IOQ of Metrix
IOQ of Metrix
Details of Equipment/System
User Department INFORMATION TECHNOLOGY
Software Name & Version No. Biométric Software COSEC Centra V. 14.31
CPPB/IT/BSC-01,
CPGB/IT/BAR-01, CPGB/IT/BAR-02, CPGB/IT/BAR-03,
Equipment Id’s
CPGB/IT/BAR-04,
CPCB/IT/BAR-01, CPCB/IT/BAR-02
Equip. Location/ Room No. MAIN ENTRANCE GATE & CEPHA BLOCK
TABLE OF CONTENTS
S No Content Page No
2.0 Objective 04
3.0 Scope 04
5.0 Responsibilities 06
7.0 Methodology 07
9.0 Annexures 34
10.0 Summary 35
11.0 Conclusions 35
12.0 Abbreviation 35
13.0 References 35
Change History
Reviewed by:
Approved by:
2.0 OBJECTIVE
Software to convert the scanned biometric data into a standardized digital format and to
compare match points of the observed data with stored data.
System
Ethernet Network
Biometric-1 Biometric-2
(IN) (OUT)
5.0 RESPONSIBILITIES
Department Responsibility
Verified by (QA):
Manufacturer MATRIX
Main Entrance Gate
Location
Cepha Block Entrance
Checked
Discrepancy? Tested By
Description Specified Actual Result By
(Yes / No) Sign/Date
Sign/Date
Operating System
Manufacturer Dell
RAM 16.00 GB
Keyboard Standard
00330-80000-
Product Id
00000-AA041
Application Software
Checked
Discrepancy? Tested By
Description Specified Actual Result By
(Yes / No) Sign/Date
Sign/Date
Software
Version 14.31
Version
Software C:/Programmfiles/
Installation Matrix/ COSEC
Path Integrate
Make MATRIX
Verification of communication
Biometric to the
System As observed
communication mode
Communication mode details from Biometric to Computer System
IP Address As observed
Power on the system and put the multimeter in AC voltage measurement range and
measure the voltage at terminal end.
Note down the voltage reading in the test data sheet. Repeat above step for all system
modules those are separately powered.
7.6.4 Acceptance criteria
Recorded measurements for voltage shall be within the specified range.
Checked
Calibrated Calibration Tested By
Test Instrument Make Model By
Date Due Date Sign/Date
Sign/Date
Tested By Checked By
Details Specified Actual
Sign/Date Sign/Date
Tested By Checked By
Procedure Expected Result Actual
Sign/Date Sign/Date
Login should be successful upon entering correct user name and correct password.
Administrator Level
Tested By Checked By
Procedure
Sign/Date Sign/Date
Expected result Actual result
For Software
Enter correct user
Login should be
name and correct
successful
password
Enter correct user
name and wrong Login should be fail
password
Enter wrong user
name and correct Login should be fail
password
Enter wrong user
name and wrong Login should be fail
password
Tested By Checked By
Procedure Expected result Actual result
Sign/Date Sign/Date
Login into the system with correct security level to enable all functions.
Click on the Menu-bar items in the software the detail check of these software features.
7.11.3 Acceptance criteria
To Navigate Data
Data Mgt.
Mgt. Screen
Access To Navigate Access
Control Control Screen
USB To Navigate USB
Manager Manager Screen
To Navigate
Attendance
Attendance Search
Search
Screen
Short To Navigate Short
Message Message Screen
To Navigate Work
Work Code
Code Screen
To Navigate
Autotest
Autotest Screen
To Navigate System
System Info
Info Screen
User Management Screen
To Add New User
New User
Screen
To navigate All
All Users
Users Screen
Display To Display Style
Style Screen
User Role Screen
User To User Defined
Defined
Role 1 Role 1 Screen
Comm. Screen
To Serial Comm
Serial Comm
Screen
PC To PC Connection
Connection Screen
Anti- To Anti-passback
passback
Setup Setup Screen
Download To Download
Options Options Screen
Short Message Screen
New To New Message
Message Screen
Personal To Personal
Messages Messages Screen
Main Screen
Login To Login
Close To Cancel
Home Screen
Enterprise To Navigate
Structure Enterprise Structure
Access To Navigate Access
Control Control
Time and To Navigate Time
Attendance and Attendance
Leave To Navigate Leave
Management Management
Visitor To Navigate Visitor
Management Management
To Navigate
Cafeteria
Cafeteria
Management
Management
Contact To Navigate Contact
Workers Workers
Management Management
Job To Navigate Job
Processing Processing and
and Costing Costing
Field Visit To Navigate Field
Management Visit Management
Report To Navigate Report
Builder Builder
Admin Screen
To Department
Department
Screen
To Employee
Employee
Screen
Transaction Screen
Leave To Leave
Application Application Screen
Admin Screen
Time Office To Time Office
policies policies Screen
To Data Process
Data Process
Screen
Database To Database Setting
Setting Screen
To SMS Setting
SMS Setting
Screen
To Bulk SMS
Bulk SMS
Screen
Email To Email Setting
Setting Screen
User To User Manage
Manage Screen
Repots Screen
Daily To Daily Reports
Reports Screen
Monthly To Monthly Reports
Reports Screen
Customised To Customised
Report Report Screen
Payroll
Employee To Employee Setup
Setup Screen
Tested By Checked By
Procedure Expected Result Actual
Sign/Date Sign/Date
During power
System should stop
failure
While the system is operating, detach communication cable. Verify the display on system.
Wait for 5 minutes then connect the communication cable that was removed.
Verify the operation in the step 2 are unchanged after the communication failure occurs.
7.13.3 Acceptance criteria
The communication is restored the system must start without any error.
Data Sheet 7.3.13
Verification of communication failure
Tested By Checked By
Procedure Expected Result Actual
Sign/Date Sign/Date
Before
System should run in healthy
communication
condition
failure
During
Error message should display
communication
on system
failure
After
Error message should disappear
communication
on system
resume
Tested By Checked By
Procedure Expected Result Actual
Sign/Date Sign/Date
5 Verification of communication
Remarks:
10.0 Summary
11.0 Conclusion
12.0 Abbreviation
Abbreviations Description
IOQ Installation And Operational Qualification
NA Not Applicable
CC Change Control
RAM Random Access Memory
Y Yes
N No
HDD Hard Disk
CPU Central Processing Unit
13.0 References
A. Validation Master Plan (SOP no: CPL/QA/017)
B. Qualification SOP’S (SOP no: CPL/QA/009)
C. Operational Manual
Reviewed by:
Approved by: