Completion Log Delivery in Exploration
Completion Log Delivery in Exploration
UNRESTRICTED DOC ID :
October 2009
- Specification -
SP2019
This document is the property of Petroleum Development Oman, LLC. Neither the whole nor any part
of this document may be disclosed to others or reproduced, stored in a retrieval system, or transmitted
in any form by any means (electronic, mechanical, reprographic recording or otherwise) without prior
written consent of the owner.
1
SP-2019 Completion Log Specification
2
SP-2019 Completion Log Specification
Contents
1. Introduction _______________________________________________________5
1.1 Purpose _____________________________________________________________ 5
1.2 References ___________________________________________________________ 5
2. Scope_____________________________________________________________6
2.1 Definitions ___________________________________________________________ 6
2.1.1 Standards________________________________________________________________ 6
2.1.2 Systems _________________________________________________________________ 6
2.2 Deliverables__________________________________________________________ 6
2.2.1 Business Records _________________________________________________________ 6
2.2.2 Reports _________________________________________________________________ 7
3. Responsibilities_____________________________________________________8
4. General Completion Log Specification _________________________________10
4.1 Completion Log Contents _____________________________________________ 10
4.1.1 Header _________________________________________________________________ 10
4.1.2 Body __________________________________________________________________ 11
4.1.3 Footer _________________________________________________________________ 11
4.2 Format_____________________________________________________________ 12
4.3 Close-out ___________________________________________________________ 12
5. Performance Monitoring ____________________________________________12
6. Review and Improvement____________________________________________12
Appendix 1. Completion Log format _____________________________________13
Appendix 2. CL Data Matrix ___________________________________________14
Appendix 3. CL Tracking Sheet ________________________________________17
Appendix 4. Shell E&P Standard Lithology _______________________________18
4
SP-2019 Completion Log Specification
1. Introduction
1.1 Purpose
This Specification describes general requirements for delivering Completion Logs as
part of the process of delivering Exploration Wells.
Completion Logs have been delivered for many years in PDO. The purpose of this
new document is to
• clarify the formal status of the CL
• clarify the roles, responsibilities and procedures for creating the CL
• give an overview of the data in the CL and the formats for publishing this data
1.2 References
Within the Control Management Framework, this Specification relates to the
following other Specifications:
5
SP-2019 Completion Log Specification
2. Scope
This Specification applies to the Completion Logs (CL) created for all Exploration
wells drilled by PDO since 1 Jan 2005.
2.1 Definitions
2.1.1 Standards
• Well name. The well name used in the Completion Log follows the standard
PDO Well naming convention (SP-1000).
• Well symbols. The Well symbols follow the standard Shell Group Standard
Legend (see revised version issued by SIEP in 1995, page 24 and onwards)
• Lithology symbols and colours. The Lithology follows the standard Shell
Group Standard Legend (1995), page 67 onwards. Also see appendix 4 for a
short overview.
• PDO Well file index – this is the list of document types related to a Well. The
CL is listed as Document type 3.16. All CL’s to be loaded into Livelink need
to be loaded under document type 3.16.
2.1.2 Systems
• WinLogPro – the software in use since May 2004 for the creation of
Completion Logs in PDO, acquired under contract C211038 until December
2009. WinLog Pro is delivered by Rees Oil & Gas Services LLC (see also
www.hrh.ltd.uk). Winlog Pro is included in PDO’s long term strategy for
completion logs. Renewal of the WinLogPro contract is the responsibility of
U11B1
• Oilfield Data Manager (ODM) - this software used to make correlation panel
in the footer for completion log.
• Livelink – this is the electronic document management system in PDO
• Power Explorer – this is the user interface on the corporate subsurface
database (RegeoNT).
• Recall Data base- Most of the logs data to be used in Winlog Pro originates
from Recall.
2.2 Deliverables
2.2.1 Business Records
The following business records are described as deliverables of the Completion Log
team in this Specification:
• The Completion Log (CL). One CL is delivered per Exploration Well. It is
possible to create more than one if the well has multiple holes. The completion
logs are stored in Livelink and designated provisional or final. Completion
logs are included as enclosures or links in the well resumes.
• The Completion Log Template. Each CL is created making use of a standard
template available in WinLog Pro. The standard template and its description
are is available for each WinLog Pro user.
• Completion Log work flow. Each CL is created making use of the CL
procedure description report, which is a step by step description of how to
create a CL.
6
SP-2019 Completion Log Specification
2.2.2 Reports
The CL Tracking Sheet. The progress of completion log completion logs is updated
by XGL31 on the weekly highlights spreadsheet and discussed on monthly bases with
XGL & XGL3 and reported status monthly to Exploration teams Managers.
7
SP-2019 Completion Log Specification
3. Responsibilities
The Chief Geologist (XEM) is the owner of this specification and is therefore
responsible for
• Regular review of the Specification
• The link between business requirements and the contents of this specification
• The link between legal requirements and the contents of this specification
The Well Owner/Seismic interpreter within Oil Exploration North (XNM1), Oil
Exploration South (XSM1), and Gas Exploration (XGM1) is responsible for
• Timely delivery of required information with the required quality. See
overview of information types and responsibilities in Chapter 4.
• Sign off of the Completion Log QC sheet
The Team leader for geological services & head of Stratigraphy in Exploration
(XGL& XGL3) are responsible for
• Monitoring the delivery of the Completion Logs
• Providing sufficient qualified resources for the delivery of the Completion
Logs
• Ensuring this Specification is followed and kept up to date; XGL& XGL3 are
the Document Custodian of this Specification
8
SP-2019 Completion Log Specification
9
SP-2019 Completion Log Specification
All this information is provided by the team responsible for the well, it is mainly the
well summary sheet in TIFF or PPT or PDF format).
Well
Summary Lithostrat Gif Owner/Seismic Using template
interpreter
Green sheet( logs
Gif PP Note: make sure values are same elsewhere
evaluation)
10
SP-2019 Completion Log Specification
Additionally the Legend of symbols (lithology, well symbols, etc.) can be found in the
header. This Legend is standard and follows the Shell Standard Legend.
A text indicating clearly the objective, result and implications would optionally be at
the header below the well summary sheet.
4.1.2 Body
The Body contains all depth dependent information. Most of this data is loaded from
the corporate database via Power Explorer. A data type – data source – responsibility
matrix is in Appendix 2.
• Lithostrat
• Chronostratigraphy; if there is dating
• ROP log
• Gas reading
• Mud Data
• Bit Data
• Casing information
• Standard Logs (Gamma Ray, Sonic, Neutron, Density, Caliper, Porosity,
Saturation, Resistivity, Flame ( Appendix 2b)
• Side Wall Samples
• Core information
• Hydro Carbon Shows, Hydro Carbon Type
• Gas readings
• Lithology (interpretation + description)
• Calcimetry
• Deviations
• Dip data
• Additional remarks
4.1.3 Footer
The Footer contains detailed well evaluation & test summary information as well as a
listing of the log runs. (Table 2).
In addition a correlation panel with offset wells at the interested intervals.
11
SP-2019 Completion Log Specification
4.2 Format
The CL is created making use of the PDO standard software WinLog Pro. The XGL3
team has set up a standard template in WinLogPro for the Exploration Completion
Log. This format should be used for all Exploration CL’s.
4.3 Close-out
A CL is final when all required data have been included in the header/body/footer and
when the exploration team and leader has signed off the CL, effectively agreeing to
completeness of the CL and that all data available at the time have been incorporated
and is of the right level of quality.
5. Performance Monitoring
Completion Logs need to be delivered 6 months after TD has reached of the well. The
delivery of a Completion Log after all data has been received and corrected takes on
average 5 months. Therefore all well owners/Seismic interpreters in Exploration need
to deliver all the required data 30 days after the well reached TD.
It is the responsibility of the Oil Exploration North Manager (XNM), Oil Exploration
South Manager (XSM), and Gas Exploration Manager (XGM) that data is delivered
on time (e.g. entered in Power Explorer / RUI) with the right level of quality and it is
the responsibility of the XGL31 team to deliver the CL after the data has been
received.
The XGL3 team is monitoring the delivery of the data per well, per data type and
reports this to the Exploration Operations meeting on a monthly basis. An example is
in the report is in Appendix 3.
12
SP-2019 Completion Log Specification
13
SP-2019 Completion Log Specification
Grid
Panel Width location in Downloaded
Panel name/content data type lattice & COMMENTS
no. ( CM) Database BY:
Scale
Major depth
increment 10 m,
none, minor increment 1
1 Depth 1 CM Scale -
1:1000 m, blue color, Text
increment 10 m,
black color
Manual, done by
2 PERIOD 0.5 time none X X
Chronostrat
XGL31
Manual, done by
3 EPOCH 0.5 time none X X
XGL31
Manual, done by
4 AGE 0.5 time none X X
XGL31
different color, black
for Palynology &
5 Biostrat 1 Top none Biozones XGL3
green for
Micropaleontology
Manual, done by
6 SUPERGROUP 0.5 time none X X
XGL31
Lithostrat
Manual, done by
7 GROUP 0.5 time none X X
XGL31
8 FORMATION 0.5 time none X XGL3
9 MEMBER 0.5 time none X XGL3
PowerExplorer;
10 REGEO CODES 1 Annotation none X
Lithostrat
TOPS DEPTH( AH Manual, done by
11 1 Annotation none X XGL3
MBDF) XGL31
PowerExplorer;
12 TVD ( SS ) 1 Annotation none
Lithostrat
PowerExplorer;
13 TWT ( MS) 1 Scale none
Lithostrat
PowerExplorer;,
14 Deviation survey 2.5 symbol Deviation
survey
Should be blocked,
PowerExplorer; Rig Site- dark green color,
ROP Log Log, linear
/ mud log/ ROP contractor scale 0-60, could be
0- 90 or 0 - 30
PowerExplorer;
Rig Site-
Bit data Annotation / mud log/ Bit
contractor
15 4 9, linear record
PowerExplorer;
Rig Site-
mud data Annotation / mud log/ mud
contractor
record
PowerExplorer;
Rig Site- casing symbol to be
casing data symbol / mud log/ Bit
contractor added manually
record
PowerExplorer;
Log, Rig Site-
16 DSL GAS Logarithmic / mud log/ HC
Logarithmic contractor
3 ind
DSL HC form/ mud Rig Site-
Annotation
INDICATIONS log/Gas contractor
Red color, scale 0-
150 API, with lt grey
GR Log, linear Recall Database Pertophysicist
fills from 0 values to
curve.
green color, dashed,
9 linear scale 500 -100
17 SONIC Recall Database Pertophysicist
4 Log, linear US/M or 240 - 40
US/M
14
SP-2019 Completion Log Specification
red if N-Hexane or
PowerExplorer; Rig Site- Acetone Reaction,
SWS Symbols none
SWS contractor Black if no
19 reaction(…000)
Core shifts to be
PowerExplorer; checked with XGL1
CORES Symbols Rig Site-
/ Cores team
contractor
none
20 LITHOLOGY 2 Lithology X XGL3 Manually done
none
%, green color for
the total Carbonate,
form/ mud log/ Rig Site- red color for the
21 CACIMETRY 1.5 logs
CALCIMETRY contractor Calcium %, Purple
fills between the 2
curves.
blue color fill from 0
to VLST curve,
Purple fill between
22 FLAME 1 logs 4, linear Recall Database Pertophysicist from 0 to VDOL
curve, pink fill
between from 0 to
VANH curve
Logs, red, scale is 1.95 -
DENSITY Recall Database Pertophysicist
23 Linear 2.95
NEUTRON 4 9 linear Recall Database Pertophysicist blue, scale 45 to -15,
Logs, Liner
RFT Symbols Recall Database Pertophysicist
Scale 0.2 - 2000,
MSFL, dotted black
Logs, 9 linear
24 RESESTIVITY Recall Database Pertophysicist line, LLS green
Logarithmic Logarithmic
straight line, LLD
straight red line.
25 SREF/VSP 1 Log none Recall Database XGP/31 Black,
Black, Yellow fill
between 0 value -
26 POROSITY 0.5 logs 3, linear Recall Database Pertophysicist
curve. Scale 0 – 0.2
or 0 – 0.4
usually Sw curve,
black color, with
27 SATURATION 1.5 logs 9, linear Recall Database Pertophysicist fills between 1 value
- curve( red fill if oil,
& green fill if gas)
28 Fluid Type 1 logs none x Pertophysicist Optional, manual
Should be possible
to type something
29 REMARKS 3 Annotation none x X
vertically or
horizontally
form/ mud log/
LITHOGY Rig Site-
30 4.5 Annotation none Lithology
DESCRIPTION contractor
Descriptions
Major depth
increment 10 m,
none minor increment 1
31 Depth 1 Scale -
1:1000 m, blue color, Text
increment 10 m,
black color
15
SP-2019 Completion Log Specification
16
SP-2019 Completion Log Specification
17
SP-2019 Completion Log Specification
Std
Abbrev Legend
Abbrev Symbol Code Abbrev Symbol Code
Index
ANHYDRITE AH 4205 Anhd 42502 AH 4205
ARKOSE AK 1260 Ark 422210 AK 1260
BRECCIA BR 1201 Brc 422201 BR 1201
CHALK CK 2230 Chk 423206 CK 2230
CHERT CT 6201 Cht 42701 CT 6201
18