0% found this document useful (0 votes)
1K views3 pages

Traffic Assignment Seee

All trips were assigned to the shortest paths using the all-or-nothing assignment technique. The links and their corresponding traffic volumes after loading are: 1-2: 200 vehicles 2-1: 600 vehicles 1-5: 350 vehicles 5-1: 450 vehicles 2-3: 300 vehicles 3-4: 250 vehicles 4-5: 1300 vehicles

Uploaded by

Rajesh Khadka
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views3 pages

Traffic Assignment Seee

All trips were assigned to the shortest paths using the all-or-nothing assignment technique. The links and their corresponding traffic volumes after loading are: 1-2: 200 vehicles 2-1: 600 vehicles 1-5: 350 vehicles 5-1: 450 vehicles 2-3: 300 vehicles 3-4: 250 vehicles 4-5: 1300 vehicles

Uploaded by

Rajesh Khadka
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Traffic Assignment

Assign the vehicle trips shown in the following O-D trip table to the network, using the all-or-
nothing assignment technique. To summarize your results, list all of the links in the network and
their corresponding traffic volume after loading.

Origin-Destination Trip Table:

Trips between Zones


From/to 1 2 3 4 5
1 - 100 100 200 150
2 400 - 200 100 500
3 200 100 - 100 150
4 250 150 300 - 400
5 200 100 50 350 -

Highway Network:

Solution

The all-or-nothing technique simply assumes that all of the traffic between a particular
origin and destination will take the shortest path (with respect to time).

For example, all of the 200 vehicles that travel between nodes 1 and 4 will travel via
nodes 1-5-4.

The tables shown below indicate the routes that were selected for loading as well as the
total traffic volume for each link in the system after all of the links were loaded.
Nodes Link Travel
From To Path Time Volume
1 2 1-2 8 100
3 1-2,2-3 11 100
4 1-5,5-4 11 200
5 1-5 5 150
2 1 2-1 8 400
3 2-3 3 200
4 2-4 5 100
5 2-4,4-5 11 500
3 1 3-2,2-1 11 200
2 3-2 3 100
4 3-4 7 100
5 3-4,4-5 13 150
4 1 4-5,5-1 11 250
2 4-2 5 150
3 4-3 7 300
5 4-5 6 400
5 1 5-1 5 200
2 5-4,4-2 11 100
3 5-4,4-3 13 50
4 5-4 6 350

Link Volume
1-2 200
2-1 600
1-5 350
5-1 450
2-5 0
5-2 0
2-3 300
3-2 300
2-4 600
4-2 250
3-4 250
4-3 350
4-5 1300
5-4 700