0% found this document useful (0 votes)
514 views14 pages

Demo Project Diary

This document outlines the procedures and requirements for undergraduate/postgraduate project work at Dhanalakshmi Srinivasan Engineering College. It details the student and guide profiles, general instructions, work plan, attendance sheets, weekly progress reports, and formats for zeroth review details. The document provides guidance for students and staff on conducting project work over an academic year.

Uploaded by

Manikandan.R.K
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
514 views14 pages

Demo Project Diary

This document outlines the procedures and requirements for undergraduate/postgraduate project work at Dhanalakshmi Srinivasan Engineering College. It details the student and guide profiles, general instructions, work plan, attendance sheets, weekly progress reports, and formats for zeroth review details. The document provides guidance for students and staff on conducting project work over an academic year.

Uploaded by

Manikandan.R.K
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 14

PROJECT DIARY (UG/PG)

(To be maintained by Batch of Students)

BATCH (20__ to 20__) :

ACADEMIC YEAR :

DEPARTMENT :

SUBJECT CODE/NAME :

STUDENTS DETAILS :

PROJECT
NAME OF THE NAME OF THE
REG NO BATCH
STUDENT GUIDE
NO.

PROPOSED TITLE OF THE PROJECT

Dhanalakshmi Srinivasan Engineering College Page 1


STUDENT’S PROFILE

DETAILS STUDENT 1 STUDENT 2 STUDENT 3 STUDENT 4

NAME

REGISTER NUMBER

ADDRESS

MOBILE NUMBER

E-MAIL ID

GUIDE’S PROFILE

EXTERNAL GUIDE
DETAILS INTERNAL GUIDE
(IF ANY)
NAME

MOBILE NUMBER

E-MAIL ID

AREA OF SPECIALIZATION

Sign of Project Co-ordinator

Note: To be filled by the batch of students

Dhanalakshmi Srinivasan Engineering College Page 2


GENERAL INSTRUCTIONS

 Project works are conducted in VIII semester.


 Plan and Description of activities for VIII semester are listed below:
Schedule Work plan

First week Project Orientation by Project coordinator

Second week Domain description by Project coordinator


(Arrange for display of staff name with specialization

Third week Zeroth review presentation

Fourth week Literature survey report submission

Fifth week First review, Chapter 1 submission

Sixth week Material collections and verification

Seventh week Second review, Chapter 2 & 3 submission

Eighth week Experimental Testing

Ninth week Rough copy submission

Tenth week Final review, Book submission

 Two Expert members are to be nominated for the smooth conduct of review by the
HOD’s
 Expert members will not be changed under any circumstances.
 Guide should be present for all the review.
 Project coordinator will monitor the ongoing process.
 During the review, handouts to be submitted in landscape format, per page 2 slides
can be accommodated.

Dhanalakshmi Srinivasan Engineering College Page 3


 Summary of review to be submitted by the project coordinator(Sample format),
Expert Expert Expert Att Total
Batch Reg Guide
S.No Name Title 1 2 3
No. No Name (100)
(25) (25) (25) (25)
1

Name Signature
Expert 1
Expert 2
Expert 3(Guide)

Project coordinator HOD

 25 marks by the expert can be categorized as presentation (15)+handout(5)+viva


questions(5).
 Attendance 25 marks can be categorized as:

Percentage Mark

91-100% 25 marks

81-90% 20 marks

71-80% 15 marks

61-70% 10 marks

51-60% 5 marks

Dhanalakshmi Srinivasan Engineering College Page 4


EVEN SEMESTER WORK PLAN

S.NO DATE WORK PLAN

Project Orientation by Project coordinator


1

Domain description by Project coordinator


2 (Arrange for display of staff name with specialization

Zeroth review presentation


3

Literature survey report submission


4

5 First review, Chapter 1 submission

6 Material collections and verification

Second review, Chapter 2 & 3 submission


7

Experimental Testing
8

Rough copy submission


9

10 Final review, Book submission

Sign of Guide Sign of Project Co-ordinator

Note: Date has to be planned by Co-ordinator and to be filled by the batch of students.It should
be approved by guide before the start of weekly activities.

Dhanalakshmi Srinivasan Engineering College Page 5


EVEN SEMESTER

Attendance Sheet
S.No Reg No Date Date Date Date Date

1
2
3
4
Sign of Guide

S.No Reg No Date Date Date Date Date

1
2
3
4
Sign of Guide

S.No Reg No Date Date Date Date Date

1
2
3
4
Sign of Guide

S.No Reg No Date Date Date Date Date

1
2
3
4
Sign of Guide

Note: Presence can be indicated as signature of each student against their register number.

Dhanalakshmi Srinivasan Engineering College Page 6


Attendance Sheet
S.No Reg No Date Date Date Date Date

1
2
3
4
Sign of Guide

S.No Reg No Date Date Date Date Date

1
2
3
4
Sign of Guide

S.No Reg No Date Date Date Date Date

1
2
3
4
Sign of Guide

S.No Reg No Date Date Date Date Date

1
2
3
4
Sign of Guide

Note: Presence can be indicated as signature of each student against their register number.

Dhanalakshmi Srinivasan Engineering College Page 7


WEEKLY PROGRESS REPORT

Description Of Sign Of
Date Of
Week Ongoing Remarks By Guide
Reg No Discussion
No Work/Completed Guide With
With Guide
Activity Date

i
ii
1
iii
iv

i
ii
2
iii
iv

i
ii
3
iii
iv

i
ii
4
iii
iv

i
ii
5
iii
iv

i
ii
6
iii
iv

7 i
ii

Dhanalakshmi Srinivasan Engineering College Page 8


iii
iv

i
ii
8
iii
iv

i
ii
9
iii
iv

i
ii
10
iii
iv

REMARKS BY PROJECT CO-ORDINATOR AT THE END OF SEMESTER:

Note: Batch of students has to fill the details and progress has to be updated by guide and at the
end of semester, remarks have to be given by Project Co-ordinator.

Dhanalakshmi Srinivasan Engineering College Page 9


ZEROTH REVIEW DETAILS

DATE : VENUE :

Batch GUIDE
Reg No Name Title Exp Exp Exp
No.
1 2 3

Acknowledgement :

DETAILS EXPERT 1 EXPERT 2 EXPERT 3(Guide)


Name

Designation

Remarks

Signature

Sign of Project Co-ordinator Sign of HOD

Dhanalakshmi Srinivasan Engineering College Page 10


FIRST REVIEW DETAILS

DATE : VENUE :

Batch
Reg No Name Title Exp Exp Exp Att Total
No.
1 2 3
(25) (25) (25) (25) (100)

Acknowledgement :

DETAILS EXPERT 1 EXPERT 2 EXPERT 3(Guide)


Name

Designation

Remarks

Signature

Sign of Project Co-ordinator Sign of HOD

Dhanalakshmi Srinivasan Engineering College Page 11


SECOND REVIEW DETAILS

DATE : VENUE :

Batch
Reg No Name Title Exp Exp Exp Att Total
No.
1 2 3
(25) (25) (25) (25) (100)

Acknowledgement :

EXPERT
DETAILS EXPERT 1 EXPERT 2
3(Guide)
Name

Designation

Remarks

Signature

Sign of Project Co-ordinator Sign of HOD

Dhanalakshmi Srinivasan Engineering College Page 12


FINAL REVIEW DETAILS

DATE : VENUE :

Batch
Reg No Name Title Exp Exp Exp Att Total
No.
1 2 3
(25) (25) (25) (25) (100)

Acknowledgement :

EXPERT
DETAILS EXPERT 1 EXPERT 2
3(Guide)
Name

Designation

Remarks

Signature

Sign of Project Co-ordinator Sign of HOD

Dhanalakshmi Srinivasan Engineering College Page 13


ASSESSMENT OF GUIDE

*R1,R2,R3-Review 1,Review 2,Review 3 & IM-Internal Marks

Batch
Reg No Name Title R1 R2 R3 IM
No.
(100) (100) (100) (20)

REMARKS BY GUIDE ABOUT THE PERFORMANCE OF BATCH

Sign of Guide Sign of Project co-ordinator Sign of HOD

Note: R1,R2, R3 represents three reviews which are planned at the even semester. Internal marks
are calculated based on the three review marks ie,300 marks will be converted to 20 marks.

Dhanalakshmi Srinivasan Engineering College Page 14

You might also like