0% found this document useful (0 votes)
1K views1 page

Electrical SLD

This document contains notes and specifications for the electrical single line diagram for a proposed sewage pumping station under Package SD 29 of the construction of a 40 MLD sewage treatment plant. It includes notes on starter operation times, motor starting types, panel construction details, interlocking, contactors, ventilation, cable laying, and earthing. The diagram is for the electrical arrangement of dry well fire (DWF) pumping at the Churial Extension pumping station under the given construction project.

Uploaded by

susovan bIswas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views1 page

Electrical SLD

This document contains notes and specifications for the electrical single line diagram for a proposed sewage pumping station under Package SD 29 of the construction of a 40 MLD sewage treatment plant. It includes notes on starter operation times, motor starting types, panel construction details, interlocking, contactors, ventilation, cable laying, and earthing. The diagram is for the electrical arrangement of dry well fire (DWF) pumping at the Churial Extension pumping station under the given construction project.

Uploaded by

susovan bIswas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

m

m m m

NOTE:-
1. AUTOMATIC STAR/DELTA STARTER OPERATION TIME SHALL BE MANUALLY AS DIRECTED.
2. PUMP MOTOR UP TO 5.5KW SHALL BE OF DOL. STARTING, ABOVE 5.5KW STAR DELTA
STARTING TO BE PROVIDED
3. LT MCC SHALL BE SHEET STEEL ENCLOSED(14 SWG) COMPARTMENTALISED, FREE
STANDING TYPE WITH DEGREE OF IP-4X PROTECTION AND POWDER COATED PAINTING OF
APPROVED SHADE;
4. APFC RELAY CONTROL FOR CAPACITOR BANK IN LT PANEL SHALL BE AT BOTH SIDE OF
BUS-COUPLER
5. SAFETY RELEASE FOR VARIOUS PROTECTION OF MOTOR AS RECOMMENDED BY PUMP
MANUFACTURER ARE TO BE PROVIDED IN LT PANEL.
6. LPBS SHALL BE INSTALLED NEAR ALL DRIVES.
7. KVAR RATING SHALL BE CALCULATED ON TOTAL WORKING LOAD FOR EACH OF THE
m m CAPACITOR BANK, FOR THE CONDITION WHEN ONLY ONE INCOMER IS WORKING AND BUS
COUPLER IS AT ON CONDITION.
8. LT BUS-COUPLER AND LT IN-COMER SHALL BE PROVIDED WITH ELECTRO-MECHANICAL
INTER-LOCKING ARRANGEMENT.
9. ALL CONTACTORS SHALL BE AC3 DUTY TYPE AND RATINGS SHALL BE SUIT TO FLC OF
DRIVES.
10. ADEQUATE SPACE SHALL BE KEPT INSIDE THE PANEL CUBICLES TO FACILITATE EASY
MAINTENANCE & REPAIR / REPLACEMENT.
11. ADEQUATE FORCED VENTILATION ARRANGEMENT FOR HEAT DISSIPATION FROM
CAPACITOR BANKS SHALL BE PROVIDED.
12. ONLY DWF MOTOR FEEDER PANELS IS NOT INCLUDED IN PACKAGE SD 29.
13.CABLE LAYING SHALL BE CONSIDERED FROM LT SWF PANEL OUTGOING FEEDER TO NEW
DWF LT PANEL AND FROM DWF LT PANEL TO DWF DRY PIT MOTORS IN PACKAGE SD 29.

m 14.EARTHING FOR THE LT PANEL & DWF MOTORS SHALL BE INCLUDED IN PACKAGE SD 29.
m m m m m m

UNDER PACKAGE SD 29

FOR TENDER PURPOSE ONLY

m m m m m

CONSTRUCTION OF 40 MLD SEWAGE TREATMENT PLANT AT BANK PLOT, M G ROAD,


JOKA (KEIIP / NCB / TR-2 / SD 29 / 2017-2018)
UNDER PACKAGE SD 29
ELECTRICAL SINGLE LINE DIAGRAM FOR PROPOSED CHURIAL
EXTENSION PS FOR DWF PUMPING ARRANGEMENT

DRG NO : KEIIP/TR-3/SD 29/07