0% found this document useful (0 votes)
61 views3 pages

Strategic Finance Assignment 2 (Solution)

1) The document calculates the covariance between the returns of stocks K and MAXR over a period from January 2018 to December 2019 using daily pricing data. 2) It finds the covariance to be 0.00340, indicating a low positive correlation between the stock returns. 3) It also calculates the risk of stock K over this period to be -2%, while the risk of stock MAXR over the same period is 6%, as measured by the coefficient of variation.

Uploaded by

Zahid Usman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views3 pages

Strategic Finance Assignment 2 (Solution)

1) The document calculates the covariance between the returns of stocks K and MAXR over a period from January 2018 to December 2019 using daily pricing data. 2) It finds the covariance to be 0.00340, indicating a low positive correlation between the stock returns. 3) It also calculates the risk of stock K over this period to be -2%, while the risk of stock MAXR over the same period is 6%, as measured by the coefficient of variation.

Uploaded by

Zahid Usman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Strategic Finance

Assignment no 2 (Solution)
CMS: 28127
Submitted To: Dr. Irum Naz K
Submitted By: Zahid Usman
Date Price Return Ri-R^
18-Jan 68.11 - -
18-Feb 66.2 -0.02804 -0.02876
MAXR Historical Data
18-Mar 65.01 -0.01798 -0.0187
Date Price Return Ri-R^ (Ri-R^)2 18-Apr 58.9 -0.09399 -0.09471
18-Jan 77.62 - - - 18-May 64.39 0.093209 0.092488
18-Feb 60.13 -0.22533 -0.2024 0.040965 18-Jun 69.87 0.085106 0.084385
18-Mar 59.58 -0.00915 0.013784 0.00019 18-Jul 71.03 0.016602 0.015881
18-Apr 58.1 -0.02484 -0.00191 3.65E-06 18-Aug 71.79 0.0107 0.009979
18-May 62 0.067126 0.090056 0.00811 18-Sep 70.02 -0.02466 -0.02538
18-Jun 66 0.064516 0.087446 0.007647 18-Oct 65.48 -0.06484 -0.06556
18-Jul 63.75 -0.03409 -0.01116 0.000125 18-Nov 63.65 -0.02795 -0.02867
18-Aug 40.45 -0.36549 -0.34256 0.117347 18-Dec 57.01 -0.10432 -0.10504
18-Sep 42.54 0.051669 0.074599 0.005565 19-Jan 59.01 0.035082 0.034361
18-Oct 19.68 -0.53738 -0.51445 0.264655 19-Feb 56.26 -0.0466 -0.04732
18-Nov 21.99 0.117378 0.140308 0.019686 19-Mar 57.38 0.019908 0.019187
18-Dec 16.31 -0.2583 -0.23537 0.055399 19-Apr 60.3 0.050889 0.050168
19-Jan 7.38 -0.54752 -0.52459 0.275191 19-May 52.56 -0.12836 -0.12908
19-Feb 9.6 0.300813 0.323743 0.10481 19-Jun 53.57 0.019216 0.018495
19-Mar 5.4 -0.4375 -0.41457 0.171868 19-Jul 58.22 0.086802 0.086081
19-Apr 6.59 0.22037 0.243301 0.059195 19-Aug 62.8 0.078667 0.077946
19-May 9.12 0.383915 0.406845 0.165523 19-Sep 64.35 0.024682 0.02396
19-Jun 10.3 0.129386 0.152316 0.0232 19-Oct 63.53 -0.01274 -0.01346
19-Jul 9.72 -0.05631 -0.03338 0.001114 19-Nov 65.12 0.025028 0.024307
19-Aug 9.38 -0.03498 -0.01205 0.000145 19-Dec 66.48 0.020885 0.020163
19-Sep 10.06 0.072495 0.095425 0.009106
19-Oct 11.17 0.110338 0.133268 0.01776 0.017305
19-Nov 14.15 0.266786 0.289716 0.083936 P 24
19-Dec 16.92 0.19576 0.21869 0.047825 24

-0.55033 1.479366 0.000721


P 24 24 0.072104
24 24 Return 0% Risk
C.V
-0.02293 0.06164
-2.29304 6.164027
Return -2% Risk 6%
C.V -0.10827
1) Calculation of Covariance
K & MAXR

(Ri-R^)2 (x-x(bar))(y-y(bar)) Covariance=


- Covariance/P
0.000827 0.005821763
0.00035 -0.000257708 2) RISK
0.008969 0.000180908
0.008554 0.00832908
0.007121 0.007379202
0.000252 -0.000177243 3) Return
9.96E-05 -0.00341829
0.000644 -0.001893047
0.004298 0.033726918
0.000822 -0.004022432
0.011034 0.024723509
0.001181 -0.018025068
0.002239 -0.015320607
0.000368 -0.007954154
0.002517 0.012205855
0.016661 -0.052515295
0.000342 0.002817105
0.00741 -0.002873421
0.006076 -0.000939178
0.000574 0.00228643
0.000181 -0.001794305
0.000591 0.007041994
0.000407 0.004409553

0.081517 -0.000268432
24
24

0.003397
0.339656
0%
-0.10827
E(x-x(bar))(y-y(bar))/N
0

= 0
= 0

= 0

You might also like