation de Dexpan?
matériau. En mélangeant et en versant Dexpan TOUJOURS:
2. Verser le mélange de coulis dans des trous chauds/mi-
› utiliser un équipement de protection individuelle:
chauds. Verser dans des trous fraîchement percés.
o lunettes de protection
3. Le diamètre du trou est trop grand.
o gants en caoutchouc
4. Pas de face ouverte ou d'espace pour que le matériau
o masque anti-poussière
se dilate et se sépare.
o vêtements appropriés
5. Trops de temps s'écoule entre le début du mélange et le
versement dans les trous. › Sélectionnez le type de produit Dexpan correct en
6. Mélanger à la main (au lieu d'utiliser une perceuse à fonction de la température du matériau
main avec une palette de mélange) avec n ° 5 ci-dessus › Assurer une ventilation adéquate dans des espaces
comme résultat. confinés
7. Mélanger plus d'un sac de Dexpan à la fois, avec n ° 5 ci- › Mélanger rapidement en s'assurant que le mélange est
dessus comme résultat. versé dans les trous dans les 5 à 10 minutes suivant la
8. Des trous trop peu profonds ou trop rapprochés. combinaison de la poudre et de l'eau
9. Utiliser de l'eau tiède. › Commencer avec un seau vide (ne pas ajouter le 2ème
10. Dexpan assis au soleil ou dans des conditions chaudes sachet à un mélange restant) Sélectionner le type de
avant d'être mélangé avec l'eau. produit Dexpan correct en fonction de la température
11. Ne pas mesurer l'eau. Utiliser trop peu d'eau du matériau
12. Trop de poussière dans les trous. › Couvrir les trous remplis d'une bâche
13. Les trous remplis exposés au soleil direct chaud.
14. Remplir les trous de manière incorrecte. INCORRECT: JAMAIS:
remplir la première rangée, de gauche à droite, puis la › regarder ou se tenir dessus des trous remplis
deuxième de droite à gauche. › verser le mélange dans des trous chauds
15. Ajouter Dexpan et de l'eau aux restes du mélange
› utiliser de l'eau chaude pour mélanger
restant du lot préalablement mélangé.
› laisser l'excès de produit dans le seau

Coulis de Démolition Dexpan


Agent de Démolition Contrôlée Non-Explosif www.dexpan-canada.com
Sécurité et Premiers Secours
AVERTISSEMENT PRÉCAUTIONS ESTIVALES
En raison de la nature hautement alcaline du produit: L'utilisation de Dexpan par temps chaud augmente les
› risque de blessures oculaires graves chances d’explosions.
› peut causer une irritation cutanée si laissé sur la peau › Sélectionnez le type de Dexpan adapté à la
› l'inhalation de poussières peut irriter l'appareil température de votre matériau et aux conditions
respiratoire et/ou les poumons météorologiques prévues
› S'assurer que tous les équipements de protection
individuelle sont utilisés
IMPORTANT › Stocker Dexpan dans des conditions d'ombre fraîches
En mélangeant et en versant Dexpan TOUJOURS:
› Utilisez de l'eau froide pour mélanger le coulis
› utiliser un équipement de protection individuelle:
› Ne pas verser le mélange dans des trous chauds
lunettes de protection gants en caoutchouc
masque anti-poussière vêtements appropriés › Ne pas regarder ou se tenir dessus des trous remplis
› Sélectionnez le type de produit Dexpan correct en › Couvrez les trous remplis avec une bâche en tissu
fonction de la température du matériau comme protection du soleil
› Assurer une ventilation adéquate dans les espaces
confinés PREMIERS SECOURS
› Mélanger rapidement en s'assurant que le mélange est Si le contact se produit sur la peau, laver immédiatement
versé dans les trous dans les 5 à 10 minutes suivant la la poudre.
combinaison de la poudre et de l'eau
Si contact avec les yeux se produit:
› Commencez avec un seau vide (ne pas ajouter un 2e - laver rapidement les yeux avec beaucoup d'eau tout
sac à un mélange restant) en soulevant les paupières
- continuer à rincer pendant au moins 15 minutes
JAMAIS - consulter un médecin si les yeux deviennent rouges ou
une irritation apparaît
› regarder ou se tenir dessus des trous remplis
› verser le mélange dans des trous chauds
› utiliser de l'eau chaude pour mélanger
› laisser l'excès de produit dans le seau
› utiliser du verre ou des boîtes fermées pour mélanger/
verser du Dexpan (peut provoquer une explosion avec
du verre ou des fragments de métal)

ÉQUIPEMENT DE PROTECTION INDIVIDUELLE

Coulis de Démolition Dexpan


Agent de Démolition Contrôlée Non-Explosif www.dexpan-canada.com
Modèles de Forage
BÉTON RENFORCÉ DÉMOLITION
Démolition complète Trous décalés
Modèle de grille pour éviter les barres d'armature

DÉMOLITION CONTRÔLÉ DIMENSIONS


Garder une zone intacte Atteindre la forme désirée, taille
Utiliser des trous de relief (non remplis) pour créer une limite Réduit la consommation de Dexpan

MUR DE RETENUE 1'


Modèle: Trous décalés par rapport à la ligne médiane

Coulis de Démolition Dexpan


Agent de Démolition Contrôlée Non-Explosif www.dexpan-canada.com
Modèles de Forage
CRÉER UNE OUVERTURE DANS UN MUR VERTICAL
Utilisez des trous de décharge (non remplis) pour créer une chambre d'expansion
Trous percés à un angle inférieur pour faciliter le remplissage

DÉMOLITION DES ESCALIERS EN BÉTON


Dans l'application ci-dessous, il est nécessaire de protéger les fondations du bâtiment où la plate-forme
d'escalier rencontre la maison.
Les trous de périmètre non remplis arrêtent la fissuration et protègent la structure
Les trous de décharge aident à la démolition

Trous remplis de Dexpan Trous vides

Coulis de Démolition Dexpan


Agent de Démolition Contrôlée Non-Explosif www.dexpan-canada.com
Modèles de Forage
JETÉE OU COLONNE EN BÉTON CRÉER UN TUNNEL
Structure en béton renforcé Nécessaire de créer un espace d'expansion
Utilisation de trous de décharge non remplis Utilisation de trous de décharge non remplis
Remplissage délibéré des trous en séquence Remplissage délibéré des trous en séquence

CREUSER DES TRANCHÉES EXTRACTION DE ROCHE


En roche ou en béton Pour créer des blocs de taille prédéterminées
Utilisation de trous de décharge non remplis Évite l’endommagement du matériel
Remplissage délibéré des trous en séquence Utiliser des trous non remplis pour faire des coins

Trous remplis de Dexpan Trous vides

Coulis de Démolition Dexpan


Agent de Démolition Contrôlée Non-Explosif www.dexpan-canada.com
Modèles de Forage
EXCAVATION DE ROCHE
Pré-fissuration d'une zone pour créer un Utilisation de trous non remplis pour réduire
espace d'expansion. l'utilisation de Dexpan

Utiliser une ligne de découpe pré-fissurée pour créer une limite extérieure,
délimiter la zone à supprimer et créer un espace d'extension.

Trous remplis de Dexpan Trous vides

Coulis de Démolition Dexpan


Agent de Démolition Contrôlée Non-Explosif www.dexpan-canada.com
Modèles de forage
PETITS ROCHERS ROCHER PLUS GRANDS

BOSSE EN ROCHE

Coulis de Démolition Dexpan


Agent de Démolition Contrôlée Non-Explosif www.dexpan-canada.com
Aide et Conseils

Nous Sommes Ici Pour Aider!


Nous voulons que vous soyez à l'aise et en confiance avec Dexpan.

Contactez-nous par téléphone ou par email si vous avez des questions ou avez besoin de conseils pour votre projet.
Réponses à vos questions
Support et conseil de projet
Modèles de forage
Devis et estimations
Demandes de renseignements concernant les détaillants et les distributeurs

S'il vous plaît noter que nous pouvons vous aider plus efficacement si vous pouvez nous envoyer:
› des photos
› dimensions
› température du matériau
› objectifs, considérations et/ou défis du projet
› outils et équipement à portée de main

SOUTIENS ET VENTES
Shawn Patton, Partenaire en gestion
1-888-219-5247
(604) 340 – 7106
[email protected]

ÉQUIPE DE SUPPORT TECHNIQUE


Appel sans frais
Lundi - Vendredi, 9 - 4 pm des Rocheuses
1-888-219-5247

Coulis de Démolition Dexpan


Agent de Démolition Contrôlée Non-Explosif www.dexpan-canada.com

You might also like