12-15-38-613-001-A - Fill the Potable Water Tank
** ON A/C ALL
System (Aircraft Electrical Power Available)
CARD: ZONE: INTERVAL:
SKILL: ACCESS: 171AL
MECH. INSP.
** ON A/C ALL
TASK 12-15-38-613-001-A
Fill the Potable Water Tank System (Aircraft Electrical Power Available)
CAUTION: THE WATER PRESSURE MUST NOT BE MORE THAN 3.45 BARS (50.0 PSI) A
PRESSURE MORE THAN 3.45 BARS (50.0 PSI) CAN CAUSE DAMAGE.
CAUTION: MAKE SURE THAT THE DRAIN VALVES STAY IN THE DRAIN POSITION
AFTER YOU DRAIN THE POTABLE WATER SYSTEM IF:
- THE BLEED AIR SYSTEM IS OFF, AND
- THE OUTSIDE AIR TEMPERATURE IS BELOW 0 DEG.C (32 DEG.F).
THIS WILL PREVENT DAMAGE TO THE POTABLE WATER SYSTEM.
NOTE: To Fill the potable water system, if electrical power is not available (Ref. TASK 12-15-
38-613-002).
REFERENCE QTYDESIGNATION
No specific 1 ACCESS PLATFORM 2M (6 FT)
No specific 1 CART - SERVICING, WATER, POTABLE
No specific 1 WATER SOURCE - GROUND
C. Referenced Information
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 1 of 8
JCP Ref: reference DATABASE REV DATE: May 01/2018
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Aug 05/2018 17:16
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK:
IGO - A318/A319/A320/A321 AMM TASK : 12-15-38-613-001-A
12-15-38 PB 301
TITLE:
A/C Reg.:
12-15-38-613-001-A - Fill the Potable Water Tank
** ON A/C ALL
System (Aircraft Electrical Power Available)
MECH. INSP.
REFERENCE DESIGNATION
** ON A/C ALL
(Ref. 12-31-38-660-001-A). Cold Weather Maintenance - Water/Waste
(Ref. 12-33-21-618-001-A). Pre-conditioning through the LP Ground Connection
(Ref. 12-33-21-618-001-A- Pre-conditioning through the HP Ground Connection
01).
(Ref. 12-33-21-618-001-A- Pre-conditioning with the APU
02).
(Ref. 24-42-00-861-001-A). Energize the Ground Service Network from the External
Power
(Ref. 24-42-00-862-001-A). De-energize the Ground Service Network Supplied from
the External Power
** ON A/C ALL
** ON A/C 401-450
Potable Water Service-Panel 2023VU SHEET 1
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 2 of 8
JCP Ref: reference DATABASE REV DATE: May 01/2018
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Aug 05/2018 17:16
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK:
IGO - A318/A319/A320/A321 AMM TASK : 12-15-38-613-001-A
12-15-38 PB 301
TITLE:
A/C Reg.:
12-15-38-613-001-A - Fill the Potable Water Tank
** ON A/C ALL
System (Aircraft Electrical Power Available)
MECH. INSP.
Z171
1/2
1/4 3/4
QUANTITY
E F INDICATOR
TANK FULL LIGHT
FILL AND
DRAIN PORT
OVERFLOW VALVE
OPEN LIGHT
N_MM_121538_3_AAQ0_01_00
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 3 of 8
JCP Ref: reference DATABASE REV DATE: May 01/2018
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Aug 05/2018 17:16
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK:
IGO - A318/A319/A320/A321 AMM TASK : 12-15-38-613-001-A
12-15-38 PB 301
TITLE:
A/C Reg.:
12-15-38-613-001-A - Fill the Potable Water Tank
** ON A/C ALL
System (Aircraft Electrical Power Available)
MECH. INSP.
Z171
A
2023VU SERVICE PANEL
OVERFLOW PORT
FILL AND
DRAIN PORT
CONTROL HANDLE
FILL/OVERFLOW/DRAIN
N_MM_121538_3_AAT0_01_00
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 4 of 8
JCP Ref: reference DATABASE REV DATE: May 01/2018
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Aug 05/2018 17:16
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK:
IGO - A318/A319/A320/A321 AMM TASK : 12-15-38-613-001-A
12-15-38 PB 301
TITLE:
A/C Reg.:
12-15-38-613-001-A - Fill the Potable Water Tank
** ON A/C ALL
System (Aircraft Electrical Power Available)
MECH. INSP.
3. Job Set-up
Subtask 12-15-38-861-050-A
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001) .
Subtask 12-15-38-865-053-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
** ON A/C 401-450
2001VU WATER SYS-QUANT-IND 1MA B06
** ON A/C ALL
Subtask 12-15-38-618-050-A
C. Preparation to Fill the Potable Water System
(1) Obey the cold weather maintenance procedure (Ref. AMM TASK 12-31-38-660-
001) .
(2) If the temperature in the aircraft is below 4 DEG.C (39.20 DEG.F) do the pre-
conditioning procedure (Ref. AMM TASK 12-33-21-618-001) .
Subtask 12-15-38-010-050-A
D. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) in position.
(2) Open the access panel 171AL.
(3) Open the POTABLE WATER FILL AND DRAIN port on the service panel.
4. Procedure
** ON A/C 401-450
(Ref. Fig. Potable Water Service-Panel 2023VU SHEET 1)
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 5 of 8
JCP Ref: reference DATABASE REV DATE: May 01/2018
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Aug 05/2018 17:16
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK:
IGO - A318/A319/A320/A321 AMM TASK : 12-15-38-613-001-A
12-15-38 PB 301
TITLE:
A/C Reg.:
12-15-38-613-001-A - Fill the Potable Water Tank
** ON A/C ALL
System (Aircraft Electrical Power Available)
MECH. INSP.
(1) If the indication system does not operate satisfactorily, do the servicing without
electrical power (Ref. AMM TASK 12-15-38-613-002) .
NOTE: The "Overflow valve open" light 6MP on the serive panel 2023VU must be
on when the overflow valve 8MP is opened.
NOTE: If the indication system does not operate and electrical power is necessary
on aircraft, you can open the CB 1MA (water system quantity indicator)
(Ref. AMM TASK 12-15-38-613-002) .
(2) Connect the fill hose of the CART - SERVICING, WATER, POTABLE or WATER
SOURCE - GROUND to the POTABLE WATER FILL AND DRAIN port.
(3) On the service panel:
· Turn the FILL/DRAIN handle to the PULL TO FILL position
· Then pull it out to the mechanical stop.
(4) If the OVERFLOW VALVE OPEN light 6MP does not come on:
· Examine the position of the overflow valve 8MP.
CAUTION: THE WATER PRESSURE MUST NOT BE MORE THAN 3.45 BARS (50.0
PSI) A PRESSURE MORE THAN 3.45 BARS (50.0 PSI) CAN CAUSE
DAMAGE.
NOTE: The "Overflow valve open" light 6MP on the service panel 2023VU must
be off when the overflow valve 8MP is closed.
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 6 of 8
JCP Ref: reference DATABASE REV DATE: May 01/2018
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Aug 05/2018 17:16
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK:
IGO - A318/A319/A320/A321 AMM TASK : 12-15-38-613-001-A
12-15-38 PB 301
TITLE:
A/C Reg.:
12-15-38-613-001-A - Fill the Potable Water Tank
** ON A/C ALL
System (Aircraft Electrical Power Available)
MECH. INSP.
NOTE: If the filling level is to be less than full, push in the Fill/DRAIN handle
and turn it to the NORMAL position. The Quantity Indicator shows the
filling level.
NOTE: The FILL/DRAIN handle will automatically move back to the NORMAL
position when the TANK FULL light comes on. The OVERFLOW
VALVE OPEN light 6MP goes off.
NOTE: If there is too much water in the tank, water will flow from the TANK
OVERFLOW port.
NOTE: If the tank is overfilled, water will flow from the "TANK
OVERFLOW" port.
** ON A/C 401-450
Subtask 12-15-38-613-050-H
B. Fill the Potable Water System
CAUTION: THE WATER PRESSURE MUST NOT BE MORE THAN 3.45 BARS (50.0
PSI) A PRESSURE MORE THAN 3.45 BARS (50.0 PSI) CAN CAUSE
DAMAGE.
(1) Connect the fill hose of the CART - SERVICING, WATER, POTABLE or WATER
SOURCE - GROUND to the POTABLE WATER FILL AND DRAIN port.
(2) On the service panel:
· Turn the FILL/OVERFLOW/DRAIN handle to the PULL TO FILL position.
· Then pull it out to the mechanical stop.
(3) Operate the water service vehicle and fill the potable water tank until the quantity
indicator shows the necessary quantity.
NOTE: If the filling level is to be less than full, push in the Fill/OVERFLOW/
DRAIN handle and turn it to the NORMAL position. The Quantity Indicator
shows the filling level.
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 7 of 8
JCP Ref: reference DATABASE REV DATE: May 01/2018
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Aug 05/2018 17:16
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK:
IGO - A318/A319/A320/A321 AMM TASK : 12-15-38-613-001-A
12-15-38 PB 301
TITLE:
A/C Reg.:
12-15-38-613-001-A - Fill the Potable Water Tank
** ON A/C ALL
System (Aircraft Electrical Power Available)
MECH. INSP.
(4) Push in the FILL/OVERFLOW/DRAIN handle and turn it to the NORMAL position.
NOTE: If there is too much water in the tank, water will flow from the "POTABLE
WATER OVERFLOW" port.
** ON A/C ALL
5. Close-up
Subtask 12-15-38-410-050-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access panel 171AL.
NOTE: Make sure that the latches are correctly locked and that the door makes a
continuous surface with the skin of the aircraft.
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 8 of 8
JCP Ref: reference DATABASE REV DATE: May 01/2018
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Aug 05/2018 17:16
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE