Project No.

E10311

F.C.F.C. VN-3
FLY ASH HANDLING SYSTEM
ASH BEND

FOR CONSTRUCTION

FORMOSA INDUSTRIES CORP.

HWA JANN ENTERPRISE CO., LTD.

Total 1+10 pages

王進生 邱清城 陳志銘


1 REVISED AS CLOUD MARK
2014/12/03 2014/12/03 2014/12/03
王進生 邱清城 陳志銘
0 FOR CONSTRUCTION
2014/11/20 2014/11/20 2014/11/20

Rev. no Revision description Revised Check Approved

By 王進生 2014/9/30 Document No.

Chk 邱清城 2014/9/30


E10311-A-004
Appr. 陳志銘 2014/9/30
HCE 華湛企業有限公司
HWA CHAN ENTERPRISE CO., LTD.
PIPING FITTING DRAWING LIST
PROJECT NO. : E10311
PROJECT NAME: 越南仁澤公用廠(VN-3)飛灰輸送系統工程 PAGE NO. 1 OF 1

DRAWING TRANSMITTAL
ITEM DOCUMENT EXPECTED FINAL STATUS WORK FOR
DOCUMENT TITLE SUBMITTED DATE-REV. NO.
NO. NO. ISSUE DATE DRAWING PORTION
RETURNED DATE-STATUS FA FI FF
3"-1000R 90° CERAMIC Y-TEE (2 IN S Rev. A Rev. 0
1 E10311-3-130A R 2014/9/30 2014/11/20 V
/1 OUT)
3"-1000R 90° CERAMIC Y-TEE (1 IN S Rev. A Rev. 0
2 E10311-3-130B R 2014/9/30 2014/11/20 V
/2 OUT)
3"-1000R 45° CERAMIC Y-TEE (2 IN S Rev. A Rev. 0
3 E10311-3-130C R 2014/9/30 2014/11/20 V
/1 OUT)
S Rev. A Rev. 0 Rev. 1
4 E10311-3-131 3"-1000R 90° CERAMIC BEND R 2014/9/30 2014/11/20 2014/12/03 V
S Rev. A Rev. 0
5 E10311-3-132 3"-1000R 60° CERAMIC BEND R 2014/9/30 2014/11/20 V
S Rev. A Rev. 0 Rev. 1
6 E10311-3-133 3"-1000R 45° CERAMIC BEND R 2014/9/30 2014/11/20 2014/12/03 V
S Rev. A Rev. 0 Rev. 1
7 E10311-3-134 3"-1000R 30° CERAMIC BEND R 2014/9/30 2014/11/20 2014/12/03 V
S Rev. A Rev. 0
8 E10311-3-135 CERAMIC CANNULATE PIPE 3"X1" R 2014/9/30 2014/11/20 V
S Rev. A Rev. 0 Rev. 1
9 E10311-3-136 CERAMIC LINED PIPE 3"X350L R 2014/9/30 2014/11/20 2014/12/03 V

ABBREVIATION:
FA: FOR APPROVAL FI: FOR INFORMATION FF: FOR FABRICATION S: SUBMITTED R: RETURNED
AP: APPROVED AF: AS FINAL PR: PRELIMINARY RF: REVISED FINAL RA: REVISED APPROVAL