E10311
F.C.F.C. VN-3
FLY ASH HANDLING SYSTEM
ASH BEND
FOR CONSTRUCTION
DRAWING TRANSMITTAL
ITEM DOCUMENT EXPECTED FINAL STATUS WORK FOR
DOCUMENT TITLE SUBMITTED DATE-REV. NO.
NO. NO. ISSUE DATE DRAWING PORTION
RETURNED DATE-STATUS FA FI FF
3"-1000R 90° CERAMIC Y-TEE (2 IN S Rev. A Rev. 0
1 E10311-3-130A R 2014/9/30 2014/11/20 V
/1 OUT)
3"-1000R 90° CERAMIC Y-TEE (1 IN S Rev. A Rev. 0
2 E10311-3-130B R 2014/9/30 2014/11/20 V
/2 OUT)
3"-1000R 45° CERAMIC Y-TEE (2 IN S Rev. A Rev. 0
3 E10311-3-130C R 2014/9/30 2014/11/20 V
/1 OUT)
S Rev. A Rev. 0 Rev. 1
4 E10311-3-131 3"-1000R 90° CERAMIC BEND R 2014/9/30 2014/11/20 2014/12/03 V
S Rev. A Rev. 0
5 E10311-3-132 3"-1000R 60° CERAMIC BEND R 2014/9/30 2014/11/20 V
S Rev. A Rev. 0 Rev. 1
6 E10311-3-133 3"-1000R 45° CERAMIC BEND R 2014/9/30 2014/11/20 2014/12/03 V
S Rev. A Rev. 0 Rev. 1
7 E10311-3-134 3"-1000R 30° CERAMIC BEND R 2014/9/30 2014/11/20 2014/12/03 V
S Rev. A Rev. 0
8 E10311-3-135 CERAMIC CANNULATE PIPE 3"X1" R 2014/9/30 2014/11/20 V
S Rev. A Rev. 0 Rev. 1
9 E10311-3-136 CERAMIC LINED PIPE 3"X350L R 2014/9/30 2014/11/20 2014/12/03 V